HomeMy WebLinkAbout20071763 Ver 1_Approval Letter_20071026of W ATF9
~~ Q
~ ~_ ~~-=1
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Coleen H. Sullins Director
Division of Water Quality
October 26, 2007
Pete Byers
3101 Mouth of the Creek Rd.
Blounts Creek, NC 27808
DWQ Project # 07-1763
Beaufort County
Subject Property: 3101 Mouth of the Creek Rd.
Tar-Pamlico Basin, Blounts Bay, 030307, 29-9, NSW, SB
AUTHORIZATION of Tar-Pamlico River Buffer Rule (15A NCAC 02B .0259) Authorization
Certificate
Dear Mr. Byers:
You have our authorization, in accordance with 15A NCAC 02B .0259 and any conditions listed below,
to impact approximately 9900 ft2 of Zone 1 of the protected riparian buffers for the purpose of
streambank stabilization at the subject property as described within your application dated October 19,
2007. In addition, you should obtain or otherwise comply with any other required federal, state or local
permits before you go ahead with your project including (but not limited to) Erosion and Sediment
Control, Non-discharge, and CAMA regulations.
This authorization is for the purpose and design that you described in your application. If you change
your project, you must notify us and you may be required to send us a new application. If the property is
sold, the new owner must be given a copy of this authorization letter and is thereby responsible for
complying with all conditions. This authorization requires you to follow the conditions listed below.
The Additional Conditions of the Authorization are:
1. Impacts Approved
The following impacts are hereby approved as long as all of the other specific and general conditions
of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including
incidental impacts:
Amount A roved (Units) Plan Location or Reference
Stream na feet na
404/CAMA Wetlands na (acres na
Waters na (acres na
Buffers 9900 (s uare ft. Zone I Plat rovided with a lication
2. Diffuse Flow
An additional condition is that all stormwater shall be directed as diffuse flow at non-erosive
velocities through the protected stream buffers and will not re-concentrate before discharging into the
stream as identified within 15A NCAC 2B .0259(5).
North Carolina Division of Water Quality Intemeh h2o.enr.state.nc.us
943 Washington Square Mall Phone: 252-946-6481
Washington, NC 27889 FAX 252-946-9215
An Equal OpportunitylAffirmative Action Employer- 50°!° Recycled/10% Post Consumer Paper
NonrthCarolina
~atura!!~
Applicant:
Page 2 of 2
Date:
3. Certificate of Completion
Upon completion of all work approved within this authorization, and any subsequent modifications,
the applicant is required to return the attached certificate of completion to the 401 Oversight/Express
Review Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center,
Raleigh, NC, 27699-1650.
4. Grading and Revegetation within Zone 2
The plans provided along with the application depict grading activities within Zone 2 of the
protected buffer. This activity is designated as "exempt" under the Buffer Rule provided that
for this project diffuse flow is maintained as per the Buffer Rule, the disturbed areas are
stabilized and reveaetated with ground cover and woody vegetation. A detailed vegetation
plan shall be provided to DWQ within 30 day of receipt of this approval.
Any disputes over determinations regarding this Authorization Certificate (associated with the approved
buffer impacts) shall be referred in writing to the Director for a decision. The Director's decision is
subject to review as provided in Articles 3 and 4 of G.S. 150B. This Authorization Certificate shall
expire five (5) years from the date of this letter.
This letter completes the review of the "No Practical Alternatives" determination under 15A NCAC 2B
.0259. If you have any questions or would like a copy of the buffer rules, please call (919) 733-1786.
This letter does not authorize any impacts to either Waters of the United States or Waters of the State.
Please contact the US Army Corps of Engineers (USAGE) or NC Division of Water Quality (DWQ) if
any impacts are proposed to either of these waters.
This letter completes the review of the "No Practical Alternatives" determination under 15A NCAC 2B
.0259. If you have any questions, please telephone Kyle Barnes of the Washington Regional Office at
252-948-3917 or Amy Chapman of the 401 OversightlExpress Unit at 919-715-6823. This letter does not
authorize any impacts to either Waters of the United States or Waters of the State. Please contact the US
Army Corps of Engineers (USAGE) or NC Division of Water Quality (DWQ) if any impacts are
proposed to either of these waters.
aSincer ,
Al Hodge erv/ o
Division of Water Quality
Surface Water Protection
Washington Regional Office
Enclosures: Certificate of Completion
cc: Corps of Engineers Washington Field Office
DWQ 401 Oversight/Express Unit
CAMA/Morehead
File copy
Central Files
Filename: 07-1763
r
DWQ Project No.:
Certification of Comple=
Applicant:
Project Name:
Date of Issuance of Wetland Permit:
County:
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any
subsequent modifications, the applicant is required to return this certificate to the 401 Oversight/Express Permitting Unit,
North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be
returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send
certificates from all of these.
Applicant's Certification
I, ,hereby state that, to the best of my abilities, due care and diligence was
used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications,
and other supporting materials.
Signature:
Agent's Certification
I,
used in the observation of the
compliance and intent of the 401
and other supporting materials.
Signature:
Date:
If this project was designed by a Certified Professional
I, as a duly registered Professional (i.e., Engineer,
Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically,
weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care
and diligence was used in the observation of the construction such that the construction was observed to be built within
substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and
specifications, and other supporting materials.
Date:
hereby state that, to the best of my abilities, due care and diligence was
construction such that the construction was observed to be built within substantial
Water Quality Certification and Buffer Rules, the approved plans and specifications,
Signature: Registration No. Date