Loading...
HomeMy WebLinkAboutNCC241387_MODIFICATION Supporting Doc (ADDL LOTS)_20240520 • CM CHARLOTTE. May 20,2024 LETTER OF APPROVAL (Updated) NVR,Inc. (dba Ryan Homes) Attn: Seth Foster 13924 Professional Center Dr, Ste 100 Huntersville,NC 2078 RE: Project Name: Sunset Creek Permit ID: LDDP-2023-00360 Denuded Acreage: 1.60 County: Mecklenburg Submitted By: NVR,Inc. Dear Sir or Madam: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. This plan approval shall expire three (3) years following the date of approval, if no preconstruction meeting and land-disturbing activity has been undertaken,as is required by Title 15A NCAC 4B .0129 and Section 17-35(b)of the City of Charlotte Code of Ordinances. Acceptance and approval of this plan is also conditioned upon your compliance with Federal, State, and local water quality laws,regulations, and rules. As of April 1,2019,all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under NCG01000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above-named project. After the form is reviewed and found to be complete,you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project,you must obtain the COC prior to commencement of any land disturbing activity. The eNOI form and fee details may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form to the Stormwater Program staff in the Raleigh Central Office. If the owner/operator of this project changes in the future,the new responsible party must obtain a new COC. Upon receiving this approval, it is the responsibility of the Financially Responsible Party, their agent, or the owner to request a pre-construction meeting by completing the Pre-Construction Meeting Request Form Sunset Creek October 23, 2023 Page 2 of 2 found at https://charlottenc.seamlessdocs.com/f/tr9c8a2tysur. Please provide at least 48 hours advance notice for the pre-construction meeting so that City Staff may coordinate and schedule the appropriate personnel. No land disturbance of any kind,including demolition, is allowed prior to the pre-construction meeting Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation 2. The NCG01 permit and the COC, once it is received 3. Records of inspections made during the previous 30 days. Also,this letter gives the notice required by G.S. 113A-61.1(a)of our right of periodic inspection to ensure compliance with the approved plan. The City of Charlotte's Sedimentation Pollution Control Program is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the City of Charlotte Code of Ordinances and the Sedimentation Pollution Control Act of 1973 (G.S. 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act and Local Code. Acceptance and approval of this plan is conditioned upon your compliance with Federal, State,and County water quality laws,regulations, and rules. This approval does not supersede any other permit or approval. Approval of this plan is based in part on the accuracy of the information provided in the Financial Responsibility Form,which you provided. You are requested to file an amended form if there is any change in the information included on the form. Your cooperation is appreciated. Sincerely, Jeff Bock,CPESC Charlotte Land Development Program