Loading...
HomeMy WebLinkAboutENV-01-Impacts_Replace_pg7_20240502�i IM)l 0 12/2023 60% DESIGN SUBMITTAL ISSUE DATE DESCRIPTION PROJECT MANAGER C. BENNETT, PE DESIGNED BY: P. BLANDFORD, PE CHECKED BY: I J. TISDALE PWS DRAWN BY: IA. MULLINS PROJECT NUMBER 110294945 NOT FOR CONSTRUCTION BETHABARA ROAD EMERGENCY @j CULVERT REPLACEMENT PROJECT Winston-Salem, North Carolina Winston Salem N D GENERAL NOTES: 1. SEE SHEET 01CG112 FOR CULVERT BAFFLES IN PROFILE 2. SEE SHEET 01CG112 FOR PLACEMENT OF RIPRAP AND GEOTEXTILE IN STREAM BED. RIP -RAP WILL BE EMBEDDED IN STREAM CHANNEL AND WILL NOT EXCEED ORIGINAL STREAM BED ELEVATION. LEGEND PROPERTY LINES / RIGHT OF WAY xxx- — EXISTING MAJOR CONTOUR — x— PROPOSED MAJOR CONTOUR -- xxx--- EXISTING MINOR CONTOUR —zxz— PROPOSED MINOR CONTOUR IJ--��tlIL _ TEMPORARY COFFER DAM PERMANENT CULVERT STREAM IM _ PERMANENT RIPRAP KEYED INTO STREAM BED NO MITIGATION / STREAM CENTERLINE t / 0 40' 80' SCALE 1"=40' ENVIRONMENTAL IMPACTS PLAN FILENAME I ENV-01.DWG I SHEET SCALE 1° 40' ENV-01 IIIIIIIIIIIIIIIIN IIIIIIIIIIIIIN mow