Loading...
HomeMy WebLinkAboutR-5777C Permit Drawings and Impact Summary Sheets.pdfSee Sheet to For Index of Sheets See Sheet t B For Standard Symbology Sheet 1 N R E OI 4 10 EGIX ��ii OJECT l✓ VICINITY MAP N.T.S. D179'-TAT Trn VDnT17j-T n_c777f' END RESURFACING ONLY Submittal February 6, 2024 STATIC OF NORTH CAROLI NA DIVISION OF HIGHWAYS CRAVEN COUNTY PERMIT DRAWING SHEET I OF 89 �`"'� bTATR PRQtF(:T RRPRRRNCR NQ 6HRBT NO. TOTAL 9N8819 °` . R-5777C ]� STATE PROD. NO. F.APROl.N0. DE6CRIPTION DATE: 1 /15/2024 44648.3.4 WA DESIGN -BUILD - LOCATION. U.S. 70 FROM THE HAVELOCK BYPASS TO EAST OF S.R.1116 (THURMAN ROAD) TYPE OF WORK: GRADING, DRAINAGE, PAVING, SIGNING, ITS AND STRUCTURES WETLAND AND SURFACE WATER IMPACTS PERMIT THIS PROJECT IS WITHIN THE MUNICPAL BOUNDARY OF THE CITY OF NEW BERN CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III. THIS IS A CONTROLLED ACCESS PROJECT WITH ACCESS BEING LIMITED TO INTERCHANGES. NAOOsiNq zo17 END TIP PROJECT R-5777C GRAPHIC SCALES DESIGN DATA PROJECT LENGTH PLANS PREPARED FOR THE NCDOT BY: HYDRAULICS ENGINEER 50 25 0 50 100 ADT 2019 = 31,800 ADT 2045 = 41,800 LENGTH ROADWAY TIP PROJECT R-5777C = 6.486 MILES StN Balfour Beatty NC LICENSE NUMBER F-0991 ®f NOR? � 0 ° K = 9 /O LENGTH STRUCTURE TIP PRO ECT R-5777C = 0.058 MILES J 900 W TRADE ST STE 715, CHARLOTTE, NC 28202 PLANS TOTAL LENGTH OF TIP PROJECT R-5777C = 6.544 MILES 2018 STANDARD SPECIFICATIONS D = 55% P.E. SIGNATURE: N RIGHT OF WAY DATE. JANUARY 17, 2023 ROADWAY DESIGN ENGINEER 50 25 0 50 100 0 T = 8 /o V = 75 MPH * o o (TTST=3/o+DUAL 5/0) J. ADAM FREEMAN, PE � � <, � p �® Ohl PROFILE HORIZONTAL (HORIZONTAL) PROJECT ENGINEER 10 5 0 10 20 FUNC. CLASSIFICATION = INTERSTATE STATEWIDE TIER NCDOT CONTACT: BYRON KYLE NCDOT - DESIGN -BUILD UNIT LETTING DATE: JANUARY 17, 2023 NARONG PHAL, PE Pl Tw%g PROJECT DESIGN ENGINEER PROFILE (VERTICAL) SIGNATURE: Submittal February 6, 2024 DETAIL 5-1 SPECIAL 'V' DITCH (Norio S-16) Front Ditch N.W.1 Slope QGround `''.'1 D F\o et \ °Ae ROBERT B. \ O Min. D=ts Fr. w s HARDISON, ET AL N X FROM STA. 15+50 TO STA. 18+50 -L- RT WETLAND WA GOODWIN DETAIL 5-3 50' 25' 0 50' 100, SPECIAL BASE DITCH ( Nor ro Smle) o SCALE: 1"=100' ,, D F e` Sop N WETLAND WB „. Min. D=2.5 Fr. B =3.0 Ft. FROM STA. 18+00 TO STA. 24+50 -SRYI B- LT r C� 8a� W �m FROM STA. 21+30 TO STA. 23+00 A RT 5 077 SON FAMILY, LLC PROJECT REFERENCE NO. SHEET NO. R-5777C 5 IOADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMIN RY PLANS DO NOT USE PO CONSTRUCTION INCOMPLE E PLANS 00 NOT USB POR �W ACQUISITION °°SEE ERMIT" WINGC ERT INLET a k CREEK SEE PERMIT URA ING SITE 2 SPEC 3'BASE DITCH (BEET 6 89 PE 3 BA E DITCH Woo 5 / .� AL W 8 g"1l19 ¢ W/CL 'I' P RAP (BANKS i4jJL \ W/CL'B'RIP RAP Id 1 �IlW HEET F SEE DETAIL 5-9F J� / EST 128 TONS, EST 335 SY GF / SEE DETAIL 5-3 -01M- _ -elM F EN Weao� SEE DETAIL 5-8 / PORE GEM M- M C) 0 Balfour Beatty �� R EN R��7�pty�� ��C� BASE DITCH Z — SPEC 2' B E LITCH W/CL 'B' RIPRAPI t� / € / x I - I U, SEE DETAIL 5-4 E T TONS, EST 131 SY GF >N� CL 'B' RIP RAP I R CD + I \NOJ SEE DETAIL 5-2 �E E _E—EiF-?-TANS YG i �� X d' w DOCUMENT NOT CONSIDERED FINAL E E Yeb- x = UNLESS ALL SIGNATURES COMPLETED E� _ - I C 24„ \ — �= V I PERMIT DRAWING Ln � ; _`•.: c oo ° �0 qa � � 42„ w M/M 'JNI151X3 l _- � _ __ N SHEET 2 OF 89 T- s' M W dJd .s (of w At %� Q = R M 163 18' PAVED ROADWAY - - - - - - _- _nITCt G DING ----- PLOWABLE FILL - --- - ----- �`r DATE: 1 /15/2024 - - - - - - - - - - 2GI - - - - - - 1. S EEL - - - DITCH W O - -- --- - ---- _ F5- M I— O REMOV i DITCH GRA --- - -0d - �d ni- - _-- _ J IN W zi — -- = SITE 1--F�BSE FILL YE __=� _ __---- _ _____�; V IQ-= o cRa s — / Q fn ( J REMOVE /IO 7��--------- __ 1 J cV � — — 7-- — -- — — — � was—LF --_ -- _ _ — _ _ J 2 LLI GRASs3T� _ --- __ ---- C W 2GI G ----_ i aif^ ----- ---=-- m _ CJ SPEC DITCH GRADING --US-7 -1V - ---------'_ -- __-- 1 N 4 -- ----o�ni------ O� F dn,-- �-- y-f WOODS I`iW y Z \Q [- W EMOvI< .D W - ��_ _ i _ - 24„ J SPEC . 'DITCH I,.N 13W30 SEE AIL 5-1 \\a 3d i -% eszl `� C V 3' BASE DIT r (n - -o i- - -may, I M _ RADE _ _ ee'e rec-13- SEE DETAIL E IN _ _ _ N M/a � la1 M/a DNUSrka RETAI / C { _ _ ^ � P \ _ db R O EST 5 TO \ \ SR -�i� - NC DEPT. OF TRANSPORTATION ® VEGETATION f,AP Z \ y VEGETATION \o \ ED ROAgyAY - REMO JAd .BI - _ - - - - - 3s NCB OdSI E / 3a / S _ -� / - - Jnd .bZ - - - - -d - -�--i U + /6J 33 tj REM VE m i- - - -�„-=r--,-- - - - (9 Uj JSONV I u R� 24 b b0 �NNNl7A' ��' r N W JNOj LE ILIZATIO JNoa / I I EMOVE 6 �� - ���� o REMOVE REMOVE W/ L AF RIP / - MH JNOJ ti I CLEAN OUT M sNlisrxa - - I I / b g J21.81 M NMONNNA.9 L EE DETAIL 5 / / �` p EXISTING DITCH N 4„ / - - M _ - - - - - - _ - s U) /LOPES OR FLATTER REMOVE CLEAN OUY� / w YID A. / / O EXISTING DITCH / e - SANBORN, ,�-� / SE PERMIT DRAWI / REMOVE ,\\ ET UX /� 3:1 SLOPFg OR / \ SHEET 5 OF 89 1 / � / y ) Ili � OR ENLARGEMENT la I\ \ A\bJ diV GOODWIN S / c' / /� ° IT N\\� ,IN / 1 p I EST SY GF \ 7\ \ CREEK r MICHAEL A. MILLER, ET UX l5e I �P JEREMY R. RODAMAKER DAVID A. SANBORN, ET UXj�ae / CROATAN FREE WILL wJ3 tlX r / / BAPTIST CHURCH 10 X I \ \ iH� ,e� a I CROATAN FREE I \ \\ \ / ��- _ - 9'y ).�. i a .L//c.,/� • WILL BAPTIST CHURCH I 15 1 \\ \ \ \ 1 \ \ S SURFACE WATER IMPACTS L 9e51 T­� DETAIL 5-4 SPECIAL BASE DITCH (Nat r" Smlel N"rur"I Ground 3., p Ditch sl.pe � DI� L.-"°�-.J Min. D=1.5 Ff. B=2 Ft. FROM STA. 13+50 TO STA. 16+00-SRY1B- LT TEMPORARY SURFACE WATER IMPACTS 0 I \ N I I I x CROATAN FREE WILL BAPTIST CHURCH (DII III FILL IN WETLAND • I I F CROATAN FREE WILL MECHANIZED CLEARING BAPTIST CHURCH A \� STA. 16+78 -SRY1 B- LT uWsl \ \\\ \ \�\\ O DETAIL 5-6 DETAIL 5-7 DETAIL 5-8 CULVERT OUTLET SCOUR HOLE STABILIZATION SPECIAL DITCH GRADING SPECIAL 3' BASE DITCH \ (NO b ScO.) ( Nor I. Scolel 4 ( Not to Smle) �2 \ sled 4 X _�� N"lu Fle'O °A N"rur"I I I Front / Na u", _ Gro""°� "aM"m�BO'0i1M" `sP� W,q'P(ge2 D P�pOS� sp G,e."d 3 D F� e< DkI, WOODS FOR -LLTI- PROFILE SEE SHEET 34 a0 \ o s.D' za"r InTI F J ./ Tu,kGe"rexrlle" / FOR -LRTI- PROFILE SEE SHEET 34 - mow\ \ WW c OPo d 1" FI m TIP' 'SEE CROSS SECTIONS Min. D=1.0 Fr. —. I. B MI"I. of 1M l,rPl / FOR -LLT- PROFILE SEE SHEET 35 \ \ GemeMile' 6ini H.I. 'Nnce GeoWAI. Und.r nI FROM STA. 12+00 TO STA. 23+00 -L- LT Min. D=2'OFt. FOR -LRT- PROFILE SEE SHEET 35 ". L,Nm= sp N. I -Ow. Di— by Enel"..r FROM STA. 13+00 TO STA. 15+50 -L- RT d=2.OFr. FOR-SRYIB- PROFILE SEE SHEET 8/ Tyye eluner-a'm 1 -1, m Ten B"nk - I<-w Orn Type of Liner= ODss 'B' Rip -Rap, Keyed -In B=3.OFt. FOR-SRYIC- PROFILE SEE SHEET 83 � : to To":, �r�u sr Gemexfile FROM STA. 16+80 TO STA. 18+00 -SRYI B- LT STA.17+08-SRY1C- RT WOODS ,,, \ Submittal February 6, 2024 DETAIL 5-1 SPECIAL 'V' DITCH (Neffo Scole) Front Difch N.W.1 Slope Q Ground D F\o Bc w s ROBERT B. \ O Min. D=1.5 Ft. = HARDISON, ET AL oFROM STA. 15+50 TO STA. 18+50 -L- RT WETLAND WA N - GOODWIN ISEE�1ERMIf �� \ CREEK 1 HEET F BAN °N`� F EN_ _ RGEMEN WIR arnal=- �e d � j DETAIL 5-2 SPECIAL 2' BASE DITCH I Not to Scale) N.—I o< Slope Ground p' on°t Dikh d ',.j D P Tuck Geefeslil. a Geofe.file B Minimum of 1N (1YP) Min. D=2.OFt. d=1.OF1. Type of Liner= Class 'B' Rip -Rap, Keyed -In B=2.OR FROM STA. 1A+00 TO STA. 16+70 -SRY1 R- LT DETAIL 5-3 50' 25' 0 50' 100, SPECIAL BASE DITCH ( Not fo Smle) o SCALE: 1"=100' Gmo d 3., D A\ Ks1 Fi N WETLAND WEI i I e I F\o Slop / _. Min. D=2.5 Ft. 13=3.0 Ft. FROM STA. 18+00 TO STA. 24+50-SRY1B- LT FROM STA. 21+30 TO STA. 23+00 A- RT RA I SA 5 SPEC 3' BASE DITCH � - RMIT U/ ITE2 W00 W/CL'B'RIP RAP � EET 6 � � _SEg,�ETAIL 5-3 IT -. EST 128 To EST 335 5Y F / SEE DETAIL 5-8 0/ /OR o—Iv Rod-� 4 /— ���s F WAN MEN j I rtD7 / CLEAN OUT R 5rylisrx EXISTING DITCH N OPES OR FLATTER REMOVE 32 —\C2� WOODS OF TRANSPORTATIONS \\ 4" RCP, '�NN�ALL a� C L ST 5 TO I SY F r4rr., \.BI 7 0 -- -- _- REMO `' DV 77 O m NW PERMIT DRAWI / LEXISTING ITCH /�/�� REMOVE / 3:1 SLOPE4 OR SHEET 5 OF 89 / )R ENUARC DENT i 11 / / / L 1 / c �? / / // // //// / / / b �I I IP RAP \ \ / Ada""' CREEK T I -f / / ' TONS uw - MICHAEL A. MILLER, ET UX / � /� / / � � I I I � I ESr SY GF � JEREMY R. N' ONa I RODAMAKER DAVID A. SANBORN, ET UX �x W� S DETAIL 5-4 SPECIAL BASE DITCH IN.— Smle) Nofurol \ oc Front Ground 3., p' Difch Siepe � DI� F\ref L.-"°�-.J Min. D=1.5 Ff. B=2 Ft. FROM STA. 13+50 TO STA. 16+00-SRY1B- LT DETAIL 5-6 CULVERT OUTLET SCOUR HOLE STABILIZATION INMM S—) m Bed Gmun�� El—li- IJefu�oa Tuck Geofeaiile a Mnimum of 1N z.o• 2:1 or ITYFf GeMeMile' F 1 H.I.PI i n u C Ohl d �s'�N.,e G WAI. Under Rip— Ierg1M1= 56 Ff, in L«.fiom Di— by Engineer Tyye of Liner- CL'll' D>R.p 1. T p B..k - KeyedJn (IYn E,1 210 Tons, &f SY GeMex k so (Li CROATAN FREE WILL BAPTIST CHURCH lod a ROATAN FREE \� \ 0 WILL BAPTIST HURCH 1 \ SURFACE WATER IMPACTS BdSI \ �1\\\q\ r /J TEMPORARY SURFACE WATER IMPACTS —CROATAN FREE RHURCI @A PTIST II II X IO FILL IN WETLAND f —303 —� II ao \ Y MECHANIZED CLEARING �\/ CROAT BAPTASTFREE CHURCHL v\ m PROJECT REFERENCE NO. SHEET NO. R-5777C 5 IOADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMIN RY PLANS DO NOT USB PO CONSTRUCTION INC®MPLE�W E PLANS DO NOT USB POR ACOU ISITION Balfour Beatty StN' DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PERMIT DRAWING SHEET 3 OF 89 DATE: 1 /15/2024 STA. 16+78 -SRY1 B- LT DETAIL 5-7 DETAIL 5-8 SPECIAL DITCH GRADING SPECIAL 3' BASE DITCH 4 (Npf fo Scolel 4 (Not fo Scole) �a 7 / i0 / X Npturol Frain ` spy �Hgp,He( D P�O�¢ Sp Ground a, D F� e< Dkh W000s FOR -LLTI- PROFILE SEE SHEET 34 � -7 Turk Geofeaile o FOR -LRTI- PROFILE SEE SHEET 34 -� 'SEE CRO55 SECTIONS MIn.D=1.0 Ft. --I. B Minimum of 1N lrYlry / FOR -LLT- PROFILE SEE SHEET 35 FROM STA. 12+00 TO STA. 23+00 -L- LT Min. D=2'OFt. FOR -LRT- PROFILE SEE SHEET 35 - e� FROM STA. 13+00 TO STA. 15+50 -L- RT d=2.OFt. FOR-SRYIB- PROFILE SEE SHEET 8/ ef� Type of Liner= Cl...'B' Rip -Rap, Keyed -In B=3.OFt. FOR-SRYIC- PROFILE SEE SHEET B3 FROM STA.16+80 TO STA.18+00-SRY7B- LT - STA.17+08-SRY1C- RT WOODS Submittal February 6, 2024 Submittal February 6, 2024 Submittal February 6, 2024 Submittal February 6, 2024 0 10 20 PROL REFERENCE NO. SHEET NO. R-5777 L-2 300 2110 260 240 220 21 180 160 1 0 120 100 80 60 40 20 20 40 60 80 100 120 1 0 160 180 200 220 2 0 2 0 2110 300 PERMIT WIN SHEE 7 OF 89 D E: 1 / 5/ 02 .683:1 �2 6111 .73 9:1 6.— 23. 0 1 .76 WETLAND W a SITE 1 SURFACE IMPACTS WATER --FILL IN P WETLAND :1 41 24. 17 '1 25 6.342: 94 — 61 61 2. — — / *E 0.0 49 3 0 3, 4.. 4:1 �2 141 .20 80: 2909 6:1 \ :i 23. 7 6:1 0.0 40 3:1 :1 - 4.748:1 6:1 204 7:1 \ :1 6: - 0.0o \ O 2 3 W 3 23.1 70 q 4 1 26 6 .8925:1 39 5:1 25.14 3: 23. 4 :1 2 5.1 .23 2:1 2675 26.0 4:1 15 +E 0.0 3 0 2 0 2 0 2 0 2 0 2 0 110 1 0 1 0 1 0 40 2 1 20 0 1 0 140 11.0 1 0 1 0 24 220 1 210 2 0 2 0 300 Submittal February 6, 2024 0 10 20 PROL REFERENCE NO. SHEET NO. R-5777 L-4 300 2110 260 240 220 21 180 160 1 0 120 100 80 60 40 20 20 40 60 80 100 120 1 0 160 180 200 220 2 0 2 0 21 0 300 PERMIT WIN SHEE 8 OF 89 D E: 1 / 5/ 02 49 a o s 49 W 0.050 1 4.7 4.25 2603 2 +0.0 20. o s a s 0.050 .030"•0.030 $ .7 244. '0- A:\ :l 2616 6. .5:1 \ f 0.0 O O W 3 W 3 0.050 0.030v 0.030 4:1 �'4-Z .176:1 :1 26 6. 23 - f 0.0 SITE 2 ET ND B 40 jr) 3 3 M CH NIZE CL ARI G 0.os0 - IL 0.030 0.030 4:1 5. .1 0 / :l 26 6. 26 - 0 f 0. 0 0.010 7 0.0301. Oa0 4:7 A 2 2 20 f 0.00 o.m0.,01 0.050 3•2< 0.020 4:1 •1 0 / :7 6. +E 0.0 300 2 0 2 0 2 0 2 0 2 0 180 1 0 1 0 1 0 1 0 2 2 1 0 140 1 0 160 180 200 220 2,10 260 2 0 300 Submittal February 6, 2024 o, G �_ ZGQPROJECT REFERENCE NO. R-5777C SHEET NO. C S A 1 + 12 — — ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER 6 + 0 SEW =1 1° 0 '-0 " llr%;l SR 1 C- IINCOMPLE DO NOT USE FOR PLANS I ACQUISITION ZTA 11,";�IA 4 -I�ITJ I cTA 19;1-4-n�O R-1- I I I I 30 1 SKEWED G EL--2 .32 GP EL 2812 I I DOCUMENT NOT CONSIDERED FINAL PROP 1 DO Y R —� UNLESS ALL SIGNATURES COMPLETED B R = — - - - - - - - 18" PIPE -- — — — - - — --- _ 'RCP 4 "RCP I 3 "X4 AT R UR C PR FIL PR P B D N S A D SE L BED LEV =1 .03 EST U ER T 1 FT SIL B REMOVED AN F O F LLE AN A D SCOUR NOT TC SCALE) NOTE : 1 NATIVE CULVERT LOW MA SH FLOW ERIAL L PR CHA ETWE VIDE NEL. N SIL CO ATIVE S IN TINU MATE HE US IAL 0' FROM DURI THE G C THE NSTR BED CTION AT T NATI E PRO E MA ECT S ERIAL TE AND YI UB E SST ECT T PE ITC NDITI NS. SEPAR ( DO kTELY NOT S ND ELE ATTACHED ATIO B OF SILL DOWELS. 7.0, �NUM IER O SILLS DETERMINED BY THE 1.01 NLET UL AT A D OUTLET SILL p B T HAIWEG� �• ___ Ihgl G TB TB 1 � SIR TB --- -_ R6kN VIEW DETAIL ( Not o Scal ( Gmund Gro ind D� Tuck Geotextil Geof xtile B (TYP) Min. =2 .8 6.01 B=5. Ft. ffiSid. ss I' Rip- op to80 Y Ge textil I■■■■RDEM■■■■N ■iiiii�liiili���... ��ii�ilr■1 I■■E1�■��■■_ ■■■1 ■i■■■■■■■■1 I■■®■■■■■■■■11 Submittal February 6, 2024 1 50' 25' 0 50' 100, PROJECT REFERENCE NO. SHEET NO. DETAIL 6-1 DETAIL 6-2 DETAIL 6-3 DETAIL 6-4 PERMIT DRAWING R-5777C 6 SPECIAL 'V'DITCH SPECIAL BASE DITCH SPECIAL BASE DITCH SPECIAL DITCH GRADING M CALE: 1"=100' SHEET 10 OF 89 ROADWAY DESIGN HYDRAULICS A ENGINEER ENGINEER (Notro Scplel INotro SwIeI 'l I Nof to Smle) 4 (Nol fo SwIe) 4 D*h "°'" F`°" ",.prod "�' DAZE- 1 /15/2024 N°fuml A' Slopa 1 of 1 °f -- -- '— -" �� Ground 3�7 �`�0< Ground 3�7 p A'\,\et Di1cn Ground J.7 p A\o°< Difcn '�,Q p �q\E F p I o I F Slope ��� F Slope SP 'PG4e<P JPp\P8 SP F Min. D=1.5 F1. " Min. D=1.5 Ff. LBJ Min. D=2.5 Fl. 8=2.0 Ft. B=3.0 Ff. 'SEE CROSS SEC KDNS Min. D=1.0 Ff. `�7 Y O FROM STA. 30+75 TO STA. 37+50-SRY1C- RT FROM STA. 23+00 TO STA. 25+50 -L- LT FROM STA. 26+00 TO STA. 35+50 -SRY1 B- LT FROM STA. 23+00 TO STA. 36+00 -L- RT FROM STA. 33+50 TO STA. 36+00 -L- MED FROM STA. 24+50 TO 26+00-SRY1B- LT q DETAIL 6-5 ��77 SPECIAL 'V' DITCH 11141`1 INm fp srolel ProM COMPANY E WEYERHAEUSER Balfour Beatty Daze CANDICE CANDICE LEE Y LEE PLISKO PLISKO StN Gsc Grpund q -1 D F\c \ \ \\ \ DOCUMENT NOT CONSIDERED FINAL o Pis Min. D=1.0 Ft. JACKSON FAMILY, LLC UNLESS ALL SIGNATURES COMPLETED ��>e N 2-2J, LLC FROM STA. 30+50 TO STA. 36+00-SRY1C- LT C) ,,\ \\\ \ SP 1sp \ "9 SP C ET BASE DI H SLATEE 2' BASE DITCH ED F C V y� 061 N ONO EE DET.R1156-3 �\ SEE DETAIL 6-2 w� CL 'B' RIP RAP b O T X3NOJ 'ow / XOG a0 I ES GF x I � \ \ 1 \\ 1 OA851 WOODS �rJ \ oHXsl I I \ \ \I \ • \ J sne Isno)) al } \ s \ 1\1 \ 1 — 3NOD E 1 G / WOODS I I JSI 31V0 _ \ \ 0 .. \s" ^ 1 C (f1 -D tc I D' gL'B'RIP RAP RD O E �E a0 ,lw EST 3 TONS p �E �l F E T 10 SY GF 1r� E E C E_ E E- 4 R c N W za^ Q = M uw 4" \ ?yD vl - -5 N_oNSNn.n - °'s3e _z ise _ �x — �-' --_— -i-- - - -- OH.SI - - ----- -- --- - --- d _ MO I .. 3315 - - - - - - - - - - - - - - - - - VOa 03nvd.8l £911 a5,21— __ REMOVE --- - - - - - - - G _ - O __ - - 9 n>l Lu Q i^ --o-+i- -- - ----- ,SEE-0EIAIL SH-------- — - - - - - -- - _ -- --- --- . __ _��� + N --od ni-- °-----------=---------3D=4 GETAiL-A,- ------ ----- _ RP -od t-- -- ----------- -- GRA55 MOUE I — W p J oe ni_ w Z + SPEC DITTC-GR7cDING —1—=_ -- - _ - �j ni- _ \ -Oi a1PAVED SHWIDER j --- = Q w REMOVE ------- — -- -- US 14 70 EBL 24'PAVED ROFDIM1' U Q LLU 2GI ls„ 2Gi -- ------ US 70 EB ---- — ------ q.pAVnsH�De� _ _ — �_�� Q ~ _ _ --- N N -- -- — — — — — — -- --- — -- ---- -- I -�---- FES a - LL _ FS, SEE DETAIL SHEET FES I IB' RCP l 2D-4 DETAIL 12 US 70 WB GRASS GRASS 7 Mo E PAVE SHOULD R $PE �DETAIL 6- -��REMOVE— _--- �C INCH G DING--�— L --�- 2Y-RIP RAP.�� ---- —_--_ _—� 70 EBL 35'PAVED ROPLri4AY \ /—� �1 Z _ ------ --- ------US FhYY ---- O - - SHOULDER f� i F� CL '2 RIP RAP WOODS PEC 3' S DITCH EST -moo'------------ EST75Y0GSF EDET � � WETLAND WC --pjFE — --I�t-- � �cn NC DEPT. OF TRANSPORTATION I Q10 =2.9 CFS SEE DETALLI6-5 TCH-- V10 =1.4 FPS SITES \\ E G DIT- .- " � a AY � Ln ------ - < —/WOOD ------ U + _ o,n._ -M- - -- �nd.oz — --- -- a.ez < -- �F2YIC� 3aDH^S < CC ------ ---- - - - --- --- - -to----- --P W °' o W - - - - i- - - - N REMOV ��PUE PUE --- — — — M/ - I _ - - - -=i _ _ and .z —_ M PUE —PUE NMONN — ��� — —L _ — — - - — — — g ana.z -s-- — sY� - o�nd,.z �= —PUE— Ig \ 4f .. �� .. A I ©fl Kl -� -e x-• PUE —PUE _ E )-= W xia Dwusl� T PUE P .. SS8 PUE _ .. SIR, ETAIL . J I III a,Hsl jOV \ HT DITCH WOODS I �E \ EE PERMIT om wsi \ x \ e'" SHEET 12 F 89- o I OR ENLA E e"\*�_—F KERN COMPANY, INC. N� WETLAND WD\ woods � KENNETH McGOWAN \y BFFG LLC CRAVEN FILL IN WETLAND COUNTY MECHANIZED CLEARING FOR -LLT- PROFILE SEE SHEETS 35 & 36 FOR -LRT- PROFILE SEE SHEET 35 & 36 Ha.o9 FOR-YIRPB- PROFILE SEE SHEET 63 FOR-SRYIB- PROFILE SEE SHEETS 8I & 82 FOR-SRYIC- PROFILE SEE SHEET 83 PRELIMIN RY PLANS DO NOT USB Po CONSTRUCTION INC®MPLE E PLANS DO NOT USE MR �W ACQUISITION Submittal February 6, 2024 50' 25' 0 50' 100, PROJECT REFERENCE NO. SHEET NO. DETAIL 6-1 DETAIL 6-2 DETAIL 6-3 DETAIL 6-4 PERMIT DRAWING R-5777C 6 SPECIAL 'V' DITCH SPECIAL BASE DITCH SPECIAL BASE DITCH SPECIAL DITCH GRADING M CALE: 1"=100' SHEET 1 1 O F 89 ROADWAY DESIGN HYDRAULICS A ENGINEER ENGINEER (Nptro Scplel INotro Swlel 'l (Nof to Smle) 4 (Nol fo Swle) 4 D*h N°fp F`°" N,.prod Dikh DAZE: 1 /15/2024 G—nd A' Slopa 1 of 1 °f •— -- '— -" �� Ground 3�7 F� �0f Ground 3�� p A'\ het Difcn Ground J.7 p A\o °< Dncn '�,Q p �q\E F p F Slope F Slope SP 'PG4e<P JPp\P8 SP F Min. D=1.5 F1. Min. D=1.5 Ff. Min. D=2.5 H. T 'jn A.� 8=2.0 Ft. B=3.0 Ff. 'SEE CROSS SECTIONS Min. D=1.0 Ff. FROM STA. 30+75 TO STA. 37+50-SRY1C- RT FROM STA. 23+00 TO STA. 25+50 -L- LT FROM STA. 26+00 TO STA. 35+50 -SRY1 B- LT FROM STA. 23+00 TO STA. 36+00 -L- RT FROM STA. 33+50 TO STA. 36+00 -L- MED FROM STA. 24+50 TO 26+00-SRY1B- LT q DETAIL 6-5 ��77 • SPECIAL 'V' DITCH INm fp srolel ProM COMPANY < E WEYERHAEUSER Balfour Beatty oe" N A'� °f o�� LEE PDLISKO CAPLISKLEE \ Gsc Grpund qr p F\c '1 \\ StN DOCUMENT NOT CONSIDERED FINAL o P�� Min. D=1.0 Ft. JACKSON FAMILY, LLC UNLESS ALL SIGNATURES COMPLETED >e N 2-2J, LLC FROM STA. 30+50 TO STA. 36+00-SRY1C- LT a � V /,(� A.�� '^ SP C 3' BASE DI H LAT 2' BASE DITCH \ �` / C v" y J ONO EE DETARS6-3 SEE DETAIL b-2 31 �61 N I CL 'B' RIP RAP �09\ /� , X N j ( T ��"� _ `^ O ES GF ✓ h l \ \ \\111� 11 OABsI LNOODS �� 31 V' aHX x\\� , \ oh x l \\\ 1 s N zs} I sn _IX a1 } 1 - (g \ \ 1 11 — oNoo E G /' i� 'L woods I jsl 31v9 ` \ \�3 ` 1 ^C (f1 P RAP O E q --E I a0 ,1 EST 31 TONS QD ` 31-�� �l Ln E T 10 SLLJY -- N W A\ ,iw x 36vo \ 24 ---- --/off N Q= V9 v s oa�iw — - - ---- I F-- (q — <-- ---- - - -- aesl - - ----- --- - --- _ _ — - --voa oaadd,ar teu as ` -J` and Uzi - -133is REMOVE _ — --- _ — —'2; ,sEE-0ETAIL — — — --- — _ — — --� - w C I` — — — — — — — — L 1� — — — — — — — — — — — — — — = �— Y _ — —od t— raAS MOVE _ --of n1— _� 8Z 1=— --_ — — ----zs — - _ — a -- _ — __- 55 J c� 111 O — --44 ni - 92 —LZ �8Z �62—+� tea] PAVE W Z + Ln SPEC DIT� GRADING —_ _ 4Z- _ _ - �i ni— — 1 W J M �- --— I — —----__—= us r+wr'z4PAveD ROAuv U Q W 2GI 75, 2Gi 9Z— US 70 <B f °° — —g pAV — — Q N —25 2�� vJ �__ z�4 —25 �c— _ �-' �25� 26� = � 28 � SEE�ETA4L-SHEET 29 28 —30 — —30— —I — IB• RCP — I ETAIti2— 27— 9Z —SZ— —25= LZ 4— 25 TONS �� --- 1£� �— US HWY 70 EBL 35'PAVED ROAL7WAY \ / �3� HOLM DER = — 30 = / �= m _ — (..� + �z7 28— 29�—30.a i_ ��i� ^m - - /M - M Lll LU CL '2 RIP RAP -"WOAI S, - --0.. EST 2 TONS PECDET 3 ITC 4 — EST 7 SY GF m WETLAND WC _ _ _ _ 32- NC DEPT. OF TRANSP TATION I \ Q1O =2.9 CFS SPEC V' DIT-F \ � E DETAIL Lz V10 =1.4 FPS SITE 3 E G m'1' RIP P .� - - _ �/i A ----------------- Lo _ _ _EST 3 5 - - _ _ - ��'' i _ lisp - 1 1 �•o (i + 28�rd24��—_LZ���W00 N W PUE %- _ LL1 d - R — _ _ � _ < � � /9ICje`— d✓ PUE 1 � o�-------- --- I --A --- - -- __ "_'8% M _.PUE _ •° C N NMONN — �F,6� — —L — _ — — — — i 2 n. .. 3 .. g 3Aa .z - -s- - = s = - - �\d.. z ���. ,r '��',�/�� h�a, ` Ig _ Pi-m£� SPbC 'V' DITCH ��C \7 PLI UE m S6E ETAIL is I III a,asl �29 as�l� N Tiwsl ei x EE ' ERMIT SE F: 89 Z SITE 4 25- 28 _tea O EN E �J s2 ;- ; 28�- zs \� \ KERN COMPANY, INC. WETLAND WD 2 '�� w / KENNETH McGOWAN oo / BFFG L COUNTY FILL IN WETLAND MECHANIZED CLEARING FOR -LLT- PROFILE SEE SHEETS 35 & 36 FOR -LRT- PROFILE SEE SHEET 35 & 36 bz zee_ FOR-YIRPB- PROFILE SEE SHEET 63 FOR-SRYIB- PROFILE SEE SHEETS 8/ & 82 °£ x FOR-SRYIC- PROFILE SEE SHEET 83 ti PRELIMIN RY PLANS DO NOT USE Po CONSTRUCTION INC®MPLE E PLANS DO NOT USB POR �W ACQUISITION VA L WETLAND WC Submittal February 6, 2024 FILL IN WETLAND MECHANIZED CLEARING WOODS 10' 5' 0 10, 20' SCALE: 1"= 20' PROJECT REFERENCE NO. SHEET NO. R-5777C PW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER INCOM PLE E FLANS DO NOT USE FOR 6W ACOUBITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PERMIT DRAWING SHEET 12 OF 89 DATE: 1 /15/2024 SITE 3 IE TO d 0 1 EXTM DID — — M I0I -- OAd- - — 10�- — 11 N ------------- _ REMOVE1= \ HW J O SITE 4 WETLAND WD -SRYIB- - 6 0 0 V110= SPEC 'V' DITCH M \ V10=1.4 CFS FPS OM1S1 PUE PUED IG DITCH Submittal February 6, 2024 0 5 10 PROJ. REFERENCE NO. SHEET NO. R-5777C SRY1C-8 150 1 0 130 120 To 100 90 80 70 60 50 40 30 20 1 1 2 D 3 D 4 D 5 D 60 70 80 90 100 1 0 120 1 0 1,0 1 0 P I WIN H ET 1 F 851 D E: 1 / 5/ 02 0.042 0. 42 4' 2958 31 + 0. 0 ILL RE O URF LY IN 29 38 - 3 + 0.00 --- ILL RE URF IN / 2907 \ 3 + 0.00 ET N W SITE FILL IN WET ND 3 ti MILL RE ONLY URF CIN �n 2887 2 + 0.00 Lo 1 0 110 1 10 1 0 1 90 0 0 0 0 40 20 1 13 23 60 0 0 0 1 0 110 130 1 0 1 0 Submittal February 6, 2024 PERMIT DRAWING 3� SHEET 14 OF 89'^�' F `a �v 07y DATE: 1/15/2024 FIT ELM�N RY�xP-NB T � p � \ zer%iru 'ia r d,Z INGtlMP E PLANB MATCHLINE 9�0� (SHEET31) BallowBeatty st' t� 0}, oxcum vo, / F a MATCHLINE-Y7-STA 23+0011HEET 301 \ Pxo, ro rseL4°on°ai"i 9 N N W / / rc, —IL x.LSrxLNT&K. c x � R, somor zsr, sr rF 1 —i — K s cs.°nr n.. w ,° mw Nr U5 70 NB _ � o --- -- —— --- ----_---_ WEo —_—_ 3 _ _ _ 3^ 2 izims�ximxz'o-�°iin39 i — u + - _ _ - ,r N _ __ - >.a,� _ SITE 7" xra —tea - O :ior Txr x,8xxn.e _ y u g:�r > P, W �= .. ,., � -� �+ .,_ ____ tl0 _ - - .I I SEE PERMIT IN/ y ti . . -- - 6 I ICI i SHEET tiJ. y y „= rn" o WE. N WE I Iel II' F LARGE T / �NE/ STREAM SAS I Inl � d �g\\ I � Mdd�J© � �'°'' A.I.e � �-a��� ��_� I I I li �I �I I h� II / / �� .•�«.. ` „. 30 hT Q10-1.0 CFS III FO% .I xpzuu= i dwnoo. „w cxuPex,.xc .. �� r "�� x' "„�• , m"-�' ,.o., ma.,M10 m..,<.,: .xo-u \ +u DFiAIL ] 1 DFiAIL sxcw,u[ xrcx m su °ncx fff e r e II UNTZ „p .ro-gym � 45+30 o x m m I �`:._ moo, s-z �` �or— — — Ra m.,..00 11 s,n`K, LLT I .. ...,,ryyy... Ic. $EE PERMIT DRAWING x.E a,Dz",°x SHEET 19 OF 89 FOR ENLARGEMENT SURFACE WATER IMPACTS ,„ FOR YIRPB PROFIIE SEE SHEET 63 Wv FOR RAB2 PRJFI(E SEE SHEET fil �"c OR PRBF,t£ S £SHEET 62 FFOORR BRlYIp/P3G PROSEE sHiEreET TEMPORARY SURFACE WATER IMPACTS —11Ft� 3n r E 8a fEE85 DeruL ?� c/ -3�- SITE 6 F71/;� FILL IN WETLAND �� Z VS /.P ^>ry, MATCHLIN Ny Y OZ r * * MECHANIZED CLEARING 0 -Y1-ST 00 IS SEE PERMIT DRAWING �'O �m°xorem�°nox i► A36+ ( I� ET 32) HE 16 OF 89 mF� �Zm N—O— °F I GRAPHIC SCALE Ao HAND CLEARING �° 3�P0 WETLAND WE Wll111-1-1-1° PLA\NS-I� Submittal February 6, 2024 PERMIT DRAWINGFR`snc ° 7 3w SHEET 15 OF 89 S OQ 2 PRBL�M�N RY�mPLANB DATE: 1/15/2024 IN T �- p ��' � s oiru°�i iaO1r s d,Z INGtlMP E PLANB MATCHLINE 9�0� e��� •� (SHEET31) Ballow Beatty StIL ' Y' tea:ii vo, r 1 /b MATCHLINE-Y7-STA 23+00(SHEET 30) r �a p � ` _� -:"4"°�"" 35 � �_ � i � I4$s a' �.� � e9 � Ci &9w�` •: oNsn a ��/ ��._ 6 N N Ll �� m,. .uEk,r�a � � � �� 6 � •}-J � f�/p � ,��1 '° ^-.s��' � 4I II � a I� ���ry � �,'i�"or / �` �a�r �'�' __ -_- P j�� � � ��-.,.. u i✓�j"_ E.;s° ( v, w ssmr`] .E — �_�%�." i tip' ]- Cry :m omm, •� or -- _�_� �_�.��_� � � an•�` _= a _ - — � N�� �(" 4 °v � r I � smu �E c Q `.-- �o EEC / a -tt7 T ' L 7 �p L� f� r r � x� oa�'b ,q� s. ..m �i� ..O �.. -I r �` � -fir �,• E �I � 1/ � s mai,. ry � / �,/ -�� o.,. '�'��,�.� .wo•, mA.Ml°mm.. ° .—a` .rt'AY°"'cn ...- F 6 a .. `.� 1 � .� '� � � Ind .•' ':— �'_ I � :or �- �o—zv- .ew«�°i_ 1 DfiNL ] 1 DFTAIL ,z I ffi q I #' a j p 3 �z r �'• m c. soft c, s c r rr� mn.x,w ro sraows a. .. m°m ma ss,n ro ma 19. u rrou n..v,m ro na ss.ee moss n. �z,so ,o n• zz.so i,r'rrn mom ma �s.eo ra sra ia.ss 11—a, IEEE r (v l rxom z.w smonc n w n •O-�/ EMp nF '• I I`��� �� e SEE PERMIT DRAWING �F°Rn -uurrr i°r�ae scc sHc�rs'�G.n.a .ie � SHEET 19LA89 FOR ENRGEE MENT S SURFACE WATER IMPACTS 'R"� PROF,rE EE sncEr u a..... �.. / ° . ,w "'"'"^ •^ \ % %�� Gk' RPR PROFI/E SEE SHED 63 Y ormo,. _ . so o n �.,..a+POvm� L SEEE 1 EEr E TEMPORARY SURFACE WATER IMPACTS roR sArimic va°F,.I see sRVl'' ea a as F71/;� FILL IN WETLAND NNP 9� MATCHLIN N Y OZ �\ * * MECHANIZED CLEARING a...;t,.. �;,'�,"•„; w, '. �V y14� -Y1-STA 36+00 S EET 32 SEE PERMIT DRAWING Sm 'O < iF ( ) SHEET 16 OF 89 GRAPHIC SCALE JT— i osrys,-�aN lll\ HAND CLEARING 3 1 0 LLIa= WETLAND 1�, d� 111LL1L1-1-1.1°PLA\NS _I� Submittal February 6, 2024 Submittal February 6, 2024 Submittal February 6, 2024 Submittal February 6, 2024 Submittal February 6, 2024 0 5 10 PROL REFERENCE NO. SHEET NO. R-5777C Y1-11 1150 1 0 1130 120 To 100 90 80 70 60 50 40 30 20 1 13 20 30 40 50 60 70 80 90 100 110 120 1 0 1,0 150 PERMIT WIN SHEET 20 OF 8 D E: 1 / 1 5/ 02 SITE 5 v v FILL N D Li o ME HA IZED CL RIN w FILL N WETLAND - 2948 - 31 + 0. 0 60 0.0 O 0.020 a :1 4• ti w 3 2993 3 + 0.00 M 0.020 0.020 SITE 5 )VET LAN E 41) g;1 :1 EC ANI ED LEAR NG w 3 ILL I WE - 3000 3 + 0.00 1 0 1 0 10 10 1 0 10 0 0 0 0 0 1 1 2 0 0 0 0 1 0 1 0 1 0 1 0 1 0 1 0 Submittal February 6, 2024 0 5 10 PROJ. REFERENCE NO. SHEET NO. R-5777C Y1-12 1150 1 0 1130 120 To 100 90 80 70 60 50 40 30 20 1 13 20 30 40 50 60 70 80 90 100 110 120 130 1,0 1 0 ro PERMIT WIN 40 0.0 0 01020 SHEET 2 F 8 FJ4,, D E:j 1 / 5/ 02 2980 .02 0.0 0 - 2924 SITE 5 M 40 ILL IN WETLAND o ME HAN ZED CLEA ZING w 3•. 4: 2927 SITE 5 0.020 0 020 41) FILL IN WETLkND a z ECH NIZE CL ARI G 29.21 31 + 50. DO 1 0 1 0 1 L 1 0 1 0 1 0 0 0 O 0 0 1 20 13 01 13 30 0 0 0 O 1 10 1 0 120 1 0 11.0 l 0 Submittal February 6, 2024 0 5 10 PROL REFERENCE NO. SHEET NO. R-5777C Y1LPD-4 1150 11.0 1130 120 To 100 90 80 70 60 50 40 30 20 1 13 20 30 40 50 60 70 80 90 1 0 110 1120 1 0 1,0 150 PERMIT WIN SHEET 2T OF 8 D E: 1 / 1 5/ 02 WETLAND WE SITE 5 ILL I W TLAN 080 0 co MEC ANI ED ZLEARING 2882 - WETLkND WE FILL IN WE LAN SITE 5 w 4;� 080 0 O80 M - 2809 - 1 0 1 0 130 1 0 110 1 100 1 0 80 70 0 0 1 3p 20 1 ti- 2 0 70 80 90 1 0 110 1 0 1 0 1 0 1 0 Submittal February 6, 2024 0 5 10 PROL REFERENCE NO. SHEET NO. R-5777C Y1RPD-6 1150 11.0 1130 120 To 100 90 80 70 60 50 40 30 20 1 13 20 30 40 50 60 70 80 90 1 0 110 1120 1 0 1,0 150 PERMIT WIN SHEET 21 OF 8 D E: 1 / 1 5/ 02 SITE 5 FILL ETLA D ET N E 40 � 5 w g•. 4. 3 ECH NIZ D C EARI G - 2759 90 ET ND VVE SITE 5 40 a FILL IN WETIAND 40 3• 0 .080 �i 3 4; , 2780 0.0 0 .080 4;) - 2829 - 25 + 0.00 1 0 1 0 1 0 140 1 110 100 1 0 0 0 0 0 13 1 2p 3p 4p 50 jo 0 80 90 1 0 110 120 1130 1 0 150 Submittal February 6, 2024 0 5 10 PROL REFERENCE NO. SHEET NO. R-5777C RY1DY3C-2 1 0 1 0 1130 120 To 100 90 80 70 60 50 40 30 20 1 13 20 30 40 50 60 70 80 90 100 110 1120 1 0 1,0 150 PERMIT WIN SHEET 24 0 F 8 JDATE: 1 / 5/ 02 25.80 17+ 0. 0 a s W o 3.7 4:1 4:7 3 25.60 2567 0 s a WULAI,113 WE ILL IN W TLA D ~ FILL IN ET ND 3 SITE 6 MECHANIZED AN CL CL ARIN ARIN 4: ;J ME HA -HA IZED D-A.LEARING CLE RIN 2333 16 + 0. 0 a g W WE LA D E SITE b 0.05 L I WETLAND ME HA IZED L RIN 24. 0 MIA AN CL R + WE LA D E W 0.0 :7 ME A IZED CLEARING 25.10 ID YV. WETLAND E SITE b W 3 ILL I W TiD 3 0.0 3:7 -MECHANIZED CLi 5.40 2533 00 —17 q; :1 FT 5.70 2568 25.20 1 0 1 0 1 0 120 10 1 140 1 0 I 0 70 60 5 201 1 2 0 0 80 90 40 10 1 oil, 0 1 0 1 0 Submittal February 6, 2024 0 5 10 PROL REFERENCE NO. SHEET NO. R-5777C RY1DY3C-4 1150 1 0 1130 120 To 100 90 80 70 60 50 40 30 20 1 13 20 30 40 50 60 70 80 90 100 110 1120 1 0 1,0 150 PERMIT WIN SHEET Ili OF 8 D E: 1 / 5/ 02 • 0.)60 4 1 2E iz 23 + 0.00 0.0 2 0. 42 30 72 27 23 + 0.00 0.022 0. 22 43 27 22 + 0.00 O o. of 0.1620 22 + 0.00 01 WE LA D WE SITE 7 o 0.0 0 0. 20 110 FILL INETLA D Ulir IMP CTS 3 W 3 :1 EC ANIZ D C LEAR NG ILL I TLAN 22 32 0.0 0 0. 20 10 WE LA D E SITE 7 t 3� FILL IN ETLA D li I I 21 + 00. DO 1 0 140 1 0 110 1 110 100 0 80 70 60 0 40 30 1)1 210 40 50 60 0 0 0 1 100 1 110 1 0 1 140 110 1 1 0 Submittal February 6, 2024 PROJECT REFERENCE NO. SHEET NO. R-5777C 200 0 0 0 ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER IINC®Ng1�L1E DO NOT USE FOR ]E ]�L.�NS ®W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED CI. STk 5 5 + 0 - P EXrG NG AT PIPE C1. — — PR P OUTLET 13ED PROP INLET B D W E= 5.7 1@ 6" 0 RCP NV 24 2 ERE" 01 Submittal February 6, 2024 PROJECT REFERENCE NO. SHEET NO. R-5777C 200 0 0 0 ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER IINC®Ng1�L1E DO NOT USE FOR ]E ]�L.�NS ®W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED L STA 19 04 -Yl PD E G Nq AlPIE C N SE=21.1 IN =19.2 BURIED .0' 1@ 6" RCP — O Submittal February 6, 2024 PROJECT REFERENCE NO. SHEET NO. R-5777C 200 0 0 0 ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER IINC®Ng1�L1E DO NOT USE FOR ]E ]�L.�NS ®W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED C ST 2 + 0 - RYl Y3 - EX G G AT PIPE CL l — J N SE 18. J URI D .0' IN B LE 1. ' 1@ " RCP Q SLLJ \ a ;J LLI � — LU p LU MH 7N0 U Q w n. IQ�U J NMON I~ EMOV LLI ~ F LIJ (n MMIgNOJ, + - Lr�_ 0 Q. r- U LLI Io c Submittal February 6, 2024 DETAIL 8-1 DETAIL 8-2 DETAIL 8-3 DETAIL 8-4 DETAIL 8-5 / SPECIAL BASE DITCH SPECIAL 'V' DITCH CULVERT INLET BANK STABILIZATION CULVERT OUTLET CHANNEL CULVERT INLET /OUTLET BANK STABILIZATION ( NM ro Sc°le) (Not I° Smle) (Not to Smle) (NO to Scala) IN— to S.IB) Frain ft �.IN°Nnl NONrpI hno�nd Dirch o N°Nrol \ of Fronl N°Nml A'"� occ Slope Ground J, D ,�.1 Ground "° d^\ Ground 3., D A"" Dirch a OMe Tuck Georedile F\mat Slop Groond 3., D �\ uck Ge°tenlile' d Tuck Ge°tetitila Key Ripr°p into mimum of 1N mu Key Riprop inb °Minimum °f 1N Channel -p1u B Min, D=1.5 Ft. -3:1 BEHIND Min. D=1.5 F. °mini m of IN Chpnnel BonomFIT) GeotexXle g DYPI Nyp) lace Geotertile Under GUARDRAIL RYE) CHANNEL BED CHANNEL BED B=2 Ft. Length=41 R. r°d°ble) Length= 47 H. Rii in Location - Min. D=2.SF1. Each SNe (voriobla) Dna<red by Engineer FROM STA. 63+45 TO STA. 66+00-L-LT Est. 60 Tons of CIPss'I'Rip-RPp, Keyed -In Typa of Liner=CL'I'Rip-R°p-Keyed-In d=2.5FL La^gth=30 Ft. FROM STA. 63+50 TO STA. 77+00 -L- RT FROM STA. 28+70 TO STA. 29+05-SRYIDY3C- LT t° Top of Bank, Est 24 CY DDE •Place Gewenile Under Rip,ap Ezt 50 Tonz, Ezt 85 SY Geotextile d=2.0 - 3.0 Ft. o o Rn sio e.5,�� a� ya �n oa� op FROM STA. 29+00 TO STA. 42+50 -SRYIA- LT FROM STA. 29+10 TO STA. 31+50 -$RYl DY3C- LT Eat 105 SY Georedile in Lomtam D.,!1d by Engineer 2170 CY DDE B=4.OF. E-30 Ton-OCln--TRipp Rnp,keyed-In, ht. 68 SY Ganteahle FROM STA. 30+50 TO STA. 31+60-SRYIDY3C- RT STA.13+30-Y1RPA-' RT STA. 11+78-Y1RPD- LT STA. 29+10-SRYIDY3C- LT L(T FROM STA. 32+10 TO STA. 34+60-SRYIDY3C- LT M O STA. 29+25-SRYIDY3C- RT PE r,0 FROM STA. 34+60 TO STA. 40+50-SRYIDY3C- LT ti FROM STA. 41+50 TO STA. 42+70-SRYIDY3C- LT FROM STA. 10+75 TO STA. 12+00 -DR2- LT S H E FROM STA. 10+75 TO STA. 12+00 -DR2- RT -_ DATE i SPEC 2' BASE DITCH i DETAIL 8-1 _ E— SPEC 'V' DITCH E— CL 'B' RIP RAP SEE DETAIL 8-2—E--E EST 2 TON$= SY GF CL 'B' RIP RAP � — — EST 2 TONS EST 7 SY GF BANK STABILIZATIO W/CL 'I' RIP RAP SEE DETAIL B-3 — WOODS SPEC 2' BASE DITCH SEE DETAIL 8-9 SPEC DITCH GRADING SEE DETAIL 8-6 SPEC 2' BASE I SEE DETAIL 8-1 CL 'B' RIP RAP EST 2 TONS EST 7 SY GF E t5E SPEC DITCH GRADING SEE DETAIL 8-6 SODOM —�.n1— d nL d 4' PAVED SHOULD _ _ _i_ _ ^ ----- ----------n--- ----------------- US HWY 70 EBL 24'PAVED ROALWAY_______��/ REMOVE -- --------------- f°a.el 4'PAVEO svoumER ?B --` ��---- -- --- --—4'PAVEO SHOULDER -------- ------ ------ --— — — — — — — — — — -- US MNY 70 WBL 24'PAVED R0"—AY ----- — — — MM D OJ,b j 4'PAVED SHOULDER �— �M— _ — — — — — — — —j1 — — — — — — — — -- — — — _ _ — — — — — �v, F-----d--------------d—GRADE*o 9RAIN------ _-SPEC 2`B Ml -- --- --- ___________------_--__-"-----SEEDETAI �13�1— — �3••f._ -- — SITE 8 ----- -- -- `-- —=--Gin,=-- — AdV- -- — — ----sd —-----/—i ----- -- ————--——————— — —ssl— --- ---- —�S,— --- EVERT CUTLET CHANNEL I I I SPEC DITCH GRADING DETAIL 8-6 SPECIAL DITCH GRADING ( NOII. Smle) IPA «y'�R/� "\POCK SP *SEE CROSS SECTIONS Min. D=1.0 Ft. FROM STA. 66+00 TO STA. 69+00 -L- LT A FROM STA. 70+50 TO STA. 77+00 -L- LT Ji RMIT DRAWING ET 29 OF 89 �, Balfour Beatty : 1 /15/2024 �� StN DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 50' 25' 0 50' 100, SCALE:1"=100' _ LU LLJ E E PROJECT REFERENCE NO. SHEET NO. R-5777C 8 tOADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMIN RY PLANS DO NOT USE Po CONSTRUCTION INC®MPLE E PLANS DO NOT USE MR 7W ACQUISITION SPEC DITCH GRADING SEE DETAIL 8-6 Q O U) + N V Q U7 LL.I c:) z_+rn 1-- ULU Q W — — Q U7 U) J ------------------------------- r— __�M— F— — I— M �--—1--_---Mr —r ----od nL--------------od nL------------------ ---- TCPr M----------------_GRAM To-156TR----- M- - - - - --------- ------- ———————————————— — — — — —— x-----M------ ------- ,--------------ss,--------------3-- — — _ — — — 27 gd — — — — — - AL M �--, — W/ C A m W/CL'I'RIP RAP (BANKS ONLY) WOODS SURFACE WATER IMPACTS SLOPE=0.8% I SEE DETAIL 8-4 I III WOODS .. .. .. .. .. .. .. I '. WOODS I I_ %i lilim TEMPORARY SURFACE WATER IMPACTS 31Y`J 14ia � N-,. a n X�� FILL IN WETLAND DETAIL 8-7 DETAIL 8-8 DETAIL 8-9 STREAM SB 3 X / Xo SPECIAL BASE DITCH TOE PROTECTION TOE PROTECTION IN WETLAND AREAS a I JNOJ Y', ( NO. to Scolel ( Not to ScOl) (Nol Io Swle) 2,J KERN COMPANY, INC. I 1� c_Na' 3',0** F— C {� N 0 g ��C aoPE Sod Dnm SPEC V' DIT 3 � s —®09 MECHANIZED CLEARING "A'°� d F N°IurolGroend 3., Gmend J, P`� GRou"D WeNand A ea F D P°6eI slo $EE DETAIL 8 BANK STABILIZATION E SYWM GEOTEKFILE �d u Min. D=1.5 Ft. d=1.0 Ft. d=1.0 Ft. B=2 H. /CL TRIP RAP EE DErnu e s $EE�LIPERM Tel D WpI°TOO lva' Geplemle ROCK CHECK DSHEET 2 8 - EC'V'DITCH HAND CLEARING Type of Liner= Class'B'Ripatop Type of Liner= CL'B'Rip-Rap FROM STA. 13+31 TO STA. 13+50 -Y1RPA-RT / SEE DETAIL 8_2 FROM STA. 35+20 TO STA. 36+00-SRYIDY3C- RT FROM STA. 34+00 TO STA. 35+20-SRYIDY3C- RT SEE DETAIL SH I / 1• DETAILTA] k EN RG E SPEC 'V' ITCH I N I RAVEN COUNTY PE 'V' DITCH SPEC DITCH LTD I S-2 O v SE :DETAIL 8-2 SEE D' AIL 8_2 GRAD / I - CL'B'RIP P - PD E EST 2 TONa EST 7 SY GI -o R P o s < c R — — — — 2 ELBOWS Q10=16 CFS V10 =1.6 FPS 4 —SRYIDY3C- 1 R P-V 2GI TX RCBC� /CL 'B' RIP RAP F 1FT \ EST 2 TONS -i-- - EST 7 SY GF F DAYLIGHT m DITCH I / M SITE 9 ** SITE 8 F' PUE RiPg.4P PUE qg To �_ PUE E ON PUE CL 'B' RIP N STABILIZATI0 EE DET S- RAPyS RIL f1 / 5 SY / EIP CL 'B' RIP RAP SEE DETAIL 8-7 EE 8-5 I EST 8 TONS TOE PROTECFION SLOPE ONLY) — — TA7CT1 A AII'l TAT!'M 7� '� EST 21 SY GF (FILL 'B'RIP RAP WETLAND WF °� I L J11YD °°�' SEE DETAILCL IN J1 o � � e�E SITE 10 R — P�E WETLAND WRR 1V — PUE 'C m FOR -LET- PROFILE SEE SHEETS 38 & 39 — PUE m ✓ FOR -LRT- PROFILE SEE SHEETS 38 & 39 PUE — r PUE FOR-YIRPA- PROFILE SEE SHEET 62 v v m m FOR-YIRPD- PROFILE SEE SHEET 65 FOR -DR2- PROFILE SEE SHEET 77 FOR -SRYIA- PROFILE SEE SHEET 79 FOR-SRYIDY3C- PROFILE SEE SHEET 85 Submittal February 6, 2024 PROJECT REFERENCE NO. SHEET NO. DETAIL 8-1 DETAIL 8-2 DETAIL K ST DETAIL 8-4 DETAIL 8-5 DETAIL 8-b R-5777C 8 SPECIAL BASE DITCH CULVERT INLET BANK STASILIZATION CULVERT OUTLET CHANNEL CULVERT INLET /OUTLET BANK STABILIZATION SPECIAL 'V' DITCH SPECIAL DITCH GRADING Na ro smlel INat to Scalel (Not to Scale, INot to scale, (Not to Scale, IN&to scale, p� ROADWAY DESIGN HYDRAULICS 2.1 ��d N°Nnl N—I ��// ENGINEER ENGINEER Dirch o PI —I \ of Front NaNml Ao`c Slope Ground Ground 3.y D A Dirch a p�° Tuck Ge°tedile `� `F' F\°( Slop Groend 3� D F` uck Ge°texlile' d Tuck Ge°texlila Key Ripr°p into nimum M1N SP '4'P/D \F� SP u Min.D=1.5 F. a Minimum gI1N CM1anneI BOHOm Geotextile g ° Minimum °f1N Channel N EL pY➢, �� Min. D=1.5 Ft. *3:1 BEHIND ITypI ITm) IrvPI (Typ) lace Geotextile Under GUARDRAIL CHANNEL BED N Riprop in Locations , Z"� B=2 Ft. Length-1 k. radablel Length= 47 H. �> Min. D=2.SF1. Each SNe � jvariabrejED D�recred by Engineer 'SEE CROSS SECTIONS Min. D=1.0 Ff. a, b FROM STA. 63+45 TO STA. 66+00 -L- LT Est. 60 Tons of Closs 'I'Rip-Rap, Keyee-In Typa of Liner=CL 'I' Rip-Rop -Keyed-In d=2.5F. Le^eth=ao Fl. FROM STA.66+00 TO STA. 69+00 -L- LT FROM STA. 63+50 TO STA. 77+00 -L- RT FROM STA. 28+70 TO STA. 29+OS-SRYIDY3C- LT b Top of Bank, Es1.24 CY DOE •Place Gewenile Under Riprap Ezt 50 Tonz, Ezt 85 SY Geotextile d=zo - a.o Ft. oo Rn sioe.,���.a e� �a �n o °° A FROM STA.29+00 TO STA.42+50-SRYIA- LT FROM STA. 29+10 TO STA. 31+50 -$RYl DY3C- LT Ebt. 1o5 sY Geotextile m Location: Dir«ted by engineer Est 170 CY DDE B=4.OF. Es1=30 Tons of Class'I'Ripe Rap, keyed -In, 168 SY Geotextile FROM STA.70+50 TO STA. 77+00 -L- LT Y FROM STA. 30+50 TO STA. 31+60-SRYIDY3C- RT STA.13+30 -YIRPA- RT STA. 11+78-Y1RPD- LT STA. 29+10-SRYIDY3C- LT / \ o✓ FROM STA. 32+10 TO STA. 34+60-SRYIDY3C- LT 1 / V TA. 29+ 5-SRYIDY3C- RT 9 FROM STA. 34+60 TO STA. 40+50-$RYIDY3C- LT C \ IV (bz\ '� PERMIT D RAW I N G J FROM STA. 41+50 TO STA. 42+70-SRYIDY3C- LT tb bZ v FROM STA. 10+75 TO STA. 12+00 -DR2- LT l /� FROM STA. 10+75 TO STA. 12+00 -DR2- RT 4� b SHEET 30 OF 89 17 Balfour Beatty' \ 29 C6�v DATE: 1/15/2024 \\ /1� SPEC 2' BA DOCUMENT NOT CONSIDERED FINAL �zy "� ��y� �b2 /lnti) v" �5€1: 6E7AI 8- 29 UNLESS ALL SIGNATURES COMPLETED Q M G \ SPEC 1 co � � � �� � � 50' 25' 0 50' 100' T � _-� SPE 'V' DITCH CL 'B' 62 �� i —J E$T 2 TIONS Q r S DETAIL 8-2 F--E ESP RA T TO `/ ST 7 SY GF O / CL'B'RIP RAP 7 G E C �E E SCALE: 1"=100' � EST 2 TONS M \ LU �l \� 7 $Y GF ./ \ j 62 C Lf.f BANK STABILIZATIO �, 62 ��6z W/C "RIP RAP b2 S DIItH G DI E DET 6-3 2 - s ti 62 ,V SEE E L 8-6 Lo Q _ WOODS w N. 62 m 9 } f— — 6Z N Ty l� Lf .0 ` 29 �) b6N rv6 M/il I P 29 —YIRPA— 2GI s o (n r^ E: 12' BASE DITCH �_ s I�IJEE �ETAIL 8- to l O v �J2q b EC DITCH TDING b� = m 62 SPEC DITCH GRADING e 3 e SPEt�gAITCH GI IN I i �% J LIJ O +� N v `L2� SEE DETAIL F� 71 - Z� e - - - - DETA�8�6 z Q} O - - - = O LIJ = � S 2— 15" = r W I_ m 6x¢e _�e— - —mE — _ � — a �eEo-s e L _ =' _ — — _0� o sz ae �ba me eZ __ = - - — rn8z_ H 2 IQ N-------------- ---- us Eer2a-PAVEaweaswa�___________ — — — — — -- - ----- — — — — -- a U) I ------�'--- _ R�MOVc-- 31 ----------- --- � — — — — — -- J —30 —30— — 4'PJVE9 SIiOl1LOFS3m —30 —30— —30 —30— I N --- -- ---- ---------- ----- 6Z ------ N EMOV jB 4'PAVED SHOULDER IW ti F -- — — — — — — — — _us rv�r�g�u8 zPAve Ro�rvAr_-- --- — _ -- ----- -- W—�— -- --- � --_ — — — s=— I2 — -- =rnT— 9PAVED-StlBtlt9ER — — 29_ _— e /1 2 �28 — 28 --Zz _2@--M 28 r — —L28 — — V' —01 A1— I — — —sue— [Z�J --- 1—----------inl-------------------M—OJ Al-- — --=vim-- a — — — — --------M------- ----- — O Z 9Z _� �_�Z-- ____ 8Z �- __ �_--------- - --------- -0 -- g------___ ___ 8�un- L,{) - _ _ - F- - - - -M- - - - - - Od -- _ SPEC 2` ITCI'r M �J+—Z`iAAbE 10AIN - } - �c��c----- 1 ibz - - - ------__-1xZ----—S—__9ET'4 --�bz —�—'i-----Jill _----M-----N —===03 -- ----- _---------_—_----------——— — — — — — — SITE 8 —— —� — ____—_=_—__ /---ssd-----OAd-- r---- — ssa----------ssE—-21ssr= _— -oin - - - - - - - - - - - - - - - - - — - - - - - - - - - - - - - - - - - - . - .. .. .. .. .. -- -- — — --- nl Od nL ssE L N ULVERT-OUTL���TTT CHA EL WOODS o"I�II I `9 �- a I I m SLOPEI'RP R F (BAN ;II Z9J SURFACE WATER IMPACTS °N�C, U �" cr_' SEE DETAIL 8-4� I — 28 2 bZ 1Ial I I z TEMPORARY SURFACE WATER IMPACTS k \z I �I I � � b �� m m � 31 91 510 0 I I I 4 DETAIL 8-7 DETAIL 8-8 Q n FILL IN WETLAND DETAIL DITCH ST EAM SB X / X� SPECIAL BASE DITCH I G3 I ONO` d TOE_ TOE PROTECTION IN WETLAND AREAS I Nm to Scale, INot to Scale, (Not to Smle) '� I KERN COMA ,INC. > s _ NATORAL SLOPE NONroI Groend' \ °`F\ °e vro�nd 3. 3'� "°"' SPEC v' DI " �09 MECHANIZED CLEARING GRDDND F 3.. "S° �D� 'w� I WeNond Area F` � F\°c slope SEE DETAIL 8- �l Nf^ Ditch SVV4 'x' d GEGTEKTRE �d �.! Min. D=1.5 Ft. c INK STABILIZATION d=1.0 Ft. d=1.0 Ft. I /CL 'TRIP PAP II EE DETAIL e s SEA ERM T D W 9D1Va' Ge°tenle Type of Liner= Class 'B'Ripat°p Type of Liner= CL 'B'Rip-Rap FROM STA. 13+31 TO STA. 13+50 -YIRPA- RT 7 % ROCK CHECK D EET 2 i 8 - EC 'Y'DITCH HAND CLEARING / O o f SEE DETAIL SH SEE DETAIL 8-2 FROM STA. 35+20 TO STA. 36+00-SRYIDY3C- IT FROM STA. 34+00 TO STA. 35+20-SRYIDI RTC�k DETAIL_' EN RG E I I SPEC 'V' ITCH N VEN COU 9 N 9 5 PE 'V' DITCH �P �LTDE1pl 8-2 8 3b� $E :DETAIL 8-2 C n,� SE D .AIL 8C-2 2 6b CL 'B'RIP P 2 I v ))) I ro-3D IN IO P E EST 2 TON a O EST 7 SY G R ti� /� i IGO --- �� c—I==_ -- —ti — _c C IN s' wr ' 10 =16 CFS\ \ / �f Q 2 ELBOWS b � (� \ b 6 / I w �s V10 =1.6 FPS 4 _—SRYlDY3 C� E U LTL�Cl GI " e�E SITE 10 2 LJ IQ / /CL 'B' RIPRIP RAP - 6 y ' B EST 2 TONS / N — —/ a F — -- // WETLAND WRR x I} EST 7 SY GIF `V / c� 2q - (/ Q E I� z� AY HT I b 22 SITES 9 ti PUE o o FOR -LET- PROFILE SEE SHEETS 38 & 39 a DIT H � / 2`a\`� ,g �c z FOR -LRT- PROFILE SEE SHEETS 38 & 39 *� SITE 8 pU 4 UE row / /�z /PUE E 28 PUE PUE PUE b m FOR -YIRPA- PROFILE SEE SHEET 62 I f—lCID CL 'B' RIP .o ,z FOR-YIRPD- PROFILE SEE SHEET 65 c� N STABILIZATIO m EF�DET S- Q $ 5 Y / Cl IP All �J C W RAP N 2 / �ST 8 T S ^ TOE PROTECTION B-D� m FOR FOR _DR2--PROFIEE SEE SHEET /7 EE e s OFILE SEE SHEET 79 WETLAND WG /esr z�s ti CIL'13'LL ROPE�ONLY) pz 2 ' 2 FOR-SRYIDY3�R PROFILE SEE SHEET 85 N WETLAND WF SEE DETAIL 8 8 �J (�" /1 PRELIMIN RY PLANS W NOT USB Po CONSTRUCTION INC®MPLE E PLANS DO NOT USE POR 7W ACQUISITION Submittal February 6, 2024 Submittal February 6, 2024 PROJECT REFERENCE NO. SHEET C. A CK C ECK D STREAM SB BANK STABILIZATION ROCK CHECK DAM R-5777C RW SHEET NO. /CL 'I' RIP RAP ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER 1 ROCK CHECK DAM 10' 5' 0 10' 20' INCOM PLE E FLANS SCALE: it y DO NOT USE FOR 6W ACOUBITION m E �� ,, PDE SPEC 'V' DITCH; CL 'B' RIP RAP PD EST 2 TONS SY G F DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED — _ — PERMIT DRAWING SHEET 32 OF 89 DATE: 1 /15/2024 0 0� o � s 1 oho 0 Cc SPEC 'V' ITCH 15" W/ 2 ELBOWS SITE 8 L Aft N 2G_ 1 15 RCP-IV -SRYlDY3C- m 2G1 29+ O 1@7'X7' RCBC 31+00 W/1FT SILLS 00 cl v DAYLIGHT DITCH 00 jOo0 1 O CJ M \ rn SPEC 'V' DITCH BANK STABILIZA 'I' W/CL RIP RAP PUE \ SURFACE WATER IMPACTS N �\ TEMPORARY SURFACE WATER IMPACTS \ I MECHANIZED CLEARING Submittal February 6, 2024 0 5 10 PROL REFERENCE NO. SHEET NO. R-5777C JRY1DY3C7 1150 1 0 1130 120 To 100 90 80 70 60 50 40 30 20 1 13 20 30 40 50 60 70 80 90 100 110 1120 1 0 1,0 150 PERMIT WIN SHEET 31 OF 8 D E: 1 / 1 5/ 02 WETLAND NVF 17SITE 8 co 0.0 0 0. 20 ME HAN ED CLEA 0 ING 30 � w g :l 2365 14 20.88 0• 01 0.020 0.020 2262 0.59 Z + 0.00 Lo Ln 0.0 0 0.1020 4:7 1 2452 O 0.012 0.1020 1 2248 2589 0.0 9 0.1020 4:1 :7 3.42 2572 0.030 0.030 24.3 1 0 1 0 1 0 140 110 160 0 0 0 0 L50 1 1 20 50 6 go 10 1 0 110 1110 130 1 0 1 0 Submittal February 6, 2024 0 5 10 PROL REFERENCE NO. SHEET NO. R-5777C 3RY1 DUC7 1 0 1 0 1130 120 To 100 90 80 70 60 50 40 30 20 1 13 20 30 40 50 60 70 80 90 100 110 1120 1 0 1,0 150 PERMIT WIN SHEET 3 F 8 D E: 1 / 1 5/ 02 0.0 0 0.1020 24.33 25 39 or ET N W SITE 9 0.0 0 0.1020 L IN WE LAN 3 4 .I M CH NIZE CL RI G 3.5 2a ao a o ET N W 0.0 0 0.1020 s " ILL I W TLA D s w SITE 9 110 M CHA IZE CL wr RIN 2 08 2368 0.020 0. 20 � � O 4 � 3:I 3 3 23.4 1 24 lz 3 + 0.00 0.020 0.1020 a s 3• 21.88 2425 33 + $0.00 0.020 0.1020 M 3: 4.2E 25.01 1 0 1 0 1 0 10 1 0 1 0 0 80 70 0 030 1 1 2D 60 0 80 90 1 1 0 110 1 0 1 0 M o 150 Submittal February 6, 2024 o, 0 n PROJECT REFERENCE NO. R-5777C SHEET NO. ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER IINC®Ng �L E DO NOT USE FOR E �L DNS ®W ACQUISITION C STA 6 + 9 -- LSA 3+ 2. G EL=3 .19 -LR- Y1R A- S E = 9 —O '-O " — 1 RP — DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 3102:1 SK WE 6" BEVE LED HE D AL I 3:1 NO RMAL 3:1 SKEINEC .30 P OP 100 YR — — — —� T LT 4" 3, Exsr BED 1 T ILL PRO S EL 23.7 ICI, BED E EV 20 77 BED WATEF SURFACE 0 TO BE RE h k OV D S (NOT TO S LE) --NOTES: 1) NATIVE CU MkTERIA ERT SHALL FROVIDE BE EEN SILLS A CONTINUOUS It, THE 6.0' CO FR SISTS THE OF MATERIA STREAM BED THAT AT IS EX rHE PROJECT AVATE SITE IS AN UBJE MAY TO BE S PPRO BJECT AL BY TO P THEE RMIT CONDI GINE R IONS. SEP RATEL AND ATTI-VA ATTACHED Y D WELS. 7 0' 'ABOVE 4 NL BA MBER AK FU DF SIL L. S DETERMINED BY THE 1.0' INLET SILL A AND UTLET TB TB SILL 1, TB TB\ TB --- TB 11 ILL — iB PLA VIE 9�3 DET IL DETAIL CULV RT IN ET BAI K STkBILIZATION (Not to Scale) (N t to S ale) I 2:1 N u ow- d 0. D Tuckeotexti ' —KeyRi ra into a Mini um f lft Riprap Ge textile a inimu of 1 P) CHANNEL BED Channel B om(Ty) B (TY ) Lengtl,=41 Ft. (Var able) ngt t. Est. 6 Tons of Cla s 'I' Ri -Rap, Keyed In T pe o Liner CL 'I Rip -Rap - eyed -In in. D=2.5 . ace o ex i e 'Prop E t 170 CY D E Est. 1 5 SY eofex ile in Locatio s Dire ednby nginee Submittal February 6, 2024 PROJECT REFERENCE NO. SHEET NO. ° n R-5777C ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER IINC®Ng pL E E pL DNS DO NOT USE FOR ®W ACQUISITION CL STA 2+ 1 - RY1 Y3 - I E 1 7' 7' CB W 1FT SIL S ° , �� DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 3. 3:1 SKEWED 3:1 NORMAL + �_ Z=-- 4 �L3 La EM D T L " B VE ED HEADIAALL Tn IT TB RT PROP 100 NR B RT 23. O 3 19.7 AIrE RS RF CE ptr)EXS BED C B D LEV =1 .80 EXST BET) 10— SL PE ° C 0 cn r i9 a N 3 E a a LtD (NOI IL TO SC ALE) *N ES: 1) N C TIVE I LVERT ATERI SHALL L B PROVI EEN E A SILLS I CONTR 4 THE UOU 7.0' C FR D NSIST M T1 RING OF MATERIAL E STR CONS THAF AM BED A RUCTION. NATIVE IS E THE P 'AVAT ROJEC ATERIAL ED SITE A D MA BE UBJEC TO ERMIT CON ITION . SE 3 D ARAT N Y AN SET ATT LEVA CHED ON BY D F SILL WELS 7.0 AB 4) N VE ELkNK MBER FULL. OF SILLS DETEWINED B THE Et HEER. 1.0' INLE SILL 11 F AND OUTL SB SILL �T TB SIL _ — — 93 DETAIL (Not to tale) t r ,� N tural oun 1111 roun Tuck Ge textil Key ipr pin Ch nnel I lottom(Tyr) Pin CHANNEL BE Rip ap in Loc Lions Ea h Site (Variable) Directed by E gine r Lemg-Rip-pap tc be I stalle To 2 Outs de To d 2.0 3. Ft. of Di ch Sicpeso Juris iction I Stre ms s= on ot class I a ey - n, s. o ex I e Submittal February 6, 2024 O N � Q F LU L1J Q 2G1-D 00 i U1 j LL]- LU = Z J Al-2GL Q f� V) 1 DETAIL 9-1 DETAIL 9-2 DETAIL 9-3 SPECIAL BASE DITCH SPECIAL 'V' DITCH STANDARD BASE DITCH IN.le Smle) IN— Xale) INor to Smlel -At rurol F-1 1 °' Slope Ground Natural No 1 °T Natural A' ,7. Ground Groand 3.7 p F\°N°r DI pe Groped II ee II D Min. D=1.5 Ft. Min. D=1.5 Ft. Min. D=2.0 H. B=2 Ft. B=3.0 H. FROM STA. 78+50 TO STA. 81+00 A- RT STA. 83+00 -L- RT FROM STA. 77+00 TO STA. 78+50 -L- RT FROM STA. 81+00 TO STA. 83+00 -L- RT O 'ROM STA. 42+50 TO STA. 44+10 -SRYIA- LT FROM STA. 42+70 TO STA.43+57 -SRYIDY3C- LT LTT :ROM STA. 44+50 TO STA. 48+44 -SRYIA- LT FROM STA. 43+57 TO STA. 46+00 -SRY1 DY3C- LT :ROM STA. 48+44 TO STA. 53+44 -SRYIA- LT FROM STA. 47+50 TO STA. 49+28-SRYIDY3C- RT 'ROM STA. 53+44 TO STA. 56+50 -SRYIA- LT FROM STA.49+32 TO STA. 53+90 -SRY1 DY3C- RT FROM STA. 54+20 TO STA. 57+00 -SRY1 DY3C- RT «1 FROM STA. 10+50 TO STA. 13+15 -Y1 D2- LT V FROM STA. 11+00 TO STA. 12+50 -Y1 D2- RT SPEC 2' BASE SEE DETAIL 9-1 — E —; 7 � JL ll��t I zsri.lei-T3- 31tl0 I WOODS 21 I SPEC DITCH GRADING I I I I DETAIL 9-4 PIPE OUTLET CHANNEL STABILIZATION 2H INor ro Xole) (TYP) N-1 Bed Elevmion Grauno� � u�d a Tuck^ eorvxrile r o i " of th Georenile' m% CAannel Bed •Place Gemei. Under Riprop length T Ft. Naeablel in Lorarions oirzned M En9inear Est. 15 of Cl­i�Rap, Keyed -In Est. 30 SY SY 'I' RGeotaNile STA. 49+30-SRYIDY3C- R1 ECJ TARHEEL INVESTMENTS, INC. SPEC 2' BASE DITCH SPEC 2' BASE DITCH SEE DETAIL 9-1 SEE DETAIL 9-1 CL'B'RIP RAP EST 3 TONS EST 10 SY GF E E E E E-------—�—E E- � HW -JK7IH- SPEC DITCH GRADING 2GI - - - - - - - - - - - - - - - - - - - - - - - - - - - - - is ,Bl- - - .Er - �� ni- - 27I - 4-M4A1612 --�— ------ --- ---- --- REMOVE d,bz CL 'B'RIPRAP� ---- EST 2 TO =-- EST ONNNn .H - - - - - ROAOVE z �� --- - - GRASS =SPA NIDQC - - - - SEE ff70L -i GRASS- -�TLF�— — EST 90 CY DDE Y�aETAtt F, / H os ni SPAC�'"hPeD46�`° � I l o <we / F W SEE DETAIL 9 / 2 / / IDS NOIS S / yOV I SITE 11 SEEDETAIL9 2 QVE I CHANNEL STABILIZA ON W/CL 'I' RIP P o KERN COMPANY, A _SEE DETAIL -4 /R 1 0- MArC �. all l 11 HLINE INSET STREAM SC Y\5E { C/WETLAND WQQ / I CL 'B' RIP RAP fC / d/ l of SEE DETAIL q DITCH EST 3 TONS / L EST 10 $Y GF / /// % SITE 10 ��•\�}\-Cj'"1. .on _ 11 \V`fl /1 / �l/ / TIE TO EXTG DITCH w� WETLAND WRR C SPEC 'V' DITCH SEE DETAIL 9-2 I SITE 10 CL 'B' RIP RAP EST 2 TONS EST 7 SY GF E:�L7O��I---------^'---------'^-- l>-]45 rB —�dA-- DETAIL 9-5 SPECIAL DITCH GRADING 4 (Nm . Sm16) 4 J_ ag\1 SP .SEE CROSS SECTION$ N�'' Min, D=1.0 Ft. Q FROM STA. 83+00 TO STA. 85+50 A- RT FROM STA. 80+00 TO STA. 91+00 -L- LT DETAIL 9-6 Z SPECIAL DITCH GRADING 4 (Nar ro Xa16) 4 I o� p .- _ 6- SPA .�q�ge[F SP �Pg�O\E 'SEE CROSS SECTIONS Min. D-1.0 Ft. B= 'Variable FROM STA. 85+50 TO STA. 91+00 -L- RT 50' 25' 0 50' 100' SCALE: 1"=100' DITCH BERM TO EL 26.8 SEE SHEET 2D-4, DETAIL 13 PROJECT REFERENCE NO. SHEET NO. R-5777C 9 IOADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMIN RY PLANS DO NOT USB PO CONSTRUCTION INC®MPLE7W E PLANS DO NOT USB POR ACOU ISITION Balfour Beatty StN' DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PERMIT DRAWING SHEET 37 OF 89 DATE: 1 /15/2024 CL 'B' RIP RAP + E E E EST 2 TONS CO _ R E—Es1zsY GF to O t (o L1J I LLJ Q z 2GI FS, SEE DETAIL SHEET -------FS SEE_------------- --- ----------- ---- W _ O 2D-4, DETAIL 12 J T- '4'PAVEO SHGULBER 15„ - 1 ni - U cy) ------- 3GH — — — I_ LLJ US HWY 70 EBL 2 r PAVER Q � _ -- -- a'PAveo snoumER --- -- 2 JI C� 1 CL 'I' RIP RAP _— GRA55 SPEC DITCH UKAIJINU EST 30 SY GF —SPEC DITCH -GRADING — — — — SEE-�EFML 9=6— -- ------ _SEE DETAIL 9=5 _ ______ _ IlD A\A/IAI!_ — ----- S hWY 70 WBL 24 PAVED ROALWAY — i l _ OF 89 -1 ---- ---- ---- ---- --+-- T— -- U o O ENI AR(LF AAr-KIT ---oe Al- --��--� 6 L: y - d]a .SI - - - - - - - - -1 - - _ _� -�-- --- 3>�--- --_-3 ---- y c > nib- --- -osn - � � ''��� {f M/tl 9NI151X3 XI ya c IA r Io-II- DUE A DUE DUE �UE DUE UEro IIA UE� II n I I —mDUm DUE I ro UE SPEC 'V' DITCH I L9 I SPE{ 'V' DITCH 6 I III 0� . WO5E9 DETAIL 9-2 I 4 CS I SEX Woods i I I a p III doNVO adsl I iI I a1N I II I I c� OaSI a I I 71" I III X I ENO e I I III I 3SnoH I I % Q I I L as I dwna I "9 X aivs/ S I * El p WETLAND WI I ROY M. ROY M. X a1N E80RN, EEORUX EBO N ET UX UX SURFACE WATER IMPACTS UTHIT, P. DOERNES ET UX MONTY A. CAMPBELL. ET UX TEMPORARY SURFACE WATER IMPACTS FILL IN WETLAND u WETLAND WRR WETLAND EXCAVATION ID CONSTRUCTION 02— STA,l3f15,0/ HAND CLEARING FOR -LLT- PROFILE SEE SHEETS 39 & 40 FOR -LRT- PROFILE SEE SHEETS 39 & 40 FOR -SRYIA- PROFILE SEE SHEETS T9 & 80 FOR-SRYIDY3C- PROFILE SEE SHEETS 85 & 86 FOR -YID2- PROFILE SEE SHEET 89 Submittal February 6, 2024 O Lo INUJ � co LU Q= iv O PA w w- LU = Z Cn U 0 — Q L� Q _ H — 1 J -- I Ja 9& DETAIL 9-1 DETAIL 9-2 DETAIL 9-3 SPECIAL BASE DITCH SPECIAL 'V' DITCH STANDARD BASE DITCH IN. re Smle) INot ro S<ale) INorro Smlel Freer DII Naruml Fronr -L '\ �r Slope Ground G—d Ground 3. !'� u< D.h Naruml A' ,7, J G�;\ Ground 'Y I eeDII F\off°r clone G—d 3.7 D F\�er D Min. D=1.5 Ft. Min. D=1.5 Ft. Min. D=2.0 H. B=2 FL B=3.0 H. ,7 FROM STA. 78+50 TO STA.81+00 -L- RT STA. 83+00 -L- RT FROM STA. 77+00 TO STA. 78+50 -L- RT FROM STA. 81+00 TO STA. 83+00 -L- RT O FROM STA.42+50 TO STA.44+10 -SRYIA- LT FROM STA.42+70 TO STA. 43+57 -SRYI DY3C- LT Ln FROM $TA. 44+50 TO STA 48+44 -SRYIA- LT FROM STA 43+57 TO STA 46+00 -SRYI DY3C- LT DETAIL 9-5 SPECIAL DITCH GRADING 4 (Nmm s<nle) `sr� ~✓�RYge<E N sr .SEE CROSS SECTIONSMin, D=1.0 Ft. ^ eN FROM STA. 83+00 TO STA. 85+50 -L- RT / FROM STA. 80+00 TO STA. 91+00 -L- LT m PROJECT REFERENCE NO. SHEET NO. R-5777C 9 tOADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMIN RY PLANS DO NOT USB PO CONSTRUCTION INCOMPLE E PLANS DO NOT USR POR 7W ACQUISITION FROM STA.48+44 TO STA. 53+44 -SRYIA- LT FROM STA. 47+50 TO STA. 49+28 -SRYI DY3C- RT STA. 49+30-SRYIDY3C- RT DETAIL 9-6 7 FROM STA.53+44 TO STA.56+50 -SRYIA- LT FROM STA. 49+32 TO STA. 53+90 -SRYI DY3C- RT SPECIAL DITCH GRADING FROM STA. 54+20 TO STA. 57+00 -SRYI DY3C- RT «1 FROM STA. 10+50 TO STA. 13+15 -Y1 D2- LT 4 (N.— scale) V FROM STA. 11+00 TO STA. 12+50 -Y1 D2- RT I /�0 8Z r v --$F— •�A�qe[ D NPR'�0`E StN sr r— J/IJ Balfour Beatty �'2g DOCUMENT NOT CONSIDERED FINAL �� �' / 'SEE CROSS SECTIONS B_n. D� floa61e. �� UNLESS ALL SIGNATURES COMPLETED FROM STA. 85+50 TO STA. 91+00 A- R7 '\Bz PERMIT D RAW I N G Q, 2� o so< boon CJ TAI; EF,L2 VESTMENTS, INC. ®2 / Q^/ 2q - SHEET 38 OF 89 SPEC 2'BASE DITCH ��jj (Zgb ABASE DITCH UUVJJ cL B RF ns� SCALE: 1"=1o� `+J \) SEE DETA{C"�1� ,Lid SEE DETAIL 9-1N�' `� �� DATE: 1 /15/2024 `\\ "V \ ^ ^ ITC ERM TO EL 26.8 N� ti I B 2 �ON." EE S ET ZD-D€fAIL 13 EST 3POST1 �g� E ®ZE yy �N} m�� �L'B'. RAP �28� Z + �T E �2 EYT 2 T N$ (fl q 2 ti R E E GF pp 2 28 Lr) O tee E� Q 0 HW g2 N �\ t - 0c , 3 (--\ - I- mREMOVE_ --- — — — -- (� WOODS CH GRADING 9 s E � [INIIii EST 90 CY DDE - SEEbETAtt V--T 2GI SHEET -------------------- — —--— —T— �-W� - — — — — — — — — — — — — — — — — — — — — v US HWY 70 EBL 24'PAVED -- ---- --- __ --- -- SHOHL9ER-- 2a —t7r RIPyfAP--- BZ -SASS— SAC BITCH OZ -- -- —SPEE 9HEH-GRABIN� ---- �sEE�EFML�=6— -- — - EST 30 SY GF'� _SEE DETAIL 9=5 ---_ __ __ ___------------- 7" S HNY 70 WBL 24 PAVED ROPL4✓AY — — — — — � --Ali--------- - $PEC^""W'IYIFC Ut SEE �DET� L 5 2 � N01$ S oU��+ SITE 11 J �_27 ti EECDETAIDLI CHANNEL TA IZA O ) KERN COMPANY, 1 _ EE DET R Vol Mqr ig . l 'RUNE INSET STREAM SC cP�4� r=(kND WQQ CT� \ ; ,lW. CL 'B' RIP RAP [ �a ' I / (ll EST 3 TONS PST 10 SY GF , o 0 I I 2 " � J 00'Og WETLAND WRR E W SPEC 'V' DITCH SEE DETAIL 9-2 / SPEC LAT 'V' DITCH of - EE DETAIL 9-2 SIT 10 ITO E G DITCH 121 E LAND WRR ID CONSTRUCTION rny�yiw�ss�.�r�� W LU ti I LU <` Q = L11 O + LCD f LLJ Lij Q U) 2 -- t t --- U o 0 cM O --_ LnW LU U) U 2 I a 11W I �I I I `a 2a 2 r ICI to zl DUE DUE DUE DU UEro IIA UE II ^p�m DUE ro UE ECLIrcH I VV 4 2 . SEi: DETAIL 9-2 i 4 CS �j II SERE nH1 6aOalaasl r l l Q / JI, I I bz I a _ — — - 3dAnd II I. aivs/ s I I Las I e /l] Na JJx I * ❑ ND p ale ROY M WETLAND WI I ROY M. ROY M. x EBORN, EEORN,T UX EBO N ET UX LIX SURFACE WATER IMPACTS UTHIT, P. DOERNES ET UX MONTY A. CAMPBELL. ET UX TEMPORARY SURFACE WATER IMPACTS FILL IN WETLAND WETLAND EXCAVATION FOR -LLT- PROFILE SEE SHEETS 39 & 40 FOR -LRT- PROFILE SEE SHEETS 39 & 40 HAND CLEARING I FOR -SRYIA- PROFILE SEE SHEETS T9 & 80 FOR-SRYIDY3C- PROFILE SEE SHEETS 85 & 86 FOR -YID2- PROFILE SEE SHEET 89 Submittal February 6, 2024 Submittal February 6, 2024 0 5 10 PROL REFERENCE NO. SHEET NO. R-5777C Y1D2-1 1150 1 0 1130 120 To 100 90 80 70 60 50 40 30 20 1 13 20 30 40 50 60 70 80 90 1 0 110 120 1 0 1 0 1 1 0 PERMIT WIN SHEET 40 OF 8 JDATE: 1 / 5/ 02 a ti W w 3 0. 11 0021 :J 2.7 24 21 O FILL IN WET N SITE 10 A-A24 0.0 8 .020 AN CL RIN 23.19 51 2 .10 FILL N ETLA D W SITE 10 4: 0.040 0.04 LIN HAND CLEARING 23. 4 2493 23.30 o � XCA ATIO WE LAN SITE 10 .� 0 4:) 3.. HAN CLEARING 24.0 2 10 23.5 o 5 � ti w 30 04 0.440 % ;1 11 2744 + O O 24. 5 24. 0 0 w Q ti � D.02 0.023 4:) 3;) 2 10 25.00 10+ 0. 1 0 1 0 1 0 1 0 1 0 1 80 70 60 0 40 301 1 2 30 40 50 60 0 80 0 100 110 120 1 0 1 0 1 0 Submittal February 6, 2024 DETAIL 10-1 RIP RAP AT EMBANKMENT I Nato style) DBeb 101rom. Grace ,.o•roie. 1.5' Place Geole,t Under Riprap in Locations Key Rip— ii- Directed by Engineer Channel—..(T.) Type of Liner= CL T Rip-RaP, Keyed -In STA. 60+05-SRY1A- LT STA. 60+15-SRY1A- LT m DETAIL \ \ I SPECIAL BASEE DITCH I (Not to Scole) N NaNrol \ Oc Front m m Ground 3y A' Dith sl D F\hoc Slime I . Min. D=1.5 Ft. B=2 Ft. FROM STA. 56+50 TO STA. 60+03-SRY1A- LT FROM STA. 60+13 TO STA. 61+24-SRYIA- LT FROM STA. 69+65 TO STA. 70+50-SRYIA- LT FROM STA. 63+30 TO STA. 69+75-SRYIDY3C- RT ECJ TARHEEL INVESTMENTS, INC. SITE 12 RIP RAP AT EMBANKMENT I EST 42 TONS, EST 60 SY GF SEE DETAIL 10-1 PEC T 2' B SE D I r- N SPEC 2' BASE DITCH f— CL 'B' RIP RAP E LL1 _ -----CE U_I EST 7SYY GF W. L Q w -- L ; DO NOT SPEC DITCH GRADING BURY INVERT O SEE DETAIL 10-4Lo — N + o0D (.0 If) - I U) C 2GI --- II RAWING — -- O — UQ U5 REMOVES G J N DETAIL--- _ C DITCH GRA�G—� �_ — �3EE-DE1•AIL 10-4 -- � i - - -G ASS w - REMOVE RETAIN PROJECT REFERENCE NO. SHEET NO. 50' 25' 0 50' 100 R-5777C 10 ROADWAY DESIGN HYDRAULICS SCALE: 1" =100' SURFACE WATER IMPACTS ENGINEER ENGINEER /8 / / woods PRELIMIN RY PLANS DO NOT USE MIL CONSTRUCTION INCOMPLETE PLANS Noll� Balfour Beatty StN N on m UNI ET STATES OF AMERICA (CR TAN NATIONAL FOREST) D o sz / / oS G7 � 5 ❑ Ci y aNnoae Atlld / DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED UNITED STATES OF AMERICA PERMIT DRAWING W ONQ l N I lanoa l V55Va9 (CROATAN NATIONAL FOREST) SHEET 41 OF 89 STREAM SD — — REMOVE DATE: 1 /15/2024 g CROATAN PRESBYTERIAN CHURCH J lJ ( CpETA a C) f3 fJ Q Q m m W � / Il C l� SEEI 10 3 C3 — El EST 5 TO R EST 1 SY GF I / / Q F I Ji .11� \ ��� —11 SPEC 'V' GRASAAREAARKING .e£oD DITCH sz•ob.lez-1B- SPEC 'V' DITCH SPEC 2' BASE DITCH SEE DETAIL 10-2 °81 pityE HW C E __ SEE DETAIL 10-3 Nory M/a s oaz �\ E ER SEE DETAIL 10-3 T E E WO $ 0 as ,a0 an / 8^ E F —F -- + as' 96ssz- _WOOD $ / £L Zfab Nory M 1T-� - IS . � � < < > > C) -Mi---- — _— -- --- --- _ MH JN C0 LU 2G z-- — ------ f _ _ _ —— --------- --__—M___ i `Q ((�W -7 T3 ---------a-----l3 —s---M--- _-- --_- l d T- - SPEC�ITCH--GRABINC =--__� NMONNNn ON, SEE DETAIL 10-4 -- -----L-----------—----u�->rr-E SPEC TDfPC'H-G RANI - - -oj ni- - - i 40TCB M 1 Zq - - -- I FS, SEE DETAILSHEET - 70 ESL �VED 24'P ROADWAY 4' PAVED SHOULDER — � = A LU - �d B4T __ Uj ----------- ---- ---���__ �_--���-- TW DETAILTO -__.. � 1 c --- _ 0 A �WABL�FFI-- -----DITCH --__ 4'PAVEO SHOULDER S� J FL L{�lLL _ _ ...,. SEE DETAI-------- -5€E.UETAil-4=—_— EMO RVE ~ O — — -Lo - t - - - 2GI - - - PAVED SHD(iLDER — 70 ��� WBL 24=PAVED Fq�PINR#LE FILL Q 2 4, AIL 11 - 1tEMOVE -- REMOVE, dy REMO --- ��_- - _ 2GI-A _ _- Sad V =- M_-- _ -- — -- - - SITE 12 a — — �� — — — - __ _ — — _ _ __ �nr ONNNl1 ,8- v 0 -- - n3835n , n ICI 40TC X JE E . /DUf D fU .� p ab a I E )U€ \ -5 GI Q `� � DUE DUES - _ %' ++ ` / — ar+rR-n UE I Du II ozl II' O� X I IdESt ITS tl1H f'� CLD'B'RIP P DUE — DUE N a,el - LLl NDUE I dWtlif rr I I ✓ 1(11 BZ 2 , SPEC N' DIT \ EST 110 'ci' EST 2 TO S h I d •SI >- (•U Q I II dWtl2), I OMSPE H I I I 131Od ° z SEE DrIL 2 I o I EST 7 SY F I U tr ^ v OM S ETAIL IO-3 9tl4i M.9£ �" I AdONVJ (~!) I Q °j5, I RETAIN `\ d1H I, w m X N JJ X SITE 13 Ic h U m D� I ) co� p=Sl 1 \ 1 SCEC ITCH I fl J D T 10-2 E=ANNEL STA 1 ION FALLOW STREAM SD - \ X I© I— E rC r I C7 V I X T—N 6A SEE EA I ` 1 p NOJ f3 n� I m STREAM SP M / °$ KENNETH WENDALL 1 I I / mI I TYLERW z CONNOR, ET UX S N° I L �6i�ER Y AMOS W. o 1 \ CONNOR IV, SEE PERM) RAWIN K ET UX - SHEET OF 89 a I \\ FOR EN RGEME T �PEC TB E DITCH '''���///JJJ, SEED AIL 10-6 > ENJAMI 1 \\ B , / LEE it DURWOOD of NI \ \ \ 3n0a1erv,o I m LAURA C. / AMOS W. CONNOR o m EBORN RAY MALINA / LAURA C. I IV ET UX DETAIL 10-3 DETAIL 10-4 SPECIAL 'V' DITCH SPECIAL DITCH GRADING (N. to scale) 4 (Not to Smle) 4 Front I � I Ditrh Nat rot � !'� Oc Slape -^ Ground 3.T D F\oP`Oc ` sP� aN,R/, D \P0\E• sv BlP JNF Min. D=1.5 H. 'SEE CROSS SECTIONS Min. D=1.0 Ff. FROM STA. 10+00 TO STA. 11+38 -Y2- LT FROM STA. 91+00 TO STA. 99+00 -L- RT FROM STA. 62+00 TO STA. 65+30-SRY1A- LT FROM STA. 91+00 TO STA. 94+00 -L- LT FROM STA. 66+30 TO STA. 69+65-SRYIA- LT FROM STA. 95+50 TO STA. 105+00 -L- LT FROM STA 57+00 TO STA 60+00-SRYIDY3C- RT FROM STA 103 0 TO STA 105 00 L RT DETAIL 10-6 LAURA C. MALINA MALINA ' SPECIAL BASE DITCH DETAIL 1 GRADING / (Novo Scale) SPECIAL DITCH GRADING I 4 (Nat to scale) � Natural oI Front D —. Ground ,7.7 w Dkt, `— r `� VE / D FMi slope C qR \P0 5P e I alp JPg �. I Min. D=2.0 Ft. B=3.0 Ft. 'SEE CROSS SECTIONS Min. D=1.0 Ff. 1�.1 B= 'Variable FROM STA. 70+30 TO STA. 71+00 -SRY1 DY3C- RT FROM STA. 91+00 TO STA. 91+50 -L- RT / FOR -LLT- PROFIL EE SHEETS 40 & 4/ FOR -LRT- PROFILE SEE SHEETS 40 & 41 FROM STA.61+90 TO STA.63+30-SRYIDY3C- RT +9 + -- STA. 69+80 -SRYIDY3C- RT FOR -Y2- PROFILE SEE SHEET 65 �B anJ FOR-SRYIA- PROFILE SEE SHEET 80 FOR-SRYIDY3C- PROFILE SEE SHEET 86 N N f� 8� t � —28- J,,m �N �}lit l // g2 DETAIL 10-2 L r SPECIAL BASE DITCH \ g2 (Not ro Scole) Jai Ground 3/ A' D'RCh `) Slope J BZ I B Min. D=1.5 F. ylliu(I B=2 F. FROM STA. 56+50 TO STA. 60+03-SRY1A- LT 'Jg 26� FROM STA. 60+13 TO STA.61+24-SRYIA- LT Z ` FROM STA. 63FROM STA. 6`9//30 T��-O]]]] STA• 69+07550SRYiD \CURT v —� ECJ �TATaL INVE23,AEfJ , IN6J f SITE 12 zg < RIP W AT EMBAN ENT EST�d2 TOISEEES-q6 Y GF ETAI a PEC 2' N PEC 2' BAS I H �L'B' IP RA 26�7� E—��U'—�-- LL1 E LLI CE E SY L L DO NOT BURY INVERT SPE DI H GRA ING 8 SEE DETA 10-4 + \� Lo Q — .. LLJ O __ — LLJ U Q W _ sm-RF:MiOVE� _-- �C RhDIIIiIG G J _—�� DETAIL 1 _Z — _ C DITCH GRADi1HG-- MUEf—ILL10=4 Submittal February 6, 2024 IF— ( y �ti —� 2>------� 2B PROJECT REFERENCE NO. SHEET NO. n \ R-5777C 10 / 5O' 21, O SO' ' 100r ROADWAY DESIGN HYDRAULICS hThftu ENGINEER ENGINEER 27 l l /Il S SURFACE WATER IMPACTS SCALE: 1"=100 �, � "� // % by 2s /g I/ w000s 41 RETAIN / �8z�— TEMPORARY SURFACE WATER IMPACTS �9 Balfour Beatty � ED S A T OF AMERICA N / o os e � awn01V z T(� ❑ /ll� 9�f �j DOCUMENT NOT CONSIDERED FINAL TAN AIATION L FOREST z ti 5 Atl,d ,�/ [ Zr3 �s UNLESS ALL SIGNATURES COMPLETED --- I ��` gti PERMIT DRAWING N I lanoa �, UNITED STATESe& AMERICA s) Its STREAM SD / — ' /� ON� �1l\ „dssda� g� /O �CROATAN NATIONAL FORES�) 26 SHEET 42 OF 89 Clbe boo \ I —J / z 9 ®ti REMOVE / / /� h 3N/el I_—�— 2� �—� DATE: 1/15/2024 / CROAT,�N PRESBYTERIAN CHURC 26 O ny� 0 / ( SrI1(EC' 'V' TCH C SEE BETA 10-3 i Q w YZ 9d' /' E I I GRASS PARKING SPEC 2' BASE DITCH m EST TONS J AREA � (\\\ EST 1 Y F / / &U F I\ �� N ] 62'Ob£19Z I13- SPEC 'V' DITCH G Z1� SEE DETAIL 10-2 5/ / PEC ' ' DITCH \ QC E EE DET 10-3 Nory Mia SEE DETAIL 10- ^' \ \ ��- wo �2 S2 1, S O as aD P III s oaz B^ m E E E E_� i SLIO oos / I/ sL rvortbx, Is F -- --- 27 � W w —------_—_ z-- -- --- _ — �25 l33 .9co NMONNNn Ury� 0F.-� EPEE-BFTCY1-GRkDiNG'--- _� - — —i — SEE DETAIL l�:�i 4 23 3E€ I cc•SEE-DE7SHEET _ 27 ROAOINAY ��== _ W W = co _ �— S� J �WABLE-FILL� -- --- DIT GRABINi3-� m 4 PAVED SypN�pER v rj FL LEFT = O �5— _ 0 LL—FMy 70 WBL 24=PAY=D Z ¢ O —GisADu G 4 FQ 1tEMOVE -- REMOVdy Ldtl _ — — � — _ co REMO�--- --� _ _ — / - — -7TOVE - _ DFA — _ — _ — — — — _ _ —sse _ — �� 1 J LU SITE 12 co 3 ICI aoT X l�E Q DUf sZ (U .- � � DUE —="' ' _ _ � � � e I _ i E LI€ I _ - dL IP P �a1N DUE�DUE �N DUE `- F- I DU /fir — ON00 I I I ES T $ N DU W NDUE w I I (� dWOtla I I NI ✓ ; BZ I SPEC LIT \ EST I10 CL 'B' RIP P E dWtl2L. I MSP H I I I 3lOd 0� z SEED AIL N I EST 7 SYO F LJ n SI Q= OM S ETAIL IO-3 O'tl�d M.a I� II I Od51 I RETAIN N `. I `\ al 5 II AdONWVJ m I JN JI X—� I m I SITE 13 Ic f I co co ads) 1 I \ 1 Ee ITCH J I CD a ( / l I D�1E 1 p C D T 10.2 fl U ET CHANNEL STA I ION NG N ��� 7 STREAM SD II \ ti uNln� / I© FaL ow i E see e A I3 I - MM FOR LARG MENT �I I STREAM SP Q0 V I � KENNETH WENDALL r 1 ` �� I MATTH W z CONNOR, ET UX S >Ia l L I TYL R p \ o J Antos w. SEE PERMI RAWIN R \ COET LI IV, _ K I w1 ET ux �I SHEET OF 89 wl aI \\ \ I FOR EN RGEME T PEC 3' B E DITCH W - 1 I— SEE D AIL 10-6 1 w � > � BENJAMI w �6 LEE �' it DURWOOD of w \\ \ B 3naalerv,o ,,'m LMAL NA o EBORN RAY, ,... ,,,• 1 / LAURA C. I IAMOS W. CONNOR IV ET UX DETAIL 10-3 DETAIL 10-4 SPECIAL 'V' DITCH SPECIAL DITCH GRADING (Nw to..I.) 4 (Not to Smle) 4 Froal I � I Dikh Nat rol � !'� Oc Slaps E -^ Ground 3./ D F\oP`Oc ` SPA ap,R/, D \P0\' Sp BLe .1r0. Min. D=1.5 H. 'SEE CROSS SECTIONS Min. D=1.0 Ff. FROM STA. 10+00 TO STA. 11+38 -Y2- LT FROM STA. 91+00 TO STA. 99+00 -L- RT FROM STA. 62+00 TO STA. 65+30-SRY1A- LT FROM STA. 91+00 TO STA. 94+00 -L- LT FROM STA. 66+30 TO STA. 69+65-SRYIA- LT FROM STA. 95+50 TO STA. 105+00 -L- LT FROM STA 57+00 TO STA 60+00-SRYIDY3C- RT FROM STA 103 0 TO STA 105 00 L RT PRELIMIN RY PLANS W NOT USE Po CONSTRUCTION INC®MPLE E PLANS DO NOT USB POR �W ACQUISITION DETAIL 10-6 LAURA C. MALINA MALINA ' SPECIAL BASE DITCH DETAIL 1 GRADING / (Nw to Scale) SPECIAL DITCH GRADING I 4 (Nat to Scale) � Goes 3./ D ee a<a rroat D f\� Slope ` SPA •y4R \POSp / I e I dip NPs' �L\ Min. D=2.0 Ft. B=3.0 Ft. 'SEE CROSS SECTIONS p Min. D=1.0 F1. V�.1 B= 'Variable FROM STA. 70+30 TO STA. 71+00-SRY1DY3C- RT FROM STA. 91+00 TO STA. 91+50 -L- RT / FOR -LLT- PROFIL EE SHEETS 40 & 41 FOR -LRT- PROFILE SEE SHEETS 40 & 41 FROM STA.61+90 TO STA.63+30-SRYIDY3C- RT +9 + -- STA. 69+80 -SRYIDY3C- RT FOR -Y2- PROFILE SEE SHEET 65 �B anJ FOR-SRYIA- PROFILE SEE SHEET 80 FOR-SRYIDY3C- PROFILE SEE SHEET 86 Submittal February 6, 2024 Submittal February 6, 2024 Submittal February 6, 2024 Submittal February 6, 2024 PROJECT REFERENCE NO. SHEET NO. R-5777C 200 0 0 0 ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER IINC®Ng1�L1E DO NOT USE FOR ]E ]�L.�NS ®W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED CL :aLMI" STA R(2-�SIQT 9 + B11RIEm L- I SITE -12" I --�C: —M A - 1-51 1. E. -102 CL S + 8 SRY A- C ST 0+ 4 SRY DY C- P GIP / 24' RCP 1" P 54" Rcp WS =19 .0 HD E NV 18 r Jg B LID TOP= 4.2 GI 17. 4 I T V B 16. 1@ 0' RCP INV Submittal February 6, 2024 DETAIL 17-2 DETAIL 17-3 N / DETAIL 17-4 DETAIL 17-5 PROJECT REFERENCE NO. SHEET NO. DETAIL 17-1 R-5777C 17 SPECIAL 'V' DITCH SPECIAL BASE DITCH SPECIAL BASE DITCH m CULVERT OUTLET BANK STABILIZATION CULVERT INLET BANK STABILIZATION (N.-smle) (Nofo Scale) (NON. scale) y 1Nofw Bcole) (N. to Scale) ROADWAY DESIGN HYDRAULICS on�n er ,,.* ENGINEER ENGINEER Nowrol A'� pzoe Slope NaNrPI p.\ oT From Nawral \ o<ot Fmnt I / ,q"P �ti^ d• �.•'° L aye tnA L Ground 3Dikh Gropnd 3� A' Dtkh l/l ry •%' Tuck GeofeMila Tuck -i=e le Gropnd 37 D F\ I D F\gz SIaPe / D Q\3h SIoP ti o Minimum of 1N o Minimum of 1N Key Rtpmp im pTYPI Key RiprPP �^f (TT) Min. D=1.5 Ft. Min. D=2.0 Ff. �, Min. D=2.0 H. Channel eonom lace Geme.lile Under C'.. .1 Rpnom Place GeoreNne Under '3:1 BEHIND B=2.0 Ft. B=3.0 Ft. •wo-a°P ro R5 ° II - o-RaP ro b. Inner I Riprap in y Ec g nz - ^ ED Riprop in LomNonz (TM) CNA N W Direned by Engineer fTYPI CHAN EL oriob eR ° ebb ED - Dinned by Engineer Ip FROM STA. 25+85 TO STA. 29+50 -SRY48- RT GUARDRAIL m m d °3+o n0 H. of one. sI„„ .a ro zN o°r,Ia. T°v Length Ft. Ff. � ro zeo�r.Ia. T°v qQ 0� Fsf.=18 Tonz of Class I Rip Rap,,keye �I sr..am° p p y �rrme°I sr.°am° _.y N ry ) FROM STA. 25+80 TO STA. 31+70-SRY48- LT FROM STA. 199+00 TO STA. 202+50 -L- LT FROM STA. 27+50 TO STA. 30+30-SRY3DY4 RT 8� FROM STA. 20+00 TO STA. 25+70-SRY4B- R7 FROM STA. 203+50 TO STA. 207+50 -L- LT �, d I Est 46 BY Geote file @t.-20 Tonz of Clazz 'I' R' Ra ke d In, Est 33 BY GeoteMile ter. FROM STA. 38+00 TO STA. 40+50-SRY3DY4C- RT I1 STA. 25+78-SRY4B- LT 25+75 SRY4B- RT ) 1 o ' T- w S SURFACE WATER IMPACTS H' w r m m m W -TEMPORARY SURFACE WATER IMPACT M/a aaJN NrvI151x3 o � o = STREAM SF — SEE PERMIT DRAWING PRELIMIN RY PLANS W NOT USE Po CONSTRUCTION INC®MPLE E PLANS DO NOT USB FOR, 7W ACQUISITION DETAIL 17-7 CULVERT INLET CHANNEL 1 Nol to Scale) Nalprol Nawml 50' 25' 0 50' 100'� Gropnd 37 D 9\ G,apnd Balfour Beatty LTprk Geotext le - GeotexKle g ° Mim'I of le SCALE: 1" 100' DOCUMENT NOT CONSIDERED FINAL Ke In Rip -Rap per Sfd. Dw 876.01 Min. D=2.OH. UNLESS ALL SIGNATURES COMPLETED Type of Liner= Class 'I' Rip -Rap B=4.DFt. PERMIT D RAW I N G Est. 80 Tons, Est. 170 SY Geoterzfile Est. 45 CY DOE CNN_ _ FROM STA. 30+30 TO STA. 30+95-SRY3DY4C- RT 1 1 SHEET 4 7 O F 8 9 Q _—� 0 NMONg \� SHEET 49 OF 89 DETAIL 17-8 \ NN I N SPECIAL DITCH GRADING e �- �NNN�,B _ FOR -E RGEMENT 4 IN—. �e°Ie) F Cc�,�uL�VvEe�RTQO�UITTLLEETT _ DATE: 1 /15/2024 --� _"- \\ \ \ - \- _TTN WR"51'nBi[I77.7'*- /CL T RIP IA 1 w��Is. 1 \\\\ \\\ \ \ SEE DETAIL 17-4 WOODS MICHAEL D. HARDISON, ET UX `5P E 'SEE CRO55 SEj - \ ��\\ \\\ \ \ \ r FROM STA. 199+00 TO STA. 203+00 -L- RT C I 1 \ \ \ E ro m FROM STA. 207+50 TO STA. 212+00 -L- LT FROM STA.204+00 TO STA. 212+00 -L- RT MICHAEL D. /HARDISON, ET X NC DEPT. OF TRANSPORTATION N \\� \\\ \ry _\M S C \�\ \\\ e o F FILL IN WETLAND Q ROBERT D. FISHER SPEC 'V' DITCH WOODS SEE DETAIL 17-1 \ \ F SPEC 'V' DITCH m \ \ $EEDETAILI7-1 MECHANIZED CLEARING ROCK CHECK DAM N SEE DETAIL SHEEF 2D-4 Fsbs:os �T3_ DETAIL 9 \ CULVERT OUTLET CHANNEL W/CL 'TRIP RAP (BANKS ONLY) SITE F \ \ V SNNVi SLOPE =0.30% CULVERT INLEF C EA OVG �\ / REMO� ` b0 / ,pS,F DETAIL 17-6 (BANK STABILIZATION d� �,y\ '\ o \ \\ Q O sMislx3 W/CL'I'RIP RAP N3 a X \ / SEE DETAIL 17-5 SPEC 2' BASE DITCH ODS31 V0 Sf18 SEE DETAIL 17-2 ®gl CL 'B' RIP RAP PEC 'V' DITCH \\ \ q� / - 0€ E57 2 TONS EE DETAIL 17-1 �- \_ EST 7 SY GF _ \ \ \� \ \\\SN1slk\ / /SPEC 'V' DITCH o lse WILDLIIiiROGNYG \ \ � \ / /SEE DETAIL 17-11 GRADE TO ENTRACE n REA(py�= ��=_ .\,� TIE TO EXTG SPEC 2' BASE DITCH CL 'B' RIP RAP _ I I'b o Tlw SS8 DITCH SEE DETAIL 17-2 EST 2 TON$ \. RE Jy I 1 d JN EfPU FGRASS EST 7 SY GF �� - - oc 0_ O - \ \ , \o \`• - - s eN six) W O 0 _ �ELBO - _ s — C. \ b N d O bd JI - % - - - - - - - m 00 DITCH GRADING r 1 N Q w --- __=_�_��1@TxTRCB .--Y-_��-- - n-- ETAILI - - U) Q � SSbb.O rr- (n-01 Al_---- = ABLE FIL �Z`� 10 --- SEE DETAIL 17-8--- --- ---- _- LL.I+ CD y =N� 2GI _ �_ w(1s/ �S --___ ---_—_ _ ___ UQw �U 2GI 15 2GI E - _ - - - - - - V10=1.6 FPS -'�/R_ �NLAACI F4 -- SPEC DITCH AD -------- -- -- —S�aD Q�= QN I� SEE = i% _ - 2GI - - - - _ _ _ �� SEEbETML==g---------- -- CV LLI n7 �- < L F U) 18" RCP -III s 2D F - - i- �NNN/7 Uc) _ _i- - /-- QO� C > * -- - - ------ �� CL 'B' RIP RAP EST 3 TONS }QLL, UE�10 SY GF I I — — 03 - a ONR x W�� DUE DUE DUE DUE DUE c I DUE lUELj� DUE cL, TIONSP SPEC VNIYMCH m - DUE DUES Y SPEC 2' BASE DITCH SEE D J \ T 7F 7F T I EST 7 SY GF CL 'B' RIP RAP SEE DETAIL 17-10 1 'ssI SPEC 2' BASE DITCH I SITE 15 DAVLIGF� DITCH W G 2 • - _ SEE DETAIL 17-2 SPEC 3' BASE DITCH \TT�.. ESTT7 SY NS GF U"1 E T D IN N 8/a SEE DETAIL 17-3 CULV T INLET CHANNEL s\�ITF7FWFLDLITE CTOSSING A ) I ELT III/CL 'I' RIPRAP (BANKS ONL p �N7 —(FM PROTECTION �LbP�Q2 T (FR'L SLOPE ONLY) $EEDETAILI7a SEE PER QRING-CL'B'RIPRAP WETLAND EXCAVATION p EST 2 TONS TIE FROM J3 1 SHEET 1 O 89 EST 5 SY GF UNITED STATES OF AMERICA EXTG DITCH fC FOR ENLARGEMENT SEE DETAIL 11-9 (CROATAN NATIONAL FOREST) \ r WETLAND WJ 7- HAND CLEARING 1 W00D5 DETAIL 17-9 \ \ Q TOE PROTECTION IN WETLAND AREAS DETAIL 17-10 DETAIL 17-11 \ \ Nof fo scale) SPECIAL 'V' DITCH SPECIAL BASE DITCH - �\dos IN— to $wlel \ s FOR -LLT- PROFILE SEE SHEETS 48 & 49 DkIt Nawrol GrounN 3'�\�'\off Nawml A'� oso< Slope \ \ wenand aea � t Nmpml \ From FOR -LRT- PROFILE SEE SHEETS 48 & 49 Gropnd 3.7 t•\�`+ \ d Gropnd 3.7 D F\°' 0id FOR -Y9- PROFILE SEE SHEET 77 D \ Slope Min. D=1.0 Ff. \ a=1.o H. Geatexne U Min. D=1s N. FOR -Y10- PROFILE SEE SHEET 77 \ � \ B=2.0 Ft. FOR-SRY3DY4C- PROFILE SEE SHEETS 90 & 9/ \ A Type of Liner= CL'B' Rip -tap FOR-SRY4B- PROFILE SEE SHEET 97 FROM FROM A. 311+50 TO OOS STA.111 92 SY94BR7LT \ 8 \ FROM STA. 31+16 TO STA. 31+53-SRY3DY4C- RT FROM STA. 32+00 TO STA. 37+30-SRY3DY4C- RT FROM STA. 10+50 TO STA. 11+00 -Y10- RT \ Submittal February 6, 2024 DETAIL 17-2 DETAIL 17-3 N DETAIL 17-4 DETAIL 17-5 PROJECT REFERENCE NO. SHEET NO. DETAIL 17-1 R-5777C 17 SPECIAL 'V' DITCH SPECIAL BASE DITCH SPECIAL BASE DITCH m CULVERT OUTLET BANK STABILIZATION CULVERT INLET BANK sTABIUZATION (Not to Sfolel INW to S 1e) Iy 1Nolto Sfple) (N. to Sfale) (Nalco scale) r ROADWAY DESIGN HYDRAULICS on�n "�f+ — t��°� �Pl- ENGINEER ENGINEER l4-1 A'� oTol Slope Nato, 1 •p.\ of From NP1-1 \ o< s Frant / 4�A'c 4 ^ d �"£� / F`Ground 3� Di h Ground 3� Dikh W L Tuck GeoreMila Tuck Geol 1. Groand 3�7 D F\� 'I D F\�851°Pe Y D Q\�° SIOP to inimum of1N tinimum m1R � � � KeY RipwP �^ pYPIKry RiprP�Min. D=1.5 FL L=J Min. D=2.0 Ff. U Min. D=2.0 Ff. Chan°el eonom loce GeoteMile Under Cho°°el aonam GaoreNne Under 1„1 llYPl CHANNEL ie aifria��irc cogs T°P den3 U=kO Ft, al D'nfh Sio an 1u Ri p in Locations '3:1 BEHIND B=2.0 FL B=3.0 F. g •Rio-aaP ro be o^ tm rnD Div by fag nz vP �nPC ry y°REo Directed by Engineer '�/ J h (✓ Drected En near N 1 FROM STA. 25+85 TO STA.29+00 -SRY4B- RT GUARDRAIL \\ m m Len lb 30 Ft. 2eom.d. TaP 'q0 FROM STA. 25+80 TO STA. 31+50-SRY43- LT FROM STA. 199+00 TO STA. 202+94 -L- LT FROM STA. 27+50 TO STA. 30+30-SRY3DY4 RT T d 30 R. of Dam saps °a S� (9 L 0 ht. Tonz of Class 'I' R'p Rap, keyed -In, Ezt. 46 SY Geotexlde Ezt.=20 Tonz of Clazz I Rip Rap, keyed -In, Ezt. 33 SY Geotextile FROM STA. 20+00 TO STA.25+70-SRY4B- R7 FROM STA. 203+50 TO STA. 207+50 -L- LT '6 .. - EROMS7A. 38+00 TO STA. 40+50-SRY3DY4C- RT I I STA. 25+78-SRY46- LT 25+75 - k,,- RT �'� 2Q �� SURFACE WATER IMPACTSUj II W /'� . �,w m -TEMPORARY SURFACE WATER IMPACT O — - — O M/a aaJN NrvI151x3 o = 5 _ �`Z� SEE PERMIT DRAWING STREAM SF PRELIMIN RY PLANS DO NOT USB FOR CONSTRUCTION INC®MPLE E PLANS DO NOT USB POR 7W ACQUISITION DETAIL 17-7 CULVERT INLET CHANNEL I Not to Scale) N.-I N-1 Ground G,aand LTpd 50' 25' 0 50' 100' -...... Balfour Beatty Gealext le Gemexdle 9 ° °mi— of 1N - SCALE: 1"-100' DOCUMENT NOT CONSIDERED FINAL Kev-1n Rip-Rop per Std. Dw 876.01 Min. D=2.OFd. Type of Liner= 0.170 'I' Rip -Rap B=4.DFf. Est. 80 Tons, Est. 170 SY Geotexrile ESL 45 CV DDE p/a as RT 1 UNLESS ALL SIGNATURES PERMIT COMPLETED D RAW I N G FROM STA. 30+30 TO STA. 30+95-SRY3DY4C- N -_ 1 SHEET 48 UI' 89 SHEET 49 OF 89 DETAIL 17-8 Q SZ� SPECIAL DITCH GRADING —f-- E-N�ARGEMENT NLVE T 1=falel I DATE: 1/15/2024 W/CL 'I' RIP I ry00DS 5P wgRige F D p\P�x� sP SEE DETAIL 17 \ MICHAEL D. HARDISON. ET UX CROSS SECTIONS Min. D=1.0 F. 4 - / FROM STA.199+00 TO STA. 203+00' -L- RT I L ,y FROM STA. 207+50 TO STA. 212+00 -L- LT FROM STA. 204+00 TO STA. 212+00 -L- RT MICHAE/HARDISON,ETD X z f �ti NC DEPT. Of-`-fi1FAN5PORTATION �` \\ \ \ C n% ROBERT D. FISHER FILL IN WETLAND \ o SPEC 'V' DITCHo�- -0m WOODS SEE DETAIL 17-1 \\� \ ' SPEC 'V' DITCH * * I J ROCK CHECK DAM SEE DETAIL 17-1\ MECHANIZED CLEARING SEE DETAIL,�IEET 2D-4 FS'b6KO9l DETAIL 9 \ \ 13 CULVERT O�IW CHANNEL SITE L \�E _ \ / fti / SS33JV W/CL TRIP RAK NLYJ CULVERT LET C \ \ / REM NN\ \ AIL U K STA IL TION # \ \ \\ W b w lbg ( FlJ i - ,� .pSsM.sixa', y°,''1 W/CL 'I' C�O o N )SEE DET17-5^• SILO I 24�-SPEC�2' BASE DITCH \2 D ODS / x �\ \ \ 9 �� 00 _ 91\1— 31VD SI18 SEE`DF�FAIL 17-2 a \\ _ 'B' RIP RA \ PEC ' 'DITCH f \ / 0€ J EST ON5 E DE IL 17-1 \\ e'Ndslxa l / - o C _ }% IiiR G w II 1 1 F. Al lse /f n ��� TIE TO EXTG EC 2' BASE DITCH REMOVE0V1' --PITCH SEE pETAIL 17_2 ST 2 "TO _ — - L' EST 7 SY GF `' �� ,off ��\, \ '7S PUE oN s1x1 I c00 ��ELBo+r- LU U Q -l@7'x7'RCB-��� _ i��- _ TILLS A —9 24� 25� r > R Q _ _-` 5 _� --1 7'x7' 5 �Y7�/L REMOVE v �GRA55- _ � WT-SILLS ro 25 26 SEE DETAIL 17 3 --- — — — — w(z) i + 2GI _ �_ w(1L/ m 1S---__-- -- g HHw N - 2GI 15 2GI E - _ - - V10=1.6 FPS - 2 �` ' SPEC -DITCH GR7fDINaZ�-------- -- — - <C/) Q�ID SEE-DETML '\g----------- -- --_- —�-- c I SHE --'�- —� b2_.. C.J N W W I yti / I \ 1 _ ONNNN -- — _ UOOD >> —ti M \ �sn — — nmbta---- }+� C >> iR 2/ a NI SIX3 - _ --- _ 00LLJ CL'B' RIP P — 15- - - -oL nL2� - �QW EST 3 T 5' EST 10 S /a DrarrsTxa— � JE— D�EU Dll -9UE D�7€ DU DUE 03 c — — — — ��� DU \ SPEC Ya®WCH w 'a— DUE DUEC CL 'B'RIP RAP EST 2 TONS ` SPECm27 BASE DITCH SEED 1 I T\ SPEC T BASE DITCH T 7F 1 EST 7 SY GF CL 'B' RIP RAP \ SEE DETAIL 17-10 'ssl SPEC 3' BASE DITCH a \R DAVLIG�r DITCH EST 2 TONS 9G z N IR a SEE DETAIL 17-2 DETAIL 17-3 \ SITE 15 I EST 7 SY OF �521L � CULVFjtT INLET CHA NEL '�� W LDLITE OSSING \ 1'1 CL TRIP RAP (RANKS NL Q..- C1 �I PROTECTION SEE DETAI -7 EE PE IN EST 2 RIP PAP \ WETLAND EXCAVATION \ p TIE FROM S� J25E�, O jro87� EST 5 SY GF IJSI{TED STATES OF AMERRR� EXTG DITCH \ (c R $EE DET z ROATAN NATION OR ST) � WETLAND WJ a / NZ —Sz HAND CLEARING �i 1100D5 DETAIL 17-9 TOE PROTECTION IN WETLAND AREAS DETAIL 17-10 \� DETAIL 17-11 1� (Nat stale) \ ` �1+ SPECIAL 'V' DITCH SPECIAL BASE DITCH (11 ) IN°t to swlel I Not so $w1e1 ( 1 qz- 0 - LT- PROF1 9z' 5F(ETS 48 & 49 Dki, 1\ Natorol Gl—& 3'� \�'\O Nawml A'� °f c Slope \ \ wetland aep \ P Nmpwl \ From \ FOR -LRT- PROFIL�'Sk%EETS 48 & 49 Ground 3. A'' of Ditfh F7L 9 D d 7 D F\o$lope ten, FOR -Y9- PRO S E SHEET 77 a=1.0 F. U rR -SO- PROFILE OF SHEET 77 Geolexne B Min. D=1.5 F. -Y/O- PROFILE PROFIILtE SHEET k� l Type of Liner= CL'B' Rip-R.p B-2.0 FL 22 R-SRY4B- PRfIFJI�JSaE SH� 9 FROM STA. 31+50 TO STA. 31+92-SRY4B- LT g \ \ FROM STA. 32+00 TO STA. 37+30-SRY3DY4C- RT �' FROM STA. 10+34 TO STA. 11+00 -Y9- RT \ FROM STA. 31+16 TO STA. 31+53-$RY3DY4C- RT FROM STA. 10+50 TO STA. 11+00 -Y10- RT \ Submittal February 6, 2024 Submittal February 6, 2024 Submittal February 6, 2024 Submittal February 6, 2024 0 10 20 PROL REFERENCE NO. SHEET NO. R-5777 L-69 300 2110 260 240 220 21 180 160 1 0 120 100 80 60 40 20 20 40 60 80 100 120 1 0 160 180 200 220 2,10 2 iO 2110 300 PERMIT WIN SHEET 52 OF 8 WERAND J D E: 1 / 5/ 02 o a � 3 EXCAVATION SITE 15 _ 26 bb e' 25.9 3.1 MEC ANI ED LEA ING 1 .28 2 2 + 0. 0 19.0 . 40 / 26 51 25.7 1.43 2 /-� 0. 0 19.10 ' n In cm :1 26 5. 36 6. 2 :l A: 25.5 4:1 / 8.58 2 / f 0. 0 19. 5 - J 1 2630 5. 25.40 - 18.73 2 0+ 0 0 19.1 25.55 J 18.88 2 26 0 f 0. 0 19.5 --- 2449 6; 25.70 1 19.03 / n oe 0 19.7 3 0 2 0 2 0 2,10 2 0 2 0 1 0 1 0 1 0 I 1 0 1 0 1 40 2 I 1 20 40 140 190 1 0 1 0 1 100 1 200 2 0 2 0 1 2 0 2 0 300 Submittal February 6, 2024 0 10 20 PROL REFERENCE NO. SHEET NO. R-5777 L-70 300 2110 260 240 220 21 180 160 1 0 120 100 80 60 40 20 1 20 40 60 80 100 120 1 0 160 180 200 220 2,10 2 0 2110 300 PERMIT WIN SHEET 5 F 8 D E: 1 / 5/ 02 4- 43: \ 2663 1 - 0 n °D 25 0.02 - 2677 25.2 - 0.025 0.025 - 3 26 86 25.10 0\:\ - 0 0.025 0.02 3 _ 2689 5 68:1 A:1 7 - 4: - n An 1 41) WETLAND WJ SITE 15 0.025 0.02 °D MECHOkNIZED _ 26 87 \ 2 72°i1 7 HANDCL _ ARI G 23+0.0 0 Q WET ND WJ EX AVA ION SITE 15 0.025 3 ME CLE HAN RIN ZED �- _ 26 79 ioa 6.68 3:1 1813 2 2+ 0. 0 LOO 3 2L 2,10 2 0 10 1 0 1 0 1 0 1 L80 20 1 20 40 1 10 1 0 1 0 1 0 1 0 200 210 2 0 210 2 0 3 0 Submittal February 6, 2024 PROJECT REFERENCE NO. SHEET NO. G n R-5777C C ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER IINC®Ng1�L1E ]E ]�L.�NS DO NOT USE FOR ®W ACQUISITION L STA 25 78-R4 P EL= 27.52 DOCUMENT NOT CONSIDERED FINAL 1 7' 7' CB W 1 FT SIL S UNLESS ALL SIGNATURES COMPLETED o �EWI II 4:1 NQRMkL B LT 22, TB RT 48" RCP 1F SILL RO ILE LO — — I --A-- C N = 18.1 __EKST cavar To 1FT SILL E REMOVED C a 1 N r r a N 3 E a a ( OT TO SCALE) SN LE BA RR UVET WISILLS . *NOTES: CULVE LOW T SH LOW U. PROVIDE CHA NEL. CO TIVE TINU TERA US L FROM DURIN IS SUB THE STREAM CO ECT 10 STRU AP BED TION. ROVAI AT TH NATIV BY TIF PROJ MATERIAL E ENGINEER ECT SI E 2 SILLS -LAY ARE T 5UEUBE .0 FT. WIDE, AST 3 DO 140T ABOV SIT BAN AFFACII-D ELE FULL, ATION B. OF S U. 0' 4 NUMBER ENGINEER. OF SILLS DETERfiINEID BY TIE 1 0' SILL AT INLET AND OU LET SILL —{ 1' �— TB TB TB SILL TB — g_ LANVIEW vns L BED ELE =1 .45 ZI)O/ DETAIL ET BANK ULVE OUT STA ILIZAT ON o S. Qe n� f m loco r d� Tuck eotextil a Min mum f lft honnel Bottom tlypj Place eotexble Und r YP) CHANNELBED d I Riprap in Loc .ions Leng h=3D Ft. Rip -Rap o b, In ailed to 2BOwsi a Top f Ditch S opes on Jnrisdkti nal Stre m ETAI BANK CULVE T INLET STABILIZATION (Notto Ge fOUn O �O Tuck eotextil a Mini um ltt honnel Bottom lac Pe Ieofexti a Und r YP) HANNE d BED I Riprap in Loc Lions Leng. =25 Y. ip_R,p lo be Ins ailed to 2B Ouisi a Top F Ditch 51 pes on erisdkfi nalSt.. s S vin Submittal February 6, 2024 PROJECT REFERENCE NO. SHEET NO. 0 n R-5777C ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER IINC®Ng1�L1E ]E ]�L.�NS DO NOT USE FOR ®W ACQUISITION CL STA 2 2 + 4 L— GP EL 29.6 —L T— I DOCUMENT NOT CONSIDERED FINAL SKEW 10 �—O I—O II UNLESS ALL SIGNATURES COMPLETED — RY3 DY C— I :1 NO 1. low :1 OWAL 3.10:1 S EW D BE EL D PROP 100YR 81' RCP WATERS RF CE PROP BED P OFI E E ST ED RO BE N SE AN SE B - FLOW FILLED Oil 4523=18.9 I.. tj LO E_ .37/D c a N ro a N 3 E a ■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■ ■��v����-1� I1y ETA L (I lot to S ale) —Natural Ground D 3•� Not I round Goteztil 9 a Mi(TYnimum m of 1ft INN-Mm- OMME■ INNOMENEEN INNEEM3001 NONMEMBER M Submittal February 6, 2024 DETAIL 18-1 DETAIL 18-2 DETAIL 18-3 DETAIL 18-4 DETAIL 18-5 SPECIAL BASE DITCH SPECIAL 'V' DITCH PIPE INLET CHANNEL PIPE OUTLET CHANNEL SPECIAL DITCH GRADING 50' 25' 0 50' 100, I Nof to Swle1 INot to Smlel (N°tt° Smlel (Nort° Scale) 4 I N— srolel 4 FmM NaoVr°I N°turol N°Nrcl N°t°r°I Ditch -" Gr°en G.wnd 1 Groend Ground 3. b'�Or Ditch N—t A'�,\et SIoPe ° d D 3:7 D 9 .� SCALE: 1"=100' D�� p\owe slope Ground 3.7 D F\0 Min. D-2.0 F. �TV Nnlm�meeof to `SPA qR/gB�FD a\Pe sP L-"..! Min. D=1.5 Ft. Min. D=1.5 H. B MaK.d=3.0 H. Ge°texlile B ° ITYP) P`_ B=20 H B=3.0 Ft. 'SEE CROSS SECTIONS Min. D=1.0 Ft. Length=40H. Key -In Rip-R°p per 5k. 0wg. 8)6.01 Min. D=3.OFt. FROM STA. 48+57 TO STA. 51+50-SRY3DY4C- RT Type of Liner=75 SY COIR FIBER MAT Type of Liner= CI— T Rip-Rop E=4.0R. FROM STA. 212+00 TO STA. 223+00 -L- RT FROM STA. 34+55 TO STA.42+62 -SRY4B- LT Est.35 CY DDE Est. 25 Tons, Est. 43 SY G—f,#h FROM STA. 212+00 TO STA. 220+50 -L- LT FROM STA. +50 T TO STA. +45 --SRY48- LT STA. 48+55-SRY3DY4C- RT STA. 42+70 -SRY4B- LT FROM STA. 216+00 TO STA. 217 -L- M FROM STA. STA.42 0 TO STA. 48+45-5RY3DY4C- RT FROM STA. 222 TO STA. 223+00 -L- LT Nq� DETAIL 18-6 I 8 STANDARD BASE DITCH ry 'y I Net t° Scale) 2011 N.—I N-1 Ground r°°n 3.7 D 3.1 Min. D=3.0 Ft. I R. BOYD JR. WETLAND WK 8=2.0 Ft. FROM STA. 43+90 TO STA. 45+00-SRY4B- LT RICHARD T. BOYD SALTWATER LAND STD T BASE DITCH IL COMPANY,LLC EST 205 CY DDE HJdnHJ DR SE D DETAIL SHEET 2D-3 SLOPE=0.73..%6 i AGS1 J INVFSTRELJ<JW, flLLC RVIEROALE UNITED STREAM SG WN STRUC RE W/TRASH RACK o METHODIST C URCH SEE DETAILS TS 2D-1 AND 2D-2 " SEE PERMIT DRAWING N DETAILS 1 AND 2 SHEET 58 OF 89 SITE 16 N L'B'RIP PAP JNOJ EC 2' BASE IT ST 5 TONS ¢ i - SEE DETAI 18-1 T 14 SY GF wX FOR ENLARGEMENT �B I 1S8 Sn9ASI a9 \ I i\ \ US \ \ \� I PIPE OL ET CHANNEL\ \ \ g ,O I \ I /CL 'I' RIP RAP iBMKS ONLY) I x LRR —31odr \ I I \ \ SPEC 2' B�SB DITZ`k� \ \ EST 5\ DE Otl,dICL '� DETAIL 18-1P \EST 3 TONS J/n I 10EST 10 SY GF dM psiCL 'B' RIP RAP I I I \ Y5EST 2 TONS ecessee��ia- I / ��1/9 I 0 OJ E T 7 S GF NON III I _ E E E bs E E E E 4° PA z 4- ~ — — >- c o LU — — U X 0 co- --- --M- --- - -�- 2G1- J N _---____ c< v) — -- — CI ---- ---- - — —1— — 2GI ——20-4,DEL Doti 0 C) d R 115918'PAVED�ROA Q LU _ --- - _ _ —te— a ///�) — .a V lSR -�� N I�. -IIIIIIIIIII� GRASS f PAVED SHOULDER �0 R �f� -inDITCHF-G_ _ v... : - - - -RL r PA SPEC III N.s Ilre .e�.. MBS£BlNO.Zd ya 1 E QI E b9 17 89\ \ — N330 JNOJ hI woods 7 \C dwnd \ C 'B'RIP P SnOl1w \ • ten\\ V Cl�i@I RIP a�'S\ } ES DNO NS10 \ W\ JNOD ESi 3 T NS Odsl ES 7 SY G NI \ — EST 10 S GIF / I \ — - I 4Y 7i SPEC '2`WE DIT JNOJ } '\ SEE DETAIL 1� �N00 \ JN00 ' MARTHA FISHER dwnd HARDISON, ET VIR d31S" \ JARVIS FRANKLIN \ HARRIS, ET UX GRIFFIN LEASING. LLC \ \ c UNITED STATES OF AMERI . \ (CROATAI•J�NATIO L FORES 1 {� I \\ 3 \ E \ U 1 1H WOODS CRAVEN COUNTY PIPE INLET CHANNEL W/COIR FIBER MAT - - SLOPE=1.25% SEE DETAIL 18-3 SPEC 'V' DITCH SEE DETAIL 18-2 O Ln RIVER BLUFFS LIMITED PARTNERSHIP SURFACE WATER IMPACTS PROJECT REFERENCE NO. SHEET NO. R-5777C 18 tOADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMIN RY PLANS W NOT USE FOCONSTRUCTION INCOMPLE E PLANS DO NOT USE FOR �W ACQUISITION Balfour Beatty StN' DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PERMIT DRAWING SHEET 56 OF 89 DATE: 1 /15/2024 2GI-D 1s" , U o Lo UL 10 } + --- Lo LLI LLJ - co cn FOR -LLT- PROFILE SEE SHEET 49 FOR -LRT- PROFILE SEE SHEET 49 FOR -Y7- PROFILE SEE SHEET 76 TEMPORARY SURFACE WATER IMPACTS FOR-SRY3DY4C- PROFILE SEE SHEET 91 FOR-SRY48- PROFILE SEE SHEETS 97 & 98 O CV LU of W UI 2 U O iz 1;T Lo M W W Q 2 � H N U I Submittal February 6, 2024 DETAIL 18-1 DETAIL 18-2 DETAIL 18-3 DETAIL 18-4 DETAIL 18-5 SPECIAL BASE DITCH SPECIAL 'V' DITCH PIPE INLET CHANNEL PIPE OUTLET CHANNEL SPECIAL DITCH GRADING 50' 25' 0 50' 100, I Nof to Swle) (Not to S.1 I (N°t t° Smle) (Nott° Scale) 4 I N— S.6) 4 FmM NaoVr°I N°turol N°Nrcl NM°r°I Ditch -" Gr°en G.wnd 1 Groend Ground 3. b.�Or Ditch N-t A'�,\et SIDPe ° d D 3:7 D 9 .� SCALE: 1"=100' D�� p\o c Slope Ground 3.7 D F\0 Min. D-2.0 F. �TV Nnlm�meeof to `SPA qR/gB�FD a\Pe SP L-"..! Min. D=1.5 Ft. Min. D=1.5 H. B MaK.d=3.0 H. Ge°texlile B ° 0YP) P`_ B=20 H B=3.0 Ft. 'SEE CROSS SECTIONS Min. D=1.0 Ft. Length=40H. Key -In Rip-R°p per 5k. 0wg. 8)6.01 Min. D=3.OFt. FROM STA. 48+57 TO STA. 51+50-SRY3DY4C- RT Type of Liner=75 SY COIR FIBER MAT Type of Liner= Class T Rip-Rpp B=4.0H. FROM STA. 212+00 TO STA. 223+00 -L- RT FROM STA. 34+55 TO STA.42+62 -SRY4B- LT Est.35 CY DDE Est. 25 Tons, Est. 43 SY G—f,#h FROM STA. 212+00 TO STA. 220+50 -L- LT FROM STA. +50 T TO STA. +45 --SRY48- LT STA. 48+55-SRY3DY4C- RT STA. 42+70 -SRY4B- LT FROM STA. 216+00 TO STA. 217 -L- M FROM STA. STA.42 0 TO STA. 48+45-$RY3DY4C- RT FROM STA. 222 TO STA. 223+00 -L- LT Nq� DETAIL 18-6 I 8 STANDARD BASE DITCH ry 'y I Net I. Scale) 2011 N.—I N-1 Ground r°°n 3.7 D 3.1 Min. D=3.0 Ft. + R.BOYD JR. WETLAND WK 8=2.0 Ft. FROM STA. 43+90 TO STA. 45+00-SRY4B- LT RICHARD T. BOYD SALTWATER LAND STD T BASE DITCH I COMPANY.LLC EST 205 CY DDE H7811H0 DR SE D DETAIL SHEET 2D-3 SLOPE=0.73..%6 i NaSI J INVFSTRELJ<J ,flLLC RVIERDALE UNITED STREAM SG WN STRUC RE W/TRASH RACK rj METHODIST C URCH SEE DETAILS TS 2D-1 AND 2D-2 " SEE PERMIT DRAWING N DETAILS 1 AND 2 SHEET 58 OF 89 SITE 16 N L'B'RIP PAP JAOJ EC 2' BASE ITCH ST 5 TONS ¢ SEE DETAI 18-1 wX FOR ENLARGEMENT T 14 SY GF e I \ I P US \ PIPE�J�CCHAINEL\CL 'I' RIP S ONL L RIP LRAP '�3lodIt \ SPEC 2' E DITZ`k� \ _ 7 SYO F ICL' DETAIL 18-1 / 'S I0d a AILV8-4 w r \ EST I I J I ti S2 \ I 1 I \, EST 1(}2$ GF dM .9 Ili I CL ' RIP RAP 2 \N I / � � I I EST 2 TONS � OD E T 7 S GIF Nory Ria \ E E E E W)C E cn �_ bs C 4i 2 /a 9NI15ix3 0, 0 is aniLsix3 ll �1'e�y �� 3 — B p— SEE DETAIL IB-5 US 7U� - z/ gel US MNY /0 EBL 24' PAD'E9�ROADWAY _ � a PAVED SHOU �—52-4'PAVED 3776DZDETi-9� SZb2 rt A C--D1TChr GRADINTiM'i 70 WBL 2a PAVED ROAlANAY _ �_ — I ° __ __ 1 ` M8S£'37H0.ZL 1d 1 E QI �E A330 7 JN00 �� OODS SN\ I V \ C II�� @@ dWn i 'RIP P Sn8l1w 1\ w�\ tl- 0N00 CEil31T RNS S ✓�S 5TNOOINS', ES] 7 SY GNOJ \�\ �1 `—� _ EST 10 5 GF O.iSI JNOJ 11 `44uYY' M S 111I / I I Sp '2�BA.SE DIT , 1� �\ if9,Zi / Y_YIL'S 1—I ✓ 7�. \ SEDETAIL 1_ JNL I` L JN00 a0 MARTHA FISHER dwnd w� o HARDISON. ET VIR dAls— D \ JARVIS FRANKLIN z HARRIS, ET UX GRIFFIN LEASING, LLC 1 \ 26 \ ti \ UNITED STATES OF AMERI CROATAI• NATIO L FORES 1I \ \ a�7 \ - t � I —tZs� PEC DITCH GRA6IRZ;- I Jt ` W00 CRAVEN COLINTY E IN ET CHAT �J W/ OIR FIBER MAT - - �jSLID E=1. % SEE DETAIL 18-3 SPEC 'V' DITCH SEE DETAIL 18-2 O Ln RIVER BLUFFS LIMITED PARTNERSHIP SURFACE WATER IMPACTS z —ZF I PROJECT REFERENCE NO. SHEET NO. R-5777C 18 tOADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMIN RY PLANS W NOT USE POCONSTRUCTION INCOMPLE E PLANS DO NOT USE FOR �W ACQUISITION Balfour Beatty StN' DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PERMIT DRAWING SHEET 57 OF 89 DATE: 1 /15/2024 o m O � t Lo Lu 0-1 W U) O W O + C� Z CO J N Q W Q C.0 (n J 2Gr-Et— t5" _- - 6 c:) ,IL 10 } + 1-- co Lo W Q W U) c ( WC' ,c 2S FOR -LLT- PROFILE SEE SHEET 49 FOR -LRT- PROFILE SEE SHEET 49 FOR -Y7- PROFILE SEE SHEET 76 TEMPORARY SURFACE WATER IMPACTS FOR-sRY3DY4c- PROFILE SEE SHEET 91 FOR-SRY48- PROFILE SEE SHEETS 97 & 98 Submittal February 6, 2024 l PROJECT REFERENCE NO. SHEET NO. R-5777C PW SHEET NO. SURFAC ATER IMPACTS \ �\ SG. / ^� O 83/�q Y ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER ? o, TEMPORA SURFACE WATER IMPACTS \ N I 10' 5' 0 INCOM PILE E PLANS 10, 20' 1 W NOT USE FOR ew ACOUBITION \ , SCALE:1"=20' WETLAND K ------- - - - - -- d v �� I DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PERMIT DRAWING SHEET 58 OF 89 i (Y3 \ PIPE UTLET CHANN Li 'I I I DATE: 1 /15/2024 W/CL RIP P (BANKS ON )i EST 25 T(", EST 50 SY F1 ESf 35 CY D Eq ; / CL 'B' RIP RAP EST 5 TONS I ' � co SITE 16 EST 14 SY GF emn o° o 00 0°0 A o Q) D 0 00 0000 O — — — — — — — o 0 4' r o - °O I o 00 0 000 0 / \ °00( 00 o 0 a - ° ° / SPEC 2'BASE o BURY VERT 1.0' Q o� I o 00 �O SI REM VE1 °QD Oo eo oQ) Oho 00 0A 1 0A0 °o 'D o 1 0 0 1- 1 -SRY4B - e ,VMOdObl G�YAVd ,8l 7661 NS OW _ M REMOVE / M a U 0� 1 �� 1 �J Al Submittal February 6, 2024 DETAIL 19-1 DETAIL 19-2 DETAIL 19-3 DETAIL 19-4 DETAIL 19-5 50' 25' 0 50' 100, SPECIAL T' DITCH SPECIAL BASE DITCH SPECIAL BASE DITCH SPECIAL DITCH GRADING STANDARD BASE DITCH (Ni f. Sr.l.) (Not to Swl.) (N. to SC.I.I 4 INm to Smle) 4 (Not to S.ol.) Dfch N.turol 14-1 SCALE: 1"=100' Nalpr.l !'� of Slope Grounl J A.\ of From Nofuml \ of Front .� �, I .— —. Ground 3 Groun Ground 3,.� t:.\O�°t ., p t\et Ni Groun 3.� D A'\�p< DiKh `1.4q JJJD--- �, p f Slope I e I f Slope SP /q \N0 SP Min. D=1.5 FL Min. D F.5 H. _. Min. D Ft. FL BCE NPR Min. D=3.0 H. B=2.0 H. B=3.0 H. 'SEE CROSS SECTIONS Min. D=1.0 Ff. B=2.0 Ft. ROM STA. 54+25 TO STA. 56+60 -Si LT FROM STA. 223+00 TO STA. 223+50 -L- LT FROM STA. 45+00 TO STA. 46+60-SRY4B- LT )M STA. 51+50 TO STA. 53+50-SRY3DY4C- RT FROM STA. 46+60 TO STA. 53+75-SRY4B- LT FROM STA. 58+50 TO STA. 61+15-SRY3DY4C- RT FROM STA. 223+50 TO STA. 224+50 -L- M )M STA. 53+50 TO STA. 58+50-Si RT FROM STA. 10+50 TO STA. 11+40 -Y8- LT FROM STA. 62+25 TO STA. 62+50-Si RT FROM STA. 223+00 TO STA. 234+00 -L- RT �Q FROM STA. 10+50 TO STA. 11+40 -Y8- RT FROM STA. 225+50 TO STA. 227+50 -L- M (9 ^-�} FROM STA. 226+00 TO STA. 234+00 -L- LT �A q....t I I I V ?0 DIAMOND INDUSTRIAL CORPORATION JTC INVESTMENTS. LLC JTC INVESTMENTS. LLC JTC INVESTMENTS, LLC JOYCE H. JOHNSON DIAMOND ORATION IAL _ STD T BASE DITCH N O I ONtlBtl _ EST 285 CY DDE N M 1 PSGdSI — LOPE=0.73% N EE DETAIL 19-5 I R WOODS CL 'B' TIP RAP Jay / EST 2 ONS \ ONtl9V EST 7 S Y GF \ 0dsi L__ I SPEC 'V'DITCH�\SEE DETAIL 19-1CL ' RIP RAP CUTOVER I 5�y CL ' IF RAP SEE \ \ HEDGE EST 3 TONS I ` EST TONS \ DRY DETENTION BASIN 4 EST 0 SY GF SPEC 2' BASE DITCH I EST Y GF E E SfE DETAIL SHEET SEE DETAIL 19-2 I s:� E PDE PDE PDE RDk PDE DE PDE E E} c c --- --- WOODS ��ancr� � eaara`.�- • SPEC �■ ��� DITCH GRADING OEM —1A-- O zO M os raw fo E8L za pw Roaowar — US 70 EB — — — ■■-f PAVES SHOULDER ll A SpEn � ! It����acsue■l���aaaaaalr�.�nnarllaK��� w � �Ittttttttttttttttt•ern e.•e Flna � • Fits E 21 10 S P + U SPEC 'V' DITCH CL 'B' RIP RAP 7F IF .T. 7F �--wroODS / I� I WOODSSEE DETAIL 19-1 EST 3 TONS / E T Y F dWlld n o CL'B'RIP RAP Wog EST 10 SY GF � Gmom II d31S I�I � SITE 17 � T ST 2 TONS _ SPEC T BASE DITCH II ST 7 SY GF / '� SEE DETAIL 19-3 rnDIT I III ,r �� WETLAND W 9-2 �� 3 I I Ilo� n And DNOC d315 / n 11W SME C �' DITCH ` — — — I E ETAIL 19-1 -— — — I ��m� o_ GdSI JC JACKSON HOMES.LLC SEE PERMIT DRAWING 4 m m SHEET 61 OF 89-i a pa w FOR ENLARGEMENT mQ — �� >�DANNY R. c III. � SPEC B,�SE DJ HARRISON. ET UX R. EARL JONES DANNY R. ON00 py I SEE DETAIL 1{ HARRISON, ET UX _ FILL IN WETLAND I I ll III �� III III WETLAND EXCAVATION o MECHANIZED CLEARING 3 Tnaasew .sl �" 3naasew .sl� 3 3naasew .sl � — PROJECT REFERENCE NO. SHEET NO. R-5777C 19 tOADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMINARY PLANS DO NOT USE MI L CONSTRUCTION INCOMPLE E PLANS DO NOT USE FOR /W ACQUISITION Balfour Beatty StN' DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PERMIT DRAWING SHEET 59 OF 89 DATE: 1 /15/2024 FOR -LLT- PROFILE SEE SHEET 50 FOR -LRT- PROFILE SEE SHEET 50 FOR -Y8- PROFILE SEE SHEET 76 FOR-SRY3DY4C- PROFILE SEE SHEET 91 FOR-SRY4B- PROFILE SEE SHEET 98 Submittal February 6, 2024 DETAIL 19-1 DETAIL 19-2 DETAIL 19-3 DETAIL 19-4 DETAIL 19-5 SPECIAL 'V' DITCH SPECIAL BASE DITCH SPECIAL BASE DITCH SPECIAL DITCH GRADING STANDARD BASE DITCH I Not ro Srole) ( Not to Swlel I Not to Scal°I 4 I Nm to Scale) 4 (Not to Scale) D kh t4.1-1 Narorol '\ °t Slope Natuml \ of From NONmI \ of Front I —. Gmund Nalpral !' Groun 3� A'. JJJ--- 3 Groun Groand 3,.1 p\o'W°t .l p Uet Dirch Groaa 3.7 D A'\ �p< Dirch —' `Y,tq D X p f Slope I e I f Slope SP /q \N0 SP Min. D=1.5 Ft. Min. D=1.5 H. _. Min. D=2.0 FL BCE NPR Min. D=3.0 H. B=2.0 Ft. 11=3.0 Ft. 'SEE CROSS SECTIONS Min. D=1.0 Ft. B=2.0 Ft. ROM STA. 54+25 TO STA. 56+60-SRY4B- LT FROM STA. 223+00 TO STA. 223+50 -L- LT FROM STA. 45+00 TO STA. 46+60-SRY4B- LT )M STA. 51+50 TO STA. 53+50-SRY3DY4C- RT FROM STA. 46+60 TO STA. 53+75-SRY4B- LT FROM STA. 58+50 TO STA. 61+15 -SRY3DY4C- RT FROM STA. 223+50 TO STA. 224+50 -L- M )M STA. 53+50 TO STA. 58+50-SRY3DY4C- RT FROM STA. 10+50 TO STA. 11+40 -Y8- LT FROM STA. 62+25 TO STA. 62+50-SRY3DY4C- RT FROM STA. 223+00 TO STA. 234+00 -L- RT FROM STA. 10+50 TO STA. 11+40 -Y8- RT FROM STA. 225+50 TO STA. 227+50 -L- M FROM STA. 226+00 TO STA. 234+00 -L- LT I I JTC INVESTMENTS. LLC JTC INVESTMENTS. LLC JTC INVESTMENTS, LLC JOYCE H. JOHNSON STD T BASE DITCH N O EST 285 CY DDE N N SLOPE =0.73% SEE DETAIL 19-5 R 50' 25' 0 50' 100' himmild SCALE: 1"=100' Nq� q ?0 DIAMOND INDUSTRIAL CORPORATION DIAMOND IINDUSTRIAL _ I ^1L-- 1 OjS1 O— 1 ads �— I �N � � � WOODS S 'B' TIP RAP ` \ g I j J EST 2 ONS ^ (/\ EST 7 SONS GF c� ( C \\ I 00dSIV \\ x I--- I\ SEE DEfAIDL119 1 N CL ' ' RIP RAP CUTOVER 26 1 \ \ \ EST 3 TON$ q(Cj DRY DE T NTIO^ SIN 4 EST 0 SY GF SPEC 2'BAS"I CH I I t EST GF�E E \ .'4 �E D AIL $H T 9VEE DETAIL 19-2 I V .7 y PDE P E P N D PDE r 8 PDE E �y F _ J C_ I WOODS _ C.J ^ _ ' a 9NUS 18 � 26 wt O GD _7 _25 OA Lo CQ > W 0 Q W U) M O W O z + 00 M J N F- 2LU W G U) U) J 1 o 00 } + (71) Lo W W Q 2 U) U) I ---min- - US HWY 70 EBL 24' PAVED ROADWAY 11C 7n CC) M Q�N m� it DITCH E ETAIL 19-1 a 4N w �Z r m� a �a wo �w DANNY R. HARRISON, ET UX 91z 4'PAVED SHOULDER 9Z --T-- �EMOY1� z UIRC s SEE DETAIL 19-4 $PEC DITCH DING _9 -- — - — — — — �EE_�ETAIFI9-� REM SR ) SPEC 'V' DITCH / CL 'B' RIP RAP Tom, Z IF IT If -w0'0 Ind In I �J� WOODSSEE DETAIL 19-1 ') EST 3 TONS Q 1S ICI CL"RIB" P /CC ( <n ,�25L' EST1� F �� SITE 17 R F T �y ✓ _ EC 3' BASE DITCH I E D 19a� /\ EC BAS DIT rONOC 31S WETLAND W 9-2 �L aJsl JC JACKSON HOMES.LLC SEE PERMIT DRAWING m m SHEET 61 OF 89 FOR ENLARGEMENT DANNY R. HARRISON, ET UX R. EARL JONES J � 3naasew sl a� I ` � 3 FILL IN WETLAND WETLAND EXCAVATION MECHANIZED CLEARING Erb— e� PROJECT REFERENCE NO. SHEET NO. R-5777C 19 tOADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION INCOMPLE E PLANS DO NOT USE FOR 7W ACQUISITION Balfour Beatty StN' DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PERMIT DRAWING SHEET 60 OF 89 DATE: 1 /15/2024 O O co N CO 0 W U) Q 2 W ---- W O + O Z V N �RA67FfG— = N W Q U) SPEC "3'BASE D SEE DETAIL 41 FOR -LLT- PROFILE SEE SHEET 50 FOR -LRT- PROFILE SEE SHEET 50 FOR -Y8- PROFILE SEE SHEET 76 FOR-SRY3DY4C- PROFILE SEE SHEET 91 FOR-SRY4B- PROFILE SEE SHEET 98 Submittal February 6, 2024 Submittal February 6, 2024 0 10 20 PROL REFERENCE NO. SHEET NO. R-5777 L-79 300 2110 260 240 220 21 180 160 1 0 120 100 80 60 40 20 20 40 60 80 100 120 1 0 160 180 200 220 2,10 2 iO 2110 300 PERMIT WIN SHEET 62 OF. 8 VIETLAN I WIL JDATE: 1 / 5/ 02 49 0. 0 0. 20 ILL I A w TLA D 3 CA ATI N SITE 17 11 7 :1 2615 5. - - _ 5'24 :i a 0.02 0.02 ME HA - IZED CLEARING 2 2 0. 0 19.3 WETLAND L o s � o. o 0.20 25 E CAV 3 O SITE 17 24.0 �00 5.2261 .\ o.oz o.02 ME - A IZED CL RIN 2 126 / f 0. 0 19.58 49 40 0. 0 - 3 7 23.9 --t- 1 26. .255:1 9:1 25 5.9 87 0.02 0.02 2 / f 0. 0 19.80 a ti49 � 0 0. 2 3 3 3 23.7 4 \ :1 1 26. .568:1 :1 2580 5.9 2 .0 0.02 0.02 - 2 O f 50.00 0.03 a - 23.6 4:1 y _ '7 26.0 9.413:10.02 25 77 5. :1 23. 0.02 4: 7 _ :\ 0 f 2,50 f 00.00 0.25 0.025 23.47 4:\ t- 4 972:1 25.85 01:1 25 5.9I 80 7. 4 24.120 0.02C0.020 0.02 2 9 f 0. 0 0.42 3 0 2 0 2 0 2410 1 210 1 200 1 180 160 1 0 1 0 140 60 400 2 60 80 100 120 1 0 160 180 2 0 2 0 2,10 2 0 2110 3 0 DETAIL 20-1 SPECIAL BASE DITCH IN-. Scale) N.ter.l oc c Front Ground 37 D G �e Ditch � � � Q° slope l.-"J Min. D=2.0 R. B=3.0 R. F FROM STA. 67+30 TO STA. 68+16 -SRY48- RT FRO :OM STA. 62+50 TO STA. 63+58-SRY3DY4C- RT FR Submittal February 6, 2024 50' 25' 0 50' 100' - DETAIL 20-3 DETAIL 20-4 WETLAND WN SPESEE TAILD ITCH DETAIL 20-2 20-8 SPECIAL 'V' DITCH PIPE INLET CHANNEL PIPE OUTLET CHANNEL iOF PROTE TION IN— to Scale) (Not to Sc.lel INot to Sc.le) SCALE: 1"=100' IL�LTsmPE. NLY) ^ Front N—I N.—I Notpr.l NONmI "I`L R P /-F /- Ditch Ground 1.\ Ground Ground Ground [� p ES Nat I p'`ec slope ?cl D 3.) D 3' } r "10=�0 CFS E55 SITE 19 Ground 3.y D Q Teck Geptenile `Tuck Geese file V10-98 FPS S AI . Min;ro.ro prin ° Minip,.ro ogle Y Min. D=1.5 Ft. Geotea;le B DYp) Geotexdle B (ryp) \ IF 7F T\� T T Length= 28 R. Length= 25 R. \ Type of Liner-CL T Rip R, - Keyed -In Type of Liner 11. 'I' Rip -Rap - Keyed -In Min. D=3.0Fd. OLFT u CHANNEL ABILIZAT�ON � 7F ROM STA. 56+60 TO STA. 57+85 -SRY48- LT Est 26 Tons, Est 55 SY Geore.tile Min.D=2.oR. Est 37 Tons, Est 65 SY Geote»ile B=4.OFL `7` �f` �h W',�L /IhRIP 1 Z� M STA 63+70 TO STA 66+25-SRY3DY4C- RT E.30 CY DDE B=2 0 - 3 OR V OM STA. 70+90 TO STA. 71+56 -SRY3DY4C- RT Est 10 CY DDSTA 58+70 -SRY48- LT � I T SE DE IS 20-6 STA. 63+69-SRY3DY4C- RT PROJECT REFERENCE NO. SHEET NO. R-5777C 20 LOADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMIN RY PLANS DO NOT USE PO CONSTRUCTION INCOMPLE E PLANS Ib NOT USE POR 7W ACOU ISITION SEE PERMIT SHEET 70 89 ��� � + FOR EN EMEN �Hy Balfour Beatty' �VE*TP p NqQ 8y'yjj� GEORGE E. BROW /-N • ='n �N DOCUMENT NOT CONSIDERED FINAL V 1 UNLESS ALL SIGNATURES COMPLETED ?o,, / VERT L' PERMIT D RAW I N G DIAMOND CORPORATION JOHN BOYD JOHN BOYD HUGHES, ET UX PROPERTIES SHORE SOUTH SOUTH SHORE PROPERTIES, INC. m / / HW �� 7N SHEET 63 OF 89 HUGHES,ET UX 1 DRAWDOWN STRU RE W/TRASH RACK UJ s i / + O SEE DETAIL E S 2D-1 AND 21 -2 DATE: 1 /15/2024 i RJ' DETAILS 1 AND 2 N / N BA K STABIL TIC) JOHN BOYD /�3113HS sne uw R HUGHES, ET UX / 301DI1S3d / SEE (TAIL 20- STREAM SE O POMIT G 7NOD, \o / . CL 'B'RIP RAP H T b�F ON-O; CL'B'RIP / �E�,1•T '� 1 A EST 5 T EST 10 SY GF O EN LLRGE NT EST 4 SYO F / -i9 CL 'B RIP RAP OUTL CHAN L alH HEDdO WOODS EST 8 TONS EST 21 SY GF 40% RAP-fKS-ONLYI ~AD --<DGE WOODS LOPE= D \ND i \ SPEC DITCH a1H iFf. ,4, E w"j PUE zo z / PUE o DU pm PU DUE 7 COODS T DRSY DETENTION BASIN #5 R _ Rygg- EE DETAIL SHEET 2D 4 i ,cesc - .. .. -. .- .. F _ _ %_ ss xa+ozl �3- P oaory Mia CO- (0- - S .- -. -. .. rasa aNlislxa •� CL T.5 RAP m�� .. ._ - � EST 16 SY GF >-L0W WOODS �r W ODDS W t Q= REMOVE WOODS - -' - F CD + N - WM W I vJ �i e r LIJ -- -- - --_ - _ _ - - - 1--__ -' -- - _-_--- ---- -- -- - ---- - NI ,DETAIL II - _ --- — _ n dodo-Y4RPB- � (q --- ur------- --_ __ I / �\ 4'PAVED SHOULDER --- �- �a-- — --- — —-------- � ---SPED-Dl7�FC �AWRG— -- _O ----- PE�9fTEF1--6RABIN—r--------------------Ai�— W Q� L� s� �!!E lIFML"" SEE DETAIL 20-7 S 70 EB --- US HWY 70 EBL 24'PAVED ROADWAY --_ CD + -- a — -- — ---- ------- Z + N ��� --------------------- ---MJ JM _-- �6r— --- --- � --- � ----- 4'P ED SHOULDER SSVF79— �4' = V NH --- J W W ORA55 9f _ RE .9 _2GI I _ _ _ _ _ 4' PAVED SHOULDER LLJ �U)(f) O �PRaplpl(•� I SPEC DITCH GRADING -77 US HWY 70 WR 24'PAVEDROANAY SPEC DITCH GRADING (n� j I SEE DETA -- SPEC DITCH GRADING �9LxE01K01LPErL------ cpp nP1A1L 20 7— — — — — — — - a v Nr () N O G —1— 2GI Jnd d 2GI n i — G%tA55 1 — PC Of W �� + - - - -- -- - -- - --- --53-- ----- N -----sse---T-------sv--- - $-sse----'------ -- ----2GI---- - -2GI---s------------------ �e- a s W ----- ---------bs ---�5 --- - - - _ B __ W Q — SR 1/5918'PAVED RC I&AY 2D�-DETAIL 11 213-4, DETAIL 10 �� — --- ----p— — — — — -- — — — ---- --- — — — -- — -- --- -- — -- — — — --— _- — —ai n — — — — — — — — — i — — — — — — — --i — — — — — — — - — — — 3dOI U CD W Gs,oas,ol < M7a oeuso b ise,9z F - - _ - �- W < }�N 1 E C l UE ll ll 1l ll 1l 2 - I I1— PUE ` S lse • • • Sl W LI E E UE — — r co PD CL 'I RIP RAP E 310d ID 7— E —_ PUE C qQ W } e^o0D5 E Oyp Z EE'Wd TONS ST SY GF r` h +E Ii/� 9Vld dO8.91 ly IO \ I PUE P E I ^ C= SITE 18 I ll� ��,.,�II� A � ° a� _ wu) -- SPEC N' ITCH - L.� Ind \ SPEC 'V' DITCH U7 I �^ T llO SEE DETA 20-11 ll vl 011 011 Qll I I'-'ll O ll o ro� SEE DETAIL 20-2 I PIPE INLET CHANNEL \I I Ig�xo - I� ��4��§ \ • • • I 1SB •I/o- I W/CL 'I' RIP RAP `Jj+" 31tl9'�� d9° "\3�.tl l0 \ X STREA SE SLOPE=4.0% q \ SEEETETAIL 20-3 10 d0aNz1 _ _ � SEE PERMIT DRAWING SHEET 66 OF 89�IA ` III III ;e h� SPEC 3'BASE DITCH FOR ENLARGEMENT r I \ I 11W51 I III III SEE DETAIL 20-1 \ \ SN8I I n� III RIVER BLUFFS LIMITED PARTNERSHIP S SURFACE WATER IMPACTS F FILL IN WETLAND • • \ II�JI Ii m I I II II DGT VENTURES,LLC mq TEMPORARY SURFACE WATER IMPACTS MECHANIZED CLEARING DETAIL 20-6 DETAIL 20-7 DETAIL 20-8 DETAIL 20-9 PIPE OUTLET CHANNEL STABILIZATION SPECIAL BASE DITCH COASTAL MINI TOE PROTECTION SPECIAL DITCH GRADING (N.to style) STORAGE �N .I.) AND AREAS (Nat° sr.le) 4 I —style) 4 OF NEW BERN Nemr.l eea ON HWY 70, LLC `dot rural EI Nptprol ._ v Groend 3.y D p'�oec Drch N.—I Ground' .6.1 y\� trace ` Gro.nd sp 4RygDJP�P9 sp e�°" sli.pe wetmnd Are. t� Ir FOR -LLT- PROFILE SEE SHEETS 50 & 5/ S iuckGeoteatile " Min.D=1.s R. d =--J I FOR -LRT- PROFILE SEE SHEETS 50 & 5/ s" ro 1. SEE CROSS SECTIONS Min. D=1.0 Ft. B=2.0 FL d=1.0 Ft. GeoedBe • I FOR-Y4RPB- PROFILE SEE SHEET 73 ° M�Nrn - I FOR-Y4RPC- PROFILE SEE SHEET 74 ehe� el Bed •pl.0 GeWeMile Under R;pmp FROM STA. 234+00 TO STA. 241+57 -L- LT �J� Lenstn= zo n q.n.Nd ;n bwtionz Diretled by E�gi.... FROM STA. 234+00 TO STA. 246+00 -L- RT FROM STA. 68+24 TO STA. 69+00-SRY46- RT Type of uner= CL B' Rip -Rap ��' FOR-SRY3DY4C- PROFILE SEE SHEETS 91 & 92 Fsi 40 T°re�Est 7S SY G o'tm;, K'y'd-�n FROM STA. 236+00 TO STA. 239+50 -L- M FROM STA. 68+57 TO STA. 69+00-SRY4B- LT ''a FOR -SRY48- PROFILE SEE SHEETS 98 & 99 STA. 68+34-SRY4B- LT Submittal February 6, 2024 50' 25' 0 50' 100, - SPEC 2' E DITCH / DETAIL 20-1 DETAIL 20-2 DETAIL 20-3 DETAIL 20-4 WETLAND WN SEE TAIL 20-8 / SPECIAL BASE DITCH PIPE INLET CHANNEL PIPE OUTLET CHANNEL �t` iOF PROTE TION SPECIAL 'V' DITCH (Not to Scale) INot to Scale) (Not to bcale) INol to Scalel SCALE: 1"=100' ILL smPE. NL Front N—I Nalvml L R /- Dibh Gropnd \ Ground bb,f-1 N-1 Natvml \ °c c Dkh Nat I Acc Slope ?:l D M1 Ground 3f D 3.� Ground G2I0 = 98 CFS ES ^ (� Ground 37 D A' �e Ground 3�f Y\moo' I` Tack Gepteeile LTvck GeeN.iile b10=1.6 FPS 5 AI SITE 19 �i Y D °Minimam prtn °Minimam efts Min. D=2.0 R. Min. D=1.5 Ft. Gwteaile B DYPI Geohxdle B (TYP) \7F�Jl B=3.0 R. Length= 28 R. Length= 25 R. Type of Liner-CL T Ri,,-R P -Keyed-In TYpa of Liner=CL T Rip -Rap - Keyed -In Min. D=3.OF4. OLFT ET CHANNEL $TABI�IZA N FROM STA. 56+60 TO STA. 57+85 -SRY48- LT Est 26 Toes, Est 55 SY Gwte.tile Min.D=2AR. Est 37 Tons,Est 65 SY G-te ile B=4.0Ff. `7` �f` �I` WFJjOL 'Z(I$`RIPY�G T FROM STA. +50 T TO STA. 68+16-SRY4B- RT FROM STA. 63+90 TO STA. 66+56-SRY3DY4C- RT Er 30 cY DDESTA. 63+69-SRY3DY4C- RT2 0 - 3.aFt. Est l0 CY DDSTA. 58+70-SRY4B- LT v� ELP DEiP.IL 16-6 N :OM STA. 62+50 TO STA. 63+58-SRY3DY4C- RT FROM STA. 70+90 TO STA. 71+56 �RY3DY4C- RT I DIAMOND INDUSTRIAL CORPORATION NI SPEC O --� LN~ ---- — )QLU _bZ GRA S � U) --- —¢ JOHN BOYD HUGHES, ET UX JOHN BOYD /1111HI HUGHES, ET UX STREAM SE EB�rT RA v ST 10 SY / SITE 18 f MM JOHN BOYD HUGHES,ET UX /,/ I + SflO 11W 4 77 3DaI1sJd SNNVi OV /A ,,iMIT I)R . , ONO3 % \ PE�fiHEHrtiRABll4E- -xe 11!lFRIL°!!f� � £Z F1� N GENIE T N1H C -L ` AP -ONLY) E w >D 'PUj . 7 DUE PL�' PROJECT REFERENCE NO. SHEET NO. R-5777C 20 LOADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMIN RY PLANS DO NOT USB PO CONSTRUCTION INCOMPL PANS DO ISITION SEE PERGALAA D�� o 6 SHEET O H :. FS2 RE�I E �Pl� � � � Balfour Beatty Nq� 8 eGEORGE E. BROW // rI N U • �N DOCUMENT NOT CONSIDERED FINAL ' V 1 t UNLESS ALL SIGNATURES COMPLETED 2 / r SOUTH SHORE SOUTH SHORE PROPER, S, r p1 ,- PERMIT DRAWING PROPERTIES, INC. / HW SHEET 64 OF 89 DRAW DOWN $TRU RE $H 2D-2 C"/u Ne V DATE: 1 /15/2024 SEE DETAIL 2D-1 N DETAILS 1 AND 2 TA IL TIO '� � $ E A 2� 6f IP TO ( ;L �5� CL 'B' RIP �4 E 4 S C\/� ESN5 / HEDg:P Woo 5 `* EST 2 Y (3F \ \/) WOODS 1n // � DRY DETENTION #5 � 10Z _ �l�- RY L{ -' - SSE DETAIL SHEET 2 ci P W yMie3-� SCLj' RIT RAP _ EST 16 SY GF -- _-- — dui— - --- ---- _� -- - ----- ------------------- S 70 EB J US HWY 70 EBL 24PAVED ROADWAY -- -- ___--- ".4 2 — — I 4' P ED R�U�EF — 5379M —25— 2�Ci -- 161— 42 bZ — SZ -{'PA2E95tlOtltBER —SZ —SZ— rINGs��- W -REMEVE USHWY 7o WBL 24'PaVEO ROADWAY �p�C DITCH GRADING SPEC DITCH GRADING 'PAVED SLOI/1PErL----- rurell 2r�r _— --- -- E-DETGL30.;'--------- 4 A —25 24 —21-----3GI NAY 2D�-DETAIL 11 R 2D-4, DETAIL 10 = - sz— ti 4� l- I T E l ll ll ll ii i1. / II 1 I — PUE 0 E - --26t CL' RIP RAP �26 E 3tllq>� 10 10 1 } W S ' \ Oy Z '0 EE'�d TONGE 9 I dOa .SI 1y v SY ST SITE 18 11 SPEC 'V' ITCH - �T III ll Y✓ oil Q SEE DEFA 20-11 oT Ir ll- 1l o PIPE I TfAPNNEL TIJ 9e� —� 'IpW/CL'I'RIP 31tl9STIR SE SLOPE=4.0SEE_ETAIL J SEE PERMIT DRAWING SHEET 66 OF 89 SPEC TBASE DITCH FOR ENLARGEMENT SEE DETAIL 20-1 \ RIVER BLUFFS LIMITED PARTNERSHIP SURFACE WATER IMPACTS FILL IN WETLAND TEMPORARY SURFACE WATER IMPACTS MECHANIZED CLEARING DETAIL 20-5 DETAIL 20-6 DETAIL 20-7 DETAIL 20-8 PIPE INLET BANK STABILIZATION PIPE OUTLET CHANNEL STABILIZATION SPECIAL BASE DITCH IN a tp Style) SPECIAL DITCH GRADING I No1Ip style I.I (Not to scale) 4 (Nett° -1.) 4 I °tssgt d. epW -G,'uu�e [ie°Nva nned Tuck GwtaMile rural pro) vE v Grovnd 3. p.� cf Dirch Key Dprop into bi nimam of IN Groan `S Ground SP AR/,QB D Q`Pe SP 'f �D� Y� °I Slope Channel0onom Po<e Geoteeile Under `Tuck Geoteatile J IF'-'. Min. D=1.5 H. ITvpl cNANN L eeD ro m ar tx 'SEE CROSS SECTIONS Min. D=1.0 Ft. (variable) 0ireci1 by Engineer t.s ° m:� B=2.0 Ft. myth Ft. Fr. Rop.wp ain.mll.a ,°sx oe„ae ep G°°t°'nl' eh°� °I e.d .pl FROM STA. 234+00 TO STA. 241+57 -L- LT =2.0 R, d p°.e°.nWin°°°I stream. au Geo-1b UMer Ripmp -20 Tons of Class T Pop Rap keyed -In, ESL 33 SY Gwt Ale -B t,= 30 Pt. N°'oblel in —i- Dbeded by Eginae, FROM STA. 234+00 TO STA. 246+00 -L- RT FROM STA. 68+24 TO STA. 69+00 -SRY48- RT Type of Uner= CL'I' Rip -Rep - Keyed -In FROM STA. 236+00 TO STA. 239+50 -L- M 68+20 -SRY48- RT Eat. 40 Tons, Est. 25 SY Geotmrile STA. 68+34-SRY4B- LT Ds �. .. F �' C N 0_M� -- -- WLU --- ------ -"i <Lli iPT —SZ— LU (z)- CD = J w Q L1_I -- Q - U7 - -25— to — U+N c`'> I— s � 'r-LU co JOH 4 Uo� (pN UE�� • • �� LJ ` m — E ^' N C� } z LU PUE�PUE 'I-= Eco (n (� ICI 2 vs \ / C V' DITCH I II \ � SEE AIL 20.�� • \ Sa�zl � ga I e w I \ r Z SN811W51 V 6 I DGT VENTURES,LLC / eyOoF —bG r COASTAL MINI DETAIL 20-9 TOE PROTECTI STORAGE ON IN WETLAND AREAS OF NEW BERN (N.. s<°I°I ON HWY 70,1-LC Y\col Wetland Are° E —J d=1.0 Ft. Geoteatile Type of Liner= CL 'B' Rip -Rap a FROM STA. 68+57 TO STA. 69+00-SRY4B- LT \l 1317 FOR -LLT- PROFILE SEE SHEETS 50 & 5/ FOR -LRT- PROFILE SEE SHEETS 50 & 5/ FOR-Y4RPB- PROFILE SEE SHEET 73 FOR-Y4RPC- PROFILE SEE SHEET 74 FOR-SRY3DY4C- PROFILE SEE SHEETS 9I& 92 FOR -SRY48- PROFILE SEE SHEETS 98 & 99 Submittal February 6, 2024 Submittal February 6, 2024 Submittal February 6, 2024 PROJECT REFERENCE NO. SHEET NO. R-5777C 200 0 0 0 ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER IINC®Ng1�L1E DO NOT USE FOR ]E ]�L.�NS ®W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED .q-HFFT A'.F—( 89 CL ST 2 5+ L- I n I rl A TE -4�t6j) CL STA 58 + 01 - RY B- CL SIA 63 + 5 SRY DY C- G IP \ NWE=8.4 36" RCP PK� CH N EL OP =26.1 C ANNEL BURIED 1.0 1@ 2" RCP 1 V 17. I Submittal February 6, 2024 I� FOR ENLARGEMENT ------------------- -- ----------- --------- -- ------ -------------�I�rj ------------ �II, 'Il lCA66 a ;u • A.a rift" pl �` i FAUWAFLAi WHOM i _ - � �. �►— c."..�., �',w' u...,:.,:.. ., �.: . ,:•.r., ...,�J.. fir,. f ' -i' _ � q +t . i 111�� • ��_ ® . -.,... ®I�I�I/U `:i�i.�1.� �� -- - _� . ,' ens _ .._, . ® ® u+. 1•s+� IIii■a� lii' a�� 1..�_I� �Illrr+rr�� �F tea_IF . h .;�, _.—' rr.ra /� •AA �--------- IKILMms. w�.. � ���®■fir "�._ -��� •::. •. ��� AM� a 372 EM, t 1 Y �k - Submittal February 6, 2024 DRAWINGSEE PERMIT RrRW"C,'.. FOR ENLARGEMENT - -_ - _ - ------------------- ®J3s�:°. .'.; •.� L .: 7[x'71� - �.. .a 5 >, �1. �•' �_1 i�lj� •.1- —11MER, 0011 l!!.r' :��— �a��i�GirZk�—�l�fi`si��l�'aa@•�1 s �. Ili�;l'� �����.:, :,�����Ilf�ec?aZk��,�� 7��w_�v w n x �._� - , , • •, • , A nr � ���.��- .:: _.. z�+n+� �?��*�r:r�'r� -_ •.r��ei� � ���`•%ak..��7, "~ �'<A�li ��'`� -- h� _a_ a � M_ ., _� :.�,•�® •:..� _ �., - _ � • - - � �—�- �.><..++s�.. a—a�.._r�. �c� Cray - � — - - = _,,,,��• - —_..� �G..3�E�•-�"�. __fir �.��.wu�r— _�. ��� 93f� _ r�-s � ,'.���,�rF1��1 _ _ _ _� � - - — _ NEI 011 iTe ...gym, ilk .. ... , _ . • � _ -Si € wlixEHIi� R-ti"Tyl� �r.�=����ii�•-�,= :� ®e . .7!�� •3 ��i!. ' TTT:--:'-'7f_;'�.,-'•�_�.,,..m- =i -- `� - s� �3�:11► it 111 1. — l Ara.arws '— =;_x' �>•rnu.. -__- -_-_ 1P� �1''.s.}''. ti' �/ . .._. flp` ..-- — Itr'� jai, � 1w,1111. ISO •' i'r�ielaiae�- _.r- tir, .r7•� ,F�nel "" ,� o � i • !�� �1���' �'n,_ � f�,+:• - `��# "i Rl�l;jt„el'�►. r'"•,�". _ s , .I /•. � � 11 is .✓ ITV If IVA o , n �•� T n Submittal February 6, 2024 FILL IN WETLAND * * MECHANIZED CLEARING OV'O 17'IV�J VN/70Nb'0 NlkN SITE 19 WETLAND WN _ _ 7F _ T _ _ 7F _ _ T \ 7F— / Tg�M\ /"7F 7F 7F 7F 9�M— — —7 7F T T �17F co 7F 7F 7F 7F 7F QIO-98 CFS— V10=1.6 FPS OUTLET CHANNEL STABILIZATION T 7F T T T 7F 7F W/CL 'I' RIP RAP 7Q+0O EST 40 TONS, EST 75 SY GF — 0000o a Hy BURY Q INVERT 1.0' r-A- i ' ktBbRY- / NVERT 1.0' i � HW BANK STABILIZATION W/CL 'I' RIP RAP SEE DETAIL 20-5 SPEC 3' BASE DITCH X x x rn o oo�oo E -SRY4B - / WOODS / SPEC 2' BASE DITCH R =-X-X� PROJECT REFERENCE NO. SHEET NO. R-5777C ^/qO PW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER INCOM PLE FE FLANS 25' 12.5' 0 25' 50' 1 OO NOT USE P R ew ACOUBITION SCALE: 1"= 50' DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PERMIT DRAWING SHEET 70 OF 89 DATE: 1 /15/2024 Submittal February 6, 2024 Submittal February 6, 2024 0 5 10 PROL REFERENCE NO. SHEET NO. R-5777C SRY4B-7 1150 1,0 1130 120 10 100 90 80 0 0 60 50 40 30 20 1 13 20 3 D 40 50 60 70 80 90 100 10 120 1 0 1,0 150 30 w 3 V1 �' 0.060 0.)60 3' - 4.1 — — — — pn — — -- --- 204' 1817 P I WIN 69 +50-00 HET 72 OF 8 DATE: 1 / 5/ 02 WE Lo D WN 0 SITE 19 � o.o 0 0. 60 MECHANIZED C EARI G :1 _ - 1917 17.51 SITE 19 WETLAND WN jn- w 10 0.060 0.)6(0 M CH NIZE CL ARI G g a 0.060 0. 60 - 1787 - 150 1 0 1 0 140 110 1 0 0 0 0 0 0 1 1 2 0 0 0 0 l 0 1 0 1 0 1 0 1 0 1 0 Submittal February 6, 2024 0 5 10 PROL REFERENCE NO. SHEET NO. R-5777C SRY4B-8 1150 1,0 1130 120 To 100 90 80 70 60 50 40 30 20 1 13 20 30 40 50 60 70 80 90 100 110 120 1 0 1,0 150 PERMIT WIN SHEET 73 OF 8 N 0.0 o. 57 D E: 1 / 5/ 02 — — — 3• �— --- 9.15 71 + 0. 0 WE LA D WN a s 3 Ln r' 0.0 0 0. 6 SITE 19 — — — — — — 1985 19. 2 71 + 0. 0 W TLX D W SITE 19 a a 0.0 0 0. 3: 426. -- -- — — — 20 25 19.5 7 + 0.00 w 0 N 0.060 1 0 4.22. -- -- --- — � _ 2058 1 .84 7 + 0.00 1 0 1,0 1130 1120 1 0 1 80 70 60 0 30 0 1 1 2 0 0 80 10 1 0 1 0 1 0 1 0 140 Submittal February 6, 2024 0 5 10 PROJ. REFERENCE NO. SHEET NO. R-5777C SRY4D-4 49 150 1 0 1130 120 To 100 90 80 70 60 50 40 30 20 1 13 20 30 40 50 60 70 80 90 100 110 1120 1 0 1,0 1 0 40 PERMIT RAWING, SITE 20 O.To 0.HET CH NIZE CL RI G 7 F 8 3 7 H ND CLE R I G � E: 1/ 2535 qn 19 + 0. 0 W LA D WP SITE 20 a ILL I W TLA D 0.0 0 0. 40 3•. :l 2 41 19 + 0. 0 0.0 0 0.? . 40 :1 2409 jn 30 0.040 0. 40 jn 4' 4:7 2405 18+ 0.DO. 0.0 0 0.)40 1 2429 23.13 17+ 50. 00 L1 0 11.0 1130 1 0 l 0 1 0 0 0 0 0 0 20 11 2o 50 60 70 80 0 100 110 1 0 130 If) 1 0 Submittal February 6, 2024 CRAVEN CRAB JONATHAN COMPANY INC. FULCHER SPEC. 2' BASE DITC SEE DETAIL 25-1 SPEC. 'V' DITCH z SEE DETAIL 25-2 �I II� SURFACE WATER IMPACTS TEMPORARY SURFACE WATER IMPACTS 50' 25' 0 50, 100, SCALE: 1"=100' \ �q0 Vq PROJECT REFERENCE NO. SHEET NO. R-5777C 25 IOADWAY DESIGN ENGINEER HYDRAULICS ENGINEER PRELIMIN RY PLANS W NOT USE PO CONSTRUCTION INCOMPLE E PLANS DO NOT USB POR �W ACQUISITION EMMA FRANCES FORD, ET AL Balfour Beatty BURNEY L. HAWKINS, ET UX DOCUMENT NOT CONSIDERED FINAL O UNLESS ALL SIGNATURES COMPLETED I+Nj SPEC. 2' BASE DITCH PERMIT D RAW I N G S118 NHIE MIT DRAWI G SEE DETAIL 25-1,1W51 T 77 OF 89 SITE 21 SHEET 75 OF 89 N GEME INLET CHANN LX fCL T R17.P IBANKS ONL - DATE: 1 /1 5/2024 WOODS xM85£/ll Zl I �EST.�CyepQE -I 0 \ r I SLOPE=3.00% -- - - - -- \ aN�D \3l _ _ _ CL 'B' RIPI RAP TIE TO DITCH EXTG i ll�\ \ ES�71T�6NS STREAM SJ E WOODS r x pNBs x C) I i�/ �� \\_ P — — =-E — — E E E w - F ; L L 24" BURY INVERT 1.0' F O w' M/N DNllslx3 _ ' O N -a� - - M/a ONll-3 ---- • - - - - - - - - � NMONNNfI ,Z CRAVEN CRAB COMPANY INC. Lf1 M CL 'B' RIP RAP EST 2 TONS EST 7 SY GF SPEC. 2' BASE DITCH SEE DETAIL 25-1 WILLIAM M. VIRTUEA ETUX M. VIRTUE, ET UX W REMOVE - - _ - - - 1,1910/ - a - - - - ' -SRY4A- LU GI-D VJ v/ —9— _ - _ ld O ---- -- ---od nl-- - - - --- ------e,nl---------__ - ---oe nl---- - --- ----------- -- ----_--_--------- _---_-_ WO — — sP€c nlTr�,PN�-- --------- ------- ---------- Z + SEE DETAIL 25-4^ S-70-EA5--- N N J �M F 2 — ---__----_-----_ —_-- ---- V---------- T -L- LU Ip c --- ---_ -- _GRASS ----- ---2GI'C --- -- -- - 1= ---- cQ G J FS SEE DETAIL SHEET 7SL-4,-DETAILIT SPEC DITCH GRADING SEE D 'L25-4 — — — ---- - -- —_- FL WABLE FILL —��� 2G1 _- ._ - �5=-------- —2Q11 0 i--. N s 15" - - - - - - - - - - - - - - - - - - - _ - - -- - - - - - ---------M------- > dal - - - -sv- - - - 3GT-D -- FS SEE DETAIL SHEET - - _+Ond -ss3- - - - - - - - - - - GRASS - --ssi-1- _ Nb2GI.m--- ��Z 2D ETAIL 11------LL.I AVMOVOH 03AVd 10P1bell as AVNOVO�I 03AVd,OZ bLll F'S �'RC���� -$RY4�2- „f9'6ZI REMOVE LUCP-III REMOVE --REMOVE REMOVE rvolry M/ VE —M —3Nil-I rs2—i t ll C3 - A3S ` O H� dO8 'I O 9,O1 18" AOS� IaQ 0 E nJs N9 18' Ai 9NUSIx3 �. US HWY 70 EBL 24' PAVED rPAVED SHOULDER FALS - -- —dad -}5 - �IVy1 TCH GRADIN - _- - = RE E N' d d.51 dO Au- DID D U U u — DUE DUE �D�IE DUB —DUE i}DUB cL-S'D JNOO lsp I I 3 Od e� II II 3lod J I E TTi N--lANln ,0 PEC 'V' DITCH I dwtlzl OM OVId I � JE D AIL 25-2 Np � • -- SFEC-V'DrtCFr CCLJJJ $EE DETAIL 25-2 pN851 pNe51 ONBSI Q ON851 © pN851 pN851 HO B ONBSI ON851 NLECTOJSR-577NB STR. #0 X X xx a X X l .8b X lHO ,9 X RIM ATION 011tld 311 N` 31tl0 DS_ - ONOO L I J o JNOJ w AdONVO —/ 011tld I� �dWNd S`2 dWfld QS - dWfld i �Y, dWNd L Np = dWfld O /' I r� �Q 011tld Od31S `zl `ii Od31S O �G $t0 W d31S J Gd31S d31SG d31S ONOO NNtll p/fly S NT8 O ROYSTON D. BLANDFORD PP f�I MICHAEL ONOO J-'Np �Np�UX LARRY W. ❑ — r O DAVENPORT, ET UX s I S 11 REBECCA C. FINER CJ EDWARD ROBERT P. JAMES L. DONALS L. RANDALL ALLEN PURYEAR & GOWING 0. LOYD, ET UX WOODCOCK, ET UX ROBINSON JR. GRAY, ET AL HILL, ET UX INVESTMENTS,LLC IN 2GT' d"nd d31S O REUBEN JULIUS LOGAN, ET UX DETAIL 25-1 DETAIL 25-2 DETAIL 25-3 DETAIL 25-4 SPECIAL BASEleDITCH SPECIAL 'V' DITCH PIPE INLET CHANNEL SPECIAL DITCH GRADING (Not to Sca) (Noll° Sc°lef (Not to Swlel I Notro Scale) 4 DiKh NONmI Nprorol G—d Front 1 at Slope Ground 3 3� Ground Ground 3. A.� ct Dikh NOl°r°I p' d\0t7 D .� �* J °DI E��et Slope Ground 3.� D a;\ t� Tuck Geeteriile `5P�/,� D \P0 SP ` Min. D=1.5 Ft. Min. D=1.5 FL Georenila g ° MiN�pt of 1N [p NFL =2.0 Ft. Rey-Ie Rip-Rpp per Sld. D,.$76.01 Min. D=zoFr. *SEE CROSS S 8 ECTIONS Min. D=1.0 Ft. FROM STA. 65+70 TO STA. 66+70-SRY4A- LT Type of Liner= CI- T Rip -Rap B=3.OFf. FROM STA. 312+00 TO STA. 313+50 -L- LT FROM STA. 63+90 TO STA. 65+20-SRY4A- LT FROM STA. 18+40 TO STA. 25+30-SRY4D2- RT ES1.29 Tons, Est.52 SV Geotextile FROM STA. 312+00 TO STA. 315+00 -L- RT FROM STA. 66+90 TO STA. 75+47-SRY4A- LT FROM STA. 25+80 TO STA. 29+80-SRY4D2- RT FROM STA. 312+50 TO STA. 316+00 -L- M FROM STA. 75+70 TO STA. 75+90 -SRYAA- LT STA. 75+60-SRY4A- LT FROM STA. 322+50 TO STA. 324+00 -L- M CD �p O N 'IT L(0 F- >- r- L LI Q LU U. O L1J O Z N J M LLJ C) < LJJ Q 2 J i O (p Q + N } L1J W PAVEMENT REMOVAL FOR -LLT- PROFILE SEE SHEETS 56 & 57 FOR -LRT- PROFILE SEE SHEETS 56 & 57 FOR-SRY4A- PROFILE SEE SHEETS 94 & 95 FOR-SRY4D2- PROFILE SEE SHEET /0/ Submittal February 6, 2024 CRAVEN CRAB JONATHAN COMPANY INC. FULCHER SEE DETAIL 25-1 \\\) \ 'V' DITCH 'IfSPEC. ETAIL 25-2 �I O L" — - I O N �cMOW 10� Q W c H = 07 V) W O _ _ - - Z N N ---- J � -- =M W 33 W --- E£ cQ c/) - FS, SEE DETAIL SHEET I 751=4TT I 32 I O d-&15-" N V00 W--- Q LLIcn N JS 1 4J Otlld . —SEC-'V'ORCFr SEE DETAIL 25-2 I ONBSI J X Iltld tl`, -/ OJ dWfld LI \? Iti J �d3�s ROYSTON D.BLANDFORD MICHAEL Ju J. LONGO, ET UX S SURFACE WATER IMPACTS TEMPORARY SURFACE WATER IMPACTS CRAVEN CRAB COMPANY INC. WILLIAM M. WILLIAM M. un VIRTUE, ET UX VIRTUE, ET UX i;� I I CL 'B' RIP RAP / EST 2 TONS 3.,J N ., TEASE EST 7 SY GF,I`",] = 2- SPEC. 2' BASE DITCH 3\ SEE DETAIL 25-1 WOODS G� I � n J �A _ TIE TO 0A DITCH WOOS X ON951 X O I< £E- 30�i- —_ s FS SEE DETAIL SHEET FCF-lid _coven o= ti 50' 25' 0 50, 100, BURNEY L. HAWKINS, ET UX N � J $W81 PERMIT DRA Sf19dS� HE T 77 OF FOR G� X I oI i ONesl LE I I \ /C I' RI RAP IBA as \ 1r SL( DNM CL 'B' RIPI RA EST'2 LIONS p 1•. \ \ EST 7ISy AVq0 Vq ?0* PROJECT REFERENCE NO. SHEET NO. R-5777C 25 IOADWAY DESIGN ENGINEER HYDRAULICS ENGINEER PRELIMINA RY PLANS DO NOT USE MI L CONSTRUCTION INCOMPLE E PLANS DO NOT USE MR /W ACQUISITION EMMA FRANCES FORD, ET AL Balfour Beatty DOCUMENT NOT CONSIDERED FINAL SPEC, TEASE DITCH UNLESS ALL SIGNATURES COMPLETED A, vY l /^V SEE DETAIL 25-1 PERMIT D RAW I N G 89 SITE 21 SHEET 76 OF 89 CHA N L �E ���; V DATE: 1 /15/2024 I III \ \ I —\SN E E ry E —C is Orvusl 3 ; ; 2 " BUY INVERT �S zO-E-8 ----"'STA- --- �GzM c7tAss US HWY 70 EEL 24PAVED / Gj�JSQ} nos. 1 ., .oa- - .. �' nJ5 �N—'ej-18, „-� �, S as 1 N —F* D D,. Q D . E C UE DUE DUE f D$1$1 DID Z sr DDUE CL'B'RIP JNOJ I 3 Od tlld PEC 'V' DITCH " 1so I I -j dlvtla M I / Sr 2 N '� I E T 7 --1-A ,09 SAE D AIL 25-2 NO I \ (\/) ON851 N � ON9SI ON851 © 1 ON9 ON95I � ON85I N T TO1SR 577 TR #0 ONssl J \ C?l .8b ,B X X lHJ "9 6 SE BOX IM T .''- NO I I © ti o L_ Al 31VO � HJ .. T n WOODS 31tl`J NO n fld Vd I I �Q 4Y �dWOd S`2 Od QS d0 W dWfld�/ 333333 ltld O d315d31S J i / rJG 31S d3IS" it d 1S ONOJ�� I,„ 3 NNtl1fJ/f1Crl Z£- 5 l8 l 1 1 LA'S S S r JNOJEt PORTW. NO DAVEN,T UX r 5❑ _ O ❑ REBECCA C. FINER r?J EDWARD ROBERT P. JAMES L. DONALS L. RANDALL ALL EN PURYEAR & GOWING 0. LOYD, ET UX WOODCOCK, ET UX ROBINSON JR. GRAY, ET AL HILL, ET UX INVESTMENTS,LLC REUBEN JULIUS LOGAN, ET UX DETAIL 25-1 DETAIL 25-2 DETAIL 25-3 DETAIL 25-4 SPECIAL BASEleDITCH SPECIAL 'V' DITCH PIPE INLET CHANNEL SPECIAL DITCH GRADING (Not to Sca) (Noll° Sc°lef (Not to Swle1 I Notro Scale) 4 Dikh N.—I N.—I N°Nrol Front 1 at Slope Ground 3 5� Ground Ground 3A.� ct Dikh N°lu.cl !' d\0t7 D .� �* J °D SIOPe Ground 3�� D a;\ t� Tuck Geeteriile D \P0 SP ` Min. D=1.5 Ft. Min. D=1.5 FL Georenila g ° MiNpt of 1N [p NPg =2.0 Ft. Key-Ie NVRpp —Sld. Dw $76.01 Min. D=zoFr. *SEE CROSS SECTIONS 8 Min. D=1.0 Ft. FROM STA. 65+70 TO STA. 66+70-SRY4A- LT Type of Liner= Clas T Rip -Rap B=MR. FROM STA. 312+00 TO STA. 313+50 -L- LT FROM STA. 63+90 TO STA. 65+20-SRY4A- LT FROM STA. 18+40 TO STA. 25+30-SRY4D2- RT Es1.29 Tons, Est.52 SV Geotextile FROM STA. 312+00 TO STA. 315+00 -L- RT FROM STA. 66+90 TO STA. 75+47-SRY4A- LT FROM STA. 25+80 TO STA. 29+80-SRY4D2- RT FROM STA. 312+50 TO STA. 316+00 -L- M FROM STA. 75+70 TO STA. 75+90 -SRYAA- LT STA. 75+60-SRY4A- LT FROM STA. 322+50 TO STA. 324+00 -L- M /HH O O N � L0 I— >- I` W X Q W c _ rn (0- - O W O z + (� LLJ J M � L W GC I - J I GJ- O �p -J - C14 V N H } Oo W W - � Q d U) PAVEMENT REMOVAL FOR -LLT- PROFILE SEE SHEETS 56 & 57 FOR -LRT- PROFILE SEE SHEETS 56 & 57 FOR-SRY4A- PROFILE SEE SHEETS 94 & 95 FOR-SRY4D2- PROFILE SEE SHEET /0/ Submittal February 6, 2024 \ PROJECT REFERENCE NO. SHEET NO. R-5777C SITE 21 N .qO 83jAq ���� PW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER SURFACE WATER IMPACTS INC®NIIPILE FE PLANS TEMPORARY SURFACE WATER IMPACTS 10' 5' 0 10, 20' 1 DO NOT USE FOR 6W ACOUBITION SCALE: 1"= 20' E E E DOCUMENT NOT CONSIDERED FINAL PIPE INLET C NNEL STREAM SJ UNLESS ALL SIGNATURES COMPLETED W/CL 'I' RIP EST RAP (BANK NLY)--\ TONS, PERMIT DRAWING _ EST _ GF SEE DETAIL -3 SHEET 77 OF 89 DATE: 1 /15/2024 P D ISPEC. --- ---—____ 3' BASE DITCH SEE DETAIL 26-1 00 0 BURY INVERT 1.0' HW i - 75 +00 76 +00 M / -SRY4A- W OD -4 ME 2G1-A 0 nl e— H o 1 1 US HWY 70 EBL 24' PAVED ROADWAY US 70 EB �`� Submittal February 6, 2024 PROJECT REFERENCE NO. SHEET NO. R-5777C 200 0 0 0 ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER IINC®Ng1�L1E DO NOT USE FOR ]E ]�L.�NS ®W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED CL STA 32 3+ L- L S A ' 5+ 50 SR 4A- SR 1C 1 6 " RICP IBURIED 1.0 ) G NW SE 17.2 1 i PROP INLET - — — — 6 " R P — — ii— INV 16.0 at 6" RC BURIED 1.)' =0.430 IN = 5.1 P T 24.91 @ 6" _ RC o OP 25 .5 1 at - 6" o CP IN =1 .4 Submittal February 6, 2024 DETAIL 26-1 DETAIL 26-2 DETAIL 26-3 SPECIAL BASE DITCH TOE PROTECTION IN WETLAND AREAS SPECIAL DITCH GRADING F FILL IN WETLAND 1 Not t° Scel°I 1 Na ro Sc°lel 1 N. m Seel 4 Netur°I Gro°ed 3. D1. Nat°rol A.. \ °c g\°� D� `\m. Slope Veeo°° �\ �' gRyBeo�He 5P MECHANIZED CLEARING �.! Min..0 Ft. F. ° .x. 8=2.0 Ft. d=1.0 Ft. Geotentile 'SEE CROSS SECTIONS Min. 11=1.0 R. °f Liner= CL'B' Ri Rn FROM STA. 324+00 TO STA. 326+00 -L- LT FROM STA. 75+90 TO STA. 80+90-SRY4A- LT T YP° P- P FROM STA. 324+00 TO STA. 326+00 -L- RT FROM STA. 81+65 TO STA. 83+20-SRY4A- LT F.RM STA. 3z�4100 TO STA. 336+00 -L- M HAND CLEARING Ln LV SEE PERMIT DRAWING HEET 77 OF 89 —I FOR ENLARGEMENT � F CL 'B' RIP RAP E SPEC. 2' BASE DITCH E T 7 SYO GF -I SEE DETAIL 26 l� E— N Q + FS SEE DE-ML - } LV ETAIL 10 e? 0�QLU C.?2 Cn 2GI Q LLI o i-- - - - - SPEC DITCH z + (� 2GI LL.I U Q LLI 1s" = Q (n -- --_—�v COLLAR I o ia 66" RCIVQ C ~ O LLI LJ.f 15" RCPIVB �nn Q= v / MDCB �ANNFfT >q v ° "o \�y CL'11'RIP RAP `•y \ EST 2 TONS f EST 7 SY GF RAVE - —E i- O M \ T T T T T m- T T T T T T T T T T T T 7p EMMA FRANCES FORD.ET AL \ \T T T T T T T T T T T T 22 T T T T T T T TOE PROTECTION 7F (FILL SLOPE ONLY) SITE CL'B'RIP RAP T T T T T T T T T \ EST 10 O S \ 1 EST 20 SY OF 1 T T T T TT T TT T SEE DETAIL 26-2 PPP`\ 1�T T T T T T T T T T T WETLAND WY T T T T T T T T 50' 25' 0 50' 100, SCALE: 1"=100' �q0 PROJECT REFERENCE NO. SHEET NO. R-5777C 26 tOADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION INCOMPLE E PLANS DO NOT USE FOR /W ACQUISITION Balfour Beatty StN' DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Ln PERMIT DRAWING SHEET 79 OF 89 DATE: 1 /15/2024 F M/N 'JNI151X3 t o � N L 00 of wLI -- ---- ---- o — SPEC—'HTRADING— ---- w o -------- SEE DETAIL 26-3 + Z (9 N —— Uj —_—_ — --- H Q W ------------------ SPEC DITCH GRADING I 15"RCP4 EI- a F T /J %✓ T T T T T T T T T T T T T T I i /T i`2F T T T T T T T T T T T T T T TI NICK ARNOLD ERNEST BARYON STARK 7 T / F T T T T ^IT T T T T T T T T T T !y I se ' — — — — — — — — —elM— — — — - \ lHJ .Rb L 7 T ; T T T T !T T g> WETLAND WZ - � T 7 T T T T I T T T T T IMPACTS SHADED GRAY \ 1 SPEC DITCH GRADING i arri�nry�''amr r.Tgo �.IMf s,r yglr.. PERMITTED UNDER R-5777AB /U-5713 PROJECT \ \ MICHAEL GLENN HDFFMAN, ET AL \ HARRY C. DDNCAN JR. I J FOR -LLT- PROFILE SEE SHEETS 57 & 58 FOR -LRT- PROFILE SEE SHEETS 57 & 58 FOR-SRY4A- PROFILE SEE SHEET 95 Submittal February 6, 2024 DETAIL 26-1 DETAIL 26-2 DETAIL 26-3 SPECIAL BASE DITCH TOE PROTECTION IN WETLAND AREAS SPECIAL DITCH GRADING F FILL IN WETLAND 1 Not t° Sc°I°I 1 Na ro Sc°lel 1 N. m Scelel 4 Netur°I Gro°ed 3. 6.� °c D'ncN Nat°rol Gro°nd' \ °c g\oQ° V 'I• \�; / D� F\°c Sloo° dAr° �F�\ sP AR�B�FD'0 5P MECHANIZED CLEARING �.! Min. D-1.5 H. ° d .x. 8=2.0 Ft. d=1.0 Ft. Geotentile 'SEE CROSS SECTIONS Min. D=1.0 Ft. °f Liner= CL'B' Ri Re FROM STA. 324+00 TO STA. 326+00 -L- LT FROM STA. 75+90 TO STA. 80+90-SRY4A- LT T YP° F- P FROM STA. 324+00 TO STA. 326+00 -L- RT FROM STA. 81+65 TO STA. 83+20-SRY4A- LT F.RM STA. 3z�4100 TO STA. 336+00 -L- M HAND CLEARING Ln N SEE PERMIT WING YSHEET F' —I E,NLARGEMT JJ\ �'S FB RIP RA� l E SP 2' BASE DITCH E T 7 SYO S f SE DETAIL 26-1 L I �\� E � N Q + F SEE DEDMTL - N LU ETAIL 10 Q LU �C O z+ --- _ SPEC N -S€€E€fA1L-SH = M z7-2&� LU Q U) -- --- I J I _ — — — --25— R O �✓ co LU LJ.J 15" CP-IV Z B M m Vi - -.NI- �/ O M 7F 7F T 7F T 7F 7F 7F T 7F 7F 7F 7p EMMA FRANCES FORD.ET AL . 6 TOE PROTECTION p `7F IF T 7F T T 7F (FILL SLOPE ONLY) /`�l SITE 22 \vJ CL'B'RIP RAP / OZ '� T T 7F 7F 7F 7F 'T \ EST 10 TONS \�\1 B' TIP RAP \ ST 20 SY GF ESTT7 \ 6 T T 2F 7F IF 7F T \ E DETAJL�6�1 T 7F IF IF T 7F WETLAND WY ,� ti \ 8 R mti - M/tl � * � 0� M/tl 'JNI151X3 —well---------gZ--- .I6-ZZeANREMODE —30" RCP —_ --�ANN G�-5777.44� —8��#0509-#0510 US--70-Wa / TQT T T T T TT� �T T I II IF F �- I \Z_/ T T T T T �- 6Z \ 28 \� 15" RCP -III / I � / NICK ARNOLD - WETLAND WZ IMPACTS S ADED GRAY \ PERMITTED UNDER R-5777AB /U-5713 PROJECT \ MICHAEL GLENN HUFFMAN, ET AL \ HARRY C.DUNCAN JR. I 50' 25' 0 50' 100, SCALE: 1"=100' �q0 PROJECT REFERENCE NO. SHEET NO. R-5777C 26 tOADWAY DESIGN ENGINEER HYDRAULICS ENGINEER PRELIMINA RY PLANS DO NOT USE FOR CONSTRUCTION INCOMPLE E PLANS DO NOT USE FOR /W ACQUISITION Balfour Beatty StN' DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Ln PERMIT DRAWING SHEET 80 OF 89 DATE: 1 /15/2024 � Qti 0` Q + N 'ITj\ < Uj < U1J — — 1 �q - - SPEc�ITCH-GRADmT aC� ---- w O SEE DETAIL 26-3 + zLjj CO N 6z --- Q Q LJJ EC�s [CE-GRAWRG. 0f C J —43—F I STARI,�, J FOR —LLT— PROFILE SEE SHEETS 57 & 58 FOR —LRT— PROFILE SEE SHEETS 57 & 58 FOR—SRY4A— PROFILE SEE SHEET 95 Submittal February 6, 2024 0 10 20 PROL REFERENCE NO. SHEET NO. R-5777 L-115 300 2110 260 240 220 21 180 160 1 0 120 100 80 60 40 20 20 40 60 80 100 120 1 0 160 180 200 220 2 0 2 0 2110 300 PERMIT WIN w T ND r I SHEET8 F 8 SITE 22 o JDATE: 1 / 5/ 02 49 3 FILL IN WELAN MECHANIZED HAND C CL EARI RIN G n. 020 0. 0 3 27. 0.025 7. 27 99 7.\ 0.025 .73 _ — ap SITE 22 WETLAND a a 3 FILL IN ET ND 40 \ .020 0.020 0 025 6.7 0.025 —_ 27.1 2z 78 .47 — 39+0.0 .020 0.020 0.025 6 ;\ 0.025 26. 27 58 .21 — - _ - 3 9+0.0 AD .020 0.020 0.025 6 .1 0.025 — 24.52 26.6 2�38 9 �- 38f0.0 71 1 .020 0.020 1 0.025 6.1 0.025 24.)4 4\ 26. i 69:1 _ _ 38f0.0 .020 0.020 0.025 0.025 23. b 26. 26 98 5. — 37+0.0 300 2 10 2 0 200 1Lo 160 1 0 120 100 60 402 20 60 1 0 140 1 0 1 140 1110 200 220 2,10 260 2110 300 Submittal February 6, 2024 0 10 20 PROJ. REFERENCE NO. SHEET NO. R-5777 L-116 300 2110 260 240 220 2110 180 160 1 0 120 100 80 60 40 20 20 40 60 80 100 120 1 0 160 180 200 220 2,10 2 0 2110 300 PERMIT WIN SHEET 812 OF 8 D E: 1 / 5/ 02 q,1 3.020 0.020 3;7 28. 0.025 10.8 7:7 29 10. 20 3 :1 0.025 213-0 lip an 40 q;1 020 0.020 3;7 0.025 9.7 7: 0.025 2 29 00 — q 020 0.020 3; 0.02s 9.7 g, :1 0.025 _ — 28. / 2990 27.78 - O O 2 O 2 W 3 W 3 3 40 q 020 0.020 3;7 0.025 8,2 .1 4:1 0,025 - 28.15 2859 27.52 WE LA D SITE 22 49 FIB IN METLkND 40 NEC:HA,NIZEP H D CLEARI LEA I G n .020 0.020 3: 0.025 7.7 . 0.025 — 28. 2839 7.25 — ET ND 22 0 z SITE W 3 FILL IN WETU,ND ECH H NIZ ND D C CLEARING EARI G �1 .020 0.020 3: 0.025 7. 3 2:1 0.025 3 0 2 0 2 0 2 0 2 0 2 0 1 0 1 0 110 1 0 140 60 40 2 11 810 1 0 1 0 1 0 14 11 2 0 2,10 2 0 2110 300 Submittal February 6, 2024 F- LU Lu CD 0 U) 1 W z J U QC G Submittal February 6, 2024 k-�\/ y � � �' Nl ��\ 2p, 2� �F%'OZ 1 \ \\ \ "mod M \z� =II� ik \ \ \ SPEC 'V' DITCH \ SEE DETAIL 32-1 50' 25' 0 50' 100, SCALE: 1"=1 11 �2J PQ VV a "\ N C I# �� �, \ A \�'� WALTER T. IVES, JR. ET U SITE 24 ,,0 NN II1JI I I/ RIP RAP LET N EL ONLY) ETAIL 32-4 \\ J E ERMIT DRAWING � 119 m1 ET�85OF89 may, t R G RY \ I z9 d °" �\/ \ N � ��, \ T l.o' T� EIS�4RGEMENT > I P.A.JE.-�.-_I L 2 z /2 I/ I I I -� Taal SITE 23 NN W/ FIBER ( I/ / R PE- \ SEED N / 1 l 21 SI V G \��> ) ` P1jE l Nl `SPEC V' DITCH '/�l \ 00 �- 1 77 P�� Vbf JR INVERT$ 1. ' u EST ti {ESSTT C EK8 v 0 SITE 24 20� �25� �z5✓ �� >\ o` \ /PLIE ,.� Li TELEPHOrvE A�_23 / 1 T �II—/�FL1•�_ LEGRAPH COMPANY EASENE \ 23 21\�� \ �kST 2220 SlY' GiiF 1� _/ 2 //� 22 a /— SE Df ETAIL 32�^/Z NJ1E\RSELL t ' •jll 1\ �� E HRECKEVV�T.ET UX rB INVERTS 1.0"•'— E N •COk�\s2 NC. I//I \ \ 2A 1 \ 110 \ \'m I \ f \\ DETAIL 32-1 DETAIL 32-2 PROJECT REFERENCE NO. SHEET NO. R-5777C 32 tOADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMIN RY PLANS DO NOT UBB Po CONSTRUCTION INC®MPLE E PLANS DO NOT USB POR /W ACQUISITION Balfour Beatty �' DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PERMIT DRAWING SHEET 84 OF 89 DATE: 1 /15/2024 JAMES THOMAS KILLINGSWORTH, ET UX a�ag� � d�a No3 \Q �3 JOHN R.BOOHER,ET UX SPECIAL 'V'DITCH PIPE OUTLET CHANNEL SURFACE WATER IMPACTS IIA to Scale) ( NO UTL $cala) Front Nao� I Natural DHch 3.J .1 G.wn Ground 3;J� A-. ec Slope d p 3 D Min. D=2.0 F1. Min.D=1.5 Ft. B Mnz. d=,.D h. TEMPORARY SURFACE WATER IMPACTS B=3.0 F1. Length=42Ft. I FROM STA, 52+ 00 TO STA. 53+88-SRY1C- LT Type of Liner=120 BY COIR FIBER MAT 91 FROM STA. TO STA. --SRY1C- LT Est. 40 CY DDE FROM STA. 11+00 +00 TO STA. 14+00 +00 SRYI DY3C- LT STA. 54+60-SRY1C- RT FROM STA. 12+00 TO STA. 14+00-SRYIDY3C- RT DETAIL 32-3 TOE PROTECTION (Nw m Scale) oa '%��� SLOPE GaOUND d F GEOTEXIILE d=1.0 Ft. Type of l-i-- CI -A 'B' Rip -Rap FROM STA. 38+50 TO STA. 39+62 -Yl- RT FROM STA. 39+76 TO STA. 41+09 -Yl- RT FROM STA. 41+24 TO STA. 42+00 -Yl- RT DETAIL 32-4 PIPE OUTLET CHANNEL IN— S,-) Natural Ground 3 3� D Nmurol Ground d 1 Tuck Georexlile GeoteNile g a Minimum of 1N 0YP1 Min. D=3.OFt. Length= 30 Ft. d-4.0F. Type of Liner-CL'1' Rip -Rap - KeyedJn B=S.OFL- 11.OFt. Est 52 Tons, Est 90 SY GeateNila E� 90 IVarieble at52 at OoHet) STA. 40+90 -Yl- LT FOR -Yl- PROFILE SEE SHEETS 60 & 61 FOR-SRYIC- PROFILE SEE SHEET 84 FOR-SRYIDY3C- PROFILE SEE SHEET 84 Submittal February 6, 2024 Submittal February 6, 2024 WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 1 14+56 to 15+65-L- 1@7'x7' RCBC 0.005 0.006 0.006 40 15+16 to 15+65-L-LT INLET CHANNEL 0.005 0.004 19 19 14+56 to 14+87-L-RT OUTLET CHANNEL 0.015 0.002 54 11 2 20+07 to 20+70-L-LT ROADWAY FILL 0.010 22+60 to 22+81-L-LT 0.001 3 29+31 to 29+62-SRY1C-LT 42" RCP 0.007 4 29+69 to 29+80-SRY1 C-RT 42" RCP 0.001 5 29+70 to 32+33-Y1- ROADWAY FILL 0.494 0.080 0.001 18+37 to 22+01-Y1 LPD- 26+34-26+38-Y1 RPD-LT 6 14+31 to 16+39-SRY1 DY3C- 30" RCP 0.121 0.030 0.032 7 56+14 to 56+26-L-RT 66" RCP OUTLET CHANNEL 0.001 0.002 6 15 18+83 to 19+46 -Y1 RPD- 66" RCP 0.010 91 18+81 to 18+94-Y1 RPD-RT INLET CHANNEL 0.002 15 18+85 to 18+94-Y1 RPD-RT INLET BANK STABILIZATION 20 19+20 to 19+46-Y1 RPD-LT OUTLET CHANNEL 0.001 13 19+20 to 19+37-Y1 RPD-LT OUTLET BANK STABILIZATION 25 TOTALS*: 0.627 0.000 0.000 0.128 0.033 0.037 0.011 255 73 0 *Rounded totals are sum of actual impacts NOTES: Revised 2018 Feb Submittal February 6, 2024 WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 7 20+16 to 21+75-SRY1DY3C- 66" RCP 0.126 0.050 0.043 0.013 156 21+38 to 21+56-SRY1 DY3C-LT INLET CHANNEL 0.001 9 21+41 to 21+56-SRY1 DY3C-LT INLET BANK STABILIZATION 20 20+39 to 20+60-SRY1 DY3C- OUTLET CHANNEL 0.002 0.001 34 17 8 63+34 to 63+43-L-RT 1@6'x7' RCBC OUTLET CHANNEL 0.004 0.003 23 15 29+06 to 29+10-SRY1 DY3C- 1 @7'x7' RCBC 0.007 0.007 67 29+05 to 29+10-SRY1 DY3C-LT INLET CHANNEL 0.002 22 29+05 to 29+10-SRY1 DY3C-LT INLET BANK STABILIZATION 30 29+15 to 29+33-SRY1 DY3C-RT OUTLET CHANNEL 0.002 28 29+15 to 29+29-SRY1 DY3C-RT OUTLET BANK STABILIZATION 30 9 34+03 to 35+29-SRY1 DY3C-RT ROADWAY FILL 0.062 0.014 0.004 10 42+04 to 42+30-SRY1 DY3C-RT ROADWAY FILL 0.002 0.002 11+24 to 12+95-Y1 D2-RT ROADWAY FILL 0.013 0.010 0.029 11 49+26 to 49+33-SRY1 DY3C-RT 36" RCP 0.001 14 49+28 to 49+32-SRY1 DY3C-RT OUTLET CHANNEL 0.001 0.001 12 15 12 94+40 to 94+99-L- 60" RCP 0.008 105 61+06 to 61+14-SRY1 DY3C-RT 94+40 to 94+53-L-LT INLET CHANNEL 0.002 20 94+47 to 94+53-L-LT INLET BANK STABILIZATION 16 TOTALS*: 0.201 1 0.000 1 0.010 0.073 1 0.078 j 0.036 1 0.012 1 507 1 126 1 0 *Rounded totals are sum of actual impacts NOTES: Revised 2018 Feb Submittal February 6, 2024 WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 13 103+70 to 103+91-L-RT 48" RCP 0.003 18 103+70 to 103+79-L-RT OUTLET CHANNEL 0.001 0.001 20 11 14 25+64 to 25+84-SRY4B- 1@7'x7' RCBC 0.001 7 25+68 to 25+83-SRY4B-RT INLET CHANNEL 0.003 18 25+72 to 25+83-SRY4B-RT INLET BANK STABILIZATION 25 25+64 to 25+84-SRY4B-LT OUTLET CHANNEL 0.001 10 25+68 to 25+84-SRY4B-LT OUTLET BANK STABILIZATION 30 202+88 to 203+25-L-LT 1 at TxT RCBC 0.001 11 202+95 to 203+14-L-LT OUTLET CHANNEL 0.004 0.003 31 21 15 201+66 to 203+45-L-RT 2@7'x7' RCBC 0.099 0.043 0.033 0.089 16 220+32 to 220+55-L-LT 54" RCP 0.004 33 220+43 to 220+55-L-LT OULET CHANNEL 0.002 0.001 20 7 17 231+01 to 232+19-L-RT ROADWAY FILL 0.004 0.019 0.016 18 234+52 to 236+79-L- 72" RCP 0.017 223 235+03 to 235+22-L-RT INLET CHANNEL 0.001 0.001 26 10 236+47 to 236+79-L-LT OUTLET CHANNEL 0.002 0.002 16 21 TOTALS*: 0.103 0.000 0.062 0.049 0.089 0.036 0.012 460 98 0 *Rounded totals are sum of actual impacts NOTES: Revised 2018 Feb Submittal February 6, 2024 WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 19 68+13 to 69+40-SRY4B-LT ROADWAY FILL 0.022 0.025 70+47 to 71+03-SRY4B-LT 0.010 0.012 20 18+84 to 19+61-SRY4D- ROADWAY FILL 0.069 0.008 0.005 21 323+61 to 323+76-L-LT 66" RCP 0.006 64 323+61 to 323+69-L-LT INLET CHANNEL 0.002 0.001 23 12 22 329+01 to 331+42-L-LT ROADWAY FILL 0.138 0.018 0.019 23 39+61 to 40+24-Y1- 54" RCP 0.011 0.002 93 18 24 40+20 to 41+30-Y1- 54" RCP 0.012 0.001 126 18 40+71 to 41+03-Y1-LT OUTLET CHANNEL 0.005 0.001 30 10 TOTAL SHEET 84 OF 87 0.627 0.000 0.000 0.128 0.033 0.037 0.011 255 73 0 TOTAL SHEET 85 OF 87 0.201 0.000 0.010 0.073 0.078 0.036 0.012 507 126 0 TOTAL SHEET 86 OF 87 0.103 0.000 0.062 0.049 0.089 0.036 0.012 460 98 0 TOTAL SHEET 87 OF 87 0.239 0.000 0.000 0.063 0.024 0.036 0.005 336 58 0 TOTALS*: 1.170 0.000 0.072 1 0.313 1 0.224 j 0.145 1 0.040 j 1558 1 355 1 0 *Rounded totals are sum of actual impacts NOTES: Site 20: Wetland WP Total Take West of-SRY4D- Due to Loss of Function: 0.039 ac (Impacts not included in table above) Fill Mitigation = 2:1, Total Take Mitigation = 1:1 Revised 2018 Feb