Loading...
HomeMy WebLinkAboutSW5240101_Supplemental Info Review_20240517 Action History (UTC-05:00)Eastern Time(US&Canada) Submit by Anonymous User 5/17/2024 11:55:43 AM(Supplemental Submittal) Accept by bethany.georgoulias 5/20/2024 1:02:54 PM (Supplemental Info Submittal) • The task was assigned to DEMLR Post-Construction Team 5/17/2024 11:55:43 AM • The task was assigned to bethany.georgoulias by round robin distribution 5/17/2024 11:55:43 AM =DEQ • Submittal from 5/17/2024 Permit Information: Please provide specific permit details below. ................................................................................................................................................................................................................................................................................................................................................................................................ What Type of Permit? Choose one: * NPDES Industrial or MS4 Permit State Stormwater(Post-Construction)Permit Other Permit Number* SW5240101 Begins with"SW","NCG",or"NCS" What DEQ Office is Reviewer:Please correct if misidentified,close this review form,and reassign task to the appropriate contact. the Primary Contact? Central Office * Washington Regional Office(Attn: Carl Dunn) Wilmington Regional Office(Attn:Christine Hall) ................................................................................................................................................................................................................................................................................................................................................................................................ Project Name* Wastewater Treatment Plant Improvements(Chatham) Owner/Operator* Siler City County: Chatham Submitter Name:* Christine Brown McGill Associates Who is submitting this information? E-mail Address:* chris.brown@mcgillassociates.com Phone Number* 828 328-2024 Additional E-mail for david.honeycutt@mcgillassociates.com Submittal (Optional) Confirmation: State Stormwater (Post-Construction) Information Uploads Choose file type and upload attachment(Reviewer may remove unnecessary submittals) File Type* Design Calculations File Upload Click the upload button,or drag and drop files to attach Rev Ditch Calculations.pdf 3.38MB Only PDF files are accepted. Is this project funded No with ARPA grant Yes funds?* Uploads contain NO Confidential YES Information* NOTE:The following information cannot be claimed as confidential:the name and address of any permit applicant or permittee,permit applications,permits,effluent data,information required by NPDES application forms provided by the Director inclusive of all forms and attachments[Ref.40 CFR 122.7(b)and(c)]. Notes about the attachments: To satisfy request in email sent on May 16th,2024 to David Honeycutt, McGill Associates,from Brianna Holland, DEQ. * By checking the box and signing box below, I certify that: o I have given true,accurate,and complete information on this form; o I agree that submission of this Supplemental Information form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act) o I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes (the"Uniform Electronic Transactions Act'); o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND o I intend to electronically sign and submit the Supplemental Information Upload form. Full Name:* Christine Brown Signature: C4tewn*P fftew*r Date Submitted: 05/17/2024 Initial Review Verify Permit No.* IMPORTANT:REVIEWER SHOULD VERIFY and revise here if necessary. SW5240101 Who needs a Copy?* Reviewer selections will only be required for offices checked here. Central Office Staff Regional Office Stormwater Contact State Stormwater RO Staff No Copy Needed Central Office Reviewer:* Notifies CO Staff with Email Jim Farkas Any Comments or This project is still assigned to Kaitlin in BIMS Added Info for CO Staff Reviewer? Review Date* 05/20/2024