HomeMy WebLinkAboutENV-01-Impacts_Replace_pg7_20240502�i
IM)l
0 12/2023 60% DESIGN SUBMITTAL
ISSUE DATE DESCRIPTION
PROJECT MANAGER C. BENNETT, PE
DESIGNED BY: P. BLANDFORD, PE
CHECKED BY: I J. TISDALE PWS
DRAWN BY: IA. MULLINS
PROJECT NUMBER 110294945
NOT FOR
CONSTRUCTION
BETHABARA ROAD EMERGENCY
@j CULVERT REPLACEMENT PROJECT
Winston-Salem, North Carolina
Winston Salem
N
D
GENERAL NOTES:
1. SEE SHEET 01CG112 FOR CULVERT BAFFLES IN
PROFILE
2. SEE SHEET 01CG112 FOR PLACEMENT OF
RIPRAP AND GEOTEXTILE IN STREAM BED.
RIP -RAP WILL BE EMBEDDED IN STREAM
CHANNEL AND WILL NOT EXCEED ORIGINAL
STREAM BED ELEVATION.
LEGEND
PROPERTY LINES / RIGHT OF WAY
xxx- — EXISTING MAJOR CONTOUR
— x— PROPOSED MAJOR CONTOUR
-- xxx--- EXISTING MINOR CONTOUR
—zxz— PROPOSED MINOR CONTOUR
IJ--��tlIL
_ TEMPORARY COFFER DAM
PERMANENT CULVERT STREAM IM
_ PERMANENT RIPRAP KEYED INTO
STREAM BED NO MITIGATION
/ STREAM CENTERLINE
t /
0 40' 80'
SCALE 1"=40'
ENVIRONMENTAL IMPACTS PLAN
FILENAME I ENV-01.DWG I SHEET
SCALE 1° 40' ENV-01
IIIIIIIIIIIIIIIIN
IIIIIIIIIIIIIN
mow