HomeMy WebLinkAbout20240520 SAW-2024-00618 NWP 12 Notice of IntentDEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 69 DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 28403-1343 S TATF.S OF May 20, 2024 Regulatory Division Action ID. SAW-2024-00618 Andrew Moore Dominion Energy North Carolina 800 Gaston Road, Building A Gastonia, North Carolina 28056 Dear Mr. Moore: This is in response to a Pre -Construction Notification (PCN) SAW-2024-00618 received on March 20, 2024, and considered complete on May 9, 2024. In submitting the PCN, you requested verification that the proposed project is authorized by a Department of the Army (DA) Nationwide Permit (NWP). The work affecting waters of the United States is part of an overall project known as M-071 Kannapolis-Concord High Pressure Expansion Project. The activities in waters of the United States include installation of a high-pressure natural gas pipeline to service Cabarrus and Rowan counties. The proposed project involves impacts to 362 linear feet of temporary stream impacts, 0.681 acres of temporary wetland impacts, and 0.079 acres of permanent wetland impacts. The project is located in the Yadkin -Pee Dee basin within portions of Enochville, Town of Landis, City of Kannapolis, Town of China Grove, and City of Concord, in Cabarrus and Rowan Counties, North Carolina. This letter is a provisional notification that your proposed project has been reviewed under NWP Number 12. In accordance with 40 CFR Part 121 (401 Rule), the Corps cannot take final action on the NWP verification request until the procedures outlined in the 401 Rule for an individual Water Quality Certificate (WQC) have been completed. Specifically, a Department of the Army (DA) permit or verification cannot be issued until a Section 401 WQC has been either issued, waived, or denied. Conditions of the Individual Section 401 WQC, will generally become conditions of any final NWP verification letter. Should state action on the required WQC approve a project different from that shown on the current application, a modification to the PCN will be required. You should notify our office of any such changes as substantial changes may require further evaluation. As stated above, this is a provisional notification. This letter does NOT provide Department of the Army (DA) authorization. You are cautioned that -2- commencement of the proposed activity(ies) requested prior to receiving a written DA authorization would constitute a violation of Federal laws and subject you to further enforcement action. Receipt of a certification from the state (e.g., NC Division of Water Resources and/or NC Division of Marine Fisheries) does not preclude the requirement for obtaining DA authorization (e.g., an NWP/RGP verification letter) prior to commencing the work. In all future correspondence, please refer to file number SAW-2024-00618. A copy of this letter is forwarded to State and/or Federal agencies for their information. If you have any questions, please contact Amber Lipsky, at (704)962-6947, or by email at Amber.L.Lipsky@usace.army.mil. Sincerely, -'�& L�V� Amber Lipsky Regulatory Specialist, Charlotte Field Office Copies Furnished: Joey Lawler, S&ME, Inc (via jlawler@smeinc.com) Andrew Pitner, NCDEQ, (via andrew.pitner@deq.nc.gov)