Loading...
HomeMy WebLinkAboutR-5777C Utility Drawings.pdfc- 0 a 3 E L a See Sheet to For Index of Sheets See Sheet t B For Standard Symbology Sheet 1 N R E OI 4 /o yz� pi 'C �4 EGIX ��ii OJECT lJ VICINITY MAP N.T.S. BEGIN TIP PROJECT R-5777C —I— POC STA.10 + 09.89 = —I— POC STA. 578 + 90.00 (R-1015) 4 Submittal February 6, 2024 STATE OF NORTH CARD I INA DIVISION OF HIGHWAYS CRAVEN COUNTY PERMIT D RAW I N G SHEET 1 OF 14°�° �`" bTATR PRQtF T REPRRENCE NQ 6EEET NO. TOTAL 9B8819 R-5777C ]� STATE PROD. NO. F.APROl.N0. DE6CRIPTION DATE: 1 /15/2024 44648.3.4 WA DESIGN -BUILD - LOCATION. U.S. 70 FROM THE HAVELOCK BYPASS TO EAST OF S.R.1116 (THURMAN ROAD) TYPE OF WORK: GRADING, DRAINAGE, PAVING, SIGNING, ITS AND STRUCTURES NAOOsiNq zo77 UTILITY WETLAND AND SURFACE WATER IMPACTS PERMIT BEGIN RESURFACING ONLY -Y3- STA. 13+04.73 BEGIN RESURFACING ONLY -SRY4B- STA. 10+69.02 BEGIN CONSTRUCTION END RESURFACING ONZY -Y10- STA.10+09.00 S BEGIN CONSTRUCTION BEGIN CONSTRUCTION END CONSTRUCTION -Y2- STA. 10+00.00-SRY/A- STA. 15+03.0] BEGIN CONSTRUCTION -Y3- STA. 13+16.85 END RESURFACING ONLY BEGIN CONSTRUCTION S OJ SRYlB- STA. 11+39.11 BEGIN BRIDGE -L- STA. 180+19.15L+� �RY4B- STA. 22+I7.00 � W END CONSTRUCTION -Y1- STA. 15+76.03A', �, 12 13 14 16—Lr 15 1 17/ ,'S?i �K p O [[[nnn -Y3R/'B- - _1,3�9 1 �`.. + ��II g 1 ��I fl� 111011111111111111 - �i,SRYLDYj 1 - _ - __ yO� ( O N e PIS' r J .t END CONS -Y5- STA. 1/+20.00 END BRIDGE END END CONSTRUCTION -L- STA. 180+98.74 -Y6- STA.11+00.41 -SRY7DY3C- >y W Y END CONSTRUCTION SITE 25 END CONSTRUCTION -Y3- STA. 27+90.87 -Y9-STA.10+8583 Q ::> C7 SITE 8 BEGIN RESURFACING ONLY SITE 6 g -SRY1C- STA. 16+59.21 BEGIN CONSTRUCTION O� END RESURFACING ONLY -DRI- STA. 10+04.06 : F'f BEGIN CONSTRUCTION N 18 19 -SRYIC- STA. 30+62./7 END BRIDGE -YI- STA. 27+44.40 +/- La N Z SITE 4 SITE 24 `J END CONSTRUCTION J -Y/- STA. 45+20.00 ' W \' Z J \ 2 — U Q� END CON: -Y7- STA. I THIS PROJECT IS WITHIN THE MUNICPAL BOUNDARY OF THE CITY OF NEW BERN CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III. THIS IS A CONTROLLED ACCESS PROJECT WITH ACCESS BEING LIMITED TO INTERCHANGES. SITE 10 \l— i�+K \ y CONSTRUCT -Y8- STA.11+01.00 N END CONSTRUCTION -SRY4B- SITE 20 a NA003i�2 0 077 -RR4- -SRY4A- 22 23 24 -L- US-70 END TIP PROJECT R-5777C —I— POT STA. 355 + 64.22 = —I— POT STA. 250 + 00.00 (U-5713 IR-5777A&B) 6 -SR1aA INCOMPLETE ]PLANS DO NOT USE FOR R/W ACQUISITION ]PRELIMINARY ]PLANS DO NOT USE FOR CONSTRUCTION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Submittal February 6, 2024 ' 50' 25' 0 50' 100, PROJECT REFERENCE NO. SHEET NO. DETAIL 6-1 DETAIL 6 DETAIL 6-3 DETAIL 6-4 PERMIT DRAWING R-5777C 6 SPECIAL 'V' DITCH SPECIAL DITCH SPECIAL BASE DITCH SPECIAL DITCH GRADING /[,jq CALE: 1" =100' SHEET 2 O F 14 ROADWAY DESIGN HYDRAULICS 'l ENGINEER ENGINEER I — -1.) Fmm (Not scale) (N.. Spate) 4 I Nm ro S.W) /'\ N I A'� Sploepe NOluml OI Front N—I�\;.' G.puwd3, Fp' D\�\p G,eppd 3o,l� '��� F sDA E: 1/15/2024p I oISlope"B ��slope `sPv R/qe� JPp\P8 sP [��T Min. D=1.5 F1. " Min. D=1.5 Ft. lam.! Min. D=2.5 Ft. ` / 'in A.�O B=2.0 Ft. B=3.0 Ft. 'SEE CROSS SEC00N5 Min. D=1.0 k. G�7 'Y FROM STA. +75 TO STA. 37+50 -SRY1C- RT FROM STA. 23+00 TO STA. 25+50 -L- LT /'� F� M $TA. 26+00 TO STA. 35+50 �RY1B- LT FROM STA. 23+00 TO STA. 36+00 -L- RT FROM STA. 33+50 TO STA. 36+00 -L- MED A / FROM STA. 24+50 TO 26+00-SRY1B- LT 'l � �' DETAIL 6-5 SPECIAL 'V' DITCH INmm xple) F,on, COMPANY WEYERHAEUSER Balfour Beatty oe" N A'> e� ��^P^ LEE PDLISKO PLISKO StN Gsc G—d p,:. D F\p \ \ \\ \ DOCUMENT NOT CONSIDERED FINAL o P�� Min. D=1.0 Ff. JACKSON FAMILY, LLC UNLESS ALL SIGNATURES COMPLETED 2-2J. LLC FROM STA. 30+50 TO STA. 36+00-SRY1C- LT C) ,,\ \\\ \ SP 1sp Sp C T BASE DI H SLATEE 2' BASE DITCH F �X N ONO EE DETABS6-3 �\ SEE DETAIL 6-2 w� CL 'B' RIP RAP X015 O T ! X3NOO ww GF x I � \ \ I \� I DA851 WOODS 3rJ tV aHXsl 31V0 \ x x� �x—X - - -I \ \ ! 1 \ \ _ F!1 N I sne na) al } \ VA1 V 1 — oNou E 1 G 3SI 31 VO WOODS q F I O' �L 'B' RIPJRAP yD C NS O E �E as uw EST 3 TONS p E-� C F E + -zse E E C E— V - -- - --- � N W _ W MN i - �� -- - - - - - -- _ - - -- - -w- y _ rSE E-0ETAIL $H _ — — — - M - - - - - M - - - _�� n -_____ _ 2D-4DETAILII------------ ----- - RPE _ _-_ GRASS _-__ MOVE �1 W y — — Z O Uj 5 C DIT TRADING —+—__—_— ---- __ - _ - - - _ - - __--a1PAVED SHOULDER j — — _ W J N -- — REMOVE ------- _ --- 1 US HWY 70 EBL 24'PAVED OAWJAY — � (� I_ U Q W 2GI ls„ 2Gi — — ------ US 70 EB ------ — q•PAVED — — — Q N (� --___---- ----- --- — -- -- (q —�---- --- Es FS, SEE DETAIL SHEET FES 4 1E' RCP j, �_� 0 2D-4 DETAIL 12 US 70 WB GRASS GRASS MO E - 2HouLD� Z' PAVE $PE -SE-6N� —�J REMOVE— ---__ =���=SPEC �H DING --��� _ I _ -Cr'25 TONS AAJ?—--- --- --_-- _—�— US hWY 70 EBL 35'PAVED ROAA51'AY�- _ - --S�d5-S4_-=— --- --- — — — — ---- -- I � -------------------------- — Ln - n - -yi - - - - - a•PAVED SHOULDER = =y= _ _ / / f��_ - co LU CL 'B' RIP RAP WOODS -=oj- - - -•�- - - - - - _ - -- - 7 w / \\ - PxoP uro . - - _ LL EST 2 TONS PECD SE DITCH C� - -. U in EST 7 SY GF WOODS !PEC 'V' DITCH NC DEPT. OF TRANSPORTATION I '•'\ EE DETAIL b-5- _ of i TIE TO .. EXTG DITCH l Ln _ ---= E 'I' R _ T 20 " aP1u AY - - 5T 39 -- --- -IOU7- U + F- _ -w- - -- �ne.bz ----- ---7 -- ana.ez PUE � � LL.I PwoP olw Pow c POP -- uuya pUE � _ PUE (/)— `� NMONN- JAd.Z i - d'^ z PwoP orx Pow ylwF 'oP we Pow cAw�F woP ula .E� cupoulr PUE "- PwoP ulp TFc cuNpul, e:c Pow PUE or urc IE coxou�i ie PnoP- � we P 158 I S ETAIL III OlHsl '� -�\ OJ T 'T 7 7F \ DITCH WOODS om ws \� \ SITE 4 ��� DIRECTIONAL BORE w UG POWER, TEL of ���-�—�� gym\ KERN COMPANY, INC. N� WETLAND WD MOODS \' KENNETH McGOWAN ALL DIRECTIONAL BORE PITS BFFG LLC �y COUNTY AND HAND HOLES TO BE LOCATED OUTSIDE OF JURISDICTIONAL AREAS FOR -LLT- PROFILE SEE SHEETS 35 & 36 FOR -LRT- PROFILE SEE SHEET 35 & 36 Ha.oe FOR-YIRPB- PROFILE SEE SHEET 63 FOR HAND CLEARING FOR-SRYIC- PROFILE SEE SHEET- PROFILE SEE S88/& 82 PRELIMIN RY PLANS DO NOT USE Po CONSTRUCTION INC®MPLE E PLANS DO NOT USB POR �W ACQUISITION Submittal February 6, 2024 0 5 10 PROJ. REFERENCE NO. SHEET NO. R-5777C SRY1C-8 150 1 0 130 120 To 100 90 80 70 60 50 40 30 20 1 1 2 D 3 D 4 D 5 D 60 70 80 90 100 1 0 110 1 0 1,0 1 0 P RJAIT E RAW1N H EET %: Q F 14 D E: 1 / 5/ 02 0 0.042 0. 42 1 4' 2958 26.35 31 + 0. 0 SITE 4 40 E ILA ND D o a 5 AND CLE RIN ILL RESURFACING O LY 2938 - 3 + 0.00 -- 4� BLAND )VD 40 LSITE 4 ILL RESURFACINGH D CLEARING 3 29 07 3 + 0.00 ILL 8. RE URF CIN 28 81 2 + 0.00 do 1 0 1 0 1,10 1 0 110 100 L 0 0 0 0 1 1 2 0 0 0 0 1 0 1 0 1 0 1 0 1 0 Submittal February 6, 2024 PERMIT DRAWING SHEET 4 OF 14 DATE: 1/15/2024 c, I MATCHLINE-Yl-S 23,00 (SHEET 30) Sir IBM will % V) M ro-111- 0 IN I D—L '5 D-L D- "I OF TA 11111T 5 OR ENLARGEMENT ALL DIRECTIONAL OUTSIDE OF JURISDICTIONAL II F, 35 AND HAND HOLES —E SEE SHEEE - mono x.v it II 1ESHEETS �T D—L VATCHLINE k, -Y1- STA 36,00 (SHEET 32) GRAPHIC SCALE ILI- RAP �01 - Lai - HAND CUEARIIN. 1 11 3,111 WETLAND WE I PLANS Submittal February 6, 2024 Submittal February 6, 2024 0 5 10 PROL REFERENCE NO. SHEET NO. R-5777C RY1DY3C-2 1 0 1 0 1130 120 To 100 90 80 70 60 50 40 30 20 1 13 20 30 40 50 60 70 80 90 100 110 1110 1 0 1,0 150 PERMIT WIN H E F 14 4:1 4: JDATE: 1 / 5/ 02 25.80 17+ 0.R a s WE LA D E W 3 SITE 6 3 7 4:1 4:1 3 25.6 2567 a WE LA D E ND CLEA ING 23,13 16 + 00. 001 a g WU LAND WE SITE 6 HIND --LEA RING 24.80 23 61 W 0.0 2 .10 W 3 3 0.0 3:7 5.40 2533 00 q; :1 5.70 2568 s �n M10 150 110 1 0 90 70 60 50 4 21 1 210 60 70 0 0 100 1 0 1 0 1 0 1 0 0 c Q r GO f :1 BANK STABILIZA W/CL 'I' RIP RAP 'XE DETAIL 8-3 Submittal February 6, 2024 DETAIL 8-1 DETAIL 8-2 DETAIL 8-3 DETAIL 8-4 DETAIL 8-5 SPECIAL BASE DITCH SPECIAL 'V' DITCH CULVERT INLET BANK STABILIZATION CULVERT OUTLET CHANNEL CULVERT INLET /OUTLET BANK STABILIZATION (No to Swle) (Nat to Swle) (N.110 Smle) (No I. Scala) (No. Swle) I From ]:I Ne1u�I 2et�nd Ditch '"mod NPNrvI Nmgrolepw N°Nrpl From \ °t Ground \ Ground "< d• Groand 3.7 D A'D of Ditch N .A" Slope 3.7 p 3' . F\col SIoI Groand 3�� D F\ uck Gvotwtile' d Tuck' m 1.`; Tuck Geore�tile Key Riprop into of 1N Ln p Minimum o11N Key Riprop inb Ge°textile B o Minimum of IN Channel BoNom (TY➢I -BJ Min. D=1.5 F. *3:1 BEHIND Min. D=1.5 F. ITy� CNpNNEL BED Channel BOHom(Typ) Ilya (TWO Place Geotertile Under B=2 Ft. GUARDRAIL Length=41 R. rvdvble) Length= 47 H. CHANNEL BED Ri ro in Le<miem Min. D=2.SF1. Each SNe (variable) Directed by Engineer FROM STA. 63+45 TO STA. 66+00 -L- LT Esc 60 Tons of cross T Rip-Rop, Keyed -In Type of Liner=CL 'I' Rip-Rop - Keyed -In Inn2. - 3 H. FROM STA. 63+50 TO STA. 77+00 -L- RT FROM STA. 28+70 TO STA. 29+05-SRYIDY3C- LT fo Top of Bank, Ezt. 24 CY DDE •Place Gewenile Under Riprep Ezt 50 Tonz, Ezf 85 SY Geote file d=2.5F. d=2.o - a.o Fc oo Rn s5i��mr� .o ¢n odm. o° FROM STA. 29+00 TO STA. 42+50-SRYIA- LT FROM STA.29+10 TO STA. 31+50 -SRYI DY3C- LT Ezf.t05 SY Geofedile on: D.,e..fed by Engineer -1170 CY DDE B=4.OF. Est.=30 Ton: of Clasz'I' Ripe Rap, kayo&ln, Est. 68 SY G—file t WOODS aCO T w r — (n SPEC 2' BASE DITCH SEE DETAIL 8-9 w0�. z + P� J (y) F- ---1 --- 2 LU MH 7NOJ UQw n Q U) PROJECT REFERENCE NO. DETAIL 8-6 R-5777 SPECIAL DITCH GRADING (No I. Swle) ROADWAY DESIGN 4 ENGINEER IPA ~y4R��\P0� SP *SEE CROSS SECTIONS Min. D=1.0 Ff. FROM STA. 66+00 TO STA. 69+00 -L- LT A FROM STA. 70+50 TO STA. 77+00 -L- LT Ji SHEET NO. ENGINEER PRELIMIN RY PLANS W NOT USB Po CONSTRUCTION INC®MPLE E PLANS DO NOT USB POR 7W ACQUISITION FROM STA. 30+50 TO STA. 31+60 -SRYIDY3C- RT STA. 13+30 -Y1 RPA- RT STA. 11+78-Y1RPD- LT STA. 29+10 -SRY1 DY3C- LT FROM STA.32+10TO STA.34+60-SRY1DY3C-LT M STA. 29+25-SRYIDY3C-RT PERMIT DRAWING r,0 FROM STA. 34+60 TO STA. 40+50 -SRYI DY3C- LT FROM STA. 41+50 TO STA. 42+70 -SRYIDY3C- LT FROM STA. 10+75 TO STA. 12+00 -DR2- LT SHEET 7 OF 14 FROM STA. 10+75 TO STA. 12+00 -DR2- RT -7, Balfour Beatty' DATE: 1 /15/2024>> i �L NTI� i SPEC 'V' DITCH ETA 'L 8 2 SPEC 2' BASE DITCH IL 8-I 10 CL 'B' RIP RAP O SST 2 TONS t� SPEC DITCH GRADING SEE DETAIL 8-6 E SPEC 2' BASE I SEE DETAIL 8-1 PNOP — GAS LINE E E SCOOM SPEC DITCH GRADING CL 'B' RIP RAP 2 TONS EST INUI wG cns LINE - SY GF - E E SPEC SPEC DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 50' 25' 0 50' 100, SCALE:1"=100' C LU LLJ Q I N v Q U) DITCH GRADING O SEE DETAIL 8-6 LU O -_-- _ - - - -- z + rn — —d A — — —2GI-D FS, CFF AlnL— ZTt'I q — — („� Q LJJ 21)= DETAIL 12 — 4'PAVED SHOULD od --n=� -- — �i ni— — F- ------------- --- US HW✓ 70 EBL 29'PAVED ROADWAY ----M / --- --- --- ___ __ Q I AND HAND HOLES TO BE LOCATED lQi II Im OUTSIDE OF JURISDICTIONAL AREAS STREAM SB � la I! 31vD1 41a � cy �I I ll,X 4 n DETAIL 8-7 DETAIL 8-8 DETAIL 8-9 3 WOODS X WOODS SPECIAL BASE DITCH TOE PROTECTION TOE PROTECTION IN WETLAND AREAS a y X Y', r(1] (N°t t° Swlel (Not to Scolel � a\ (No110 Swle) 2,J KER DIRECTIONAL BORE =1 � .B _ ii 3>0' SLOPE oc�w N°tur°I .°t Fr^^t SPEC 'DI Xg _ _ NnTURAL \f N-1 GroDnd' Groend 3� 3' Ditch ` UG TEL C CUR o..D d f wexond prep 3 F`\ D P°�g1 slop SEE DETAIL 8- BAN STABILIZATION A SVIN GEOTDTILE �d LBj Min. D=1.5 H. /C 'I' RIP RAP 0 C d=1.0 Ff. d=1.0 Ff. Ge°textile B=2 H. E DETAIL 8-5 11gOivd -- COMPANY, INC. Cn �J Type of Liner= Clwe'B' Rip-R,p Type Of Liner= CL'B' RipA p FRO - RT ROCK CHECK DAM - EC DETAIL HAND CLEARING SEE DETAIL SHEET 2D-4 I SEE DEFAIL 8-2 FROM STA.35+20 TO STA.36+00-SRriDY3C- RT FROM STA. 34+00 TO STA. 35+20-SRYIDY3C- RT DIRECTIONAL BORE DETAIL 9 SPEC 'V' E ITCH I RAVEN COUNTY UG POW, TEL PE 'V' DITCH SPEC ' ' DITCH SEE DETAI 8-2 v SE :DETAIL B-2 SEE D AIL B-2Q- CL 'B' RIP RAP EST 2 TONS 'o EST 7 SY P TE / IE_ — — — — — — R R TEL �ABLLG _ BLEB - E — — <� `— R 15" W/ < S pa � P' ` 2 ELBOWS GY ARSITE 9 PROPOSED 6" PVC SL ��� WOP UIG PG CAB 41'PNOP O/G:I]W LES— PROP wG PUE "oulT _ TABILI-T DIRECTIONAL BORE `� '1EEC IL 8-5 UG POW, TEL , \ 4 SRYIDYJC- / „E / - 2GI Pa° "` ' e�E SITE 10 oIa TT:Lo . " EST 2 TONS — _ _", F — -- — P"GpGIGP°�ppe"Q�EWETLAND WRR EST 7 SY GF F - - R oP OIN Pow L:nE —PROP DIN Pow LINE L x oP alx Pan LINE ND, U,B Pow CABLES oP a PUNCE,E v -o G FOR -LET- PROFILE SEE SHEETS 38 & 39 Ro uic Pw cABLEe PR PROP ufa Pow CABLES PUE m Tn FOR -LRT- PROFILE SEE SHEETS 38 & 39 PR PROP I E wG TEL ooNoulT PRaP G i I ROP G Pw BLEG PROP rB L ooNoulT - ooNou= oNo PUE — FOR-YIRPA- PROFILE SEE SHEET 62 PUE PUE TOM, W PUE PUE PUE PPUE PROP F1 g CL 'B' RIP v o FOR-YIRPD- PROFILE SEE SHEET 65 €[:S S�(FILEL Y GF / OPROTECTION SEE DETAIL 8-7 m m FOR -DR2- PROFILE SEE SHEET 77 WETLAND WG UGE POW, TELBORE SLOPE ONLY) FOR -SRY/A- PROFILE LEE SHEET 79 L 'B'RIP RAP FOR-SRYlDY3C- PROFILE SEE SHEET 85 EE DETAIL 8-8 ---- —_— -------- - REMOVE ---------- ------------ 4'PAVED SHOULDER _---- --------- -------- — — — — — ------------ -- ------ --_-- -------- —_ ---- --—4'PAVED SHOULDER -------- ---- ----------- --------------- — — — — — — — — --- — — -- US MNY 70 WBL 29'PAVED ROADWAY ----- _— —� 2 = � �— _ SHOULDER C 1f — 1T 1} — — W — f--_—If — —9'PAVED -- — I— _—W— — — — — - - - i� ^---- ----- ---- - -�J __��--"-------- —� T� - -Al ----d--------------d-GRABE*o ----K------------- _ — — _ JAL — — — — -- — — — — — — — °--------- ae nL - - - - - - - 9RkM-_------------------SPEC Z` -------------------W---------- - - - —Od Ai fTCfi- d --------- --"-----------------G1UbE o - dnl------ - - - - -- - ----- - -- fo -TN-----W------- S— s -__ — — — — — — — — — — — — — — — — — — — — — — — — �_z r = —z� -------------odnL----- - _ -__-=- oe Alni— — —OAd — — — �3'•r --r- - -- p — — — — — — — — — — — — — — — — — —ssJ— _ — — — — — — — — — —ssf— — — — — — ssi - i — — — — — — —ss — — — — - - _ -- ---- - ---- -_ — — — — — — — — — — — —ssi— — — — — — — — — — — — _ — _ — -_- � \ - _ - - - - -- — — -- — — —— —od ni-- — — — — — — — ai Ai — _ — ssi — — — — — — — — — — — — — — — — — — —od nL of Al - CULVERT OUTLET CHANNEL M/a 01 113,ZS'0 I I � I I M/a Ol d13 ,19'0 - .. - .. .. .- .- .. -. .. .. .. .. -. .. .. I'ORIa RAP (BANKS ONLY) WOODS I I I I III WOODS ALL DIRECTIONAL BORE PITS UT ILITY POLE IMPACTS (18" DIAM) SLOPE SEE DETAIL 8-4 !I I WOODS FILL IN WETLAND: 20 SF Submittal February 6, 2024 0 5 10 PROL REFERENCE NO. SHEET NO. R-5777C 3RY1 DUC7 1 0 1 0 1130 120 To 100 90 80 70 60 50 40 30 20 1 13 20 30 40 50 60 70 80 90 100 110 1110 1 0 1,0 150 PERMIT WIN H E F 14 D E: 1 / 5/ 02 0.0 0 0.1020 24.33 25 39 0 r 0 0.020 0.1020 4 •7 3.5 2a ao � o 0.0 0 0.1020 s" s w 2 08 2368 4 )TOO WETLA4,ND E 0.020 0.1020 � o SITE 9 4 3; 7 3 HAND LEAR NG 3 23.4 1 24.12 3 + 0.00 0.0 0 0.1020 a s 3• 21.88 2425 rn 33 + 0.00 0.020 0. 20 M 3: 4.2 z of 110 U o 1 0 1 0 1 0 140 0 0 0 0 0 1 p 1 2 0 0 0 0 1 0 1 0 1 0 1 0 1 0 1 1 0 I II I I I I I I I I I I II I I I I I I I I I I II II II II I I I SPEC 2' BASE D CH G B LINE SEE DETAIL 9-1 po 1I Gr CV _ w It OD -- I- LL.I ..�...�...�. U) W Q Submittal February 6, 2024 DETAIL 9-1 DETAIL 9-2 DETAIL 9-3 SPECIAL BASE DITCH SPECIAL 'V' DITCH STANDARD BASE DITCH I Neff° Smle) IN— kale) (N.. Smle) Frenf Natural NO NN1 F.NN 1 °t Slop Ground II ee II Ground 3.Y p PyN't SI pe Ground 3.2 F\o"°t/ p 3' D Min. D=1.5 Ft. Min. D=1.5 H. Min. D=2.0 N. B=2 Ft. B=3.0 H. FROM STA. 78+50 TO STA. 81+00 A- RT STA. 83+00 -L- RT FROM STA. 77+00 TO STA. 78+50 -L- RT FROM STA. 81+00 TO STA. 83+00 -L- RT O 'ROM STA. 42+50 TO STA. 44+10 -SRYIA- LT FROM STA. 42+70 TO STA. 43+57 -SRYI DY3C- LT Ln :ROM STA. 44+50 TO STA. 48+44 -SRYA- LT FROM STA. 43+57 TO STA. 46+00 -SRYI DY3C- LT :ROM STA. 48+44 TO STA. 53+44 _SRYIA- LT FROM STA. 47+50 TO STA. 49+28 -SRY1 DY3C- RT 'ROM STA.53+44 TO STA. 56+50 -SRYIA- LT FROM STA. 49+32 TO STA. 53+90 _SRYIDY3C- RT FROM STA. 54+20 TO STA. 57+00-SRYIDY3C- RT UT FROM STA. 10+50 TO STA. 13+15 -Y1 D2- LT C' FROM STA. 11+00 TO STA. 12+50 -Y1 D2- RT DETAIL 9-4 PIPE OUTLET CHANNEL STABILIZATION 21t (Nef fo Xolal a(Ty PI N 1Bed III.- Elevmi; n Gnun Ground ap,k mpfvxfile r n aIN Le GrofeNile' Cban del Bed m% ngth=12 H. (var' I 'Flare .—I. Under Ripmp bk in Lorofions UirzaM by Engineer Eat. 15 aClass'I'Rip-Rap, Keyed -In Est. 30 SY SY Geawcfile STA. 49+30 -SRYIDY3C- R1 ECJ TARHEEL INVESTMENTS, INC. SPEC T BASE DITCH SPEC 2' BASE DITCH :SEE DETAIL 9-1 SEE DETAIL 9-1 CL 'B' RIP RAP EST 3 TONS PROP U/G GAS4LIN G GV LI —E— E — _ — — — — — — - tttllpiiii H W -J 17JA- SPEC DITCH GRADING CL 'B' RIP RAP EST 2 TONS EST 7 SY GF PROJECT REFERENCE NO. SHEET NO. DETAIL 9-5 R-5777C 9 SPECIAL DITCH GRADING ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER 4 (Na Sale) 4 ._ ._ Ip� gR�gBZ J .PNk sp 'SEE CROSS SECTIONS Min. D=1.0 Ft. Q FROM STA. 83+00 TO STA. 85+SO 4- RT FROM STA. 80+00 TO STA. 91+00 -L- LT DETAIL 9-6 Z SPECIAL DITCH GRADING 7 4 (N.. Scale) 4 D i _ ._ ��f Balfour Beatty StN Asp DOCUMENT NOT CONSIDERED FINAL I ^ I 'SEE CROSS SECTIONS � Min. D-1.o Ft. B= `Variable UNLESS ALL SIGNATURES COMPLETED FROM STA. 85+50 TO STA. 91+00 -L- RT PERMIT D RAW I N G 50' 25' 0 50' 100, SHEET 9 OF 14 DITCH BERM TO EL 26.8 SCALE: 1"=100' DATE: 1 /15/2024 SEE SHEET 2D-4, DETAIL 13 7 PRELIMIN RY PLANS W NOT USB Po CONSTRUCTION INC®MPLE E PLANS DO NOT USE MR 7W ACQUISITION NAE L­ cns uN CL 'B' RIP RAP + IQ E GP U/G w LIN EST 2 TONS f) O^ �° wa Lo � LU z I 1- � FS, SEE DETAIL SHEET I ZS'bLa13Z-13- 2D-4 DETAIL 11 2GI n 2GI-D I WOODS 2GI ` FS 2 E ETAIL DETAIL SHEET WOODS00 r 2GI 10 FS, SEE DETAIL SHEET I SPEC DITCH GRADING = - = _ LLJ W W .ZI M--� --M-I----M---- ----- ------------ -9 702eg------ -- ---- ---- ---- -- --_-- ------------ --- --- --- -- O 2 M 1 M M _ M _ _ W Z (q —� ,— � � - — -- —�,L— —�, -- -- — --- -- — Z ++ O -L - - -L- - 2D-4 DETAIL 12 �d n.-2GL - - - - - /_ - - �d nL �U nL ni_ _ _ -J Q tIL-SH -{"7»- i i Al-nl- �U nl C - - - - 2GI-D - �" = 6) UQ-D�^RR1L ---�- - ---- -- ---- --- --- -- ------ aPA�QS LPE�_-�5_-3GF MOVELij I— us Rwr 7o EBL 2q' PAVED Q Cn Q =-- --- -- 4'PAVED SMOumER --- -- Jt _ GRASS -- --- GRASS CL'I'RIP RAP----S4EE�ITCH-GRADING ---- SPEC DITCH�6- --- (n _ -- __ --- SPEC DITCH GRAD -----_ J ----------- ------ e, EST 90 CY DDE - EST 30 SY GI SEE DETAIL 9-5-___---- _---------- 0 o ro w ---- -- -� q•p�VFn c.vnll[/)Eo S MNY 70 WBL 24 PAVED ROALWAY _ SPA iV31DT -_ dbZ CL'B'RIP RAPS / SEE "L�-- --L-- -i-- ---- HW -- -- - --L-- ---- _ L _ ---- --L-_ ------/--`T- --L- (� Q Q ----- EST-2 To _� - --- - _y — i ni GRAS.L - C(Yi Q a - _ NNNfI .9 4 - - - E- - - ssi- - - - d - - - - -_- -ssi- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Ln W - - - - - - Y - — — — — W _ s .° REMOVE Mnv REMOVE REMOVE IY -os nIE ib E- b `JNIISI m U/G PqY ♦E /N /G�'L W PBDp Z% TEO Olx GW PROP I PROP ROP P DUE I DUE a U �UE DUE a Hen UE I I SPEC'�*yt--- NE / F e°s ' DUE LIE -DUm DUE m U SPEC 'V' DITCH SPE�'V' DITCH 6 Po I n I SEE DETAIL 9 / 2 d woSER DETAIL 9-2 SEX WOODS N015 S OV 1 I I J woods I I= 1 w odsl n l I / aoou'T DITCH lop. I III I I OjSI d III do wtlo I I { I aJN SEE DETAIL 9-2 77 ?0S CHANNEL STABILIZA ON eWi / I I 1 ` _ ❑ 1 11 X // INO a` s/ SITE 25 W/CL'I'RIP P I I I I I 1 I I ins P cP� KERN COMPANY, INC. SEE DETAIL -4 - I I 60 dvind I I, X alvo S 11 COMPANY 7 , / pia + Nl8 I MATCHLI E g DIRECTIONAL BORE N° A P N NSET UG COMM S X �H R0Y M. A �a G,a ROY M. ROY M. EBORN, EEORUX EBO N ET UX �JUX ERNEST P. DOUTHIT, ET UX N� iJ e 1l / a WETLAND WQQ ld I CRAVEN COUNTY RICHARD D. MONTY A. C '9 Lp / W / / , SPEC LAT 'V' DITCH HARDISON, ET UX CAMPBELL. ET UX C CL 'B' RIP RAP fC 0 1 SEE DETAIL 9-2 ,(� - EST 3 TONS ALL DIRECTIONAL BORE PITS v� �j I , / EST 10 SY GF /lI r _X ( l TIE TO AND HAND HOLES TO BE LOCATED D .GG F / EXTG DITCH OUTSIDE OF JURISDICTIONAL AREAS l W I SPEC 'V' DITCH ww o 0 E SEE DETAIL 9-2 W `" E D CONSTRUCTIONHANFOR -LLT- PROFILE SEE SHEETS 39 & 40 7IO2— ST,4,I3+/J).OI � CLEARING FOR -LRT- PROFILE SEE SHEETS 39 & 40 � �. FOR -SRYIA- PROFILE SEE SHEETS 79 & 80 Mg7CH I FOR-SRYIDY3C- PROFILE SEE SHEETS 85 & 86 LAVE INcc, FOR -YID2- PROFILE SEE SHEET 89 Submittal February 6, 2024 a .. MCMIMM It)t)!M r • ] l.i Y � a V : �r �I 10 .na ni. • - .. - �i�s�..z��l-��_ _- TT.• � is 31 - - �� v ell'II =3n1 of � � � S - - ,.... ��, ® ® SYiY-' �� �� _� .. � FYI i1�F1 III �� I�i�11� _ i — _ Inc �� --=— �.� -- r RF.,.,.. ! � J�P�,.�-�0��3 ���4'—�''.'.�"!A:T- �,� .�Ir... •�. �"3 �aer\vfzi!'�. `\` �i•av'r - ii.MF�s+n^7•�e� A 1 ul .a 11 , . . I 0AND HAND HOLES TO Submittal February 6, 2024 Submittal February 6, 2024 0 5 10 PROL REFERENCE NO. SHEET NO. R-5777C SRY4D-4 49 150 1 0 1130 120 To 100 90 80 70 60 50 40 30 20 1 13 20 30 40 50 60 70 80 0 1 0 110 1120 110 1 0 1 0 P wI N SITE 20 0.0 0 O. HA D CLEARING H E 1 F l 3r� AND CLE IN DATE: 1 / 2535 19 + 0.00 a a = w 3 0.0 0 0.040 30 3•. :l 2 41 19 + 0. 0 0.040 0. 40 :1 2409 49 jr) 0.0 0 O. 40 4' 4:7 2405 18+ 00. DO 0.0 0 0.)40 30 1 2429 17+ 50.100 150 110 1 0 110 110 140 1 0 0 I 0 O 50 1 1 2 30 40 0 70 80 90 H ±oL1, 0 1 0 110 to� Submittal February 6, 2024 Submittal February 6, 2024 WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 4 29+79 to 30+89-SRY1C-RT UTILITY 0.037 6 15+01 to 16+52-SRY1 DY3C-RT UTILITY 0.065 9 33+49 to 34+26-SRY1 DY3C-RT UTILITY 0.018 10 42+03 to 42+44-SRY1 DY3C-RT UTILITY 0.029 20 19+01 Tto 19+56-SRY4D-RT UTILITY 0.032 24 41+21 to 41+38-Y1-RT UTILITY 0.001 25 46+04 to 46+32-SRY1 DY3C-RT UTILITY 0.003 TOTALS*: 0.000 0.000 0.000 0.000 0.185 0.000 0.000 0.000 0.000 0.000 *Rounded totals are sum of actual impacts NOTES: Site 10: Utility Pole Impacts (Fill -18" Diameter Pole) = 20 sf Revised 2018 Feb