HomeMy WebLinkAboutSW6230806_Recorded Document_20240516 U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2018-01374 County:Moore U.S.G.S. Quad:NC-Carthage GENERAL PERMIT (REGIONAL AND NATIONWIDE)VERIFICATION Permittee: Tri-South Builders Inc. Wes Caddell Address: PO Box 805 Carthage,NC 28327 Telephone Number: 910-585-0475 E-mail: wescaddell@gmail.com Size(acres) 137 Nearest Town Carthage Nearest Waterway Little River River Basin Cape Fear USGS HUC 03030004 Coordinates Latitude:35.2891 Longitude:-79.4135 Location description: The project site is approximately 137 acres located adjacent to Star Ridge Road,near the town of Carthage,Moore,County,North Carolina. Description of projects area and activity: This verification authorizes the permanent dischage of fill material into 101 linear feet of stream channel and 0.373 acre of wetlands for the construction of roadway infrastructure associated with the Brookwood residential subdivision. Mitigation is required for this proposal. Applicable Law(s): N Section 404(Clean Water Act,33 USC 1344) ❑Section 10(Rivers and Harbors Act,33 USC 403) Authorization: NWP 29.Residential Developments SEE ATTACHED NWP GENERAL, REGIONAL, AND/OR SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the enclosed Conditions, your application signed and dated 8/20/2020, and the enclosed plans entitled "Brookwood subdivision wetland impact" dated 7/15/2020. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order,a restoration order,a Class I administrative penalty,and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide authorization is modified,suspended or revoked. If, prior to the expiration date identified below, the nationwide permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide permit authorization expires or is suspended,revoked,or is modified,such that the activity would no longer comply with the terms and conditions of the nationwide permit,activities which have commenced(i.e.,are under construction) or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide permit's expiration,modification or revocation,unless discretionary authority has been exercised on a case-by-case basis to modify,suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources(telephone 919-807-6300)to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act(CAMA),prior to beginning work you must contact the N.C.Division of Coastal Management Morehead City,NC,at(252)808-2808. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal,State or local approvals/permits. If there are any questions regarding this verification,any of the conditions of the Permit,or the Corps of Engineers regulatory program, please contact James Lastinger at 919-554-4884 ext 32or James.C.Lastinger(a)usace.army.mil. Corps Regulatory Official: �• e4r � ✓ Date: 09/29/2020 Expiration Date of Verification: 03/18/2022 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so,please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.army.mil/cm_apex/Vp=136:4:0 Copy furnished: Agent: Hal Owen and Associates Krissina Newcomb Address: PO Box 400 Lillington,NC 27546 Telephone Number: 910-893-8743 E-mail: krissina@halowensoil.com SAW-2018-01374 SPECIAL CONDITIONS a. In order to compensate for impacts associated with this permit, mitigation shall be provided in accordance with the provisions outlined on the most recent version of the attached Compensatory Mitigation Responsibility Transfer Form. The requirements of this form, including any special conditions listed on this form, are hereby incorporated as special conditions of this permit authorization. Action ID Number: SAW-2018-01374 County: Moore Permittee: Tri-South Builders Inc.,Wes Caddell Project Name: Brookwood residential subdivision/Star Ridge Road/Carthage/Moore County Date Verification Issued: 09/29/2020 Project Manager: James Lastinger Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: James Lastinger Raleigh Regulatory Office U.S Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest,North Carolina 27587 or James.C.Lastinger@usace.army.mil Please note that your permitted activity is subject to a compliance inspection by a U. S.Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date SAW-2018-01374 Compensatory Mitigation Responsibility Transfer Form Permittee:Tri-South Builders Inc.,Wes Caddell Action ID: SAW-2018-01374 Project Name: Brookwood residential subdivision/Star Ridge Road/Carthage/Moore County County: Moore Instructions to Permittee: The Permittee must provide a copy of this form to the Mitigation Sponsor, either an approved Mitigation Bank or the North Carolina Division of Mitigation Services (NCDMS), who will then sign the form to verify the transfer of the mitigation responsibility. Once the Sponsor has signed this form, it is the Permittee's responsibility to ensure that to the U.S.Army Corps of Engineers(USACE)Project Manager identified on page two is in receipt of a signed copy of this form before conducting authorized impacts, unless otherwise specified below. If more than one mitigation Sponsor will be used to provide the mitigation associated with the permit,or if the impacts and/or the mitigation will occur in more than one 8-digit Hydrologic Unit Code (HUC), multiple forms will be attached to the permit, and the separate forms for each Sponsor and/or HUC must be provided to the appropriate mitigation Sponsors. Instructions to Sponsor:The Sponsor must verify that the mitigation requirements(credits)shown below are available at the identified site. By signing below, the Sponsor is accepting full responsibility for the identified mitigation, regardless of whether or not they have received payment from the Permittee. Once the form is signed,the Sponsor must update the bank ledger and provide a copy of the signed form and the updated bank ledger to the Permittee,the USACE Project Manager,and the Wilmington District Mitigation Office (see contact information on page 2). The Sponsor must also comply with all reporting requirements established in their authorizing instrument. Permitted Impacts and Compensatory Mitigation Requirements: Permitted Impacts Requiring Mitigation* 8-digit HUC and Basin:03030004,Cape Fear River Basin Stream Impacts(linear feet) Wetland Impacts(acres) Warm Cool Cold Riparian Riverine Riparian Non-Riverine Non-Riparian Coastal 0.373 *If more than one mitigation sponsor will be used for the permit,only include impacts to be mitigated by this sponsor. Compensatory Mitigation Requirements: 8-digit HUC and Basin:03030004, Cape Fear River Basin Stream Mitigation (credits) Wetland Mitigation (credits) Warm Cool Cold Riparian Riverine Riparian Non-Riverine Non-Riparian Coastal 0.42 Mitigation Site Debited: Daniels Creek Umbrella Mitigation Bank (List the name of the bank to be debited.For umbrella banks,also list the specific site. For NCDMS,list NCDMS. If the NCDMS acceptance letter identifies a specific site, also list the specific site to be debited). Section to be completed by the Mitigation Sponsor Statement of Mitigation Liability Acceptance: I, the undersigned, verify that I am authorized to approve mitigation transactions for the Mitigation Sponsor shown below, and I certify that the Sponsor agrees to accept full responsibility for providing the mitigation identified in this document(see the table above), associated with the USACE Permittee and Action ID number shown. I also verify that released credits (and/or advance credits for NCDMS), as approved by the USACE, are currently available at the mitigation site identified above. Further, I understand that if the Sponsor fails to provide the required compensatory mitigation, the USACE Wilmington District Engineer may pursue measures against the Sponsor to ensure compliance associated with the mitigation requirements. Mitigation Sponsor Name: Name of Sponsor's Authorized Representative: Signature of Sponsor's Authorized Representative Date of Signature Conditions for Transfer of Compensatory Mitigation Credit: • Once this document has been signed by the Mitigation Sponsor and the USACE is in receipt of the signed form, the Permittee is no longer responsible for providing the mitigation identified in this form, though the Permittee remains responsible for any other mitigation requirements stated in the permit conditions. • Construction within jurisdictional areas authorized by the permit identified on page one of this form can begin only after the USACE is in receipt of a copy of this document signed by the Sponsor, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. For authorized impacts conducted by the North Carolina Department of Transportation (NCDOT), construction within jurisdictional areas may proceed upon permit issuance; however, a copy of this form signed by the Sponsor must be provided to the USACE within 30 days of permit issuance. NCDOT remains fully responsible for the mitigation until the USACE has received this form,confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. • Signed copies of this document must be retained by the Permittee, Mitigation Sponsor,and in the USACE administrative records for both the permit and the Bank/ILF Instrument. It is the Permittee's responsibility to ensure that the USACE Project Manager(address below) is provided with a signed copy of this form. • If changes are proposed to the type, amount, or location of mitigation after this form has been signed and returned to the USACE, the Sponsor must obtain case-by-case approval from the USACE Project Manager and/or North Carolina Interagency Review Team (NCIRT). If approved, higher mitigation ratios may be applied,as per current District guidance and a new version of this form must be completed and included in the USACE administrative records for both the permit and the Bank/ILF Instrument. Comments/Additional Conditions:A letter from Wildlands Holdings IV,LLC,confirming they are willing and able to accept the applicant's compensatory mitigation responsibility, dated 8/14/2020 was included with the preconstruction notification. This form is not valid unless signed below by the USACE Project Manager and by the Mitigation Sponsor on Page 1. Once signed,the Sponsor should provide copies of this form along with an updated bank ledger to:1)the Permittee,2)the USACE Project Manager at the address below, and 3)the Wilmington District Mitigation Office,Attn: Todd Tugwell, 11405 Falls of Neuse Road, Wake Forest,NC 27587(email:todd.tugwell@usace.army.mil). Questions regarding this form or any of the permit conditions may be directed to the USACE Project Manager below. USACE Project Manager: James Lastinger USACE Field Office: Raleigh Regulatory Office US Army Corps of Engineers 3331 Heritage Trade Drive,Suite 105 Wake Forest, North Carolina 27587 Email: James.C.Lastinger@usace.army.mil icern.e.a 09/29/2020 USACE Project Manager Signature Date of Signature Current Wilmington District mitigation guidance, including information on mitigation ratios,functional assessments,and mitigation bank location and availability, and credit classifications(including stream temperature and wetland groupings) is available at http://ribits.usace.army.mil Compensatory Mitigation Responsibility Transfer Form Permittee:Tri-South Builder Inc.,Wes Caddell Action ID: SAW-2018-01374 Project Name: Brookwood residential subdivision/Star Ridge Road/Carthage/Moore COunty County: Moore Instructions to Permittee: The Permittee must provide a copy of this form to the Mitigation Sponsor, either an approved Mitigation Bank or the North Carolina Division of Mitigation Services (NCDMS), who will then sign the form to verify the transfer of the mitigation responsibility. Once the Sponsor has signed this form, it is the Permittee's responsibility to ensure that to the U.S.Army Corps of Engineers(USACE)Project Manager identified on page two is in receipt of a signed copy of this form before conducting authorized impacts, unless otherwise specified below. If more than one mitigation Sponsor will be used to provide the mitigation associated with the permit,or if the impacts and/or the mitigation will occur in more than one 8-digit Hydrologic Unit Code (HUC), multiple forms will be attached to the permit, and the separate forms for each Sponsor and/or HUC must be provided to the appropriate mitigation Sponsors. Instructions to Sponsor:The Sponsor must verify that the mitigation requirements(credits)shown below are available at the identified site. By signing below, the Sponsor is accepting full responsibility for the identified mitigation, regardless of whether or not they have received payment from the Permittee. Once the form is signed,the Sponsor must update the bank ledger and provide a copy of the signed form and the updated bank ledger to the Permittee,the USACE Project Manager,and the Wilmington District Mitigation Office (see contact information on page 2). The Sponsor must also comply with all reporting requirements established in their authorizing instrument. Permitted Impacts and Compensatory Mitigation Requirements: Permitted Impacts Requiring Mitigation* 8-digit HUC and Basin:03030004,Cape Fear River Basin Stream Impacts(linear feet) Wetland Impacts(acres) Warm Cool Cold Riparian Riverine Riparian Non-Riverine Non-Riparian Coastal 0.373 *If more than one mitigation sponsor will be used for the permit,only include impacts to be mitigated by this sponsor. Compensatory Mitigation Requirements: 8-digit HUC and Basin:03030004, Cape Fear River Basin Stream Mitigation (credits) Wetland Mitigation (credits) Warm _ Cool Cold Riparian Riverine Riparian Non-Riverine Non-Riparian Coastal 0.328 Mitigation Site Debited: NCDMS (List the name of the bank to be debited.For umbrella banks,also list the specific site. For NCDMS,list NCDMS. If the NCDMS acceptance letter identifies a specific site, also list the specific site to be debited). Section to be completed by the Mitigation Sponsor Statement of Mitigation Liability Acceptance: I, the undersigned, verify that I am authorized to approve mitigation transactions for the Mitigation Sponsor shown below, and I certify that the Sponsor agrees to accept full responsibility for providing the mitigation identified in this document(see the table above), associated with the USACE Permittee and Action ID number shown. I also verify that released credits (and/or advance credits for NCDMS), as approved by the USACE, are currently available at the mitigation site identified above. Further, I understand that if the Sponsor fails to provide the required compensatory mitigation, the USACE Wilmington District Engineer may pursue measures against the Sponsor to ensure compliance associated with the mitigation requirements. Mitigation Sponsor Name: Name of Sponsor's Authorized Representative: Signature of Sponsor's Authorized Representative Date of Signature Conditions for Transfer of Compensatory Mitigation Credit: • Once this document has been signed by the Mitigation Sponsor and the USACE is in receipt of the signed form, the Permittee is no longer responsible for providing the mitigation identified in this form, though the Permittee remains responsible for any other mitigation requirements stated in the permit conditions. • Construction within jurisdictional areas authorized by the permit identified on page one of this form can begin only after the USACE is in receipt of a copy of this document signed by the Sponsor, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. For authorized impacts conducted by the North Carolina Department of Transportation (NCDOT), construction within jurisdictional areas may proceed upon permit issuance; however, a copy of this form signed by the Sponsor must be provided to the USACE within 30 days of permit issuance. NCDOT remains fully responsible for the mitigation until the USACE has received this form,confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. • Signed copies of this document must be retained by the Permittee, Mitigation Sponsor,and in the USACE administrative records for both the permit and the Bank/ILF Instrument. It is the Permittee's responsibility to ensure that the USACE Project Manager(address below) is provided with a signed copy of this form. • If changes are proposed to the type, amount, or location of mitigation after this form has been signed and returned to the USACE, the Sponsor must obtain case-by-case approval from the USACE Project Manager and/or North Carolina Interagency Review Team (NCIRT). If approved, higher mitigation ratios may be applied,as per current District guidance and a new version of this form must be completed and included in the USACE administrative records for both the permit and the Bank/ILF Instrument. Comments/Additional Conditions:A letter from NCDMS,confirming they are willing and able to accept the applicant's compensatory mitigation responsibility,dated 9/24/2020 was included with the preconstruction notification. This form is not valid unless signed below by the USACE Project Manager and by the Mitigation Sponsor on Page 1. Once signed,the Sponsor should provide copies of this form along with an updated bank ledger to:1)the Permittee,2)the USACE Project Manager at the address below, and 3)the Wilmington District Mitigation Office,Attn: Todd Tugwell, 11405 Falls of Neuse Road, Wake Forest,NC 27587(email:todd.tugwell@usace.army.mil). Questions regarding this form or any of the permit conditions may be directed to the USACE Project Manager below. USACE Project Manager: James Lastinger USACE Field Office: Raleigh Regulatory Office US Army Corps of Engineers 3331 Heritage Trade Drive,Suite 105 Wake Forest, North Carolina 27587 Email: James.C.Lastinger@usace.army.mil I- 09/29/2020 USACE Project Manager Signature Date of Signature Current Wilmington District mitigation guidance, including information on mitigation ratios,functional assessments, and mitigation bank location and availability, and credit classifications(including stream temperature and wetland groupings) is available at http://ribits.usace.army.mil E RO• ooGVI\P'RSI 1 NOTE: - - - WETLANDS IMPACT _ —�'I 1'�— ; ;, AREA 1 4/! 39 41 i \ �, AREA OF WETLANDS IMPACT — AREA 1 : 8,447.00 SF (0.19 ACS) / ����� 6 r 6 \ ; ,m ° " �"� AREA OF WETLANDS IMPACT — AREA 2A: 3,621.48 SF 0.08 ACS ®00 ( '/ AREA OF WETLANDS IMPACT — AREA 26: 4.196.98 SF (0.10 ACS) 0140161PHASE 1A ���' 442\ TOTAL AREA OF WETLANDS IMPACT — 0.37 ACS �'V`/ 1,I I 54 CASE 2 4�` / 42 �� /�`� iii n 1s 15 14 ® � 11 �, i i ® I 1 1, li l 13 1 12 h1 ®A / �✓ �/� /` 35 PHASE 2 sa ; 'LT) a 1' 1 10 N®A: 4s j 1 Length of STREAM IMPACT - S1: 101 LF / ss � \ 37 \� 25 I 0i CDCD/ �m 36 `�/�1 i s i , m`I iiiI --; HASE 1 B 27 2s � J I / 0 �Ji 5s � l' 6 Co 3o PHASE 2 l®�; . 21 � PHASE 3 �✓ \ �' 6G \ ‘;;AN 22 I 74 �i \ 1� J 61 3 1 �\J PHASE 3 7 :::k,---- , \ -----, fort:10\\ \____--- ,_ , OinV::-:::.:::,- w‘an-:\_, .----,_,,i ‘i. \\ ,sa,) ;,),,,,\\..„ \ ) ,,,--77 11 CD : ::: :1:1_ \igi:Thrit 1 `\ iiir \,� PHASE iN ' \\, 441\ 9)---- (----"\ Ca '-- -5 /" 0 NNN• / N2 \\�\,/ Stream Impact (S1) & WETLANDS IMPACT AREA 2A ' l Co WETLANDS IMPACT AREA 2B --� c / 87 8 >✓ V\7(3) , m. \/ ���Jsa �',, V � ��,s1 � 1 �/ '• --=' PHASE4 �(m m ` m \2 93 94 ADDENDUM DESCRIPTION: BROOKWOOD SUBDMSION OVERALL WETLANDS IMPACT WETLANDS IMPACT MAP DRAWING SCALE: DESIGN: DRAWN: MOORE COUNTY,NORTH CAROLINA 1" = 400' PAP TDB 400 0 200 400 800 I I I I DRAWING SET NO.: SHEET OF LKC Engineering,olio 1 5 5 GRAPHIC SCALE ( IN FEET ) Engineering 140rdeen,Aqua C Court Aberdeen,he 28315 Court Landscape Architecture 0:910.420.1437 ISSUE DATE: ADDENDUM NO.: F:910 637 0096 Surveying:UTZ:: Ikcengineering.mm cease No.P-1095 7/15/20 N/A • c'' '.,\� \ d'.,,I ,,,: .'�?.,`\��\ . " REVISIONS O_ % �%. ` fit ,,,,.o,,, ��� �`� \ { _® DESCRIPTIONDATE BY • On, \ r♦A A' �G�', ��� •"r������ 1 1-6w TEE ����� d d� I 0� . O• �` ' A 1 I I FFITSS,SF 2-6" GATE VALVES i -� A \ W aE ` o• \ LIMITS OF ''+ ♦ 1 1 I I 1-FIRE HYDRANT ASS ? .Q A� WETLANDS (TYP.) j �♦� 1j���•� I 1 I I �.�..ss. 1 I 11 1-Ba TEE 6�' P B C RO / s��� ti• u, 2q c G i . �� • �' 1 m 1 I 1 1-6" GATE VAL o� ; PH2 YI-04 \ ~ 'ya f"!jv���tF�.� �� PHASE LINE / '� oo � � 1 1 ® 1 I 11 II A .o /, -18" Pp OUT• 442 w. ....«.Q��,•• G "sz i 1I \ !2p \ PHASE 1A/2 / l �/� ♦ p y\ `��♦;F 15 1 1 1 I L_h '/ - PHASE LINE er \ ` / �v I I I J 24" INV OUT: 442.00 n• \/�1 1 PERMITTED LIMITS OF e ♦ \ �„' ,�\ I I PHASE LINE I I \ 1 -- .4 /_ . , , Q PHASE 1A/2 I- 1 1 \ I \ L- a- y ���"' PERMITTED UNITS OF ♦ i C l WETLANDS IMPACT - _ I PHASE 2 1 \ J -'� . E \1 rn ,. `_ 1 \ 8.447SF (TYP.) `J -' �� 1 1 -6"TEE -\ \ _�-... ""- � \• ♦ WETLANDS IMPACT - O Z a m 0 0 0 1\ \ \ - $ ' ..- -... I8.447SF (TYP.) O PLUG D L.-2 00^O 3i ♦� MS' _ \ \ �►. 4, 1 I I 2-6" GATE VALVES %�" O \\\ Q�\�'��\1j� \ \ \ �� �'J ,g 1 -_--- 1-FI\E HYDRANT SM. \ �_rI - _ , ♦ BLOW-OFF AND (� c-o,,o N- ca. 1-6"TEE \ 18+00-� '1+0„o tg 1 I EM VE AN `\\ , ' ��\ � . I 2-6" G•TE VALVES \ _ / _ �° I ) ar U r�m•C aka\A,.� \ s �n r w• \ \ �_ �� '9x \ rn �7"17+00 N ^i �f� 2 \ / N..c Z co 1 1+.0 _ T:'� ,� 2"BLOW-OFF AS-BM. - .-_ o ro rn-�C p�/ 0 ��_ WATERLINETO EX. a��n o p a�i Z\ of a�.♦ -^ - .0 I'' '•.....-... L -f��-� 16+00 ��o '� .--`__. 0�'40 ^. %= ���.�-ic'-`%: TIE NEW PAVEMENT : fa C c :��\ \\\ " 'W' \ \N72,a 13+- y \ !=� �z o_.? �� _��� �: •rn v rn rn rn,n �\ 0 -` 0 �"�•- - �' �_ aT/ TO EXISTING PAVEMENT 2 v c o •e�'�i►�i�`��`v������� kt / ..I1�...�,15+00 , f is ... �aa ���� ���o' .".� �'\ `\ - MATCH ELEVATIONS O w Q ii y � •moo_ a`\� ��� �t� No. * \ 1 0 v ..�.� �. WWI" - -55_LF 18" RCP,O .90% J .. ` ` � / / w O u u +; R. ,`� � ` STA. 21+io.1s U o Y J 1 'P'C�o .i o. / o ��. i.'i - CROW __ /0 ? �� awa ,1 �.\ / Y v¢ 2S o.\ \ACE '�= \ ''\, + 0 i A� � \ 6d PUB PHI FES-0 r-���1 !,�'' \\\ (n'N., J �\ '� < Ill 1 q ' 3 1, \ ���.��Jw�` \J �\ \ s ' Pu R Z \ �®'"� 1_ �l�, R 18" INv pur:a42.00 � le \ `, 1. 1 9�CRO \ \ \ \�� BEGIN PAVEMENT. - ' / 2r _ r _ I I i / _/ e v���s, s. •,1 --1 I I /54 F 24" RCP 7 1.8�x \ \ $ 1-6" CROSS N. N \\ //1 ��� PHASE 2 r l --- I /6" PLUG 1 3-6" GATE VALVES / i' ENFIELD DRIVE Q`ti� R I'1 I I II / PH2 HW-0 •' i / \1„-,...,),.....,,- \22"p�_\�\\\� Z p1CU \\\ 1-FIRE HYDRANT ASSM. / / STA.: 14+00 _ •� I 1 1 1 / 24" INV OUT:441.00 • - I 1 I I _ \� .c o1 \,01�\1�"I\ /// _____ c- i1W E� .' N I II 11 III z,9® // PHASE UNE ♦ ice/ EX.\15• FE\�`Z 'J o�� \\\� v + 1 tn El. {60' y941C S,q �+ Q v m 1 // I� 1, .<<�o.11 \.li I 11, I II / • PHASE 1A/2�" / // '� /O � 1 \.�\\\ .0 y " I RAPC SCALE (IN FEET)22"x3a" CALL 811 Bweep eL81 1UG Wetland Impact 1 PVI STA: 10+65.00 0.194 acre PVI ELEV: 462.29 K: 17.49 LVC: 108.00 N o m o 0o m PVI STA: 12+25.00 w ,-N F. of 6 PVI ELEV: 449.50 �z +0 z� 7 V. K: 40.04 aq .... L.„.. a LVC: 200.00 N p0 f¢ - 0>=y• v 0 a rn w HP STA: 17+77.54 LP STA: 19+31.09 0 o w+ >m m a • o n oo HP ELEV: 446.50 LP ELEV: 445.30 exaa, Nj o PVI STA: 14+75.00 0 In PVI STA: 17+38.65 PVI STA: 20+00.00 la �a�' z a a + +w PVI ELEV: 438.75PVI ELEV: 444.45 LLI N m PVI ELEV:3447.07 470 I - -_z n• + Nj.d V: 59.61 K: 36.11 K: 31.09 W -z - .. I 470 L C: 100.00 LVC: 150.00 m J_ J V 1...1 y1 U „w -}- _ LVC: 200.00 m s \\ maw o> if)., _ .. 1 . rn � O � 10 m __... �ii. zo m 4. _- Zi o ooe.i o (CI 0 S w+ 0 0 5 -'-. _....1 _- N M N o 0 e? O a o zd w m m j N 11 6l C!_ O 465 -- - I 1 +a +a +a +w +a m aw�wa arnaa Oa Oa _- I f 465 460 i a '°a m m a OF)a am.,o; w z rn ±< N + + _1.. 2% -I w w w n w sm+ n • - _.. 460 Z (Y'1 E T _._ _4- N V I f%l __ .. co V -.. __ .. __ ..id _ >N,lal O + M z yj N w z __'. �.._ -- _... >m j lal _- _... o m ..__. o w'�Ly*�SOn+o n Zn a r,.. N o ov�i Q r- Q N a _ _ - -- -.._. m W I __ wF. mw�^ wui wo¢� U ,♦ d ' J ' _� \. . . _.._ m� m i i - t- m --- - I- L a oN m+ mo� ,?j� �. 1 -I O O e 460 � N N --i vj -- -. - - ar° zd. wad •a N;�o z ------ ,__ r z o z'- O O _...__.- -_ T °; .a a M 1�'- 460 455 ------------ ¢ - io in•• -vj �p m n n ry N o- ,---- �e �' jF w O+M.. yOj -__ I '^ �M p+j Vj� WN ¢ oww 455 + + ._ .O I _ JJz J2 _. 1_._._. II`\' W� 1n�m m m� O 0 09 ¢ J WO)".. J ¢aate ZO 4 a.. + + a ,._ w � QFINI �n\ -r5i 455 450�` \ GRADE _.. wz� �� v W�ti --- -- GRADE , / �i-�'L. Q W i, �� 450 445 z z®o - •>s� / ----- �; - zw. �Qw,d _�-. __ 18'SD 445 Z m __ _ `� �3. 1 m w C,i w z __. 15% 6 P �� ---•-- !- -_. t _ O0q , o w w VC C 1 Q z� 3 445 _..-- Y 445 440 \... \\ __. --,-- --- 1, .--- --- 20LF 6".DIP CENTERED� -- -� z ::: --- 440 435 _ w..--. - _- I - 0 = ro A ._-- -f- ` T ` 435 435 - - CC 3 - 430 ' ---- I ---' -- - ---_- } I - I , -t T. __` - -- - fI i _, ----._ .,--, _.._.__. 1_-. �- --�---- _- - -F---.__.. -- y CD 0 430 430 425 7 -.._ _.r _- --. - -_}----f- i I i - -_-- i i __... DATE: JUL.,201 8 csi csJ MM] p M -N MM 0 V CDC O N O M m N 425 DESIGNED: FDW co ,^O°f vNi tV �+ •r �O co m vj o N a N ami m a m Oro DRAWN: FDW a a'� avj 4.N �� a'0, a ,ri a a •°'• ' om a a a s " a N. as'2 a s a s a CHECKED: TAC d d' + <a aµ NO.00 7 1 10+00 11+ 12+00 13+00 14+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 C-0 :\ ../ \ \ . / / . •/ ii' / i , � 1 I IcI I 1 / II . i I I LIMIITS OF WETLANDS \ I I I IMPACT — AREA 2A I I 3,621.48 SF (0.08 ACS) I I �., LIMIITS OF WETLANDS � Au ``� Impact Si \ IMPACT — AREA 2B 9��i� � � 101 LF of stream ' 4,196.98 SF (0.10 ACS) %kilo. Dc\c4) I NilliF41r04011111'1! _ ...,,.: %�%:�� I WOO,'Alli . A.- ,41111111.1;ZkanirraiiiilaWAimmumm......._411111111161111 '- s Kg ft 1 rd..e r a re o 14411rfl \____ 2 1 !-1 All:41prAlliVA11115:0 illill_wiligailla (1, / 1111-15......_ 1111111111110.'- r Alid AW. \ AVIIII / / w.lt ,. 47 ,� 2+01 / zurTatei- PRININNiiiii......miL, AWAIIVAWirardWal NOTE. / 4°,....lair mir lrc..•,.;sue — .�►...�,'1 410- ' _= - eifVeVita ���AREA OF WETLANDS IMPACT — AREA 1: 8,446.87 SF (0.19 ACS) ,uh • ,uh / �� 14 " / AREA OF WETLANDS IMPACT — AREA 2A: 3,621.48 SF (0.08 ACS) �' / / J AREA OF WETLANDS IMPACT AREA 2B: 4.196.98 SF (0.10 ACS) • \......!...-------- •• / / / TOTAL AREA OF WETLANDS IMPACT — 0.37 ACS / IA,h,‘ / / // // ///, // // //7 // Length of STREAM IMPACT/1: 101 LF / / / / /// /: iI1 // / / / / / / / / / / / / / / / / / . / / 'ADDENDUM DESCRIPTION: BROOKWOOD SUBDMSION AREA 2A/ B WETLANDS IMPACT WETLANDS IMPACT MAP 14_ DRAWING SCALE: DESIGN: DRAWN: MOORE COUNTY,NORTH CAROLINA 1" = 30' PAP TDB 30 0 15 30 60 I I I I DRAWING SET NO.: SHEET OF LKC Engineering, 1 3 5 Engineering 140 Aqua Shed Courturt Aberdeen,NC 28315 GRAPHIC SCALE ( IN FEET ) Landscape Architecture 0:910.420.1437 ISSUE DATE: ADDENDUM NO.: F:910.637.0096 LKCSurveying Ikcengineering.com License No.P-1095 7/15/2020 N/A LP STA: 20+72.21 LP ELEV: 414.96 PVI STA: 20+45.85 PVI ELEV: 414.15 K: 35.00 LVC: 159.12 o 425 Z o o rr- z co a N 425 N � g Z g E• . Z In CO (0 � a � '- QO ?im + N ui Im + + LIIJJ o - ZN � CNN ZNN CNN Q Q N 0 W w w - Z � H W C' � w ZcH 420 - 0 mQcn w < cn — m4cn U 0 • 420 \303q m - _ FUTURE GRADE _ 1.52% 415 - \ _ _ _ - -..--` / 415 \ - - \ - 410 — _ ____,,/ 21" R 410 culvert Iengt of 63.33' _ EXISTING GRADE 24" RCP NOTE: 405 culvert length of 61.5' - - 405 AREA OF WETLANDS IMPACT - AREA 1 : 8,446.87 SF (0.19 ACS) - AREA OF WETLANDS IMPACT - AREA 2A: 3,621.48 SF (0.08 ACS) - AREA OF WETLANDS IMPACT - AREA 2B: 4.196.98 SF (0.10 ACS) - TOTAL AREA OF WETLANDS IMPACT - 0.37 ACS - 400 400 Length of STREAM IMPACT - S1: 101 LF 19+00 20+00 21 +00 22+00 ADDENDUM DESCRIPTION: BROOKWOOD SUBDIVISIONAREA 2A/26 WETLANDS IMPACT WETLANDS IMPACT PROFILE _ - DRAWING SCALE: DESIGN: DRAWN: MOORE COUNTY,NORTH CAROLINA 1 " = 50' PAP TDB 50 0 25 50 100 I I I I DRAWING SET NO.: SHEET OF LKC Engineering,pllc 1 4 5 GRAPHIC SCALE ( IN FEET ) Lands Engineering 140 Aqua Shed court Aberdeen,NC 28315 cape Architecture 0:910.420.1437 ISSUE DATE: ADDENDUM NO.: F:910.637.0096 rlINICSurveying Ikcengineering.coor ense No.P-1095 7/15/2020 N/A