HomeMy WebLinkAboutWQ0045189_Application (FTSE)_20240517DocuSign Envelope ID: 27179AAA7-1273-4651-63CD-5401941C0363
ttalit State of North Carolina
DWRNC'Dertof Ervtrp'�S1ie'`tal Q y Department of Environmental Quality
Division of Water Resources
�� �nr}n FAST TRACK
Division of Water Resources FTA 10-23 & SUPPORTING DOCUMENTATION
U11..'i
� Rra;011st10 icg
t
sAp�%frbn Number: obci6s if + (to be completed by DWR)
All items must be completed or the application will be returned
1. APPLICANT INFORMATION:
I. Applicant's name: CITY OF SANFORD (company, municipality, HOA, utility, etc.)
2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Privately -Owned Public Utility
❑ Federal ❑ State/County ® Municipal ❑ Other
3. Signature authority's name: PAUL M. WEEKS JR., PE per 15A NCAC 02T .0106(b)
Title: UTILITIES AND ENGINEERING DIRECTOR
4. Applicant's mailing address: P O BOX 3729
City: SANFORD State: NC Zip: 27331-�
5. Applicant's contact information:
Phone number: (919) 777-1 l 19 Email Address: PAUL.WEEK SaSANFORDNC.NET
11. PROJECT INFORMATION:
1. Project name: Laurel Oaks Phase 2 (a.k.a. 2A, 2B, Amenity)
2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project
If a modification, provide the existing permit number WQ00__. and issued date: ,
For modifications, also attach a detailed narrative description as described in Item G of the checklist.
If new construction, but part of a master plan, provide the existing permit number: WQ00_._
3. County where project is located: LEE
4. Approximate Coordinates (Decimal Degrees): Latitude: 35.4207' Longitude:-79.13207'
5. Parcel ID (if applicable): 9650-97-7167-00, 9660-07-6455-00, 9660-15-0255-00, 9660-26-3703-00 (or Parcel ID to closest
downstream sewer)
Ill. CONSULTANT INFORMATION:
I. Professional Engineer: JASON M. SMITH, PE License Number: 034070
Firm: J M SMITH ENGINEERING, LLC
Mailing address: P O BOX 331
City: CORNELIA State: GA Zip: 30531-
Phone number: (706) 894-2331 Email Address: JMSMITH JMSMITHENGINEERING.COM
IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION:
I. Facility Name: Big Buffalo Wastwater Reclamation Facility Permit Number: NCO024147
Owner Name: City of Sanford
V. RECEIVING DOWNSTREAM SEWER INFORMATION:
1. Permit Number(s): WQ0042276
2. Downstream (Receiving) Sewer Information: 12 inch ® Gravity - Force Main
3. System Wide Collection System Permit Number(s) (if applicable): WQCS N( /A)
FORM: FTA 10-23 Page I of
State of North Carolina
DWR
Department of Environmental Quality
Division of Water Resources
FAST TRACK SEWER SYSTEM EXTENSION APPLICATION
Division of Water Resources FTA 10-23 & SUPPORTING DOCUMENTATION
Owner Name(s): CITY OF SANFORD
FORM: FTA 10-23 Page 2 of 5
VI. GENERAL REQUIREMENTS
L If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached?
❑ Yes ❑ No ® N/A
2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached?
❑ Yes ❑ No ® N/A
3. If the Applicant is a Home/Property Owners' Association, has an HOA/POA Operational Agreement (FORM: HOA) and
supplementary documentation as required by 15A NCAC 02T.0115(c) been attached?
❑ Yes ❑ No ® N/A
4. Origin of wastewater: (check all that apply):
® Residential (Individually Owned) ❑ Retail (stores, centers, malls) ❑ Car Wash
❑ Residential (Leased) ❑ Retail with food preparation/service ❑ Hotel and/or Motels
❑ School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool/Clubhouse
❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash
❑ Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment)
5. Nature of wastewater: 100 % Domestic % Commercial % Industrial (See 15A NCAC 02T .0103(20))
If Industrial, is there a Pretreatment Program in effect? ❑ Yes ❑ No
6. Hasa flow reduction been approved under 15A NCAC 02T .0114(fl? ❑ Yes ®No
➢ If yes, provide a copy of flow reduction approval letter with this application
7. Summarize wastewater generated by project:
Establishment Type (see 02T.0114(f))
Daily Design Flow a,b
No. of Units
Flow
SFR RESIDENTIAL HOMES - 3 BR
225 gal/Unit
119
26,775 GPD
AMENITY CENTER / POOL
10 gal/person
200
2,000 GPD
SPORT COURTS
50 gal/court
3
150 GPD
CLUBHOUSE / RESTROOMS
50 gal/100 sgft
1220 sf
610 GPD
gal/
GPD
gal/
GPD
Total
29,535 GPD
a See 15A NCAC 02T .0114(b), L), (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e. proposed unknown
non-residential development uses; public access facilities located near high public use areas; and residential property
located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4).
b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01141 shall be
determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data.
8. Wastewater generated by project: 29,535 GPD (per 15A NCAC 02T .0114 and G.S. 143-215.1)
➢ Do not include future flows or previously permitted allocations
If permitted flow is zero, please indicate why:
❑ Pump Station/Force Main or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line.
Please provide supplementary information indicating the approximate timeframe for permitting upstream sewers with flow.
❑ Flow has already been allocated in Permit Number: Issuance Date:
❑ Rehabilitation or replacement of existing sewers with no new flow expected
❑ Other (Explain):
FORM: FTA 10-23 Page 3 of 5
VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers):
1. Summarize gravity sewer to be permitted:
Size (inches) Length (feet) Material
8" 1193.7 SDR-26
➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria
➢ Section III contains information related to minimum slopes for gravity sewer(s)
➢ Oversizing lines to meet minimum slope requirements is not allowed and a violation of the MDC
VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains):
PROVIDE A SEPARATE COPY OF THIS PAGE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT
1. Pump station number or name:
2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: - °
3. Total number of pumps at the pump station:
3. Design flow of the pump station: millions gallons per day (firm capacity)
➢ This should reflect the total GPM for the pump station with the largest pump out of service.
4. Operational point(s) per pump(s): gallons per minute (GPM) at feet total dynamic head (TDH)
5. Summarize the force main to be permitted (for this Pump Station):
Size (inches) Length (feet) Material
If any portion of the force main is less than 4-inches in diameter, please identify the method of solids reduction per
MDCPSFM Section 2.01C.l.b. ❑ Grinder Pump ❑ Mechanical Bar Screen ❑ Other (please specify)
6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1):
❑ Standby power source or ❑ Standby pump
➢ Must have automatic activation and telemetry - 15A NCAC 02T.0305(h)(1)(B)_
➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day
➢ Must be permanent to facility and may not be portable
Or if the pump station has an average daily flow less than 15,000 gallons per day 15A NCACO2T.0305(h)(1)(C):
❑ Portable power source with manual activation, quick -connection receptacle and telemetry -
or
❑ Portable pumping unit with plugged emergency pump connection and telemetry:
➢ Include documentation that the portable source is owned or contracted by the applicant and is compatible with the station.
➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage
capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided
as part of this permit application in the case of a multiple station power outage.
FORM: FTA 10-23 Page 4 of 5
IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T.0305(f)):
1. Does the project comply with all separations/alternatives found in 15A NCAC 02T .0305(f) & (g)? ® Yes ❑ No
15A NCAC 02T.0305 contains minimum separations that shall be provided for sewers stems:
Setback Parameter*
Separation Required
Storm sewers and other utilities not listed below (vertical)
18 inches
ZWater mains (vertical - water over sewer preferred, including in benched trenches)
18 inches
ZWater mains (horizontal)
10 feet
Reclaimed water lines (vertical - reclaimed over sewer)
18 inches
Reclaimed water lines (horizontal - reclaimed over sewer)
2 feet
**Any private or public water supply source, including any wells, WS-I waters of Class I or
Class II impounded reservoirs used as a source of drinking water, and associated wetlands.
100 feet
**Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal
high water (or tide elevation) and wetlands associated with these waters (see item IX.2)
50 feet
**Any other stream, lake, impoundment, or ground water lowering and surface drainage
ditches, as well as wetlands associated with these waters or classified as WL.
10 feet
Any building foundation (horizontal)
5 feet
Any basement (horizontal)
10 feet
Top slope of embankment or cuts of 2 feet or more vertical height
10 feet
Drainage systems and interceptor drains
5 feet
Any swimming pools
10 feet
Final earth grade (vertical)
36 inches
➢ If noncompliance with 02T.0305(f) or (g), see Section X.1 of this application
*15A NCAC 02T.0305(g) contains alternatives where separations in 02T.0305(f) cannot be achieved. Please check "yes"
above if these alternatives are used and provide narrative information to explain.
**Stream classifications can be identified using the Division's NC Surface Water Classifications webpage
2. Does this project comply with the minimum separation requirements for water mains? ® Yes ❑ No ❑ N/A
➢ If no, please refer to 15A NCAC 18C.0906(f) for documentation requirements and submit a separate document,
signed/sealed by an NC licensed PE, verifying the criteria outlined in that Rule.
3. Does the project comply with separation requirements for wetlands? ® Yes ❑ No ❑ N/A
➢ Please provide supplementary information identifying the areas of non-conformance.
➢ See the Division's draft separation requirements for situations where separation cannot be met.
➢ No variance is required if the alternative design criteria specified is utilized in design and construction.
4. Is the project located in a river basin subject to any State buffer rules? ❑ Yes Basin name: ® No
If yes, does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ❑ Yes ❑ No
➢ This includes Trout Buffered Streams per 15A NCAC 2B.0202
5. Does the project require coverage/authorization under a 404 Nationwide/individual permits ❑ Yes ® No
or 401 Water Quality Certifications?
➢ Please provide the permit number/permitting status in the cover letter if coverage/authorization is required.
6. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? ® Yes ❑ No
Per 15A NCAC 02T.0I05(c)(6), directly related environmental permits or certification applications must be being prepared,
have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion
and sedimentation control plans, stormwater management plans, etc.).
7. Does this project include any sewer collection lines that are deemed "high -priority?" ❑ Yes ® No
Per 15A NCAC 02T.0402, "high -priority sewer" means any aerial sewer, sewer contacting surface waters,
siphon, or sewers positioned parallel to streambanks that are subject to erosion that undermines or deteriorates the sewer.
Siphons and sewers suspended through interference/conflict boxes require a variance approval.
➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location).
High priority lines shall be inspected by the permittee or its representative at least once every six -months and
inspections documented per 15A NCAC 02T.0403(a)(5) or the permittee's individual System -Wide Collection permit.
FORM: FTA 10-23 Page 5 of 5
DocuSign Envelope ID: 27F9AAA7-1273-4B51 -B3CD-5401941 C0363
X. CERTIFICATIONS:
1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations
and Force Mains (latest version), and the Gravity Sewer Minimum Design Criteria (latest version) as applicable?
® Yes ❑ No
If no, for projects requiring a single variance, complete and submit the Variance/Alternative Design Request application
(VADC 10-14) and supporting documents for review to the Central Office. Approval of the request will be issued
concurrently with the approval of the permit, and proiects requiring a variance approval may be subiect to longer
review times. For proiects requiring two or more variances or where the variance is determined by the Division to be a
significant portion of the proiect, the full technical review is required.
2. Professional Engineer's Certification:
1 Jason M Smith, PE , attest that this application for
(Professional Engineer's name from Application Item III.1.)
Laurel Oaks Phase 2 (a.k.a. 2A, 213, Amenity)
(Project Name from Application Item II.1)
has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans,
specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further
attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations,
Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting
of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this
submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and
have judged it to be consistent with the proposed design.
NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. Misrepresentation of the application
information, including failure to disclose any design non-compliance with the applicable Rules and design criteria, may subject
the North Carolina -licensed Professional Engineer to referral to the licensing board. (21 NCAC 56.0701)
North Carolina Professional Engineer's seal, signature, and date:
3. Applicant's Certification per 15A NCAC 02T .0106(b):
Paul M. Weeks Jr. P.E.
I, ,attest that this application for
Laurel oaks Phase 2
(Signature Authority Name from Application Item 1.3.) (Project Name from Application Item II.1)
attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge.
I understand that if all required parts of this application are not completed and that if all required supporting documentation
and attachments are not included, this application package is subject to being returned as incomplete. I understand that any
discharge of wastewater from this non -discharge system to surface waters or the land will result in an immediate enforcement
action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division
of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application
package are not completed and that if all required supporting information and attachments are not included, this application
package will be returned to me as incomplete.
NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation.
Signature:
DocuSigned by:
�aA h. (auks Y. P.f. 2/26/2024
BBC39E6667844B9... Date:
FORM: FTA 10-23 Page 6 of 5
DocuSign Envelope ID ABD89404-672A-4F70-A1 C9-574C7561 EAA4
State of North Carolina
Department of Environmental Quality
ijw. R Division of Water Resources
_ Flow Tracking for Sewer Extension Applications
Division of Water Resources (FTSE 10-23)
Application Number: FT-372
Entity Requesting Allocation: City of Sanford
Project Name for which flow is being requested: Laurel Oaks Ph. 2
More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump
stations along the route of the proposed wastewaterJlow.
Complete this section only if you are the owner of the wastewater treatment plant.
a. WWTP Facility name: Big Buffalo Wastewater Treatment Plant
b. WWTP Facility Permit #: NCO024147
All,flows are in MGD
c.
WWTP facility permitted flow:
12.0000
d.
Estimated obligated flow not yet tributary to the WWTP:
1.8137
e.
WWTP facility's actual average flow:
4,0280
f.
Total flow for this specific request:
0.02954
g.
Total actual and obligated flows to the facility:
5.87128
h.
Percent of permitted flow used:
49%
Complete this section for each pump station you are responsible for along the route of this proposed
List pump stations located between the project connection point and the WWTP.
(A)
(g)
(C)
(D)=(B+C)
(EHA-D)
Pump
Pump
Firm
Design
Approx
Obligated,
Total Current
Available
Station
Station
Capacity'
Average
Current
Not Yet
Flow Plus
Capacity'
(Name or
Permit
DailyFlow2
Avg Dads
Tributary
Obligated
Number)
Number
rFirm`nA.
Flou
Daily Flow,
Flow
MGD
DIGD
►1GD
NIGD
MGD
NIGD
Gasters Creek
#002
40291
1.6116
10195
0.4709
14905
0.1212
OWA
#NA
#N;A
#N,A
MA
#1N:A
MA
ON -A
#N-A
#N,A
#N A
#N A
#N-A
tN+A
#NrA
#N A
#N:A
#N A
#N.A
#N-A
MA
t. The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that
can be achieved with the largest pump taken out of service.
2. Design Average Flow is the firm capacity of the pump station divided by the peaking factor (pit not
less Than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria.
3. A Planning Assessment Addendum shall be attached for each pump station located between the
project connection point and the WNVTP where the Available Capacity is 5 0.
Downstream Facility Name (Sewer)- City of Sanford Collection System
Downstream Permit Number: WQCS00047
III. Certification Statement
I, Paul Weeks, Jr. PE, certify to the best of my knowledge that the addition of the volume of
Page 1 of 6 FTSE 10-23
DocuSign Envelope ID: ABD89404-672A-4F70-A1 C9-574C7561 EAA4
wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater
treatment facility and that the flow from this project is not anticipated to cause any capacity related
sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment
plant under normal circumstances, given the implementation of the planned improvements identified in
the planning assessment where applicable. This analysis has been performed in accordance with local
established policies and procedures using the best available data. This certification applies to those items
listed above in Sections I and II plus all attached planning assessment addendums for which I am the
responsible party. Signature of this form certifies that the receiving collection system or treatment works
has adequate capacity to transport and treat the proposed new wastewater.
E
Dacu3pned 6y:
aul, A&, a1t.t s Y, P.f, .
BBG34EM7844B4
Signing Official Signature
Utilities & Engineering Director
Title of Signing Official
02 26::24
Date
Page 2 of 6 FTSE 10-23
LAUREL OAKS SUBDIVISION
PHASE 2 & AMENITY GRAVITY SEWER USGS MAP
SANFORD, NORTH CAROLINA
LAUREL OAKS SUBDIVISION
PHASE 2 & AMENITY GRAVITY SEWER
P STATION
SS
PHASE 1 �r
AMENITY
AERIAL PHOTO MAP
�r
3ANFORD, NORTH CAROLINA
m
LAUREL OAKS SUBDIVISION
PHASE 2 & AMENITY CENTER GRAVITY SEWER
BOUNDARY MAP
J`—GASTERS CREEK
t PUMP STATION
S OUTFALL
�a PHASE 9
SS OUTFALL
PHASE i
PHASE 2
SANFORD, NORTH CAROLINA
CFO
U'li'ItUluufll
�eriuF: �r.Ydar
Jason Via
534 Eagle Drive
Daytona Beach, F-L 3211
Mobile: 678-595-6945
via.jason@outlook_ com
State of North Carolina
Department of Environmental Quality
Division of Water Resources
3800 Barrett Drive
Raleigh, NC 27609
Office Phone: 791-4200
To Whom it may concern:
TRANSMITTAL
Transmittal LO-PH2-001
Date: February 12th, 2024
1VCDept Of Eno"
ot,1.iental Quality.
MAR 2 tg. 4
Raleig ACg1-olla1 officc
Please find enclosed the Laurel Oaks Subdivision - Phase 2 — Sewer Application for Modified Permit located
in Sanford, Lee County, North Carolina.
Please let us know if you have any questions.
Item Job Name
Laurel Oaks Subdivision Phase 2
Date Description
02/12/24 B. Project Narrative
02/12/24 C.$600 Check for payment of Application Fee
02/12/24 D. Fast Track Sewer System Extension Application (FTA 10-23)
E. Flow Tracking/Acceptance Fornm for Sewer Extension Applications
02/12/24 (FTSE 10-23)
02/12/24 F1. USGS Map
02/12/24 F2. Boundary Map
02/12/24 F3. Aerial Map
Job Number
22-018
Quantity
2 Copies
1 Check
2 Copies
2 Copies
2 Copies
2 Copies
2 Copies
Page 1 of 1
February 20, 2024
Laurel Oaks Phase 2 Proiect Narrative
Smith
ENGINEERING, LLC
This is a request Sewer permit for the Phase 2 development in the Laurel Oaks Subdivision. In
addition, the City of Sanford is adopting the sewer flows per Session law 2023-137.
Permitting efforts of the Phase 2 development consists of 119 three bedroom Single Family Residential
homes on approximately 30 acres. The development is part of an approved master plan that includes
622 total units. Lots of Phase 2 connect to new proposed piping this application as well as existing the
Phase 1 Gravity Sewer Main Outfall that flows by to the Gaster's Creek Pump Station. Phase consists
of 1,193.7 ft of new 8-inch SDR-26 with 5 new connecting Sewer manholes.
The proposed project will meet all of DWR' s minimum design criteria for sanitary sewer extensions.
The design flow rate for this project is calculated at 29,535 GPD based on NCAC 2T Rules for
wastewater flow rates as revised per Session Law 2023-137 — Changes to Wastewater Design Flow
Rates in 15A NCAC 02T .0114(b) and the anticipated flow for the aforementioned homes. The
proposed sanitary sewer line sizes are more than adequate to convey the design flow rates. Additional
future sewer services are proposed to be installed along the route but will not be placed into service
until lots are permitted by the City of Sanford and NCDEQ. Please find attached the following
information in support of the application:
• Fast Track Sewer System Extension Application (FTA 10-23)
• Flow Tracking/ Acceptance Form for Sewer Extension Applications (FTSE 10-23)
• USGS Map
• Aerial Map
• Boundary Map
• $600 Check for payment of Application Fee
Should you have any questions, please contact me at (678) 267-3690 or imstnithfct imsrnithet� pit, teerinu,com
Sincerely,
Jason M. Smith, P.E.
155 Clarkesvi Ile Street
Post Office Box 331
Cornelia. GA 30531
Main Line: 706-894-2331
Cell: 706-244-8180
Atlanta Area Phone: 678-267-3690
Fax:678-267-3731
Email :jmsmith gjmsmithengineering.com
[External] RE: Laurel Oaks Phase 2 (a.k.a. 2A, 213, Amen ity)_AdditionaI Information
Request
Jason Smith <jmsmith@jmsmithengineering.com>
Fri 5/17/2024 2:12 PM
To:Pasha, Tanvir <tanvir.pasha@deq.nc.gov>
Cc:Jason Via <via.jason@outlook.com>
1 3 attachments (3 MB)
_D. FTA 10-23_Laurel Oaks Phase 2.pdf; _F1. usgs map3.pdf; _F2.aerial map 21.pdf;
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report
Message button located on your Outlook menu bar on the Home tab.
Tanvir,
I have attached the revised FTA, AERIAL, and USGS maps. If you need me to send anything else,
please let me know. I am assuming all of the other documents are still OK. I had this prepared right
after you had sent me the comments and had just not sent it.
This is not an ARPA funded project.
Thanks,
Jason
Jason M. Smith, PE
J M Smith Engineering, LLC
PO Box 331
155 Clarkesville Street
Cornelia, GA 30531
voice (706) 894-2331 or (678) 267-3690
Fax (678) 267-3731
Mobile (706) 244-8180
www.jmsmithengineering.com
From: Pasha, Tanvir <tanvir.pasha @deq.nc.gov>
Sent: Thursday, April 18, 2024 11:00 AM
To: Paul Weeks <paul.weeksCcDsanfordnc.net>; Jason Smith <jmsmith jmsmithengineering.com>
Subject: Laurel Oaks Phase 2 (a.k.a. 2A, 213, Amenity)_Additional Information Request
Hello Paul and Jason,
After reviewing the Fast Track Sewer System Extension Application for Laurel Oaks Phase 2 (a.k.a. 2A, 213,
Amenity), additional information is required in order to further process the application. Please provide the
following information by May 17, 2024, and note that the requested information must be submitted within 30
days of this request, or the applicant will be required to submit a new application and application fee in
accordance with 15A NCAC 02T .0107.
1. Is this an ARPA funded project? If so, -please include the DWI assigned ARPA project number in
your response.
2. FTA section V1.6 needs to be checked.
3. FTA section V1.8 missing information.
4. FTA sections IX.1 needs to be checked.
5. Topographical map and/or the aerial map provided are not sufficient. According to Section F of
the Application Instructions, an 8.5-inch x 11-inch color copy of a USGS Topographic Map needs to
clearly identify the project area, including the closest surface waters, general location of the
gravity sewer, pumpstations, and force mains, and the downstream connection points for the
receiving sewer. Also please indicate the direction of flow.
15A NCAC 02T .0107 Staff Review and Permit Preparation states:
• "(2) (e) If an application is accepted and later found to be incomplete, the applicant shall be
advised how the application or accompanying supporting information may be modified to make it
complete. The staff shall advise the applicant:
(2) if all required information is not submitted within 30 days, the project will be returned as
incomplete. Any resubmittal of a returned application shall be accompanied with a new application
fee."
Please contact me with any questions that you may have regarding this request.
*Please note that the fee for fast track sewer extension permits has increased to $600 as of October 3, 2023
[as stipulated in the 2023 House Appropriations Act, House Bill 259, Water Quality and Stormwater Fees,
Section 12.14(a)].
Sincerely,
A B M "Tanvir" Pasha (he/him)
Environmental Engineer
Division of Water Resources — Raleigh Regional Office
North Carolina Department of Environmental Quality
3800 Barrett Drive, Raleigh, NC 27609
Office: 919-791-4250; Cell: 984-202-3390
tanvirpasha@deq.nc.gov