Loading...
HomeMy WebLinkAboutEast_Buffalo_MY3_Credit Release Schedule_signedProject Name: Sponsor Name: USACE Action ID: NCDWQ Action ID: Non-Forested Wetland Credits Warm Water Cool Water Cold Water Riparian Riverine Riparian Non-Riverine Non-Riparian Coastal 4,432.50 1.75 4,432.50 1.75 Scheduled Releases Warm Water Cool Water Cold Water Scheduled Releases Riparian Riverine Riparian Non-Riverine Non-Riparian Scheduled Releases Coastal 1 (Bank/Site Establishment)1, 2, 3 15%1,653.3 15%0.26 15%12/16/2020 12/16/2020 2 (Year 0/As-Built)3 15%509.0 15%0.26 15%Sep-21 10/4/2021 3 (Year 1 Monitoring)10%324.3 10%0.18 10%Feb-22 5/5/2022 4 (Year 2 Monitoring)10%324.3 10%0.18 15%Apr-23 5/12/2023 5 (Year 3 Monitoring)10%324.3 15%0.26 20%Feb-24 6 (Year 4 Monitoring) 5%162.2 5%0.09 10%Feb-25 7 (Year 5 Monitoring)10%324.3 15%0.26 15%Feb-26 8 (Year 6 Monitoring)5%162.2 5%0.09 NA NA Feb-27 9 (Year 7 Monitoring)10%324.3 10%0.18 NA NA Feb-28 Stream Bankfull Standard4 10%NA NA NA NA NA NA Varies4 Total Credits Release to Date 3,135.200 1.14 Date 4 - A 10% reserve of credits to be held back until the bankfull event performance standard has been met. Contingencies (if any): None Signature of Wilmington District Official Approving Credit Release 1 - The first credit release milestone is based on the potential credits stated in the approved mitigation plan. 2 - The first credit release shall occur upon establishment of the mitigation bank, which includes the following criteria: 1) Execution of the MBI or UMBI by the Sponsor and the USACE; 2) Approval of the final Mitigation Plan; 3) Mitigation bank site must be secured; 4) Delivery of the financial assurances described in the Mitigation Plan; 5) Recordation of the long-term protection mechanism and title opinion acceptable to the USACE; 6) 404 permit verification for construction of the site, if required. 3 - 89% release of total preservation credits within Site at establishment. 150 remaining credits released 30% at milestone 2, and using interm release %'s thereafter. Current and Future Credit Releases Credit Release Milestone Stream Credits Forested Wetland Credits Non-Forested Wetland Credits Projected Release Date Actual Release Date Potential Credits from As-Built Survey SAW-2019-01296 Year Project Instituted:2020 2019-1132 version 1 Date Prepared:7/23/2021 (Updated 2/13/2024) Total Potential Credits Credit Classification Stream Credits Forested Wetland Credits Potential Credits from Mitigation Plan Wilmington District Mitigation Bank Credit Release Schedule Little Tennessee Umbrella Mitigation Bank: East Buffalo Mitigation Site County:Graham County Wildlands Holdings VI, LLC 8-Digit HUC:06010204 324.3 5/14/2024 5/14/2024