Loading...
HomeMy WebLinkAbout310244_Application_20240328 State of North Carolina Department of Environmental Quality Division of Water Resources Animal Waste Management Systems Request for Certification of Coverage Facility Currently covered by an Expiring Sate Non-Discharge General Permit On September 30, 2024, the North Carolina State Non-Discharge General Permits for Animal Waste Management Systems will expire. As required by these permits, facilities that have been issued Certificates of Coverage to operate under these State Non-Discharge General Permits must apply for renewal at least 180 days prior to their expiration date. Therefore,all applications must be received by the Division of Water Resources by no later than April 3,2024. Please do not leave any question unanswered. Please verify all information and make any necessary corrections below. Application must be signed and dated by the Permittee. 1. Certificate Of Coverage Number: AWS310244 2. Facility Name: Next Generation 2 3. Permittee's Name(same as on the Waste Management Plan): Next Generation Family Ventures LLC 4. Permittee's Mailing Address: 314 Willard Edwards Rd City: Beulaville State: NC Zip: 28518 Telephone Number: 910-298-3012 Ext. E-mail: 5. Facility's Physical Address: 363 Willard Edwards Rd City: Beulaville State: NC Zip: 28518 6. County where Facility is located: Du tin 7. Farm Manager's Name(if different from Landowner): 8. Farm Manager's telephone number(include area code): 9. Integrator's Name(if there is not an Integrator,write "None"): Murphy-Brown LLC 10. Operator Name(OIC): Nicholas Edwards Phone No.: 910-290-0531 OIC#: 996567 11. Lessee's Name(if there is not a Lessee,write"None"): 12. Indicate animal operation type and number: Current Permit: Operations Type Allowable Count Swine-Feeder to Finish 2,880 Operation Types: Swine Cattle Dry Poultry Other Types Wean to Finish Dairy Calf Non Laying Chickens Horses-Horses Wean to Feeder Dairy Heifer Laying Chickens Horses-Other Farrow to Finish Milk Cow Pullets Sheep-Sheep Feeder to Finish Dry Cow Turkeys Sheep-Other Farrow to Wean Beef Stocker Calf Turkey Pullet Farrow to Feeder Beef Feeder Boar/Stud Beef Broad Cow Wet Poultry Gilts Other Non Laying Pullet Other Layers 13. Waste Treatment Lagoons,Digesters and Waste Storage Ponds(WSP):(Fill/Verify the following information. Make all necessary corrections and provide missing data.) Structure Type Estimated Liner Type Estimated Design Freeboard Structure (Lagoon/Digester/ Date (Clay,Synthetic, Capacity Surface Area 'Redline" Name WSP) Built Unknown) (Cubic Feet) (Square Feet) (Inches) DP Lagoon 7/22/1993 Full,clay 579,929.00 68,800.00 19.50 I L I I I I I Submit one (1) copy of the Certified Animal Waste Management Plan (CAWMP) with this completed and signed application as required by NC General Statutes 143-215.10C(d), either by mailing to the address below or sending it via email to the email address below. The CAWMP must include the following components: 1. The most recent Waste Utilization Plan(WUP),signed by the owner and a certified technical specialist,containing: a. The method by which waste is applied to the disposal fields(e.g.irrigation,injection,etc.) b. A map of every field used for land application(for example:irrigation map) c. The soil series present on every land application field d. The crops grown on every land application field e. The Realistic Yield Expectation(RYE)for every crop shown in the WUP £ The maximum PAN to be applied to every land application field g. The waste application windows for every crop utilized in the WUP h. The required NRCS Standard specifications 2. A site map/schematic 3.Emergency Action Plan 4.Insect Control Checklist with chosen best management practices noted 5. Odor Control Checklist with chosen best management practices noted 6.Mortality Control Checklist with selected method noted-Use the enclosed updated Mortality Control Checklist 7.Lagoon/storage pond capacity documentation(design,calculations,etc.) Please be sure the above table is accurate and complete. Also provide any site evaluations,wetland determinations,or hazard classifications that may be applicable to your facility. 8. Operation and Maintenance Plan If your CAWMP includes any components not shown on this list,please include the additional components with your submittal. (e.g.composting,digesters,solids separators,sludge drying system,waste transfers,etc.) I attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that, if all required parts of this application are not completed and that if all required supporting information and attachments are not included,this application package will be returned to me as incomplete. Note: In accordance with NC General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application may be subject to civil penalties up to $25,000 per violation. (18 U.S.C. Section 1001 provides a punishment by a fine of not more than$10,000 or imprisonment of not more than 5 years,or both for a similar offense.) Print the Name of the Permittee/Landowner/Signing Official and Sign below.(If multiple Landowners exist,all landowners should sign. If Landowner is a corporation,signature should be by a principal executive officer of the corporation): Name(Print): r` �t C3lc) Title: Signature: '�J`�s!C t,J Date: Name(Print): J V t C 'kv-S �I o r•�a Title: ' O h�y Signature: Date: a,'p'l$ .Z-T Name(Print): Title: Signature: Date: THE COMPLETED APPLICATION SHOULD BE SENT TO THE FOLLOWING ADDRESS: E-mail: animal.operations@deq.nc.gov NCDEQ-DWR Animal Feeding Operations Program 1636 Mail Service Center Raleigh,North Carolina 27699-1636 Murphy-Brown, LLC 3/10/2014 2822 Hwy 24 West P.O. Box 856 Warsaw, NC 28398 NUTRIENT UTILIZATION PLAN Grower(s): Dexter Edwards AJ41<Y Farm Name: D & P Farm 614''t'�°` County: Du lin Farm Capacity: Farrow to Wean Farrow to Feeder Farrow to Finish Wean to Feeder Feeder to Finish 2880 Storage Structure: Anaerobic Lagoon Storage Period: >180 days Application Method: Irrigation The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface water and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner 1. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. 2. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and available water holding capacities. 3. Normally waste shall be applied to land eroding at less than 5 tons per acre per year. Waste may be applied to land eroding at 5 or more tons per acre annually, but less than 10 tons per acre per year providing that adequate filter strips are established. 4. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DWQ regulations. 5. Wind conditions should also be considered to avoid drift and downwind odor problems. 6. To maximize the value of the nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied not more than 30 days prior to planting a crop or forages breaking dormancy. Injecting the waste or disking will conserve nutrients and reduce odor problems. 1 of 8 This plan is based on the waste application method shown above. If you choose to change methods in the future, you need to revise this plan. Nutrient levels for different application methods are not the same. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. In some cases you may want to have plant analysis made,which could allow additional waste to be applied. Provisions shall be made for the area receiving waste to be flexible so as to accommodate changing waste analysis content and crop type. Lime must be applied to maintain pH in the optimum range for specific crop production. This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H .0217 adopted by the Environmental Management Commission. AMOUNT OF WASTE PRODUCED PER YEAR (gallons,ft',tons,etc.): Ca acit T e Waste Produced Per Animal Total Farrow to Wean 3212 gal/yr galtyr Farrow to Feeder 4015 gal/yr gal/yr Farrow to Finish 10585 galtyr gal/yr Wean to Feeder 223 gal/yr gal/yr 2880 Feeder to Finish 986 gal/yr 2,839,680 gai/yr Total 2,839,680 gall r AMOUNT OF PLANT AVAILABLE NITROGEN PRODUCED PER YEAR (lbs): Ca acit T e Nitro en Produced -or Animal Total Farrow to Wean 5.4 Ibs/yr Ibs/yr Farrow to Feeder 6.5 lbs/yr Ibs/yr Farrow to Finish 26 Ibs/yr Ibs/yr Wean to Feeder 0.48 Ibs/yr Ibs/yr 2880 Feeder to Finish 2.3 Ibstyr 6,624 Ibstyr Total 6,624 Ibs r Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. LAND UTILIZATION SUMMARY The following table describes the nutrient balance and land utilization rate for this facility Note that the Nitrogen Balance for Crops indicates the ratio of the amount of nitrogen produced on this facility to the amount of nitrogen that the crops under irrigation may uptake and utilize in the normal growing season. Total Irrigated Acreage: 22.46 Total N Required 1st Year: 6860.3 Total N Required 2nd Year: 0 Average Annual Nitrogen Requirement of Crops: 6,850.30 Total Nitrogen Produced by Farm: 6,624.00 Nitrogen Balance for Crops: (226.30) The following table describes the specifications of the hydrants and fields that contain the crops designated for utilization of the nitrogen produced on this facility. This chart describes the size, soil characteristics,and uptake rate for each crop in the specified crop rotation schedule for this facility. 2 of 8 Reception Area Specifications Tract Field Irrigated Soil 1st Crop Time to 1st Crop 1st Crop Lbs N/Ac Lbs N Total Ibs N 2nd Crop Time to 2nd Crop 2nd Crop Lbs N/Ac Lbs N Total Ibs N Total Total lbs N Acres e T Code A Yield Its N/Unit Residual /Ac Utilized Code I Yield Ibs N/Unit Residual /Ac Utilized Lbs N/Ac Utilized 4936 Pivot 12.76 F0 B Mar-Se 5.1 50 255 3253.8 K S e 50 2A 2.2 Fo B Mar-Se 5.1 50 50 6�8320553691.8 255 561 K 50 50 1 671 26 1 Fo B Mar-Se 5.1 50 255 255 K 50 50 50 305 305 2C 0.5 Fo B Mar-Se 5.1 50 255 127.5 K 50 50 25 305 152.5 3A 4.5 Fo B Mar-Se 5.1 50 255 1147.5 K 50 50 225 305 1372.5 3B 1.5 Fo B Mar Set 5.1 50 255 382.5 K Sept-Apr 1 50 50 75 305 457.5 L1-L8 23.24 NbA *see cro options list ed below Q Ma-Au ust 3.0 50 150 D Feb15-June 117.0 1.14 133.38 F it-Au us 883.0 0.089 78.587 N Se t-A ril 61.0 2.09 riFAu u 127.49 O A sl 40.0 4 1 K Sept-April 1.0 50 50 Totals: 22.48 5727.3 1123 6850.3 3(a)of 8 This plan does not include commercial fertilizer. The farm should produce adequate plant available nitrogen to satisfy the requirements of the crops listed above. The applicator is cautioned that P and K may be over applied while meeting the N requirements. In the future, regulations may require farmers in some parts of North Carolina to have a nutrient management plan that addresses all nutrients. This plan only addresses nitrogen. In interplanted fields(i.e. small grain, etc, interseeded in bermuda), forage must be removed through grazing, hay, and/or silage. Where grazing, plants should be grazed when they reach a height of six to nine inches. Cattle should be removed when plants are grazed to a height of four inches. In fields where small grain, etc, is to be removed for hay or silage, care should be exercised not to let small grain reach maturity, especially late in the season(i.e. April or May). Shading may result if small grain gets too high and this will definately interfere with stand of bermudagrass. This loss of stand will result in reduced yields and less nitrogen being utilized. Rather than cutting small grain for hay or silage just before heading as is the normal situation, you are encouraged to cut the small grain earlier. You may want to consider harvesting hay or silage two to three times during the season, depending on the time small grain is planted in the fall. The ideal time to interplant small grain, etc, is late September or early October. Drilling is recommended over broadcasting. Bermudagrass should be grazed or cut to a height of about two inches before drilling for best results. CROP CODE LEGEND Crop Code Crop Lbs N utilized/unit yield Barley B 1.6 Ibs N/bushel Hybrid Bermudagrass-Grazed 50 Ibs N/ton C Hybrid Bermudagrass- Hay 50 Ibs N/ton D Corn-Grain 1.25 Ibs N/bushel E Corn-Silage 12 Ibs N/ton F Cotton 0.12 Ibs N/Ibs lint G Fescue-Grazed Ibs N/ton H Fescue-Hay I Oats 50 Ibs N/ton 1.3 Ibs N/bushel Rye K Small Grain-Grazed 2.4 Ibs N I bushel 50 Ibs N/acre L Small Grain - Hay 50 Ibs N/acre M Grain Sorghum 2.5 Ibs N/cwt N Wheat O Soybean 2.4 Ibs N/bushel p 4.0 Ibs N/bushel Pine Trees 40 Ibs N/acre/yr Acres shown in the preceding table are considered to be the usable acres excluding required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in the tables. See attached map showing the fields to be used for the utilization of animal waste. 4 of 8 r_ SLUDGE APPLICATION: The following table describes the annual nitrogen accumulation rate per animal in the lagoon sludge Farm Specifications PAN/ r/animal Farm TotaUvr Farrow to Wean 0.84 Farrow to Feeder 1 Farrow to Finish 4.1 Wean to Feeder 0.072 2880 Feeder to Finish 0.36 1036.8 The waste utilization plan must contain provisions for periodic land application of sludge at agronomic rates. The sludge will be nutrient rich and will require precautionary measures to prevent over application of nutrients or other elements. Your production facility will produce approximately 1036.8 pounds of plant available nitrogen per year will accumulate in the lagoon sludge based on the rates of accumulation listed above. If you remove the sludge every 5 years, you will have approximately 5184 pounds of plant available nitrogen to utilize. Assuming you apply this PAN to hybrid bermuda grass hayland at the rate of 300 pounds of nitrogen per acre,you will need 17 acreas of land. If you apply the sludge to corn at a rate of 125 pounds per acre,you will need 41.472 acres of land. Please note that these are only estimates of the PAN produced and the land required to utilize that PAN. Actual values may only be determined by sampling the sludge for plant available nitrogen content prior to application Actual utilization rates will vary with soil type, crop,and realistic yield expectations for the specific application fields designated for sludge application at time of removal. ,.. APPLICATION OF WASTE BY IRRIGATION: The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs. This rate is limited by initial soil moisture content,soil structure, soil texture, water droplet size,and organic solids. The application amount should not exceed the available water holding capacity of the soil at the time of irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the crop. If surface irrigation is the method of land application for this plan, it is the responsibility of the producer and irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in the preceding table. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. *This is the maximum application amount allowed for the soil assuming the amount of nitrogen allowed for the crop is not over applied. In many situations,the application amount shown cannot be applied because of the nitrogen limitation. The maximum application amount shown can be applied under optimum soil conditions. Your facility is designed for>180 days of temporary storage and the temporary storage must be removed on the average of once every 6 months. In no instance should the volume of the waste stored in your structure be within the 25 year 24 hour storm storage or one foot of freeboard except in the event of the 25 year 24 hour storm. It is the responsibility of the producer and waste applicator to ensure that the spreader equipment is operated properly to apply the correct rates to the acres shown in the tables. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. Call your technical specialist after you receive the waste analysis report for assistance in determining the amount of waste per acre and the proper application prior to applying the waste. 5of8 Application Rate Guide The following is provided as a guide for establishing application rates and amounts. Soil Application Rate Application Amount Tract Hydrant Tvpe Crop in/hr * inches 4936 Pivot Fo B 0.5 1 2A Fo B 0.5 1 2B Fo B 0.5 1 2C Fo B 0.5 1 3A Fo B 0.5 1 3B Fo B 0.5 1 L1-L8 NbA *see crop 0.4 1 Q *N/A #N/A #N/A #N/A 6of8 Additional Comments: Additional land shown is not re juired for the plan to balance, but may be used if desired. Acres shown on this land are 'wetted acres', with SB515 setbacks applied. Pulls 1AA, 1A&1B have been replaced with Pivot, per irrigation design b Kevin Westin. 7of8 NUTRIENT UTILIZATION PLAN CERTIFICATION Name of Farm: D &P Farm �- Owner: Dexter Edwards Manager: Owner/Manager Agreement: I/we understand and will follow and implement the specifications and the operation and maintenance procedures established in the approved animal waste nutrient management plan for the farm named above. Itwe know that any expansion to the existing design capacity of the waste treatment and/or storage system, or construction of new facilities, will require a new nutrient management plan and a new certification to be submitted to DWQ before the new animals are stocked. I/we understand that I must own or have access to equipment, primarily irrigation equipment, to land apply the animal waste described in this nutrient management plan. This equipment must be available at the appropriate pumping time such that no discharge occurs from the lagoon in the event of a 25 year 24 hour storm. I also certify that the waste will be applied on the land according to this plan at the appropriate times and at rates which produce no runoff. This plan will be filed on site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by NCDWQ upon request. Name of Facility Owner: Dexter Edwards —�o y Signature: Date Name of Manager(if different from owner): Signature: Date Name of Technical Specialist: Toni W. Kin Affiliation: Murphy-Brown, LLC. Address: 2822 Hwy 24 West, PO Drawer 866 Warsaw, NC 28398 Telephone: (910) 293-3434 Signature: Date _ 8of8 Required Specifications For Animal Waste Management I. Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste that reaches surface water is prohibited. 2. There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of the waste, he/she shall provide evidence of an agreement with a landowner, who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the waste production facility to secure an update of the Nutrient Management Plan when there is a change in the operation, increase in the number of animals, method of application, receiving crop type, or available land. 3. Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based upon soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of applications for other nutrients. 4. Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land eroding at more than 5 tons per acre per year but less than 10 tons per acre per year provided grass filter strips are installed where runoff leaves the field (see USDA, NRCS Field Office Technical Guide Standard 393 - Filter Strips). S. Odors can be reduced by injecting the waste or by disking after waste application. Waste should not be applied when there is danger of drift from the land application field. 6. When animal waste is to be applied on acres subject to flooding, waste will be soil incorporated on conventionally tilled cropland. When waste is applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding (see "Weather and Climate in North Carolina" for guidance). 7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor and flies. -------- ---- --- - --^--- -- ________ 176392 -- --- -------- ------------ Database Version,.1 Date Printed: 3/23/201 1 Specification Page I 8. Animal waste shall not be applied to saturated soils, during rainfall events, or when the soil surface is frozen. 9. Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. 10. Nutrients from waste shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste/nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11. Any new swine facility sited on or after October 1, 1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and canal. Animal waste, other than swine waste from facilities sited on or after October 1, 1995, shall not be applied closer that 25 feet to perennial waters. 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14. Waste shall be applied in a manner not to reach other property and public right-of-ways. 15. Animal waste shall not be discharged into surface waters, drainageways, or wetlands by a discharge or by over-spraying. Animal waste may be applied to prior converted cropland provided the fields have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharge directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. ----------- 176392 Database Version 3.1 - _ ----- - Date Printed: 3/23/201 1 Specification Pale 2 -� 17. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage, or discharge. 18. If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution, and erosion. 19. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be kept on site. 20. Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption, it should only be applied pre-plant with no further applications of animal waste during the crop season. 21. Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. 22. Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate-determining nutrient, unless other restrictions require waste to be applied based on other nutrients, resulting in a lower application rate than a nitrogen based rate. Zinc and copper levels in the soils shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted and maintained for optimum crop production. Soil and waste analysis records shall be kept for a minimum of five years. Poultry dry waste application records shall be maintained for a minimum of three years. Waste application records for all other waste shall be maintained for five (5) years. 23. Dead animals will be disposed of in a manner that meets North Carolina regulations. ----- --- ------------ _ 176392 Database Version 3.1 Date Printed: 3/23/201 1 Specification Page 3 Crop Notes The following crop note applies to field(s): 3A, 313, 3C, 31), 4A,413,4C Small Grain: CP,Mineral Soil, medium leachable In the Coastal Plain, oats and barley should be planted from October 15-October 30; and rye from October 15-November 20. For barley, plant 22 seed/drill row foot and increase the seeding rate by 5%for each week seeding is delayed beyond the optimum time. See the seeding rates table for applicable seeding rate modifications in the current NCSU "Small Grain Production Guide". Also, increase the initial seeding rate by at least 10%when planting no-till. Oats should be planted at 2 bushels/acre and rye at 1-1 1/2 bushels/acre. Plant all these small grains at 1-1 1/2" deep. Adequate depth control is essential. Review the NCSU Official Variety "green book" and information from private companies to select a high yielding variety with the characteristics needed for your area and conditions. Apply no more than 30 lbs/acre N at planting. Phosphorus and potash recommended by a soil test can also be applied at this time. The remaining N should be applied during the months of February-March. The following crop note applies to field(s): IA, 1B Small Grain: CP, Mineral Soil, medium leachable In the Coastal Plain, oats and barley should be planted from October 15-October 30; and rye from October 15-November 20. For barley, plant 22 seed/drill row foot and increase the seeding rate by 5% for -- each week seeding is delayed beyond the optimum time. See the seeding rates table for applicable seeding rate modifications in the current NCSU "Small Grain Production Guide". Also, increase the initial seeding rate by at least 10% when planting no-till. Oats should be planted at 2 bushels/acre and rye at 1-1 1/2 bushels/acre. Plant all these small grains at 1-1 1/2" deep. Adequate depth control is essential. Review the NCSU Official Variety "green book" and information from private companies to select a high yielding variety with the characteristics needed for your area and conditions. Apply no more than 30 lbs/acre N at planting. Phosphorus and potash recommended by a soil test can also be applied at this time. The remaining N should be applied during the months of February-March. 176392 Database Version 3.1 Date Printed: 03-23-2011 Crop Note Page Page 1 of 2 The following crop note applies to field(s): 3A, 313, 3C, 3D, 4A,413, 4C Berinudagrass: CP,Mineral Soil,Moderately Well Drained. Adaptation: Well-adapted. In the Coastal Plain,hybrid bermudagrass sprigs can be planted Mar. 1 to Mar. 31, Cover sprigs 1"to 3" deep(1.5"optimal). Sprigs should be planted quickly after digging and not allowed to dry in sun and wind. For Coastal and Tifton 78 plant at least 10 bu/ac in 3' rows, spaced 2'to 3' in the row. Generally a rate of 30 bu/ac is satisfactory to produce full groundcover in one or two years under good growing conditions.Tifton 44 spreads slowly, so use at least 40 bu/ac in 1.5' to 2' rows spaced 1' to 1.5' in row. For broadcast/disked-in sprigs use about 60 bu/ac. Soil test for the amounts of lime, phosphorus, potassium and micronutrients to apply preplant and for annual maintenance. Apply 60 to 100 lb/ac N in the establishment year in split applications in April and July. For established stands apply 180 to 240 lb/ac N annually in split applications, usually in April and following the first and second hay cuts. Reduce N rates by 25% for grazing. Refer to NCSU Technical Bulletin 305 Production and Utilization of Pastures and Forages in North Carolina for more information or consult your regional agronomist or extension agent for assistance. The following crop note applies to field(s): 1 A, 1 B Bermudagrass: CP, Mineral Soil, Moderately Well Drained. Adaptation: Well-adapted. >.� In the Coastal Plain, hybrid bermudagrass sprigs can be planted Mar. 1 to Mar. 31. Cover sprigs l"to 3" deep(1.5"optimal). Sprigs should be planted quickly after digging and not allowed to dry in sun and wind. For Coastal and Tifton 78 plant at least 10 bu/ac in 3' rows, spaced 2' to 3' in the row. Generally a rate of 30 bu/ac is satisfactory to produce frill groundcover in one or two years under good growing conditions. Tifton 44 spreads slowly, so use at least 40 bu/ac in 1.5' to 2' rows spaced 1' to 1.5' in row. For broadcast/disked-in sprigs use about 60 bu/ac. Soil test for the amounts of lime,phosphorus, potassium and micronutrients to apply preplant and for annual maintenance. Apply 60 to 100 lb/ac N in the establishment year in split applications in April and July. For established stands apply 180 to 240 lb/ac N annually in split applications, usually in April and following the first and second hay cuts. Reduce N rates by 25% for grazing. Refer to NCSU Technical Bulletin 305 Production and Utilization of Pastures and Forages in North Carolina for more information or consult your regional agronomist or extension agent for assistance. 176392 Database Version 3.1 Date Printed: 03-23-2011 Crop Note Page Page 2 of 2 NUTRIENT UTILIZATION PLAN REQUIRED SPECIFICATIONS Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. 2 There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of the waste, he/she shall provide evidence of an agreement with a landowner, who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the waste production facility to secure an update of the Nutrient Utilization Plan when there is a change in the operation, increase in the number of animals, method of application, recieving crop type, or available land. 3 Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based upon soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of applications for other nutrients. 4 Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land eroding at more than 5 tons per acre per year but I per acre per year provided grass filter strips are istalled here runoff leaves the feld (See USDA, MRCS Field Office Technical Guide Standard 393 - Filter Strips). 5 Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the land application field. 6 When animal waste is to be applied on acres subject to flooding, waste will be soil incorporated on conventionally tilled cropland. When waste is applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding (See "Weather and Climate in North Carolina" for guidance). 7 Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor and flies. —' 8 Animal waste shall not be applied to saturated soils, during rainfall events, or when the 1 of 3 NUTRIENT UTILIZATION PLAN REQUIRED SPECIFICATIONS (continued) 9 Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. 10 Nutrients from waste shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste/nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. Any new swine facility sited on or after October 1, 1995 shall comply with the following: 11 The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and canal. Animal waste, other than swine waste from facilities sited on or after October 1, 1995, shall not be applied closer than 25 feet to perennial waters. 12 Animal waste shall not be applied closer than 100 feet to wells. Animal waste shall not be applied closer than 200 feet of dwellings other than those 13 owned by the landowner. Waste shall be applied in a manner not to reach other property and public right-of-ways. 14 Animal waste shall not be discharged into surface waters, drainageways, or wetlands by discharge or by over-spraying. Animal waste may be applied to prior converted cropland 15 provided the fields have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharge directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 16 2of3 NUTRIENT UTILIZATION PLAN REQUIRED SPECIFICATIONS (continued) 17 A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage, or discharge. 18 If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular 19 basis to prevent breakdowns, leaks and spills. A regular maintenance checklist should be kept on site. Animal waste can be used in a rotation that includes vegetables and other crops for direct 20 human consumption. However, if animal waste is used on crops for direct human consumption, it should only be applied pre-plant with no further applications of animal waste during the crop season. Highly visible markers shall be installed to mark the top and bottom elevations of the 21 temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate-determining 22 nutrient, unless other restrictions require waste to be applied based on other nutrients, resulting in a lower application rate than a nitrogen based rate. Zinc and copper levels in the soil shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted and maintained for optimum crop production. Soil and waste analysis records shall be kept for a minimum of five years. Poultry dry waste application records shall be maintained for a minimum of three years. Waste application records for all other waste shall be maintained for a minimum of five years. Dead animals will be disposed of in a manner that meets North Carolina regulations. 23 3of3 Next Generation Form , _ � � • n, .1:�'�� a �5 i ���'Zrr�`��1 � • `J •� �yP= f .. Fay - New . P ivo �► Specifications: Valley Pivot 360 Machine Length 1 00' End Gun Radius d PPi 9.35 Ac, w/o End Gun Y 12.76 Ac. w/End Gun E y'•�4i �tY r� 0 ` g '0029 t9 Designed 'id Installed cry Benchrm 'Buildings,& irrigcr � # 1 1� U$PFam IAA Q 1B O O 1A 28 1AA- 5.2 sA 1A - 4.5 18 - 4.5 2A - 2.239 2B - 1.0 2C - 0.5 3A - 4.5 3B - 1.5 3i-aV-Y Swine Farm Waste Management Odor Control Checklist Source Cause BMPs to Minimize Odor Site Specific Practices Farmstead • Swine production M Vegetative or wooded buffers; tR Recommended best management practices; © Good judgment and common sense Animal body surfaces • Dirty manure-covered animals O Dry floors Floor surfaces o Wet manure-covered floors M Slotted floors; -- Gi~ Waterers located over slotted floors; O Feeders at high end of solid floors; O Scrape manure buildup from floors; O Underfloor ventilation for drying Manure collection pits 0 Urine; Q.-Frequent manure removal b flush ,,pit recharge, • Partial microbial decomposition or scrape; O Underfloor ventilation Ventitation exhaust fans o Volatile gases; d Fan maintenance; - Dust Cl Efficient air movement Indoor surfaces • Dust lT Washdown between groups of animals; O Feed additives; O Feeder covers; O Feed delivery downspout extenders to feeder _ covers Flush tanks 0 Agitation of recycled lagoon O Flush lank covers; liquid while tanks are filling O Extend fill lines to near bottom of tanks with anti-siphon vents Flush alleys • Agitation during wastewater O Underfloor flush with underfloor ventilation conveyance Pit recharge points • Agitation of recycled lagoon O Extend recharge lines to near bottom of pits liquid while pits are filling with anti-siphon vents Lift stations • Agitation during sump tank O Sump tank covers filling and drawdown Outside drain collection a Agitation during wastewater O Box covers or junction boxes conveyance AMOr November 11, 1996, Page 3 ! s Source Cause End of drainpipes BMWs to minimize Odor oon P�� • Agitation during wastewater O Site Spec- lagoon la Extend ic 1'nctices g conveyance discharge Pout of pipes underneath Lagoon surfaces . lagoon liquid level Volatile gas emissions; &Y"pro r lagoon liquid capacity; Pe • Biological mixing; C�''"Correct lagoon stator - • Agitation p procedures; O Minimum surface area-to-volume ratio; ❑ Minimum agitation when.putnping; 0 Mechanical aeration; Irrigation sprinkler a High pressure agitation; 9-"'Proven biological additives nozzies LI Irrigate on dry days with little Or no wind; • Wind drift O""'Minimum recommended operating Pe g pressure; B``Pump intake near lagoon liquid surface; LPump from second-stage oon Storage tank or basin • Partial microbial decomposition- surface O Bottom or midlevel loading; • Mixing while filling; O Tank covers; • Agitation when emptying O Basin surface mats of solids; 0 Proven biological additives or oxidants Settling basin surface • Partial microbial decom position; O Extend drainpipe outlets underneath liquid • Mixing while filling; level; . • Agitation when emptying O Remove settled solids regularly Manure,slurry or sludge • Agitation when spreading; spreader outlets O Soil injection of slung/sludges; • Volatile gas emissions Cl Wash residual manure from spreader after use; Uncovered manure, Volatile gas emissions while ❑ Proven biological additives or oxidants slurry or sludge on Geld drying Cl drying injection of slurry/sludges �--- surfaces ❑ Soil incorporation within 48 hrs.; O Spread in thin uniform layers for rapid drying; Dead animals ❑ Proven biological additives or oxidants • Carcass decomposition Dead animal disposal • Carcass decomposition 3`!'roper disposition of carcasses pits 0 Complete covering of carcasses in burial pits; • Incomplete combustion O Proper location/construction of disposal pits Incinerators O Secondary stack burners AMOC-November 11, 1996, Page 4 Source Cause Standing water around . BMPs to Miaimin Odor Proper drainage; 13°"Grade and landscape such that water drains Site Slecific rractkes facilities • Microbial decomposition of away from facilities organic matter Manure tracked onto • Poorly maintained access roads public roads from farm [a''"Fatm access road maintenance access Additional Information Swine Manure Management; o200 Rule1BMP Packet Available From: Swine Production Farm Potential Odor Sources and Remedies; EBAE Fact Sheet NCSU,County Extension Center Swine Production Facility Manure Management:Pit Recliarge-Lagoon Treatment; EBAE 12&88 NCSU-BAE Swine Production Facility Manure Management:Underfloor Flush-Lagoon Treatment; EBAE 129-88 NCSU-SAE or Livestock Manure Treatment and Storage; EBAE 103-83 NCSU-BAE Lagoon Design and Management f Calibration of Manure and Wastewater Application Equipment; EBAE Fact Sheet NCSU-BAE Controlling Odors from Swine Buildings; PIH-33 NCSU-BAE Environmental Assurance Program; NPPC Manual NCSU-Swine Extension Options for Managing Odor; a report from the Swine Odor Task Force NC Pork Producers Assoc Nuisance Concerns in Animal Manure Management:Odors and Flies; PRO107, 1995 Conference Proceedin s NCSU Agri Communications g Florida Cooperative Extension AMOC-November 11, 1996, Page 5 Insect Control Checklist for Animal Operations IIA91's to confroi Insects blush t iwtcis Liquid Systeulls .solids �� - - Sites Specific 1'ractires - --- Accuo►ulatiun of - _ - - -- - - --------- f'lusll syslem is designed and operated - sufficiently to remove accuntttlated solids from - �,,/utters as designed. t�' Remove bridging of accnmulaled solids at ag�,uos and fits .-- Crusted Solids - discharge f Maintain lagoons,settling basins and 1►its where - pest breeding is apparent to ntiniutize file -- -- - crosting of solids to a depth of no more than 6- l.ae.csI,iVc VcLctative- -. - --- - -- -- uteltes over more than 30%ofstn lace.I)ccaying vegetation _ r u u�ti th Iblaintain vegetative control along lagoons attd other impoundments to prevent accumulation of decaying vegetative matter - - ---- -- —- __ ----- --- along water's edge on imporurrlmcnt's periutelcr. -- _ 1)1-ysyslettt! ��— • Iced Spillage --- -------- -- -- -- — - -- �' Uesign,operate and maintain feed syslertts — bunkers and trouc;hs)to minimize file -- - �cctltnulation of decaynng wastage. t't ('lean ap Village on if rowine basis(e_g-, 7- 10 day interval during summer, 15-30 day iulerval l�cd titer.,} nurlatiuns Of It.ed residue inring wuper). Accu I� ticducc moisUtre accamul:rliou witl:ir�anej- -- - - --. around immediate periutcler of fcrxl slurat;e areas by insuring drainage away!icon silt. and/or providing adeytl:rte crnuaintnettt(e_g., coverer!bin for brewer's gr:►io and similar hil;it nroisture grain producls). f7 inspect titr anc!retl►ovc or bicak up ae r�anulated solids in filler Wilts around feed slorage as needed. AN - I(�,tcii�her 1I, tc3:}G, I'age 1 _ .tiuyrcc An;ural!luldirtb q sr ,tst ,r -- ---�-- Cause - Accumnlations ofanintal wastes IIMPs fo Control Insects - - and feed wastage Eliminate low - -- areas Ilia!trap ntotsture alonb -- _ ~� fences st,ec;r- IC ract ces- and other locations where waste accumulates and disturbance by animals is y minimal. n Maintain fence rows and filter strips around animal holding areas to minimize g; accumulations of wastes(i.e.,inspect for and iA Y I+lanurc Ilaurllin `- remove or break up accumulated solids as S)Stcnts Acctuuulatiorts of animal+vaster needed). [7 R day ve during winter)whe spillage on a routine basis e-•--da interval during surnmer; 15-30�1.ry ir>ferv�l re manure is loaded for lane! ~--- --- application or disposal. rl Provide li)r adequate drainage around manure stockpiles. - n Inspect for an('remove or break tip accttrntrlaterl ----_- .. - - - wastes in I;Iter strips around stockpiles and I'ur mute intunttatiun contact the Cooperative I:xtcnsiup .�---- rnantire handling areas as needed. k,,lcrl,l+, !J[ Service,!)el►artntcnt of l:ntomolo• , _._.--__ -- 65. Rox 7(!3,PJurth('arolur,t State IJuivr•tsity, ---- ---- - --- 140venj13,;r !!. !rl')G, !'a8e2 i EMERGENCE' ACTION PLAN PHONE NUMBERS DWQ Ord -79.1 .. 7.zis EMERGENCY MANAGEMENT SYSTEM 7// SWCD 1 21 �-c NRCS — a��s.6-;PeLv This plan will be implemented in the event that wastes from your operation are leaking, overflowing, or running off site. You should not wait until wastes reach surface waters or leave your property to consider that you have a problem. You should make every effort to ensure that this does not happen. This plan should be posted in an accessible location for all employees at the facility. The following are some action items you should take. 1. Stop the release of wastes. Depending on the situation, this may or may not be possible. Suggested responses to some possible problems are listed below. A. Lagoon overflow-possible solutions are: a. Add soil to berm to increase elevation of dam. b. Pump wastes to fields at an acceptable rate. c. Stop all flows to the lagoon immediately. d. Call a pumping contractor. e. Make sure no surface water is entering lagoon. B: Runoff from waste application field-actions include: a. Immediately stop waste application. b. Create a temporary diversion to contain waste. c. Incorporate waste to reduce runoff. d. Evaluate and eliminate the reason(s) that caused the runoff. e. Evaluate the application rates for the fields where runoff occurred. C: Leakage from the waste pipes and sprinklers-action include: a. Stop recycle pump. b. Stop irrigation pump. — — c. Close valves to eliminate further discharge. d. Repair all Ieaks prior to restarting pumps. D: Leakage from flush systems, houses, solid separators-action include: a. Stop recycle pump. b. Stop irrigation pump. i c. Make sure no siphon occurs. d. Stop all flows in the house, flush systems, or solid separators. -. 1 December 18, 1996 e. Repair all leaks prior to restarting pumps. E: Leakage from base or sidewall of lagoon. Often this is seepage as opposed to flowing leaks- possible action: a. Dig a small sump or ditch away from the embankment to catchall seepage, put in a submersible pump, and pump back to lagoon. b. If holes are caused by burrowing animals, trap or remove animals and fill holes and compact with a clay type soil. c. Have a professional evaluate the condition of the side walls and lagoon bottom as soon as possible. 2. Assess the extent of the spill and note any obvious damages. a. Did the waste reach any surface waters? b. Approximately how much was released and for what duration? c. Any damage noted, such as employee injury, fish kills, or property damage? d. Did the spill leave the property? e. Does the spill have the potential to reach surface waters? f. Could a future rain event cause the spill to reach surface waters? g. Are potable water wells in danger(either on or off of the property)? h. How much reached surface waters? 3: Contact appropriate agencies. a. During normal business hours, call your DWQ (Division of Water Quality) regional office; Phone - . After hours, emergency number: 919-733-3942. Your phone call should include: your name, facility, telephone number, the details of the incident from item 2 above, the exact location of the facility,the location or direction of movement of the spill,weather and wind conditions. The corrective measures that have been under taken, and the seriousness of the situation. b. If spill leaves property or enters surface waters, call local EMS Phone number - c. Instruct EMS to contact Iocal Health Department. d. Contact CES, phone number - - , local SWCD office phone number and local NRCS office for advice/technical assistance phone number - - 4: If none of the above works call 911 or the Sheriffs Department and explain your problem to them and ask that person to contact the proper agencies for you. 5: Contact the contractor of your choice to begin repair of problem to minimize off-site damage. a. Contractors Name: b. Contractors Address: c. Contractors Phone: 2 December 18, 1995 6: Contact the technical specialist who certified the lagoon (NRCS, Consulting Engineer, etc.) a. Name: b. Phone: 7: Implement procedures as advised by DWQ and technical assistance agencies to rectify the damage, repair the system, and reassess the waste management plan to keep problems with release of wastes from happening again. 3 December 18, 1996 � 1" o2TT Version—November 26,2018 Mortality Management Methods Indicate which method(s) will be implemented. When selecting multiple methods indicate a primary.versus secondary option. Methods other than those listed must be approved by the State Veterinarian. Primary Secondary Routine Mortality Burial three feet beneath the surface of the ground within 24 hours of knowledge of animal death. The burial must be at least 300 feet from any flowing stream or public body of water (G.S.106-403). The bottom of the burial pit should beat least one foot above the seasonal high water table.Attach burial location map and plan. a Landfill at municipal solid waste facility permitted by NC DEQ under GS 15A NCAC 13B .0200. Rendering at a rendering plant licensed under G.S. 106-168.7 Complete incineration according to 02 NCAC 52C .0102. A composting system approved and permitted by the NC Department of Agriculture&Con- sumer Services Veterinary Division (attach copy of permit). If compost is distributed off-farm, additional requirements must be met and a permit is required from NC DEQ. D In the case of dead poultry only, placing in a disposal pit of a size and design approved by the NC Department of Agriculture&Consumer Services(G.S. 106-549.70). a Any method which, in the professional opinion of the State Veterinarian, would make possible the salvage of part of a dead animal's value without endangering human or animal health. (Written approval by the State Veterinarian must be attached). aMass Mortality Plan Mass mortality plans are required for farms covered by an NPDES permit. These plans are also recommended for all animal operations. This plan outlines farm-specific mortality man- agement methods to be used for mass mortality. The NCDA&CS Veterinary Division sup- ports a variety of emergency mortality disposal options; contact the Division for guidance. • A catastrophic mortality disposal plan is part of the facility's CAWMP and is activated when numbers of dead animals exceed normal mortality rates as specified by the State Veterinarian. • Burial must be done in accordance with NC General Statutes and NCDA&CS Veterinary Division regulations and guidance. • Mass burial sites are subject to additional permit conditions (refer to facility's animal waste management system permit). • In the event of imminent threat of a disease emergency, the State Veterinarian may enact additional temporary procedures or measwres for disposal according to G.S. 106-399.4. nature of Farm Owner/Manager - Date Signature of Technical Specialist Date .i &-ator:DEXTER EDWARDS County: DUPLIN Date: 07/22/93 )istance to nearest residence (other than owner) : 2000.0 feet 1. STEADY STATE LIVE WEIGHT 0 sows (farrow to finish) x 1417 lbs. 0 lbs 0 sows (farrow to feeder) x 522 lbs. 0 lbs 2880 head (finishing only) x 135 lbs. - 388800 lbs 0 sows (farrow to wean) x 433 lbs. 0 lbs 0 head (wean to feeder) x 30 lbs. = 0 lbs TOTAL STEADY STATE LIVE WEIGHT (SSLW) = 388800 lbs 7. MINIMUM REQUIRED TREATMENT VOLUME OF LAGOON Volume = 388800 lbs. SSLW x Treatment; Volume(CF)/lb. SSLW Treatment Volume(CF)/lb. SSLW= 1 cF/lb. SSLW Volume = 388800 cubic feet 3. STORAGE VOLUME FOR SLUDGE ACCUMULATION Volume = 0.0 cubic feet % „Owner Sludge rwillsbe removed ts no gassneeded." 4. TOTAL DESIGN VOLUME Inside top length 320.0 feet ; Inside top width 215.0 feet Top of dike at elevation -48.5 feet Freeboard 1.0 feet ; Side slopes 2.5 : 1 (Inside lagoon) Total design lagoon liquid level at elevation 47.5 feet Bottom of lagoon elevation 36.5 feet Seasonal high water table elevation 42.0 feet Total design volume using prismoidal formula SS/END1 SS/END2 SS/SIDE1 SS/SIDE2 LENGTH WIDTH DEPTH 2.5 2.5 2.5 2.5 315.0 210.0 11.0 AREA OF TOP LENGTH * WIDTH = 315.0 210.0 66150.0 (AREA OF TOP) AREA OF BOTTOM LENGTH * WIDTH = 260.0 155.0 40300.0 (AREA of BOTTOM) AREA OF MIDSECTION LENGTH * WIDTH * 4 287.5 182.5 209875.0 (AREA OF MIDSECTION * 4) CU. FT. = AAREA TOP + (4*AREA MIDSECTION) + AREA BOTTOMU * DEPTH/6 66150.0 209875.0 40300.0 1.8 VOLUME OF LAGOON AT TOTAL DESIGN LIQUID LEVEL = 579929 CU. FT. C0010115052! r 'TEMPORARY STORAGE REQUIRED DRAINAGE AREA: Lagoon (top of dike) Length * Width = 320.0 215.0 68800.0 square feet Buildings (roof and lot water) Length * Width = 0.0 0.0 0.0 square feet TOTAL DA 68800.0 square feet Design temporary storage period to be 180 days. R. Volume of waste produced Approximate daily production of manure in CF/LB SSLW 0.00136 Volume = 388800 Lbs. SSLW * CF of Waste/Lb./Day * 180 days Volume = 94947 cubic feet :L. Volume of wash water �% This is the amount of fresh water used for washing floors or volume of fresh water used for a flush system. Flush systems that recirculate the lagoon water are accounted for in 5A. Volume = 0.0 gallons/day * 180 days storage/7.48 gallons per CF Volume = 0.0 cubic feet �C. Volume of rainfall in excess of evaporation Use period of time when rainfall exceeds evaporation by largest amount. 180 days excess rainfall = 7.0 inches Volume = 7.0 in * DA / 12 inches per foot Volume = 40133.3 cubic feet s�- Ct)p10115o530 7 5D. Volume of 25 year - 24 hour storm Volume = 7.5 inches / 12 inches per foot * DA Volume = 43000.0 cubic feet TOTAL REQUIRED TEMPORARY STORAGE 5A. 94947 cubic feet 58. 0 cubic feet 5C. 40133 cubic feet 5D. 43000 cubic feet TOTAL 178081 cubic feet � . SUMMARY Total required volume 566881 cubic feet Total design volume avail. 579929 cubic feet Min. req. treatment volume plus sludge accumulation 388800 cubic feet At elev. 44.5 feet ; Volume is 393067 cubic feet (end pumping) Total design volume less 25yr-24hr storm is 536929 cubic feet At elev. 46.9 feet ; Volume is 540710 cubic feet (start pumping) Seasonal high water table elevation 42.0 feet DESIGNED BY: i ` PPROVED BY: DATE: as ''3/ J DATE: NOTE: SEE ATTACHED WASTE UTILIZATION PLAN -- � an4 A I I;A4i'lI. OPERATION & MAINTENANCE PLAN Proper lagoon liquid management should be a year-round priority, It is especially important to manage levels so that you do not have problems during extended rainy and wet periods, Maximum storage capacity should be available in the lagoon for periods when the receiving crop is dormant (such as wintertime for bermudagrass) or when there are extended rainy spells such as the thunderstorm season in the summertime. This means that at the first signs of plant growth in the later winter/early spring, irrigation accordi ry enough to ng to a farm waste management plan should be done whenever the land is d receive lagoon liquid. This will make storage space available in the lagoon for future wet Periods. In the late summer/early fall the lagoon should be pumped down to the low marker (see Figure 2-1) to allow for winter storage. Every effort should be made to maintain the lagoon close to the minimum liquid level as long as the weather and waste utilization plan will allow it. Waiting until the lagoon has reached its maximum storage capacity before starting to irrigate does not leave room for storing excess water during extended wet periods. Overflow from the lagoon for any reason except a 25-year, 24-hour storm is a violation of state law and subject to penalty action. The routine maintenance of a lagoon involves the following: Maintenance of a vegetative cover for the dam. Fescue or common bermudagrass are the most common vegetative covers. The vegetation should be fertilized each year, if needed, to maintain a vigorous stand. The amount of fertilizer applied should be based on a soils test, but in the event that it is not practical to obtain a soils test each year, the lagoon embankment and surrounding areas should be fertilized with 800 pounds per acre of 10-10-10, or equivalent. Brush and trees on the embankment must be controlled. This may be done by mowing, spraying, grazing, chopping, or a combination of these practices. This should be done at least once a year and possibly twice in years that weather conditions are favorable for heavy vegetative growth. NOTE: If vegetation is controlled by spraying, the herbicide must not be allowed to enter the lagoon water. Such chemicals could harm the bacteria in the Iagoon that are treating the waste. Maintenance inspections of the entire lagoon should be made during the initial filling of the lagoon and at least monthly and after major rainfall and storm events, Items to be checked should include, as a minimum, the following: Waste Inlet Pipes, Recycling Pipes, and Overflow Pipes---look for; 1. separation of joints 2. cracks or breaks 3, accumulation of salts or minerals 4, overall condition of pipes -- Lagoon surface---look for: 1. undesirable vegetative growth 2. floating or lodged debris Embankment---look for: 1. settlement, cracking, or "jug" holes 2. side slope stability---slumps or bulges 3. wet or damp areas on the back slope 4. erosion due to lack of vegetation or as a result of wave action 5. rodent damage Larger lagoons may be subject to liner damage due to wave action caused by strong winds, These waves can erode the lagoon sidewalls, thereby weakening the lagoon dam. A good stand of vegetation will reduce the potential damage caused by wave action. If wave action causes serious damage to a lagoon sidewall, baffles in the lagoon may be used to reduce the wave impacts, Any of these features could lead to erosion and weakening of the dam. If your lagoon has any of these features, you should call an appropriate expert familiar with design and construction of waste lagoons. You may need to provide a temporary fix if there is a threat of a waste discharge, However, a permanent solution should be reviewed by the technical expert. Any digging into a lagoon dam with heavy equipment is a serious undertaking with potentially serious consequences and should not be conducted unless recommended by an appropriate technical expert. Transfer Pumps---check for proper operation of: 1. recycling pumps 2. irrigation pumps Check for leaks, loose fittings, and overall pump operation. An unusually loud or grinding noise, or a large amount of vibration, may indicate that the pump is in need or repair or replacement. NQTB: Pumping systems should be inspected and operated frequently enough so that you are not completely "surprised" by equipment failure. You should perform your pumping system maintenance at a time when your lagoon is at its low level. This will allow some safety time should major repairs be required. Having a nearly full lagoon is not the time to think about switching, repairing , or borrowing pumps. Probably, if your lagoon is full, your neighbor's lagoon is full also. You should consider maintaining an inventory of spare parts or pumps, Surface water diversion features are designed to carry all surface drainage waters (such as rainfall runoff, roof drainage, gutter outlets, and parking lot runoff) away from your lagoon and other waste treatment or storage structures. The only water that should be coming from your lagoon is that which comes from your flushing (washing) system pipes and the rainfall that flits the lagoon directly. You should inspect your diversion system for the following, l, adcquate vegetation 2, diversion capacity 3, ridge berm height Identified problems should be corrected promptly. It is advisable to inspect your system during or immediately following a heavy rain. If technical assistance is needed to determine proper solutions, consult with appropriate experts. You should record the level of the lagoon just prior to when rain is predicted, and then record the level again 4 to 6 hours after the rain (assumes there is no pumping). This will give you an idea of how much your lagoon level will rise with a certain rainfall amount (you must also be recordin4 your rainfall for this to work). Knowing this should help in planning irrigation applications and storage, If your lagoon rises excessively, you may have an inflow problem from a surface water diversion or there may be seepage into the lagoon from the surrounding land. Lagoon Operation Startup: 1. Immediately after construction establish a complete sod cover on bare soil surfaces to avoid erosion. 2. Fill new lagoon design treatment volume at least half full of water before waste loading begins, taking care not to erode lining or bank slopes. 3. Drainpipes into the Iagoon should have a flexible pipe extender on the end of the pipe to discharge near the bottom of the lagoon during initial filling or another means of slowing the incoming water to avoid erosion of the lining. 4. When possible, begin loading new lagoons in the spring to maximize bacterial establishment (due to warmer weather). 5. It is recommended that a new lagoon be seeded with sludge from a healthy working swine lagoon in the amount of 0.25 percent of the full lagoon liquid volume. This seeding should occour at least two weeks prior to the addition of wastewater. 6. Maintain a periodic check on the lagoon liquid pH. If the pH falls below 7.0, add agricultural lime at the rate of 1 pound per 1000 cubic feet of lagoon liquid volume until the pH rises above 7.0. Optimum lagoon liquid pH is between 7.5 and 8.0. 7. A dark color, lack of bubbling, and excessive odor signals inadequate biological activity, Consultation with a technical specialist is recommended if these conditions occur for prolonged periods, especially during the warm season. Loading: The more frequently and regularly that wastewater is added to a lagoon, the better the lagoon will function. Flush systems that wash waste into the lagoon several times daily are optimum for treatment. Pit recharge systems, in which one or more buildings are drained and recharged each day, also work well. Practice water conservation---minimize building water usage and spillage from leaking waterers, broken pipes and washdown through Proper maintenance and water conservation. Minimize feed wastage and spillage by keeping feeders adjusted, This will reduce the amount of solids entering the lagoon Management: • Maintain lagoon liquid level between the permanent storage level and the full temporary storage level. Place visible markers or stakes on the lagoon bank to show the minimum liquid level and the maximum liquid lever (Figure 2-1). Start irrigating at the earliest possible date in the spring based on nutrient requirements and soil moisture so that temporary storage will be maximized for the summer thunderstorm season. Similarly, irrigate in the late summer/early fall to provide maximum lagoon storage for the winter. The lagoon liquid level should never be closer than 1 foot to the lowest point of the dam or embankment. • Do not pump the lagoon liquid level lower that the permanent storage level unless you are removing sludge, Locate float pump intakes approximately 18 inches underneath the liquid surface and as far away from the drainpipe inlets as possible. Prevent additions of bedding materials, long-stemmed forage or vegetation, molded feed, plastic syringes, or other foreign materials into the lagoon. Frequently remove solids from catch basins at end of confinement houses or wherever they are installed, Maintain strict vegetation, rodent, and varmint control near lagoon edges. Do not allow trees or large bushes to grow on lagoon dam or embankment. • Remove sludge from the lagoon either when the sludge storage capacity is full or before it fills 50 percent of the permanent storage volume. If animal production is to be terminated, the owner is responsible for obtaining and implementing a closure plan to eliminate the possibility of a pollutant discharge. Sludge Removal: Rate of lagoon sludge buildup can be reduced by: • proper lagoon sizing, • mechanical solids separation of flushed waste, • gravity settling of flushed waste solids in an appropriately designed basin, or minimizing feed wastage and spillage. Lagoon sludge that is removed annually rather than stored long term will: have more nutrients, have more odor, and • require more land to properly use the nutrients. Removal techniques: Hire a custom applicator. Mix the sludge and lagoon liquid with a chopper-agitator impeller pump through large-bore sprinkler irrigation system onto nearby cropland; and soil incorporate. Dewater the upper part of lagoon by irrigation onto nearby cropland or forageland; mix remaining sludge; pump into liquid sludge applicator; haul and spread onto cropland or forageland; and soil incorporate. • Dewater the upper part of lagoon by irrigation onto nearby cropland or forageland; dredge sludge from lagoon with dragline or sludge barge; berm -- an area beside lagoon to receive the sludge so that liquids can drain back into lagoon; allow sludge to dewater; haul and spread with manure spreader onto cropland or forageland; and soil incorporate. Regardless of the method, you must have the sludge material analyzed for waste constituents just as you would your lagoon water. The sludge will contain different nutrient and metal values from the liquid. The application of the sludge to fields will be limited by these nutrients as well as any previous waste applications to that field and crop requirement. Waste application rates will be discussed in detail in Chapter 3. When removing sludge, you must also pay attention to the liner to prevent damage. Close attention by the pumper or drag-line operator will ensure that'the lagoon liner remains intact. If you see soil material or the synthetic liner material being disturbed, you should stop the activity immediately and not resume until you are sure that the sludge can be removed without liner injury. If the liner is damaged it must be repaired as soon as Possible. Sludge removed from the lagoon has a much higher phosphorus and heavy metal content than liquid. Because of this it should probably be applied to land with low phosphorus and metal levels, as indicated by a soil test, and incorporated to reduce the chance of erosion. Note that if the sludge is applied to fields with very high soil-test phosphores, it should be applied only at rates equal to the crop removal of phosphorus. As with other wastes, always have your lagoon sludge analyzed for its nutrient value. The application of sludge will increase the amount of odor at the waste application site. Extra precaution should be used to observe the wind direction and other conditions which could increase the concern of neighbors. - Possible Causes of Lagoon Failure Lagoon failures result in the unplanned discharge of wastewater from the structure. Types Of failures include leakage through the bottom or sides, overtopping, and dam, AssumingPe g breach of the ensuring structure.safety. Items which may lead o lagoon failuresinclude responsibility for • Modification of the lagoon structure---an example is the placement of a pipe in the dam without proper design and construction. (Consult an expert in lagoon design before placing any pipes in dams,) • Lagoon liquid levels---high levels are a safety risk. Failure to inspect and maintain the dam, Excess surface water flowing into the lagoon. Liner integrity---protect from inlet pipe scouring, damage during sludge removal, or rupture from lowering lagoon liquid level below groundwater table. NOTE: If lagoon water is allowed to overtop the dam, the moving water will soon cause gullies to form in the dam. Once this damage starts, it can quickly cause a large discharge of wastewater and possible dam failure.