Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
310209_Application_20240304
State of North Carolina Department of Environmental Quality Division of Water Resources Animal Waste Management Systems Request for Certification of Coverage Facility Currently covered by an Expiring Sate Non-Discharge General Permit On September 30, 2024, the North Carolina State Non-Discharge General Permits for Animal Waste Management Systems will expire. As required by these permits, facilities that have been issued Certificates of Coverage to operate under these State Non-Discharge General Permits must apply for renewal at least 180 days prior to their expiration date. Therefore,all applications must be received by the Division of Water Resources by no later than April 3,2024. Please do not leave any question unanswered. Please verify all information and make any necessary corrections below. Application must be signed and dated by the Permittee. 1. Certificate Of Coverage Number: AWS310209 2. Facility Name: anier'-'`' _ Asyttpky Pr�lre 3. Permittee's Name(same as on the Waste Management Plan): Murphy Piglets LLC 4. Permittee's Mailing Address: 588 Piney Grove Rd City: Albertson State: NC Zip: 28508 Telephone Number: - - E-mail: zSM, 9 5. Facility's Physical Address: 356 Bill Sutton Rd City: Albertson State: NC Zip: 28508 6. County where Facility is located: Du lin 7. Farm Manager's Name(if different from Landowner): 8. Farm Manager's telephone number(include area code): JJ II�-- 9. Integrator's Name(if there is not an Integrator,write"None"): TI-c..*4,k5C. G4%wS 10. Operator Name(OIC): Phone No.: - - OIC#:-44629--- a% . so��y zsa-56o-34aq Ca©scg�- 11. Lessee's Name(if there is not a Les ee,write"None"): tr+ C� _ _` 12. Indicate animal operation type and number: 5 EC (��T fl � ��t=. P SIeN�lo Current Permit: Operations Type Allowable Count Swine-Wean to Feeder 6,400 Operation Types: Swine Cattle Dry Poultry Other Types Wean to Finish Dairy Calf Non Laying Chickens Horses-Horses Wean to Feeder Dairy Heifer Laying Chickens Horses-Other Farrow to Finish Milk Cow Pullets Sheep-Sheep Feeder to Finish Dry Cow Turkeys Sheep-Other Farrow to Wean Beef Stocker Calf Turkey Pullet Farrow to Feeder Beef Feeder Boar/Stud Beef Broad Cow Wet Poultry Gilts Other Non Laying Pullet Other Layers 13. Waste Treatment Lagoons,Digesters and Waste Storage Ponds(WSP); (Fill/Verify the following information. Make all necessary corrections and provide missing data.) Structure Type Estimated Liner Type Estimated Design Freeboard Structure (Lagoon/Digester/ Date (Clay,Synthetic, Capacity Surface Area "Redline" Name WSP) Built Unknown) (Cubic Feet) (Square Feet) (Inches) LAGOON#i Lagoon 3 3C C AIV IfT 00? ZZ ItpW 19.00 LAGOON#2 Lagoon O jr0 s G S 6 0 19.00 Submit one (1) copy of the Certified Animal Waste Management Plan (CAWMP) with this completed and signed application as required by NC General Statutes 143-215.10C(d), either by mailing to the address below or sending it via email to the email address below. The CAWMP must include the following components: 1. The most recent Waste Utilization Plan(WUP),signed by the owner and a certified technical specialist,containing: a. The method by which waste is applied to the disposal fields(e.g.irrigation, injection,etc.) b. A map of every field used for land application(for example: irrigation map) c. The soil series present on every land application field d. The crops grown on every land application field e. The Realistic Yield Expectation(RYE)for every crop shown in the WUP f. The maximum PAN to be applied to every land application field g. The waste application windows for every crop utilized in the WUP h. The required NRCS Standard specifications 2.A site map/schematic 3. Emergency Action Plan 4. Insect Control Checklist with chosen best management practices noted 5. Odor Control Checklist with chosen best management practices noted 6.Mortality Control Checklist with selected method noted-Use the enclosed updated Mortality Control Checklist 7. Lagoon/storage pond capacity documentation(design,calculations,etc.) Please be sure the above table is accurate and complete. Also provide any site evaluations,wetland determinations,or hazard classifications that may be applicable to your facility. 8. Operation and Maintenance Plan If your CAWMP includes any components not shown on this list, please include the additional components with your submittal. (e.g.composting,digesters,solids separators,sludge drying system,waste transfers,etc.) I attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that, if all required parts of this application are not completed and that if all required supporting information and attachments are not included,this application package will be returned to me as incomplete. Note: In accordance with NC General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application may be subject to civil penalties up to $25,000 per violation. (18 U.S.C. Section 1001 provides a punishment by a fine of not more than$10,000 or imprisonment of not more than 5 years,or both for a similar offense.) Print the Name of the Permittee/Landowner/Signing Official and Sign below.(If multiple Landowners exist,all landowners should sign. If Landowner is a corporation, signature should be by a principal executive officer of the corporation): Name(Print): /'Qc� l'�tU/' Ort�cdu�P �1it(e: Oc,44-� Signature: Date: Name(Print): Title: Signature: Date: Name(Print): Title: Signature: Date: THE COMPLETED APPLICATION SHOULD BE SENT TO THE FOLLOWING ADDRESS: E-mail: animal.operations@deq.nc.gov NCDEQ-DWR Animal Feeding Operations Program 1636 Mail Service Center Raleigh,North Carolina 27699-1636 Notification of Change of Ownership Animal Waste Management Facility (Please type or print all information that does not require a signature) In accordance with the requirements of 15A NCAC 2T.1304(c)and 15A NCAC 2T.1305(d)this form is official notification to the Division of Water Resources (DWR) of the transfer of ownership of an Animal Waste Management Facility. This form must be submitted to DWR no later than 60 days following the transfer of ownership. General Information: Previous Name of Farm: Lanier's Nursery Facility No: 31 -209 Previous Owner(s)Name: Ann H. Herring Phone No: (252) 568 - 3989 New Owner(s)Name: Murphy Piglets, LLC Phone No: New Farm Name(if applicable): Murphy Piglets, LLC Mailing Address: 588 Piney Grove Road Albertson, NC 28508 Farm Location: Latitude and Longitude: 350 05' 06" / 770 48' 06" County: DUplin Please attach a copy of a county road map with location identified,and provide the location address and driving directions below(Be specific: road names,directions,milepost,etc.): 356 Bill Sutton Road Albertson, NC 28508 Operation Description: Type of Swine No. of Animals Type of Swine No. of Animals Type of Cattle No. of Animals B Wean to Feeder 6400 ❑ Gilts ❑ Dairy ❑ Wean to Finish ❑ Boars ❑ Beef ❑ Feeder to Finish ❑Farrow to Wean Type of Poultry No. of Animals ❑ Farrow to Feeder ❑ Layer ❑ Farrow to Finish ❑ Pullets Other Type of Livestock: Number ofAnimals: Acreage Available for Application: 27.60 Required Acreage: 12.00 Number of Lagoons/Storage Ponds: 2 Total Capacity: 311843 Cubic Feet(ft3) Owner/Manager Agreement I (we)verify that all the above information is correct and will be updated upon changing. I (we)understand the operation and maintenance procedures established in the Certified Animal Waste Management Plan (CAWMP) for the farm named above and will implement these procedures. I (we) know that any modification or expansion to the existing design capacity of the waste treatment and storage system or construction of new facilities will require a permit modification before the new animals are stocked. I (we) understand that there must be no discharge of animal waste from the storage or application system to surface waters of the state either directly through a man-made conveyance or from a storm event less severe than the 25-year, 24-hour storm and there must not be run-off from the application of animal waste. I (we) understand that this facility may be covered by a State Non-Discharge Permit or a NPDES Permit and completion of this form authorizes the Division of Water Resources to issue the required permit to the new land owner. Name of Previous Land Owner: Ann H. Herring Signature: Date: Name of New Land Owner: Murphy Piglets, LLC (Bradley & Mary Anne H. Murphy) Signature: Date: Name of Manager(if different from owner): Signature: Date: Please sign and return this form to: Animal Feeding Operations N.C. Division of Water Resources Water Quality Regional Operations Section 1636 Mail Service Center Raleigh,NC 27699-1636 June 12,2015 Animal Waste Management System Operator Designation Form WPCSOCC NCAC 15A 8F.0201 Facility/Farm Name: Murphy Piglets, LLC Permit#: AWS310209 Facility ID#: 31 _ 209 County: Duplin Operator In Charge(OIC) 33 dl�e Name: �Gt 4 P k r First I /Middle Last Jr,Sr.etr. Cert Type/Number: Work Phone: Signature• Date: 4 "1 certify that 1 agree to my desi nation as the 0 rator in Charge for the facility noted.I understand and will abide by the rules and regulations pertaining to the responsibilities set forth in 15A NCAC 08F.0203 and failing to do so can result in Disciplinary Actions by the Water Pollution Control System Operators Certification Commission.- Back-up Operator In Charge(Back-up OIC) (Optional) First Middle Last Jr,Sr,etc. Cert Type/Number: Work Phone: ( ) Signature: Date: "1 certify that I agree to my designation as Back-up Operator in Charge for the facility noted.I understand and will abide by the rules and regulations pertaining to the responsibilities set forth in 15A NCAC 08F.0203 and failing to do so can result in Disciplinary Actions by the Water Pollution Control System Operators Certification Commission." Owner/Permittee Name: Murphy Piglets, LLC (Bradley & Mary Anne H. Murphy) Phone#: (�S Z� s�O -3�0 q Fax#: ( ) Signature• Date: (Owner or authorized agent)// L Mail or fax to: WPCSOCC 1618 Mail Service Center Raleigh,N.C.27699-1618 Fax:919-733-1338 (Retain a copy of this form for your records) Revised 82007 '��e Nutrient Management Plan For Animal Waste Utilization 02-24-2016 This plan has been prepared for: This plan has been developed by: Murphy Piglets, LLC (31-209) Ronnie G. Kennedy Jr. Bradley&Mary Anne Murphy Agriment Services, Inc. 588 Piney Grove Road PO Box 1096 Albertson, NC 28508 Beulaville, NC 28518 252-568-2648 veloper Signature Type of Plan: Nitrogen Only with Manure Only Owner/Manager/Producer Agreement I(we) understand and agree to the specifications and the operation and maintenance procedures established in this nutrient management plan which includes an animal C waste utilization plan for the farm named above. I have read and understand the Required Specifications concerning animal waste management that are included with this plan. Av��� (�— Signa a(owner) U Date AV4" aurC l0 Signature( anager r prod er) Date This plan meets the minimum standards and specifications of the U.S. Department of Agriculture-Natural Resources Conservation Service or the standard of practices adopted by the Soil and Water Conservation Commission. /g�. / /, Plan Approved By: echnical Specialist Signature Date ---------------------------------------------------------------------------------------------------------------------------------------------g------------------ Preview Database Version 4.1 Date Printed: 02-24-2016 Cover Page 1 i i Nutrients applied in accordance with this plan will be supplied from the following source(s): Commercial Fertilizer is not included in this plan. I S5 Swine Nursery Lagoon Liquid waste generated 1,222,400 gals/year by a 6,400 animal Swine Nursery Lagoon Liquid operation.This production facility has waste storage capacities of approximately 180 days. j Estimated Pounds of Plant Available Nitrogen Generated per Year Broadcast 2203 Incorporated 2644 Injected 2644 Irrigated 2203 Max. Avail. Actual PAN PAN Sure us/ Actual Volume Volume Surplus/ PAN(lbs) * Applied (lbs) Deficit(lbs) Applied (Gallons) Deficit(Gallons) Year 1 2,203 4789 -2,586 2,656,616 -1,434,216 Year 2 2,203 2240 -37 1,242,595 -20,195 I i I I -------------- ---- - ------- ---------------------------- "d" -------------- --------------------------- -------------------..----- Note: In source ID,S means standard source,U means user d�fined source. *Max.Available PAN is calculated on the basis of the actual application method(s)identified in the plan for this source. 470235 Database Version 4.1 Date Printed: 11-12-2014 Source Page 1 of 1 The Waste Utilization table shown below summarizes the waste utilization plan for this operation. This plan provides an estimate of the number of acres of cropland needed to use the nutrients being produced. The plan requires consideration of the realistic yields of the crops to be grown,their nutrient requirements, and proper timing of applications to maximize nutrient uptake. This table provides an estimate of the amount of nitrogen required by the crop being grown and an estimate of the nitrogen amount being supplied by manure or other by-products,commercial fertilizer and residual from previous crops. An estimate of the quantity of solid and liquid waste that will be applied on each field in order to supply the indicated quantity of nitrogen from each source is also included. A balance of the total manure produced and the total manure applied is included in the table to ensure that the plan adequately provides for the utilization of the manure generated by the operation. Waste Utilization Table Year 1 Nitrogen Comm Res. Manure Liquid Solid Liquid Solid PA Fert. (Ibs/A) PA ManureA Manure Manure Manure Nutrient Nutrient Nutrient pplied Applied Applied Applied Req'd Applied Applied (acre) (acre) (Field) (Feld) (lbs/A) (Ibs/A) (lbs/A) Source Total Use. Applic. Applic. 1000 Tract Field ID Soil Series Acres Acres Crop RYE Period N N N Method N gal/A Tons 1000 gals tons 72412 1 SS Noboco 3.90 3.90 Corn,Grain 115 bu. 2/15-6/30 131 0 20 Irrig. IN 1 61.58 0.00 240.16 0.00 72412 1 SS Noboco 3.90 3.90 Wheat,Grain 60 bu. 9/14/30 125 0 0 Irrig. 63 34.67 0.00 135.23 0.00 72412 2 SS Noboco 3.60 3.60 Corn,Grain 115 bu. 2/15-6/30 131 0 20 brig. 111 61.58 0.00 221.69 0.00 72412 2 SS oboco 3.60 3.60 Wheat,Grain 60 bu. 9/14/30 125 0 0 Irrig. 63 34.67 0.00 124.83 0.00 72412 3 SS Noboco 6.70 6.70 Corn,Grain 115 bu. 2/15-6/30 131 0 20 Irrig. 111 61.58 0.00 412.59 0.00 72412 3 SS Noboco 6.70 6.70 Wheat,Grain 60 bu. 9/14/30 125 0 0 brig. 63 34.67 0.00 232.31 0.00 72412 4 SS Noboco 6.70 6.70 Corn,Grain 115 bu. 2/15-6/30 131 0 20 Irrig_ 111 61.58 0.00 412.59 0.0 72412 4 S5 Noboco 6.70 6.70 Wheat,Grain 60 bu. 9/14/30 125 0 0 brig. 63 34.67 0.00 232.31 0.00 72412 5 SS Noboco 6.70 6.70 Corn,Grain 115 bu. 2/15-6/30 131 0 20 Irrig. 111 61.58 0.00 412.59 0.00 72412 5 SS oboco 6.70 6.70 Wheat,Grain 60 bu. 9/14/30 125 0 0 Irrig. 63 34.67 0.00 232.31 0.00 Total Applied,1000 gallons 2,656.62 Total Produced,1000 gallons 1,222.45 9.;-r Balance, 1000 gallons s" -1,434.22 Total Applied,tons X � `' ' 0.00 Total Produced,tons PAW, 0.00 Balance,tons Notes: 1. In the tract column,-symbol means leased,otherwise,owned. 2. Symbol *means user entered data. 470235 Database Version 4.1 Date Printed: I I/]2/2014 WUT Page 1 of 2 j The table shown below provides a summary of the crops or rotations included in this plan for each field. Realistic Yield estimates are also provided for each crop in the plan. In a dition,the Leaching Index for each field is shown, where available. Planned Crops Summary Total se le Leaching Tract Field Acres Acres Index(LI) Soil Series Crop Sequence RYE 72412 1 3.90 3.90 N/A Noboco I Corn,Grain 115 bu. Wheat,Grain 60 bu. i Soybeans,Double Crop 38 bu. 72412 2 3.60 3.60 N/A Noboco Corn,Grain 115 bu. I I Wheat,Grain 60 bu. Soybeans,Double Crop 38 bu. 72412 3 6.70 6.70 N/A Noboco Corn,Grain 115 bu. Wheat,Grain 60 bu. Soybeans,Double Crop 38 bu. 72412 4 6.70 6.70 N/A Noboco Corn,Grain 115 bu. Wheat,Grain 60 bu. jSoybeans,Double Crop 38 bu. 72412 5 1 6.701 6.70 N/A Noboco I Corn,Grain 115 bu. Wheat,Grain 60 bu. j Soybeans,Double Crop 38 bu. PLAN TOTALS: 27.60 27.60 2 Low potential to contribute to soluble None nutrient leaching below the root zone. >=2& Moderate potential to contribute to Nutrient Management(590)should be planned. <= 10 soluble nutrient leaching below the root zone. High potential to contribute to soluble Nutrient Management(590)should be planned. Other conservation practices that improve nutrient leaching below the root zone. the soils available water lding capacity and improve nutrient use efficiency should be > 10 considered. Examples are Cover Crops(340)to scavenge nutrients,Sod-Based Rotations (328),Long-Term No-Tilj(778),and edge-of-field practices such as Filter Strips(393)and Riparian Forest Buffers(391). I Ii I 470235 Database Version 4.1 Date Printed 11/1=014 PCs Page I of 1 NOTE: Symbol *means user entered data. I Waste Utilization Table Year 2 Nitrogen Comm Res. Manure Liquid Solid Liquid Solid PA Fen. (lbs/A) PA ManureA Manure Manure Manure Nutrient Nutrient Nutrient pphed Applied Applied Applied Req'd Applied Applied (acre) (acre) (Field) (Field) (lbs/A) (lbs/A) (lbs/A) Source Total Use. Applic. Applic. 1000 Tract Field ID Soil Series Acres Acres Crop RYE Period N N N Method N gal/A Tons 1000 gals tons 72412 1 S5 Noboco 3.90 3.90 Wheat,Grain 60 bu. 9/1-4/30 125 0 0 Irrig. 63 34.67 0.00 135.23 0.00 72412 1 S5 Noboco 3.90 3.90 Soybeans,Double Crop 38 bu. 4/1-9/15 *132 0 0 Irrig. 132 73.23 0.00 285.60 0.00 72412 2 SS Noboco 3.60 3.60 Wheat,Grain 60 bu. 9/1-4/30 125 0 0 Irrig. 63 34.67 0.00 124.83 0.00 72412 2 SS Noboco 3.60 3.60 Soybeans,Double Crop 38 bu. 4/1-9/15 *132 0 0 brig. 0 0.00 0.00 0.00 0.00 72412 3 SS Noboco 6.70 6.70 Wheat,Grain 60 bu. 9/1-4/30 125 0 0 Irrig. 63 34.67 0.00 232.31 0.00 72412 3 SS Noboco 6.70 6.70 Soybeans,Double Crop 38 bu. 4/1-9/15 *132 0 0 brig_ 0 0.00 0.0 0.00 0.00 72412 4 SS Noboco 6.70 6.70 Wheat,Grain 60 bu. 9/14/30 125 0 0 Irrig. 63 34.67 0.00 232.31 0.00 72412 4 S5 Noboco 6.70 6.70 Soybeans,Double Crop 38 bu. 4/1-9/15 *132 0 0 Irrig. 0 0.00 0.00 0.00 0.00 72412 5 SS Noboco 6.70 6.70 Wheat,Grain 60 bu. 9/14/30 125 0 0 Irrig. 63 34.67 0.00 232.31 0.00 72412 5 SS Noboco 6.70 6.70 Soybeans,Double Crop --r38 bu. 4/1-9/15 *132 0 0 brig. 0 0.00 0.00 0.00 0.00 Total Applied,1000 gallons 1,242.60 Total Produced, 1000 gallons 1,222.4C `` i._ Balance, 1000 gallons -20.20 Total Applied,tons 0.00 Total Produced,tons 0.00 Balance,tons " "" 0.00 r,. Notes: 1. In the tract column,-symbol means leased,otherwise,owned. 2. Symbol*means user entered data. 470235 Database Version 4.1 Date Printed: 1 1/12/2014 WUT Page 2 of 2 0 f The Irrigation Application Factors for each field in this plan are shown in the following table. Infiltration rate varies with soils. If applying waste nutrients through an irrigation system,you must apply at a rate that will not result in runoff. This table provides the maximum application rate per hour that may be applied to each field selected to receive wastewater. It also lists the maximum application amoupt that each field may receive in any one application event. Irrigation Application Factors i Application Rate Application Amount Tract Field Soil Series (inches/hour) (inches) 72412 1 Noboco 0.50 1.0 72412 2 Noboco, 0.50 1.0 72412 3 Noboco 0.50 1.0 72412 4 Noboco 0.50 1.0 72412 5 Noboco 0.50 1.0 i I i I 470235 Database Version 4.1 Date Printed 11/12/2014 IAF Page I of 1 NOTE: Symbol*means user entered data. The following Lagoon Sludge Nitrogen Utilization table provides an estimate of the number of acres needed for sludge utilization for the indicated accumulation period. These estimates are based on average nitrogen concentrations for each source,the number of animals in the facility and the plant available nitrogen application rates shown in the second column. Lagoon sludge contains nutrients and organic matter remaining after treatment and application of the effluent. At clean out,this material must be utilized for crop production and applied at agronomic rates. In most cases, the priority nutrient is nitrogen but other nutrients including phosphorous,copper and zinc can also be limiting. Since nutrient levels are generally very high, application of sludge must be carefully applied. Sites must first be evaluated for their suitability for sludge application. Ideally, effluent spray fields should not be used for sludge application. If this is not possible,care should be taken not to load effluent application fields with high amounts of copper and zinc so that additional effluent cannot be applied. On sites vulnerable to surface water moving to streams and lakes,phosphorous is a concern. Soils containing very high phosphorous levels may also be a concern. Lagoon Sludge Nitrogen Utilization Table Maximum Maximum Sludge Crop PA-N Rate Application Rate Minimum Acres Minimum Acres Minimum Acres lb/ac 1000 gal/ac 5 Years Accumulation 10 Years Accumulation 15 Years Accumulation Swine Nursery Lagoon Sludge-Standard Corn 120 bu 150 14.69 14.60 29.19 43.79 Hay 6 ton R.Y.E. 300 29.38 7.30 14.60 21.89 Soybean 40 bu 160 15.67 13.68 27.37 41.05 AWN 1 ------------------------•-------------------------------------------•--------------•------------------------------------ 470235 Database Version 4.1 Date Printed: 11-12-2014 Sludge Page 1 of 1 The Available Waste Storage Capacity table provides an estimate of the number of days of storage capacity available at the end of each month of the plan. Available storage capacity is calculated as the design storage capacity in days minus the number of days pf net storage volume accumulated. The start date is a value entered by the user and is defined as the dale prior to applying nutrients to the first crop in the plan at which storage volume in the lagoon or holding pond is equal to zero. Available storage capacity should be greater than or equal iito zero and less than or equal to the design storage capacity of the facility. If the available storage ca0acity is greater than the design storage capacity,this indicates that the plan calls for the application of nutrients that have not yet accumulated, If available storage capacity is negative, the estimated volume of accumulated waste exceeds the design storage volume of the structure. Either of these situations vindicates that the planned application interval in the waste utilization plan is inconsistent with the structure's temporary storage capacity. Source Name Swine Nursery Lagoon Liquid Design Storage Capacity(Days) Start Date 9/1 180 Plan Year Month Available Storage Capacity(Days) 1 1 28 1 2 101 1 3 171 1 4 180 1 i 5 180 1 6 180 1 7 149 1 8 118 1 i 9 145 1 10 180 1 11 180 1 12 180 2 1 180 2 2 180 2 3 180 2 4 180 2 5 166 2 6 153 2 7 139 2 8 125 2 9 104 2 10 73 2 11 43 2 12 12 *Available Storage Capacity is calculated as of the end of each month. ........................................................................................................................................................... .. ... 470235 Database Version 4.1 Date Printed: 11-12-2014 Capacity Page 1 of 1 Required Specifications For Animal Waste Management 1. Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste that reaches surface water is prohibited. 2. There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of the waste, he/she shall provide evidence of an agreement with a landowner, who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the waste!production facility to secure an update of the Nutrient Management Plan when there is a change in the operation, increase in the number of animals, method of application, receiving crop type, or available land. ' 3. Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based upon soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of applications for other nutrients. 4. Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land;eroding at more than 5 tons per acre per year but less than 10 tons per acre per year provided grass filter strips are installed where runoff leaves the field (see USDA, NRCS Field Office Technical Guide Standard 393 -Filter Strips). 5. Odors can be reduced by injecting the waste or by disking after waste application. Waste should not be applied when there is danger of drift from the land application field. 6. When animal waste is to be applied on acres subject to flooding, waste will be soil incorporated on conventionally tilled cropland. When waste is applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding (see "Weather and Climate in North Carolina" for guidance). ------------------------------------------------------------------------------------------------------------------------- ----------------------------- -------- 470235 Database Version 4.1 Date Printed: 11/12/2014 Specification Page 1 7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor and flies. S. Animal waste shall not be applied to saturated soils, during rainfall events, or when the soil surface is frozen. i 9. Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste jto a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. 10. Nutrients from waste shall not be applied in fall or winter for spring p g planted crops on soils with a high poter tial for leaching. Waste/nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than.30 days prior to 'lanting of the crop or forages breaking dormancy. 11. Any new swine facility sited on or after;October 1, 1995 shall comply with the following: The outer perimeter of toe land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and canal. Animal waste, other than swine waste from facilities sited on or after October 1, 1995, shall not be applied closer that 25 feet to perennial waters. 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. I) 14. Waste shall be applied in a manner not!to reach other property and public right-of-ways. ------------------------------------------------------------------------------------------------------------------------------------------------------------ 470235 Database Version 4.1 Date Printed: 11/12/2014 Specification Page 2 15. Animal waste shall not be discharged into surface waters, drainageways, or wetlands by a discharge or by over-spraying. Animal waste may be applied to prior converted cropland provided the fields have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharge directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 17. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments,!berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protectlthe vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage, or discharge. 18. If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution, and erosion. 19. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be kept on site. 20. Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. 4owever, if animal waste is used on crops for direct human consumption, itjshould only be applied pre-plant with no further applications of animal waste during the crop season. 21. Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. ------------------------------------------------------------------------------------------------------------------------------------------------------------------- 470235 Database Version 4.1 Date Printed: 11/12/2014 Specification Page 3 22. Waste shall be tested within 60 days of'utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate-determining nutrient, unless other restrictions require waste to be applied based on other nutrients, resulting in a lower application rate than a nitrogen based rate. Zinc and copper levels in the soils shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. ipH shall be adjusted and maintained for optimum crop production. Soil and waste analysis records shall be kept for a minimum offive years. Poultry dry waste application records shall be maintained for a minimum of three years. Waste application records for all other waste shall be maintained for five (5)years. 23. Dead animals will be disposed of in a manner that meets North Carolina regulations. i - -- ---------------------------------- -------------------------------------------------------------------------------------------- ----------------- --- 470235 Database Version 4.1 Date Printed: 11/12/2014 Specification Page 4 Crop Notes The following crop note applies to field(s): 1,2, 3,4, 5 Corn: CP,Mineral Soil, medium leaching In the Coastal Plain,corn is normally planted when soil temperatures reach 52 to 55 degrees fahrenheit. Review the Official Variety "green book" and information from private companies to select a high yielding variety with the characteristics needed for your area and conditions. Plant 1-2" deep.Plant populations should be determined by the hybrid being planted.Increase the seeding rate by 10%when planting no-till.Phosphorus and potassium recommended by a soil test can be broadcast or banded at planting. When planting early in cool,wet soil, banded phosphorus will be more available to the young plants.An accepted practice is to apply 20-30 lbs/acre N and 20-301bs/acre phosphorus banded as a starter and one-half the remaining N behind the planter.The rest of the N should be applied about 30-40 days after emergence. The total amount of N is dependent on soil type. When including a starter in the fertilizer program,the recommended potassium and any additional phosphorus is normally broadcast at planting. Plant samples can be analyzed during the growing season to monitor the overall nutrient status of the corn.Timely management of weeds and insects are essential for corn production. The following crop note applies to field(s): 1, 2, 3, 4, 5 Double-Crop Soybeans,Coastal Plain: Mineral soil,medium leachable Double-crop soybeans should be planted as early in June as possible with planting completed by July 4th. When no-tilling soybeans in small grain straw, it is essential to manage the straw to achieve adequate plant populations. Review the NCSU Official Variety"green book" and information from private companies to select a high yielding variety with the characteristics needed for your area and conditions. Plant 2-4 seed/row foot for 7-8" drills; 4-6 seed/row foot for 15" rows; 6-8 seed/row foot for 30"rows and 8-10 seed/row foot for 36" rows.Increase the seeding rate by at least 10%for no-till planting. Seeding depth should be 1-1 1/2" and adequate depth control is essential. Phosphorus and potash recommended for the soybeans can be applied to the wheat in the Fall. Soybeans produce their own nitrogen and are normally grown without additions of nitrogen. However, applications of 20-30 lbs/acre N are sometimes made at planting to promote early growth and vigor. Tissue samples can be analyzed during the growing season to monitor the overall nutrient status of the soybeans. Timely management of weeds and insects is essential for profitable double crop soybean production. ----------------------------------------------------------------------------------------------------------------------------------------------------------------- 470235 Database Version 4.1 Date Printed: 11-12-2014 Crop Note Page 1 of 2 The following crop note applies to field(s): 1,2,3, 4,5 Wheat: Coastal Plain,Mineral Soil, medium leachable In the Coastal Plain,wheat should be planted from October 20-November 25. Plant 22 seed/drill row foot at 1-1 1/2" deep and increase the seeding rate by 5%for each week seeding is delayed beyond the optimum time. See the seeding rates table for applicable seeding rate modifications in the current NCSU "Small Grain Production Guide". Also, increase the initiaN seeding rate by at least 10%when planting no-till.Adequate depth control when planting the wheat is;essential.Review the NCSU Official Variety "green book" and information from private companies to select a high yielding variety with the characteristics needed for your area and conditions.Applyjno more than 30 lbs/acre N at planting. Phosphorus and potash recommended by a soil test report can also be applied at this time.The remaining N should be applied during the months of February-March;The total N is dependent on the soil type. Plant samples can be analyzed during the growing season to monitor the nutrient status of the wheat. Timely management of diseases, insects and weeds are essential for profitable wheat production. i I i 1 i i i I I i i i III II II i ---___ ------- - ________________________________-_-____---_--___--------____---------- 470235 Database Version 4.1 Date Printed: lr 1-12-2014 Crop Note Page 2 of 2 y, •. 1/ 'f�. ti, y.1��,q` :i�' fyq it .;pt.L1. ' � � " 4 'h i•` h •.a 1 5 i�+ -t� t- t ` '1 1� i ltt;N ,r�'�, , Ir at ,7f •fit ' -, • 4"�,' i7);+4n„ .�Sf r a -{, ,' J ,�. ( -Ar^ '• �Y��tt'ftr -�. ,��.N'� f 1, f Ji•,ft .� !t,(- t.+ ^..I' SI ''tL �� t . # rr fq•' l� � n,i`4 ��.��}1� tk}f ^ �l6p} � ��N� s� i� •�f, ; 1 • �ttj f � St,. a�'r• ` '��1` .. Li�, .. y �t M'7,�',� ��f � a•�, ; ,'S' � r i_•r,e1 if���t� i - ctf �!- "�.1:4 �r � I y� 1.!{�.,t-�RTiC � t _�t ��Rs�r\ � �•�k-S r. +dJ rj�t:�� .` �., S�{r���� F�„!r.�l •'�FT `. Ki {R ;,itK k tia f _ r;,, y�,x, 1� S1! :G# i., ''+ ►:;..�'+*"YY St{iAi�1► r,`.,' l.;a t %.f .*'r?:d'7�����`/ •:.�bN -�;_1�.f ir. j�i y �r`* K l t� � )4 �T ifMk' ' '' .pl• it jH.^•-. •�' 3,,,4.7Y yti J J��). Iq Y, IZ!�i ll a..r� �}, < t'{' it ,r.'�i• •h"� @�� 'tl`� y ' > 19 rr4 � .y. ro' S 1#)fy1 tr 'fa'•�f S t. 4,Iw ,�+ ,1 ^' 1., t � t •t Sv .1'!�d �STI �.t y s;�t;1 I ,S•'�J r ,3..y,�.- tl .�l •�;•! • ��v11y 5r"i-.i < f,;1.t" 4 ^73, rtl 4 .f4 • Al, IrIdj ,} JK•j_''1 '. SYti.+7.'4°.et�� .AY '•1 � }u* 1. �1 < �ti!' •�4`s�z 4 t, ,fir* l ...5� ���, f #2' ',ir+ a ^T "�'�+,1 y���"S:-+`,�'t>&?� '�;. ,;,� "Sr•1� :�:f t t _ ;._ � d t 4 r t ' Y' ,�; 'r �;'I -C - •+ a r-f _Yri i - S '; # rt� �h ''• a JJ�t�y- �` N. f ,. !' .t :� ,I 1 i+� f,t�Fw'`!s r !°•�. ,{�� t''�"�'y vt yh 41 y�Yl ,N 4'}-(}y �;t r, # � ' ! '..�p� .. ••c�'wL• +�i. �{�'� � y}Y' / - ,ut/, tS,j rW � f �•}]'; �7• .(" - 'tom' i¢{��,,, ra, �u i�yy�q .., (p.,.�� ;{� ')�• � �.. yhyl!�'� 1{�i' '.if ., :1i t ? 4H ' � {�'irh"d'� � ��iy r� .t''�il'�r � r .rvf n°.t +,t•4 4yt,�� .. - :/ ri -7YM i. r tr :r•. Wettable Acres lerpretalflon Agriment Services Inc. P.O.Box 1096 Beulaville,NC 28518 (252)568-2648 Grower Information 252 50 398 Add=8''292,BIL L SU1T01!T ROAD p AL$t tt3'SON (state)INC (Zip) 28509 (County)Du lin (Facility Number 31-209 TRACK CODES I+'IElE1),NUMBERS= PULL NUMBERS ..PULL*W I S. PULL LENGTHS „1 ACRE=43.560 WETTABLE ACRES T-72412` 1.0 2640 640.0 4380 0 3.9 T-72412 40 600.0 2.0 43;56p.0;- 3.6 3.0 204.01 1,100.0 43560:0 6.7 ". .T 7?Al2.5598 4.0 2640 1100.0 6.7 TOTALS. 10.0 20.8 80% of WETTED DIAMETER 330' I D (D 73, c :) r ro n � w s a e O (D O rr O (D [D Q fD EXHMrr D-1 IRRIGATION SYSTEM DESIGN PARAMETERS Landowner/Operator Name: .4,t County: Address: o„ 'pa, G o Date: ._ 2 02 A�J Telephone: 0.5�? Tq TABLE 1 - Field Specifications Approximate Maximum Maximum Maximum Application Useable Size Application per Irrigation Field[ of Fleld2 Slope Rate3 Cycle3 Number (acres) Soil Type (%) Crop(s) (ln/hr (Inches) Comments CoenC7 p a,.,. ib�u If Tt59 Tff IQA.� C.�of" ail I 1See attached map. 2Total field acreage minus required buffer areas. 311efer to N.C.Irrigation Guide,Field Office Technical Guide,Section Q G. Annual application must not exceed the agronomic rates for the soil and crop used. MRCS, NC JUNE, 1996 BIG GUN° PERFORMANCE TABLES U.S. UNITS 100 SERIES BIG GUNS — 240 TRAJECTORY" 100 T TAPER BORE NOZZLES Nozzle Nozzle Nozzle Nozzle Nozzle Nozzle Not 21B NOLDB Nott�e NOitle—� 5' SS' 6' 65' 7' 75' 8' 85' 9' 10" PS.I. GPM DIA. GPM DIA. GPM DIA. GPM CIA. GPM DIA. GPM DIA. GPM OIA GPM DIA GPM DIA GPM DIA 6 SO 50 205' 64 215' 7a 225' 87 235' ' 100 2a5' 115 256' 130 265' 150 273' 165 260 204 300 70 1 60 225' 75 238' 68 250' 101 263' 120 275' 136 283' 155 295' 177 302' 197 710' 20 338 iFASOU3211 M=UIX25 s3Tt�'J$'90 68 245' 63 258' 100 27 ' 117 283' 135 295' 155 306• 175 315' 201 326' 223 '135' 274t 3621 110 76 265' 92 278' 111 290' 129 303' 150 315' 171 324' 195 335' 22? 7aa I 2a7 64 Uri J55' JOa 7d0 'Avadapa only with 1`100 6 SR100, 100 R RING NOZZLES 100 ON DIFFUSER NOZZLES PSI 71 RING 77 RING 81 RING .86 RING .69 RING .93 RING MEN OFI 96 RING 0 5 DN 0 6 DN 0 7 DN c.E Jr. GPM DIA GPM OIA GPM DIA GPM OIA GPM DIA GPM OIA I GPM DIA GPM OIA GPM OIA I GPM OIA I GPM D;; 40 88 208 78 212 91 215 103 224 118 235 1Ja 238 152 242 45 ,Sa 66 169 71LUI7 91 2 LLU- Q,,hie 9o.3 60 81 235 98 ?a0 110 2a5 125 260 tat�2�0 16a 27s U 'ti 7 I4H5oD1'i6.,3[I1L%V7hMei4[t'.li��tfi9ai&ilMumm 110 200 ,a3 2+6 tlttA-Al duit1 * tgw t r zr r+ Iif�.fii� C —� 60 94 255 111 265 127 275 1a5 285 163 300 169 305 1" 115 _ ,DO 105 270 � NIMM1fi124 280 42 295 162 305 182 320 212 32s TIt 2Jbj'a��. Ir1 lr":S 1t l tC Ifil tips. Lu�'it "Trio ONmeler OI th o..rs apptosirrlately 3%less 10r Inc 21'trajectory angle.6%loss lot Ia'. 150 SERIES BIG GUNS — 240 TRAJECTORY" 150 T TAPER BORE NOZZLES Nozzle Nozzle Nortl Nozzle NOt tle Notzle P.S.I. GPM ] DIA. GPM DIA. GP .9' DIA. GPM 1.0' DIA. GPM 1.1• CIA GPM 1.2- DIA +JI e GPM DIA 60 110 265' 143 285' 182 305' 225 325' ?)S 1a51 } 330 365' 1 385 380 }d192951Y!<71ti80ri� ct 7Zdll4j15a► $5 80 128 290' 165 710' 210 335• 260 355' 315 375' 380 395' 4a5 410 �VLj1a575.�1:Y3ltZ5 �► 100 uJ 7# 204 185 130' 235 355' 290 J75' 355 <00! 425 a20' Soo 440 ,20 1s) 3tRaract»Ts �11�� litit52I3Ii1SS9"I 150' 258 J75' 320 395' 385 a20' 465 e.0' S<5 e60 150 R RING NOZZLES Rin, Ring R,ng Ring 86 Ring 97' amq rig a6 . LOB Lla' 1 DIA 26' 134' c;. PS.I. I GPM DIA GPM DIA. GPM DIA. GPM DIA. GP T GPM DIA I G GPM DIA DIA 60 110 260' 143 280' 182 300' S 3t5' 275 3J5 330 r 350' 385 36s D !f3' SY35�� slltxMSi�ii41S312if' 80 1?8 280' 165 300' 210 320' so—�ao 315 060• ta�Mn�r��aSao Sao aa5 3gs 100 143 100' 185 120' 235 340' 290 360' 155 380 I 42 40WAA %=:112i�'1:4252:Zs&Q. '=j � 360'120 157 3;5' 204 JJS' 120 180' l3gIB31Z8Q5!?19 -00' Al 465 420 l�{IlEf 54 55l1L S2:>sE1� <35 '.The Miniver 01 Ih'o'.s apoloaimalBly 3%less Ior the 21'trajectory angle. 200 SERIES BIG GUNS — 270 TRAJECTORY" 200 T TAPER BORE NOZZLES No2tle Nozzle Nozzle Nozzle No Zia Nozzle Nozzle Np7zl? — LO5' 111 1.2' 1.J' t.a" IS' 16• )5l >+�9r c P.S.I. GPM OIA. GPM DIA. GPM DIA. GPM DIA. GPM DIA. GPM DIA. GPM DIA GPM D-A I GSM D•A Emmmut p 9b a259 70 270 160' 710 380' 355 395' a15 af0' a80 a30' 555 a50' 630 a65' 755 a ♦ 95' 690 Sty' 90 310 390' 350 410• 405 425' 475 445' Say 465' 625 485 715 505' 855 575 1005 555' 5fficdK�71'tN 110 340 410' 390 430 <45 450' 525 470' 605 495' 695 515' 790 535' 945 565 31S�t101C: I 370 425' 425 445' 485 465' 565 4e5' 655 Sty' 755 540' 860560ip2S5�g90— IfjfiC 620. j � 200 R RING NOZZLES t 9 c u (1.?9' actual) (1�<6'a ;ng, (t56.actual 1 l,1• Ring771.t:-Ring I 1• R,ny 2- an PS.I. C�PM DIA GPM DIA GPM D1A. GPM actual)IA aCI OIA D1P83" actuDal) 1193' actual) GPM DIA WHJYFA�II o3 60 250 3a0' 330 370' 365 390' 445 410' 515 425' 585 <40' 695 <55 60 290 770' 3a0 ap0 <a5 a20' S�iS ia0' 590 a55' 675 a)0' 386m1L� a��i" a05 eyp 10o 325 39C' a25 a25' 500 aa5' 5)5 ImWon �65t' i 1F32 o1M�Y�67.ofii$1 l�}SltNalim e&'mQY,MI&L.ilt'.TS(7�'lil.Ej, i111 16tYia i1 31 3351ri li-iAILIW51=53.Mr I t20 ]SS a,0' a65 aa5' 5a5 a65' 630 a65' 725 $00' 825 $20' 965 5c5 1 ZB� iB 5 la< $05t te' 'i E`yl ifi625. ` Sd"TM dtametet of,riro.t is appr0timately 2%less for the 24'trajectory angle•S1`b less 10,the 21'trajectory angle. The BIG GUN+ pedotmance Bata has Dean obtained under ideal Zest conotnons and may be adversely affected by wind.poot hydraulic entrance conOthOhs or other 1a:,D,s Nelson litigation Corporation makes no representation regarding droplet Condition.uniformly 0•aopucai,on rare Operator:Marty Best County: Duplin Date: 03/18/93 Distance to nearest residence (other than owner) : 2200.0 feet 1. STEADY STATE LIVE WEIGHT 0 sows ( farrow to finish) x 1417 lbs. = 0 lbs 0 sows ( farrow to feeder) x 522 lbs. = 0 lbs 0 head (finishing only) x 135 lbs. - 0 lbs 0 sows (farrow to wean) x 433 lbs. = 0 lbs 3200 head (wean to feeder) x 30 lbs. = 96000 lbs TOTAL STEADY STATE LIVE WEIGHT (SSLW) = 96000 lbs 2. MINIMUM REQUIRED TREATMENT VOLUME OF LAGOON Volume = 96000 lbs. SSLW x Treatment Volume(CF) /lb. SSLW Treatment Volume(CF)/lb. SSLW= 1 CF/lb. SSLW Volume = 96000 cubic feet 3 . STORAGE VOLUME FOR SLUDGE ACCUMULATION Volume = 0.0 cubic feet ; "Owner requests no sludge storage. Sludge will be removed as needed. " ' . TOTAL DESIGN VOLUME Inside top length 200.0 feet ; Inside top width 120. 0 feet Top of dike at elevation 148.5 feet Freeboard 1.0 feet ; Side slopes 2. 5 : 1 (Inside lagoon) N& Total design lagoon liquid level at elevation 47 .5 feet Bottom of lagoon elevation 37 .5 feet Seasonal high water table elevation 43 .0 feet i Total design volume using prismoidal formula f� • SS/END1 SS/END2 SS/SIDE1 SS/SIDE2 LENGTH WIDTH DEPTH j0 2.5 2.5 2 .5 2.5 195 .0 115 .0 10.0 l� p� AREA OF TOP LENGTH * WIDTH = 195.0 115 .0 22425.0 (AREA OF TOP) AREA OF BOTTOM LENGTH * WIDTH = 145.0 65.0 9425.0 (AREA OF BOTTOM) AREA OF MIDSECTION LENGTH * WIDTH * 4 170.0 90.0 61200.0 (AREA OF MIDSECTION * 4) CU. FT. _ [AREA TOP + (4*AREA MIDSECTION) + AREA BOTTOM] * DEPTH/ 22425.0 61200.0 9425 .0 1 VOLUME OF LAGOON AT TOTAL DESIGN LIQUID LEVEL = . 155083 CU. FT r f 5. TEMPORARY STORAGE REQUIRED DRAINAGE AREA: Lagoon (top of dike) Length * Width = 200.0 120.0 24000.0 square feet Buildings (roof and lot water) Length * Width = 0.0 0.0 0.0 square feet TOTAL DA 24000.0 square feet Design temporary storage period to be 180 days. 5A. Volume of waste produced Approximate daily production of manure in CF/LB SSLW 0. 00136 Volume = 96000 Lbs. SSLW * CF of Waste/Lb. /Day * 180 days Volume = 23444 cubic feet 5B. Volume of wash water This is 'the amount of fresh water used for washing floors or volume of fresh water used for a flush system. Flush systems that recirculat the lagoon water are accounted for in 5A. Volume = 0.0 gallons/day * 180 days storage/7 . 48 gallons per CF Volume = 0.0 cubic feet 5C. Volume of rainfall in excess of evaporation Use period of time when rainfall exceeds evaporation by largest amount 180 days excess rainfall - 7 .0 inches Volume = 7.0 in * DA / 12 inches per foot Volume = 14000.0 cubic feet l" 5D. Volume of 25 year - 24 hour storm Volume = 7 . 5 inches / 12 inches per foot * DA Volume = 15000.0 cubic feet TOTAL REQUIRED TEMPORARY STORAGE 5A. 23444 cubic feet 5B. 0 cubic feet 5C. 14000 cubic feet 5D. 15000 cubic feet TOTAL 52444 cubic feet 6. SUMMARY Total required volume 148444 cubic feet Total design volume avail. 155083 cubic feet Min. req. treatment volume plus sludge accumulation 96000 cubic f At elev. 44.6 feet ; Volume is 96365 cubic feet (end pumping) Total design volume less 25yr-?4hr storm is 140083 cubic feet At elev. 46.7 feet ; Volume is 137635 cubic feet (start pumpinc Seasonal high water table elevation 43 .0 feet c 7. DESIGNED BY: Ay OF- APPROVED BY: DATE: J? f 3��--j DATE: 13� (C � NOTE: SEE ATTACHED WASTE UTILIZATION PLAN _SCS DOES NOT CERTIFY THAT EXCAVATION AND FILL VOLUMES ARE CORRECT 713 -- - co co : CMLA G Nil •ram--i---Y°—Fj �.__�.. _ . _ -- —� � � '-i co I.- C' - - i _.,tor:Marty Best County: Duplin Date: 10/20/95 i'.6tance to nearest residence (other than owner) : 2700.0 feet AVERAGE LIVE WEIGHT (ALW) 0 sows ( farrow to finish) x 1417 lbs. = 0 lbs 0 sows ( farrow to feeder) x 522 lbs. = 0 lbs 0 head ( finishing only) x 135 lbs. = 0 lbs 0 sows ( farrow to wean) x 433 lbs. - 0 lbs 3200 head (wean to feeder) x 30 lbs. - 96000 lbs Describe other : 0 Total Average Live Weight = 96000 lbs 'r MINIMUM REQUIRED TREATMENT VOLUME OF LAGOON Volume = 96000 lbs. ALW x Treatment Volume(CF) /lb. ALW Treatment Volume(CF) /lb. ALW = 1 CF/lb. ALW Volume = 96000 cubic feet 1. STORAGE VOLUME FOR SLUDGE ACCUMULATION I(OW'Ngz -FCifae5M NO SLGVtE 5tv2A , Volume = 0.0 cubic feet 4cuV6-E wtU. sE JZ�-M(JVao AS PJ&-VDM i TOTAL DESIGNED VOLUME Inside top length ( feet)--------------------- 160.0 Inside top width ( feet)---------------------- 160.0 Top of dike elevation ( feet)----------------- 46.5 Bottom of lagoon elevation ( feet)------------ 35.5 Freeboard ( feet)----------------------------- 1.0 Side slopes (inside lagoon)------------------ 3.0 1 Total design volume using prismoidal formula SS/END1 SS/END2 SS/SIDE1 SS/SIDE2 LENGTH WIDTH DEPTH 3.0 3.0 3.0 3.0 154.0 154.0 10.0 AREA OF TOP LENGTH * WIDTH = 154.0 154.0 23716 (AREA OF TOP) AREA OF BOTTOM LENGTH * WIDTH = 94.0 94.0 8836 (AREA OF BOTTOM) AREA OF MIDSECTION LENGTH * WIDTH * 4 124.0 124.0 61504 (AREA OF MIDSECTION * 4) CU. FT. _ [AREA TOP + (4*AREA MIDSECTION) + AREA BOTTOM] * DEPTH/6 23716.0 61504.0 8836.0 1.7 Total Designed Volume Available = 156760 CU. FT. 5 2EMPORARY STORAGE REQUIRED I DRAINAGE AREA: Lagoon (top of dike) Length * Width = 160.0 160.0 25600.0 square feet Buildings (roof and lot water) 0.0 square feet Describe this area. TOTAL DA 25600.0 square feet Design temporary storage period to be 180 days. 'A. Volume of waste produced Feces & urine production in gal. /day per 135 lb. ALW 1.37 Volume = 96000 lbs. ALW/135 lbs. ALW * 1.37 gal/day 180 days Volume = 175360 gals. or 23443.9 cubic feet Volume of wash water This is the amount of fresh water used for washing floors or volume of fresh water used for a flush system. Flush systems that recirculate the lagoon water are accounted for in 5A. Volume = 0.0 gallons/day * 180 days storage/7.48 gallons Volume = 0.0 cubic feet per CF C. Volume of rainfall in excess of evaporation Use period of time when rainfall exceeds evaporation by largest amount. 180 days excess rainfall = 7.0 inches Volume = 7.0 in * DA / 12 inches per foot Volume = 14933.3 cubic feet I t �. 'Volume of 25 year - 24 hour storm Volume = 7.5 inches / 12 inches per foot * DA Volume = 16000.0 cubic feet TOTAL REQUIRED TEMPORARY STORAGE 5A. 23444 cubic feet 5B. 0 cubic feet 5C. 14933 cubic feet 5D. 16000 cubic feet TOTAL 54377 cubic feet 6. SUMMARY Temporary storage period____________________> 180 days Rainfall in excess of evaporation=====______> 7.0 inches 25 year - 24 hour rainfall__________________> 7.5 inches Freeboard___________________________________> 1.0 feet Side slopes_________________________________> 3.0 : 1 ' Inside top length___________________________> 160.0 feet Inside top width____________________________> 160.0 feet Top of dike elevation_______________________> 46.5 feet ti Bottom of lagoon elevation__________________> 35.5 feet Total required volume_______________________> 150377 cu. ft. Actual design volume________________________> 156760 cu. ft. Seasonal high watertable elevation (SHWT)===> 41.4 feet Stop pumping elev.__________________________> 42.7 feet Must be > or = to the SHWT elev.====__-_-_> 41.4 feet Must be > or = to min. req. treatment el.=> 41.5 feet Required minimum treatment volume=====______> 96000 cu. ft. Volume at stop pumping elevation=====_______> 97336 cu. ft. Start pumping elev._________________________> 44.7 feet Must be at bottom of freeboard & 25 yr. rainfall Actual volume less 25 yr.- 24 hr. rainfall==> 140760 cu. ft. Volume at start pumping elevation=====______> 138372 cu. ft. Required volume to be pumped________________> 38377 cu. ft. Actual volume planned to be pumped=====_____> 41036 cu. f Min. thickness of; soil liner when required== .6 feet � BY: BY: &14F,INC Pcltz. H7CQ'NM (�MlT DATE: DATE: It ol NOTE: SEE ATTACHED WASTE UTILIZATION PLAN COMMENTS: f ■ ■■■■■■■■H ■■, /IrL�!�7.fiF oGl9�It1IC!.'%1��■■■■■■i■■ii■H i73�" ■■■ ■ ■■i"5.7�>T'.�y'+-3tll'L*II<raP'(� mo � D• J77�Ash■� ■mow■>.■�. ����'`'•i�: �■i a■wFs\�■ .: _ s ■i►A'� . ■■■tea■ ��p r�;L7/l�r " • " ...• ..fir' '.!7' '� � .�■..v. ■.�III NOW�■..■�... ■a■■■aaw®m■��■i■ui■i■�■u� ww■■■®Emil ®�®■■ O■i■ s ■�rr►r for raw r rr �■■��O■■wtl�Tis.L;�-� Ii�ww V ��Vy11 r / , "�. Murphy Piglets, LLC AWS310209 System Calibration Information presented in manufacturer's charts are based on average operation conditions with relatively new equipment. Discharge rates and application rates change over time as equipment gets older and components wear. In particular, pump wear tends to reduce operating pressure and flow. With continued use, nozzle wear results in an increase in the nozzle opening which will increase the discharge rate while decreasing the wetted diameter. You should be aware that operating the system differently than assumed in the design will alter the application rate, diameter of coverage, and subsequently the application uniformity. For example, operating the system with excessive pressure results in smaller droplets, greater potential for drift, and accelerates wear of the sprinkler nozzle. Clogging of nozzles can result in pressure increase. Plugged intakes or crystallization of mainlines will reduce operating pressure. Operating below design pressure greatly reduces the coverage diameter and application uniformity. For the above reason, you should calibrate your equipment on a regular basis to ensure proper application rates and uniformity. Calibration at least once every three years is recommended. Calibration involves collecting and measuring flow at several locations in the application area. Any number of containers can be used to collect flow and determine the application rate. Rain gauges work best because they already have a graduated scale from which to read the application amount without having to perform additional calculations. However, pans, plastic buckets, jars, or anything with a uniform opening and cross-section can be used provided the liquid collected can be easily transferred to a scaled container for measuring. For stationary sprinklers, collection containers should be located randomly throughout the application area at several distances from sprinklers. For traveling guns, sprinklers should be located along a transect perpendicular to the direction of pull. Set out collection containers 25 feet apart along the transect on both sides of the gun cart. You should compute the average application rate for all nonuniformity of the application. On a windless day, variation between containers of more than 30 percent is cause for concern. You should contact your irrigation dealer or technical specialist for assistance. 'Reprinted for Certification Training for Operations of Animal Waste Management Systems Manual 1 Murphy Piglets, LLC AWS310209 OPERATION & MAINTENANCE PLAN Proper lagoon management should be a year-round priority. It is especially important to manage levels so that you do not have problems during extended rainy and wet periods. Maximum storage capacity should be available in the lagoon for periods when the receiving crop is dormant (such as wintertime for bermudagrass) or when there are extended rainy spells such as a thunderstorm season in the summertime. This means that at the first sign of plant growth in the later winter / early spring, irrigation according to a farm waste management plan should be done whenever the land in dry enough to receive lagoon liquid. This will make storage space available in the lagoon for future wet periods. In the late summer/ early fall the lagoon should be pumped down to the low marker (see Figure 2-1) to allow for winter storage. Every effort should be made to maintain the lagoon close to the minimum liquid level as long as the weather and waste utilization plan will allow it. Waiting until the lagoon has reached its maximum storage capacity before starting to irrigated does not leave room for storing excess water during extended wet periods. Overflow from the lagoon for any reason except a 25-year, 24-hour storm is a violation of state law and subject to penalty action. The routine maintenance of a lagoon involves the following: • Maintenance of a vegetative cover for the dam. Fescue or common bermudagrass are the most common vegetative covers. The vegetation should be fertilized each year, if needed, to maintain a vigorous stand. The amount of fertilized applied should be based on a soils test, but in the event that it is not practical to obtain a soils test each year, the lagoon embankment and surrounding areas should be fertilized with 800 pounds per acre of 10-10-10, or equivalent. • Brush and trees on the embankment must be controlled. This may be done by mowing, spraying, grazing, chopping, or a combination of these practices. This should be done at least once a year and possibly twice in years that weather conditions are favorable for heavy vegetative growth. NOTE: If vegetation is controlled by spraying, the herbicide must not be allowed to enter the lagoon water. Such chemicals could harm the bacteria in the lagoon that are treating the waste. Maintenance inspections of the entire lagoon should be made during the initial filling of the lagoon and at least monthly and after major rainfall and storm events. Items to be checked should include, as a minimum, the following: Waste Inlet Pipes, Recycling Pipes, and Overflow Pipes --look for: 1. separation of joints 2. cracks or breaks 3. accumulation of salts or minerals 4. overall condition of pipes 2 Murphy Piglets, LLC AWS310209 Lagoon surface -- look for: 1. undesirable vegetative growth 2. floating or lodged debris Embankment -- look for: 1. settlement, cracking, or"jug" holes 2. side slope stability-- slumps or bulges 3. wet or damp areas on the back slope 4. erosion due to lack or vegetation or as a result of wave action 5. rodent damage Larger lagoons may be subject to liner damage due to wave action caused by strong winds. These waves can erode the lagoon sidewalls, thereby weakening the lagoon dam. A good stand of vegetation will reduce the potential damage caused by wave action. If wave action causes serious damage to a lagoon sidewall, baffles in the lagoon may be used to reduce the wave impacts. Any of these features could lead to erosion and weakening of the dam. If your lagoon has any of these features, you should call an appropriate expert familiar with design and construction of waste lagoons. You may need to provide a temporary fix if there is a threat of a waste discharge. However, a permanent solution should be reviewed by the technical expert. Any digging into a lagoon dam with heavy equipment is a serious undertaking with potentially serious consequences and should not be conducted unless recommended by an appropriate technical expert. Transfer Pumps -- check for proper operation of: 1. recycling pumps 2. irrigation pumps Check for leaks, loose fittings, and overall pump operation. An unusually loud or grinding noise, or a large amount of vibration, may indicate that the pump is in need of repair or replacement. NOTE: Pumping systems should be inspected and operated frequently enough so that you are not completely "surprised" by equipment failure. You should perform your pumping system maintenance at a time when your lagoon is at its low level. This will allow some safety time should major repairs be required. Having a nearly full lagoon is not the time to think about switching, repairing, or borrowing pumps. Probably, if your lagoon is full, your neighbor's lagoon is full also. You should consider maintaining an inventory of spare parts or pumps. • Surface water diversion features are designed to carry all surface drainage waters (such as rainfall runoff, roof drainage, gutter outlets, and parking lot runoff) away from your lagoon and other waste treatment or storage structures. The only water that should be coming from your lagoon is that which comes from your flushing (washing) system pipes and the rainfall that hits the lagoon directly. You should inspect your diversion system for the following: 1. adequate vegetation 2. diversion capacity 3. ridge berm height 3 Murphy Piglets, LLC AWS310209 Identified problems should be corrected promptly. It is advisable to inspect your system during or immediately following a heavy rain. If technical assistance is needed to determine proper solutions, consult with appropriate experts. You should record the level of the lagoon just prior to when rain is predicted, and then record the level again 4 to 6 hours after the rain (assumes there is no pumping). This will give you an idea of how much your lagoon level will rise with a certain rainfall amount (you must also be recording your rainfall for this to work). Knowing this should help in planning irrigation applications and storage. If your lagoon rises excessively, you may have an overflow problem from a surface water diversion or there may be seepage into the lagoon from the surrounding land. Lagoon Operation Startup: 1. Immediately after construction establish a complete sod cover on bare soil surfaces to avoid erosion. 2. Fill new lagoon design treatment volume at least half full of water before waste loading begins, taking care not to erode lining or bank slopes. 3. Drainpipes into the lagoon should have a flexible pipe extender on the end of the pipe to discharge near the bottom of the lagoon during initial filling or another means of slowing the incoming water to avoid erosion of the lining. 4. When possible, begin loading new lagoons in the spring to maximize bacterial establishment (due to warmer weather). 5. It is recommended that a new lagoon be seeded with sludge from a healthy working swine lagoon in the amount of 0.25 percent of the full lagoon liquid volume. This seeding should occur at least two weeks prior to the addition of wastewater. 6. Maintain a periodic check on the lagoon liquid pH. If the pH falls below 7.0, add agricultural lime at the rate of 1 pound per 1000 cubic feet of lagoon liquid volume until the pH rises above 7.0. Optimum lagoon liquid pH is between 7.5 and 8.0. 7. A dark color, lack of bubbling, and excessive odor signals inadequate biological activity. Consultation with a technical specialist is recommended if these conditions occur for prolonged periods, especially during the warm season. Loading: The more frequently and regularly that wastewater is added to a lagoon, the better the lagoon will function. Flush systems that wash waste into the lagoon several times daily are optimum for treatment. Pit recharge systems, in which one or more buildings are drained and recharged each day, also work well. 4 Murphy Piglets, LLC AWS310209 • Practice water conservation --- minimize building water usage and spillage from leaking waterers, broken pipes and washdown through proper maintenance and water conservation. • Minimize feed wastage and spillage by keeping feeders adjusted. This will reduce the amount of solids entering the lagoon. Management: • Maintain lagoon liquid level between the permanent storage level and the full temporary storage level. • Place visible markers or stakes on the lagoon bank to show the minimum liquid level and the maximum liquid level. (Figure 2-1). • Start irrigating at the earliest possible date in the spring based on nutrient requirements and soil moisture so that temporary storage will be maximized for the summer thunderstorm season. Similarly, irrigate in the late summer / early fall to provide maximum lagoon storage for the winter. • The lagoon liquid level should never be closer than 1 foot to the lowest point of the dam or embankment. • Don not pump the lagoon liquid level lower than the permanent storage level unless you are removing sludge. • Locate float pump intakes approximately 18 inches underneath the liquid surface and as far away from the drainpipe inlets as possible. • Prevent additions of bedding materials, long-stemmed forage or vegetation, molded feed, plastic syringes, or other foreign materials into the lagoon. • Frequently remove solids from catch basins at end of confinement houses or wherever they are installed. • Maintain strict vegetation, rodent, and varmint control near lagoon edges. • Do not allow trees or large bushes to grow on lagoon dam or embankment. • Remove sludge from the lagoon either when the sludge storage capacity is full or before it fills 50 percent of the permanent storage volume. • If animal production is to be terminated, the owner is responsible for obtaining and implementing a closure plan to eliminate the possibility of a pollutant discharge. Sludge Removal: Rate of lagoon sludge buildup can be reduced by: 5 Murphy Piglets, LLC AWS310209 • proper lagoon sizing, • mechanical solids separation of flushed waste, • gravity settling of flushed waste solids in an appropriately designed basin, or • minimizing feed wastage and spillage. Lagoon sludge that is removed annually rather than stored long term will: • have more nutrients, • have more odor, and • require more land to properly use the nutrients. Removal techniques: • Hire a custom applicator. • Mix the sludge and lagoon liquid with a chopper- agitator impeller pump through large -bore sprinkler irrigation system onto nearby cropland; and soil incorporate. • Dewater the upper part of lagoon by irrigation onto nearby cropland or forageland; mix remaining sludge; pump into liquid sludge applicator; haul and spread onto cropland or forageland; and soil incorporate. • Dewater the upper part of lagoon by irrigation onto nearby cropland or forageland; dredge sludge from lagoon with dragline or sludge barge; berm an area beside lagoon to receive the sludge so that liquids can drain back into lagoon; allow sludge to dewater; haul and spread with manure spreader onto cropland or forageland; and soil incorporate. Regardless of the method, you must have the sludge material analyzed for waste constituents just as you would your lagoon water. The sludge will contain different nutrient and metal values from the liquid. The application of the sludge to fields will be limited by these nutrients as well as any previous waste applications to that field and crop requirement. Waste application rates will be discussed in detail in Chapter 3. When removing sludge, you must also pay attention to the liner to prevent damage. Close attention by the pumper or drag-line operator will ensure that the lagoon liner remains intact. If you see soil material or the synthetic liner material being disturbed, you should stop the activity immediately and not resume until you are sure that the sludge can be removed without liner injury. If the liner is damaged it must be repaired as soon as possible. Sludge removed from the lagoon has a much higher phosphorus and heavy metal content than liquid. Because of this it should probably be applied to land with low phosphorus and metal levels, as indicated by a soil test, and incorporated to reduce the chance of erosion. Note that if the sludge is applied to fields with very high soil-test phosphors, it should be applied only at rates equal to the crop removal of phosphorus. As with other wastes, always have your lagoon sludge analyzed for its nutrient value. 6 Murphy Piglets, LLC AWS310209 The application of sludge will increase the amount of odor at the waste application site. Extra precaution should be used to observe the wind direction and other conditions which could increase the concern of neighbors. Possible Causes of Lagoon Failure Lagoon failures result in the unplanned discharge of wastewater from the structure. Types of failures include leakage through the bottom or sides, overtopping, and breach of the dam. Assuming proper design and construction, the owner has the responsibility for ensuring structure safety. Items which may lead to lagoon failures include: • Modification of the lagoon structure -- an example is the placement of a pipe in the dam without proper design and construction. (Consult an expert in lagoon design before placing any pipes in dams.) • Lagoon liquid levels-- high levels are a safety risk. • Failure to inspect and maintain the dam. • Excess surface water flowing into the lagoon. • Liner integrity -- protect from inlet pipe scouring, damage during sludge removal, or rupture from lowering lagoon liquid level below groundwater table. NOTE: If lagoon water is allowed to overtop the dam, the moving water will soon cause gullies to form in the dam. Once this damage starts, it can quickly cause a large discharge of wastewater and possible dam failure. Murphy Piglets, LLC AWS310209 EMERGENCY ACTION PLAN PHONE NUMBERS DIVISION OF WATER QUALITY (DWQ) (910)796-7215 EMERGENCY MANAGEMENT SERVICES (EMS) (910)296-2160 SOIL AND WATER CONSERVATION DISTRICT (SWCD) (910)296-2120 NATURAL RESOURCES CONSERVATION SERVICE (NRCS) (910)296-2121 COOPERATIVE EXTENSION SERVICE (CES) (910)296-2143 This plan will be implemented in the event that wastes from your operation are leaking, overflowing or running off site. You should not wait until wastes reach surface waters or leave your property to consider that you have a problem. You should make every effort to ensure that this does not happen. This plan should be posted in an accessible location for all employees at the facility. The following are some action items you should take. 1. Stop the release of wastes. Depending on the situation, this may or may not be possible. Suggested responses to some possible problems are listed below. A. Lagoon overflow-possible solutions are: a) Add soil to berm to increase elevation of dam. b) Pump wastes to fields at an acceptable rate. c) Stop all flow to the lagoon immediately. d) Call a pumping contractor. e) Make sure no surface water is entering lagoon. B. Runoff from waste application field-actions include: a) Immediately stop waste application. b) Create a temporary diversion to contain waste. c) Incorporate waste to reduce runoff. d) Evaluate and eliminate the reason(s)that cause the runoff. e) Evaluate the application rates for the fields where runoff occurred. C. Leakage from the waste pipes and sprinklers-action include: a) Stop recycle pump. b) Stop irrigation pump. c) Close valves to eliminate further discharge. d) Repair all leaks prior to restarting pumps. D. Leakage from flush systems, houses, solid separators-action include: a) Stop recycle pump. b) Stop irrigation pump. c) Make sure siphon occurs. d) Stop all flow in the house, flush systems, or solid separators. E. Leakage from base or sidewall of lagoon. Often this is seepage as opposed to flowing leaks- possible action: a) Dig a small sump or ditch from the embankment to catch all seepage, put in a submersible pump, and pump back to lagoon. b) If holes are caused by burrowing animals, trap or remove animals and fill holes and compact with a clay type soil. 8 Murphy Piglets, LLC AWS310209 c) Have a professional evaluate the condition of the side walls and the lagoon bottom as soon as possible. 2. Assess the extent of the spill and note any obvious damages. a. Did the waste reach surface waters? b. Approximately how much was released and for what duration? c. Any damage notes, such as employee injury, fish kills, or property damage? d. Did the spill leave the property? e. Does the spill have the potential to reach surface waters? f. Could a future rain event cause the spill to reach surface waters? g. Are potable water wells in danger(either on or off the property)? h. How much reached surface waters? 3. Contact appropriate agencies. a. During normal business hours call your DWQ regional office; Phone #, After hours, emergency number: (919) 733-3942. Your phone call should include: your name, facility number, telephone number, the details of the incident from item 2 above, the exact location of the facility, the location or direction of the movement of the spill, weather and wind conditions. The corrective measures that have been under taken, and the seriousness of the situation. b. If the spill leaves property or enters surface waters, call local EMS phone number. c. Instruct EMS to contact local Health Department. d. Contact CE's phone number, local SWCD office phone number and the local NRCS office for advice/technical assistance phone number. 4. If none of the above works call 911 or the Sheriff's Department and explain your problem to them and ask the person to contact the proper agencies for you. 5. Contact the contractor of your choice to begin repair or problem to minimize offsite damage. a. Contractors Name: Agrimenc Services,Inc. b. Contractors Address: Po Box 1096, Beulaville,NC 28518 c . Contractors Phone: (252)568-2648 6. Contact the technical specialist who certified the lagoon (NRCS, Consulting Engineer, etc.) a. Name: Geno Kennedy b. Phone: (910)289-0395 7. Implement procedures as advised by DWQ and technical assistance agencies to rectify the damage, repair the system, and reassess the waste management plan to keep problems with release of wastes from happening again. 9 Murphy Piglets, LLC AWS310209 INSECT CONTROL CHECKLIST FOR ANIMAL OPERATIONS Source Cause BMP's to Minimize Odor Site Specific Practices (Liquid Systems) Flush Gutters Accumulation of solids (,/)Flush system is designed and operated sufficiently to remove accumulated solids from gutters as designed. (yj Remove bridging of accumulated solids at discharge _Lagoons and Pits Crusted Solids (VO Maintain lagoons,settling basins and pits where pest breeding is apparent to minimize the crusting of solids to a depth of no more than 6-8 inches over more than 30%of surface. Excessive Decaying vegetation(✓)Maintain vegetative control along banks of Vegetative Growth lagoons and other impoundment's to prevent accumulation of decaying vegetative matter along water's edge on impoundment's perimeter. (Dry Systems) Feeders Feed Spillage () Design,operate and maintain feed systems(e.g.. bunkers and troughs)to minimize the accumulation of decaying wastage. () Clean up spillage on a routine basis(e.g.7-10 day interval during summer;15-30 day interval during winter). Feed Storage Accumulation of feed () Reduce moisture accumulation within and around residues immediate perimeter of feed storage areas by insuring drainage away from site and/or providing adequate containment(e.g.,covered bin for brewer's grain and similar high moisture grain products). () Inspect for and remove or break up accumulated solids in filter strips around feed storage as needed. Animal Holding Accumulation of animal () Eliminate low area that trap moisture along fences Areas wastes and feed wastage and other locations where waste accumulates and disturbance by animals is minimal. () Maintain fence rows and filter strips around animal holding areas to minimize accumulations of wastes (i.e.inspect for and remove or break up accumulated solids as needed). MIC—November 11, 1996 10 Murphy Piglets, LLC AWS310209 Dry Manure Handling Accumulations of animal ()Remove spillage on a routine basis(e.g.7-10 day Systems wastes interval during summer;15-30 days interval during winter)where manure is loaded for land application or disposal. ()Provide for adequate drainage around manure stockpiles ()Inspect for and remove or break up accumulated wastes in filter strips around stockpiles and manure handling areas as needed. The issues checked (4 pertain to this operation. The landowner/ integrator agrees to use sound judgment in applying insect control measures as practical. I certify the aforementioned insect control Best Management Practices have been reviewed with me. (Landown r Si na ure) For more information contact the Cooperative Extension Service, Department of Entomology, Box 7613, North Carolina State University, Raleigh, NC 27695-7613. AMIC-- November 11, 1996 11 Murphy Piglets, LLC AWS310209 SWINE FARM WASTE MANAGEMENT ODOR CONTROL CHECKLIST Source Cause BMP's to Minimize Odor Site Specific Practices _Farmstead Swine production (,/)Vegetative or wooded buffers: ( )Recommended best management practices; ( /Good judgment and common sense Animal body Dirty manure ( )Dry floors surfaces covered animals Floor surfaces Wet manure-covered (/)Slotted floors; floors (/)Waterers located over slotted floors; (,/)Feeders at high end of solid floors; ( )Scrape manure buildup from floors; ( )Underfloor ventilation for drying Manure collection Urine ( )Frequent manure removal by flush,pit pits recharge or scrape Partial microbial ( )Underfloor ventilation decomposition Ventilation Volatile gases (V)Fan maintenance; exhaust fans Dust (v/)Efficient air movement Indoor surfaces Dust (,/)Washdown between groups of animals ( )Feed additives; ( )Feeder covers; ( )Feed delivery downspout extenders to feeder covers Flush Tanks Agitation of recycled( )Flush tank covers lagoon liquid while tanks ( )Extend fill lines to near bottom of tanks are filling with anti-siphon vents Flush alleys Agitation during waste ( )Underfloor flush with underfloor water conveyance ventilation Pit recharge Agitation of recycled()Extend recharge lines to near bottom of points lagoon liquid while pits pits with anti-siphon vents are filling Lift stations Agitation during sump ( )Sump tank covers tank filling and drawdown Outside drain Agitation during waste ( )Box Covers collection or water conveyance junction boxes End of drain Agitation during waste ( )Extend discharge point of pipes pipes at lagoon water underneath lagoon liquid level Lagoon surfaces Volatile gas emissions (v/)Proper lagoon liquid capacity Biological mixing ( )Correct lagoon startup procedures Agitation ( )Minimum surface area-to-volume ratio( )Minimum agitation when pumping ( )Mechanical aeration ( )Proven biological additives Irrigation sprinkler High pressure agitation (V)Irrigate on dry days with little or no wind nozzles Wind draft ( )Minimum recommended operation pressure ( )Pump intake near lagoon liquid surface ( )Pump from second-stage lagoon AMOC—November 11,1996 12 Murphy Piglets, LLC AWS310209 Storage tank or Partial microbial ( )Bottom or midlevel loading basin surface decomposition Mixing while ( )Tank covers filling Agitation when emptying( )Basin surface mats of solids ( )Proven biological additives or oxidants Settling basin Partial microbial decom- ( )Extend drainpipe outlets underneath liquid surface position Mixing while filling level Agitation when emptying ( )Remove settled solids regularly Manure,slurry or Agitation when spreading ( )Soil injection of slurry/sludges sludge spreader Volatile gas emissions ( )Wash residual manure from spreader after use outlets ( )Proven biological additives or oxidants Dead animals Carcass decomposition (4Proper disposition of carcasses Dead animal Carcass decomposition ( )Complete covering of carcasses in burial pits disposal pits ( )Proper location/construction of disposal pits Incinerators Incomplete combustion ( )Secondary stack burners Standing water improper drainage (,()Farm access road around facilities maintenance Microbial decomposition of away from fagktiesmatter _Manure tracked Poorly maintained access (V)Farm access road maintenance onto public roads roads from farm access Additional Information: Available From: Swine Manure Management 0200 Rule/BMP Packet NCSU-County Extension Center Swine Production Farm Potential Odor Sources and Remedies,EBAE Fact Sheet NCSU-BAE Swine Production Facility Manure Management:Pit Recharge—Lagoon Treatment:EBAE128-88NCSU-BAE Swine Production Facility Manure Management:Underfloor Fluse-Lagoon Treatment 129-88NCSU-BAE Lagoon Design and Management for Livestock Manure Treatment and Storage; EBAE103-83NCSU-BAE Calibration of Manure and Wastewater Application Equipment EBAE Fact Sheet NCSU-BAE Controlling Odors from Swine Buildings;PIH-33 NCSU-Swine Extension Environmental Assurance Program: NPPC Manual NC Pork Producers Assoc Options for Managing Odor;a report from the Swine Odor Task Force NCSU Agri Communication Nuisance Concerns in Animal Manure Management: Odors and Flies;PR0101, Florida Cooperative Extension 1995 Conference Proceedings The issues checked (✓) pertain to this operation. The landowner/ integrator agrees to use sound judgment in applying odor control measures as practical. I certify the aforementioned odor control Best Management Practices have been reviewed with me. (Landown r Signature) 13 Murphy Piglets, LLC Swine Farm Waste Management —Odor Control Checklist Permit No.: AWS310209 Date: 3/4/2024 INSTRUCTIONS FOR USE Owner Signature: JA ♦ Odor Control Checklist is required by General Statute 143-215.10C(e)(1) ♦ Check any/all the BMPs you will implement on this facility. Items checked/selected become a requirement of the CAWMP. ♦ Items in bold or pre-selected are required. ♦ Add any site-specific details related to the selected BMPs ♦ Include any other odor control measures not listed ♦ NOTE: Not all BMPs may be cost-effective for every facility. Evaluate each BMP prior to selecting for your facility. Cause/Source BMP Option to Minimize Odor Comments Site Specific Practices FARMSTEAD ♦ Swine Production ❑ Maintain vegetative or wooded buffers at or •Traps dust and gases, provides dilution near property boundary and visual screening • May require third party input/approval ♦ Improper drainage ❑ Grade and landscape so water drains away • Reduce odors and vectors that occur from facilities and prevent ponding with stagnant conditions ❑ Maintain farm access roads and prevent traffic • Prevents spillage during transport and in waste application area tracking of waste onto public roads ❑ Other BMPs—please describe MORTALITY MANAGEMENT ♦ Carcass ® Dispose of mortality using method approved • Required by statute and permit Decomposition by NCDA&CS State Veterinarian. Manage • May require third party input/approval According to CAWMP(Mortality Management Checklist) and permit(s). ❑ Put carcasses in refrigerated (or freezer)dead boxes within 24 hours for short-term mortality storage. ♦ Incomplete Incineration ❑ Use incinerators with secondary burners for • Reduce odors by complete incineration complete combustion. ❑ Other BMPs—please describe Swine AMOC Page 1 of 6 APPROVED—7/25/2019 Murphy Piglets, LLC Swine Farm Waste Management— Odor Control Checklist Permit No.: AWS310209 Cause/Source BMP Option to Minimize Odor Comments Site Specific Practices HOUSE/BARN—WASTE HANDLING ♦ Flush tanks ❑ Install flush tank covers • Pit-flush systems ♦ Odorous Gases ❑ Flush pits at least 4 times per day • Pit-flush systems ♦ Partial microbial ❑ Empty pits at least once every 7 days • Pit-recharge or"pull-plug" systems decomposition ❑ Underfloor flush with pit ventilation ♦ Agitation of wastes ❑ Install/extend fill lines to near bottom of tanks with anti-siphon vents ❑ Install covers on outside waste collection or junction box ❑ Install sump tank covers for lift stations ♦ Ammonia ❑ Flush/recharge with treated effluent ❑ Treat waste in pits with proven biological or • Monitor for any solids accumulation in pit chemical additive ❑ Other BMPs—please describe HOUSE/BARN—FLOOR AND INDOOR SURFACES ♦ Manure covered floors ❑ Scrape manure from alleys into pens daily •Will move with other manure via pits ❑ Install fully slotted floor system ❑ Install waterers over slotted floor area ❑ Install feeders at high end of solid floors • Where applicable ♦ Odorous Gases ❑ Scrape manure buildup from floors and walls •Aids in animal cleanliness ❑ Keep floors dry •Aids in animal cleanliness ❑ Install underfloor ventilation for drying ❑ Replace bedding/scrape at frequency to •Solid floor/bedding systems keep bedding dry ❑ Other BMPs—please describe Swine AMOC Page 2 of 6 APPROVED—7/25/2019 Murphy Piglets, LLC Swine Farm Waste Management— Odor Control Checklist Permit No.: AWS310209 Cause/Source BMP Option to Minimize Odor Comments Site Specific Practices HOUSE/ BARN —VENTILATION ♦ Dust ❑ Clean fans regularly—specify frequency ♦ Volatile/odorous gases ❑ Efficient air movement ❑ Install temperature and humidity sensors to control ventilation ❑ Treat barn exhaust • Examples: biofilters, wet scrubbing, windbreaks • May reduce ventilation rate depending on method ❑ Other BMPs—please describe HOUSE/ BARN —FEED ♦ Dust ❑ Install feed covers ♦ Adsorbed Gases ® Keep outdoor feed storage covered except a Required by rule 15A NCAC 02D.1802 When necessary to add/remove feed ❑ Minimize free-fall height of dry feed ❑ Install feed delivery downspout extenders to the feed covers ❑ Remove spoiled/unusable feed on regular basis ❑ Feed pellets instead of dry meal • May require third party input/approval ❑ Use feed additives • May require third party input/approval ♦ Ammonia ❑ Use feed-reduced crude protein diet • May require third party input/approval ❑ Other BMPs—please describe HOUSE/BARN—GENERAL ♦ Dust ❑ Install temperature and humidity sensors • Maintain relative humidity at 40 to 65% ♦ Odorous Gases to control ventilation ❑ Use ultraviolet light to treat indoor air ❑ Use indoor or outdoor electrostatic space •Can be used to treat exhaust air charge system ❑ Other BMPs—please describe Swine AMOC Page 3 of 6 APPROVED—7/25/2019 Murphy Piglets, LLC Swine Farm Waste Management —Odor Control Checklist Permit No.: AWS310209 Cause/Source BMP Option to Minimize Odor Comments Site Specific Practices LAGOON/WASTE STORAGE STRUCTURE ♦ Volatile Gases ® Maintain proper lagoon volume •Sufficient liquid volume/depth is required for proper anaerobic treatment ❑ Minimize free-fall height of waste from discharge pipe to lagoon surface ❑ Extend discharge point of pipe to below lagoon • Use caution not to scour or damage lagoon liner liquid level ❑ Maintain proper surface area-to-volume ratio ❑ Use correct lagoon start-up procedures ❑ Aerate for odor control ® Manage sludge levels based on annual sludge survey as required by permit ❑ Keep spilled feed or foreign debris out of lagoon to prevent excess sludge accumulation ❑ Install/use solids separation system ❑ Use proven biological or chemical additives • Monitor for any increase in rate of solids accumulation ❑ Use permeable lagoon covers (not a digester) ❑ Use impermeable lagoon cover or • Methane can be flared if not utilized anaerobic digester ❑ Other BMPs—please describe LAND APPLICATION ♦ Odorous gases ® Perform land application in accordance with CAWMP ♦ Wind drift ® Pump intake near lagoon surface • Required by rule 15A NCAC 02D.1802 ❑ Pump from second stage lagoon ❑ Follow good neighbor policy •Avoid application on known weekends, special days, or holidays/eves if possible ❑ Operate at minimum recommended pressure ❑ Increase setbacks beyond those required by statute, rule, or permit Swine AMOC Page 4 of 6 APPROVED—7/25/2019 Murphy Piglets, LLC Swine Farm Waste Management — Odor Control Checklist Permit No.: AWS310209 Cause/Source BMP Option to Minimize Odor Comments Site Specific Practices LAND APPLICATION (CONTINUED) ❑ Apply during favorable wind conditions, • Recommend checking predicted average hourly (especially for traveling guns or impact wind speed within 24 hours prior to sprinklers) anticipated start ❑ When practical, apply waste on sunny days •Allows for vertical dissipation of odor rather than cool, overcast days ❑ When possible, apply waste mid-morning to • Allows for better vertical dissipation of odor late-afternoon ❑ For traveling guns, use taper-ring or taper-bore • Less odor and drift than ring nozzles nozzles ❑ For traveling guns, use largest-available nozzle that provides acceptable application uniformity ❑ Replace impact sprinklers with low-drift nozzles on center pivots and linear move systems. ❑ Use hose-drag system ❑ Use injection method for waste application ❑ Other BMPs—please describe SLUDGE DISPOSAL ♦ Odorous gases ❑ Transport sludge in covered vehicles or tankers ❑ Apply in thin, uniform layers • Speeds drying and prevents ponding ❑ Incorporate land-applied sludge as soon as • Required within 48 hours or prior to next rain event, practical after application,and in accordance whichever is first,for conventionally tilled with permit. bare soils ❑ Use injection method for sludge application ❑ Dewater sludge prior to application ❑ Use alternatives to land application,such as compost, gasification, energy generation, etc. ❑ Other BMPs—please describe Swine AMOC Page 5 of 6 APPROVED—7/25/2019 ADDITIONAL INFORMATION AVAILABLE FROM: Air Management Practices Assessment Tool (AMPAT) www.extension.iastate.edu/ampat/ AHG-538-A Certification Training for Animal Waste Management Systems:Type A NC Division of Water Resources EBAE 103-83—Lagoon Design and Management for Livestock Manure Treatment and Storage www.bae.ncsu.edu EBAE 128-88—Swine Production Facility Manure Management: Pit Recharge-Lagoon Treatment www.bae.ncsu.edu EBAE 129-88—Swine Production Facility Manure Management: Underfloor Flush-Lagoon Treatment www.bae.ncsu.edu EBAE Fact Sheet—Calibration of Manure and Wastewater Application Equipment www.bae.ncsu.edu EBAE Fact Sheet—Swine Production Farm Potential Odor Sources and Remedies www.bae.ncsu.edu NC NRCS Standard 359—Waste Treatment Lagoon www.nres.udsa.gov NC NRCS Standard 380—Windbreak/Shelterbelt Establishment www.nres.udsa.gov NC NRCS Standard 422—Hedgerow Planting www.nres.udsa.gov NC NRCS Standard 442—Sprinkler System www.nres.udsa.gov Nuisance Concerns in Animal Manure Management: Odors and Flies; PRO107 1995 Conference Proceedings Florida Cooperative Extension Service Options for Managing Odor: A Report from the Swine Odor Task Force NC State University Swine AMOC Page 6 of 6 APPROVED—7/25/2019 Version—November 26,2018 Mortality Management Methods Indicate which method(s)will be implemented. When selecting multiple methods indicate a primary versus secondary option. Methods other than those listed must be approved by the State Veterinarian. Primary Secondary Routine Mortality ❑ ❑ Burial three feet beneath the surface of the ground within 24 hours of knowledge of animal death. The burial must be at least 300 feet from any flowing stream or public body of water (G.S.106-403). The bottom of the burial pit should be at least one foot above the seasonal - high water table.Attach burial location map and plan. ❑ ❑ Landfill at municipal solid waste facility permitted by NC DEQ under GS 15A NCAC 13B .0200. ❑ ❑ Rendering at a rendering plane licensed under G.S. 106-168.7. ®/❑ Complete incineration according to 02 NCAC 52C .0102. ❑ Q A composting system approved and permitted by the NC Department of Agriculture &Con- sumer Services Veterinary Division(attach copy of permit). If compost is distributed off-farm, additional requirements must be met and a permit is required from NC DEQ. In the case of dead poultry only,placing in a disposal pit of a size and design approved by the ❑ ❑ NC Department of Agriculture&Consumer Services(G.S. 106-549.70). ❑ ❑ Any method which, in the professional opinioruof the State Veterinarian,would make possible the salvage of part of a dead animal's value without endangering human or animal health. (Written approval by the State Veterinarian must be attached). ❑ Mass Mortality Plan Mass mortality plans are required for farms covered by an NPDES permit. These plans are also recommended for all animal operations. This plan outlines farm-specific mortality man- agement methods to be used for mass mortality. The NCDA&CS Veterinary Division sup- ports a variety of emergency mortality disposal options; contact the Division for guidance. • A catastrophic mortality disposal plan is part of the facility's CAWMP and is activated when numbers of dead animals exceed normal mortality rates as specified by the State Veterinarian, • Burial must be.done in accordance with NC General Statutes and NCDA&CS Veterinary Division regulations and guidance. • Mass burial sites are subject to additional permit conditions (refer to facility's animal waste management system permit). • In the event of imminent threat of a disease emergency,the State Veterinarian may enact additional temporary procedures or measures for disposal according to G.S. 106-399.4. I OLI�4 3 Signatur of farm 0 ner/M ager Date Signature of chnical Specialist Date DEVICES TO AUTOMATICALLY STOP IRRIGATION EVENTS STATE GENERAL PERMITS The State of North Carolina has issued State General Permits for animal facilities to operate in North Carolina. These Permits meet both State and EPA requirements and provide coverage for the following types of facilities. a AWG100000-Swine Facilities AWG200000-Cattle Facilities • AWG300000-Poultry Facilities with a liquid waste management system You have recently been issued a Certificate of Coverage(COC)to operate your animal facility under one of these General Permits. Condition II.24 of each of these Permits reads as follows: The Pemrittee shall: a.install,operate,and maintain devices on all irrigation pumps/equipment designed to automatically stop irrigation activities during precipitation;or b.commit to provide for the presence of the OIC,a designated backup OIC,or a person under the supervision of an OIC or designated backup OIC at all times during the land application of waste so that in case of a precipitation event,the irrigation activities will be stopped immediately. This commitment must be submitted in writing to the Division on a form supplied by,or approved by,the Division.[G.S§90A-47] Installation of devices or submission of alternate documentation shall be completed within 12 months of the issuance of the COC for this General Permit. The Permittee shall maintain such devices according to the manufacturer's instructions and warranties.This Condition does not apply to manure spreaders or other equipment pulled by manned vehicles.[1 SA NCAC 02T.0108(b)] P ease check the bog below that indicates your commitment to do one of the following. Within twelve(12)months of the effective date of a COC issued under this permit,I shall install,operate and maintain devices on all irrigation pumps/equipment designed to automatically stop irrigation activities during precipitation. This condition does not apply to manure spreaders or other equipment pulled by manned vehicles. I will commit to provide for the presence of the Operator in Charge(OIC),the designated backup OIC,or a person under the supervision of an OIC or backup OIC at all times during the land application of waste. "I certify under penalty of law that this document was prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information, the information submitted is,to the best of my knowledge and belief,true,accurate,and complete.I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." ALA rPA Se A le fr .3/- a 09 Facility Niftne 4 J Permit Number A ur12kie P;aleTS LL4f Owner/Permiftee f4ame an Title(type or print) /� r w / Signature of er/Pe a ate P` Signature of erator barge different from Pecmittee) Date Mail to: Animal Feeding Operations 1636 Mail Service Center Raleigh,NC 27699-1636 DTASIE 1-22-2020