Permanent Diversion Swale Design Date May, 2024
Project Name Project No.
By
Brookwood Subdivision - Phase 4 TSB-18.01
r Location TDB
Moore County, North Carolina Checked By
PAP
Rainfall Intensity(in/hr) Storm Design Used
2 year 10 year 25 year 100 year 25 year 8.83
6.28 8.00 8.83 9.91
* based on 5 min. ToC
Mr Calculating Run-off Coefficients ('C')
Surface Type Percentages
Swale Unimp. Asphalt Concrete Brick Roof Roof Sandy Soils Heavy Soils Wooded
Areas Area Area Area inclined Flat <2% 2-7% >7% <2% 2-7% 1 >7% Areas
Values 1 0.35 0.95 0.95 0.85 1.00 0.90 0.10 0.15 0.20 0.15 0.20 0.30 0.15
EXAMPLE 40% 15% 33% 12%
PH4-SW-01 10% 10% 80%
PH4-SW-02 _ 10% 80% 10%
PH4-SW-03 40% 27% 33%
PH4-SW-04 10% 10% 80%
PH4-SW-05 40% 27% 33%
PH4-SW-06 40% 27% 33%
PH4-SW-07 40% 27% 33%
PH4-SW-08 33% 20% 47%
PH4-SW-09 40% 27% 33%
PH4-SW-10 40% 27% 33%
Calculating Swale Size
Design Check
Drain. Drain. Calculated Use Q n Side Depth Bottom Design/ Channel
Swale Area Area Cc Cc (cfs) Slope Width Trial cfs Slope
EXAMPLE 43,560 sf 1.00 ac. 0.57 0.57 5.06 0.030 3:1 0.78 ft 0.00 ft Increase 1.00%
PH4-SW-01 69,022 sf 1.58 ac. 0.27 0.30 4.20 0.030 3:1 0.34 ft 4.00 ft OK 1.50%
PH4-SW-02 95,854 sf 2.20 ac. 0.24 0.30 5.83 0.030 3:1 0.40 ft 4.00 ft OK 1.50%
PH4-SW-03 10,951 sf 0.25 ac. 0.49 0.49 1.08 0.030 3:1 0.18 ft 4.00 ft OK 1.50%
PH4-SW-04 29,853 sf 0.69 ac. 0.27 0.30 1.82 0.030 3:1 0.21 ft 4.00 ft OK 1.50%
PH4-SW-05 18,602 sf 0.43 ac. 0.49 0.49 1.83 0.030 3:1 0.19 ft 4.00 ft OK 2.68%
PH4-SW-06 33,719 sf 0.77 ac. 0.49 0.49 3.33 0.030 3:1 0.27 ft 4.00 ft OK 2.68%
PH4-SW-07 7,324 sf 0.17 ac. 0.49 0.49 0.72 0.030 3:1 0.11 ft 4.00 ft OK 2.00%
PH4-SW-08 5,505 sf 0.13 ac. 0.44 _ 0.44 0.49 0.030 3:1 0.10 ft 4.00 ft OK 2.00%
PH4-SW-09 23,035 sf 0.53 ac. 0.49 0.49 2.27 0.030 3:1 0.23 ft 4.00 ft OK 2.00%
PH4-SW-10 38,829 sf 0.89 ac. 0.49 0.49 3.83 0.030 3:1 0.29 ft 4.00 ft OK 2.00%
Calculating Swale Size Lining Types
X-section Wetted Hydraulic Trial Trial Top Width Shear Calculated Straw Straw w/Tack Coat
Area of Perimeter Radius Discharge Velocity of Channel Stress Lining S75 Straw S75 Straw with Net
Swale Flow (sf) Flow (ft) (ft) (cfs) (fps) (ft) (Ib/sf) Type P300 P300 Polypropylene
EXAMPLE 1.83 sf 4.93 ft 0.37 ft 4.67 cfs 2.56 ft/sec 4.68 ft 0.49 lb/sf S75 Straw P550 P500 Polypropylene
PH4-SW-01 1.71 sf _ 6.15 ft 0.28 ft 4.42 cfs 2.59 ft/sec 6.04 ft 0.32 lb/sf S75 Straw Riprap A Class A Riprap
PH4-SW-02 2.08 sf 6.53 ft 0.32 ft 5.90 cfs 2.84 ft/sec 6.40 ft 0.37 lb/sf S75 Straw Riprap B Class B Riprap
PH4-SW-03 0.82 sf 5.14 ft 0.16 ft 1.46 cfs 1.79 ft/sec _ 5.08 ft 0.17 lb/sf S75 Straw Riprap 1 Class 1 Riprap
PH4-SW-04 0.97 sf 5.33 ft 0.18 ft 1.90 cfs 1.96 ft/sec 5.26 ft 0.20 lb/sf S75 Straw
PH4-SW-05 0.87 sf 5.20 ft 0.17 ft 2.14 cfs 2.47 ft/sec 5.14 ft 0.32 lb/sf S75 Straw
PH4-SW-06 1.30 sf 5.71 ft 0.23 ft 3.94 cfs 3.03 ft/sec 5.62 ft 0.45 lb/sf S75 Straw
PH4-SW-07 0.48 sf 4.70 ft 0.10 ft 0.73 cfs 1.53 ft/sec 4.66 ft 0.14 lb/sf S75 Straw
PH4-SW-08 0.43 sf 4.63 ft 0.09 ft 0.62 cfs 1.44 ft/sec 4.60 ft 0.12 lb/sf S75 Straw
PH4-SW-09 1.08 sf 5.45 ft 0.20 ft 2.57 cfs 2.38 ft/sec 5.38 ft 0.29 lb/sf S75 Straw
PH4-SW-10 1.41 sf 5.83 ft 0.24 ft 3.85 cfs 2.73 ft/sec 5.74 ft 0.36 lb/sf S75 Straw
An Construction Schedule
Minimum Bottom Side Top Channel Channel
Depth Width Slope Width Slope Lining
Swale (ft) (ft) (ft) %
PH4-SW-01 1.50 ft 4.00 ft 3:1 13.00 ft 1.50% S75 Straw
PH4-SW-02 1.50 ft 4.00 ft 3:1 13.00 ft 1.50% S75 Straw
PH4-SW-03 1.50 ft 4.00 ft 3:1 13.00 ft _ 1.50% S75 Straw
PH4-SW-04 1.50 ft 4.00 ft 3:1 13.00 ft _ 1.50% S75 Straw
PH4-SW-05 1.50 ft 4.00 ft 3:1 13.00 ft 2.68% S75 Straw
PH4-SW-06 1.50 ft 4.00 ft 3:1 13.00 ft 2.68% S75 Straw
PH4-SW-07 1.50 ft 4.00 ft 3:1 13.00 ft 2.00% S75 Straw
PH4-SW-08 1.50 ft 4.00 ft 3:1 13.00 ft 2.00% S75 Straw
PH4-SW-09 1.50 ft 4.00 ft 3:1 13.00 ft 2.00% S75 Straw
PH4-SW-10 1.50 ft 4.00 ft 3:1 13.00 ft 2.00% S75 Straw
Intensity information tab should be updated per local requirements, current setting is from NOAA website for the project area.
indicates example user inputted data, do not delete.
indicates user provided data, all else is calculated.
Date
Permanent Diversion Swale Design May,2024
Project Name Project No.
Brookwood Subdivision-Phase 4 TSB-18.01
,�I By
1 Location TDB
Moore County,North Carolina Checked By
PAP
Rainfall Intensity(in/hr) Storm Design Used
2 year 10 year 25 year 100 year WM= 8.83
6.28 8.00 8.83 9.91
*based on 5 min.ToC
Calculating Run-off Coefficients('C')
Surface Type Percentages
Swale Unimp. Asphalt Concrete Brick Roof Roof Sandy Soils Heavy Soils Wooded
Areas Area Area Area inclined Flat <2% 2-7% >7% <2% 2-7% >7% Areas
Values 0.35 0.95 0.95 0.85 1.00 0.90 0.10 0.15 0.20 0.15 0.20 0.30 0.15
EXAMPLE11=.140% 15% 33% 12%
PH4-SW-11 40% 27% 33%
PH4-SW-12 20% 20% 60%
PH4-SW-13 10% 80% 10%
PH4-SW-14 40% 27% 33%
PH4-SW-15 15% 70% 15%
PH4-SW-16 50% 40% 10%
PH4-SW-17 10% 80% 10%
Calculating Swale Size
Design Check
Drain. Drain. Calculated Use Q n Side Depth Bottom Design/ Channel
Swale Area Area Cc Cc (cfs) Slope Width Trial cfs Slope
EXAMPLE 43,560 sf 1.00 ac. 0.57 0.57 5.06 0.030 3:1 0.78 ft 0.00 ft Increase 1.00%
PH4-SW-11 7,284 sf 0.17 ac. 0.49 _ 0.49 0.72 0.030 3:1 0.32 ft 0.00 ft OK 3.39%
PH4-SW-12 11,578 sf 0.27 ac. 0.34 0.34 0.80 _ 0.030 3:1 0.48 ft 0.00 ft OK 3.39%
PH4-SW-13 78,500 sf 1.80 ac. 0.24 0.30 4.77 0.030 3:1 0.70 ft 0.00 ft OK 2.22%
PH4-SW-14 26,821 sf 0.62 ac. 0.49 0.49 2.64 _ 0.030 3:1 0.50 ft 0.00 ft OK 4.22%
PH4-SW-15 183,195 sf 4.21 ac. 0.28 0.30 11.14 0.030 3:1 0.96 ft 0.00 ft OK 2.00%
PH4-SW-16 105,918 sf 2.43 ac. 0.56 0.56 11.92 _ 0.030 3:1 0.75 ft 1.00 ft OK 3.19%
PH4-SW-17 24,673 sf 0.57 ac. 0.24 0.30 1.50 0.030 3:1 0.51 ft 0.00 ft OK 1.00%
Calculating Swale Size Lining Types
X-section Wetted Hydraulic Trial Trial Top Width Shear Calculated Straw Straw w/Tack Coat
Area of Perimeter Radius Discharge Velocity of Channel Stress Lining S75 Straw S75 Straw with Net
Swale Flow(sf) Flow(ft) (ft) (cfs) (fps) (ft) (lb/sf) Type P300 P300 Polypropylene
EXAMPLE 1.83 sf 4.93 ft 0.37 ft 4.67 cfs 2.56 ft/sec 4.68 ft 0.49 lb/sf B. S75 Straw P550 P500 Polypropylene
PH4-SW-11 0.31 sf 2.02 ft 0.15 ft 0.80 cfs 2.60 ft/sec 1.92 ft 0.68 lb/sf S75 Straw Riprap A Class A Riprap
PH4-SW-12 0.69 sf 3.04 ft 0.23 ft 2.36 cfs 3.41 ft/sec 2.88 ft 1.02 lb/sf S75 Straw Riprap B Class B Riprap
PH4-SW-13 1.47 sf 4.43 ft 0.33 ft 5.22 cfs 3.55 ft/sec 4.20 ft 0.97 lb/sf S75 Straw Riprap 1 Class 1 Riprap
PH4-SW-14 0.75 sf 3.16 ft 0.24 ft 2.93 cfs 3.91 ft/sec 3.00 ft 1.32 lb/sf S75 Straw
PH4-SW-15 2.76 sf 6.07 ft 0.46 ft 11.49 cfs 4.16 ft/sec 5.76 ft 1.20 lb/sf S75 Straw
PH4-SW-16 2.44 sf 5.74 ft 0.42 ft 12.21 cfs 5.00 ft/sec 5.50 ft 1.49 lb/sf S75 Straw
PH4-SW-17 0.78 sf 3.23 ft 0.24 ft 1.50 cfs 1.93 ft/sec 3.06 ft 0.32 lb/sf S75 Straw
Construction Schedule
Minimum Bottom Side Top Channel Channel
Depth Width Slope Width Slope Lining
Swale (ft) (ft) (ft) % _
PH4-SW-11 0.33 ft 0.00 ft 3:1 1.98 ft 3.39% S75 Straw
PH4-SW-12 0.50 ft 0.00 ft 3:1 3.00 ft 3.39% S75 Straw
PH4-SW-13 0.60 ft 0.00 ft 3:1 3.60 ft 2.22% S75 Straw
PH4-SW-14 0.50 ft 0.00 ft 3:1 3.00 ft 4.22% S75 Straw
PH4-SW-15 1.00 ft 0.00 ft 3:1 6.00 ft 2.00% S75 Straw
PH4-SW-16 1.00 ft 1.00 ft 3:1 7.00 ft 3.19% S75 Straw
PH4-SW-17 0.60 ft 0.00 ft 3:1 3.60 ft 1.00% S75 Straw
Intensity information tab should be updated per local requirements,current setting is from NOAA website for the project area.
indicates example user inputted data,do not delete.
indicates user provided data,all else is calculated.
Date
Permanent Diversion Swale Design May., 2024
i[_i KC Project Name Project No.
By
Brookwood Subdivision - Phase 4 TSB-18.01
Location TDB
Moore County, North Carolina Checked By
PAP
Rainfall Intensity(in/hr) Storm Design Used
2 year 10 year 25 year 100 year 25 year 8.83
6.28 8.00 8.83 9.91
* based on 5 min. ToC
Mr Calculating Run-off Coefficients ('C') 1111
Surface Type Percentages
I Swale Unimp.Areas Asphalt Concrete Brick Roof Roof Sandy Soils Heavy Soils Wooded
Area Area Area inclined Flat <2% 2-7% >7% Heavy
2-7% >7% Areas 1
Values 0.35 0.95 0.95 0.85 1.00 0.90 0.10 0.15 0.20 0.15 I 0.20 I 0.30 0.15
EXAMPLE = 40% 15% 1 33% 12%
PH4-SW-18 50% 50%
PH4-SW-19 80% 20%
PH4-SW-20 30% 37% 33%
PH4-SW-21 32% 10% 58%
PH-SW-22 100%
MI lr
Calculating Swale Size III
Design Check
Drain. Drain. Calculated Use Q n Side Depth Bottom Design/ Channel
Swale Area Area Cc Cc (cfs) Slope Width Trial cfs Slope
EXAMPLE 43,560 sf 1.00 ac. 0.57 0.57 5.06 0.030 3:1 0.78 ft 0.00 ft Increase 1.00%
PH4-SW-18 67,491 sf 1.55 ac. 0.58 0.58 7.87 0.030 3:1 1.00 ft 2.00 ft OK 1.08%
PH4-SW-19 110,800 sf 2.54 ac. 0.16 0.30 6.74 0.030 3:1 0.50 ft 2.00 ft OK 3.50%
PH4-SW-20 75,633 sf 1.74 ac. 0.41 0.41 6.23 0.030 3:1 1.00 ft 2.00 ft OK 0.93%
PH4-SW-21 41,215 sf 0.95 ac. 0.44 0.44 3.63 0.030 3:1 1.00 ft 2.00 ft OK 2.00%
PH-SW-22 17,158 sf 0.39 ac. 0.20 0.30 1.04 0.030 3:1 1.00 ft 2.00 ft OK 1.10%
iWir = Calculating Swale Size V Lining Types
X-section Wetted Hydraulic Trial Trial Top Width Shear Calculated Straw Straw w/Tack Coat
Area of Perimeter Radius Discharge Velocity of Channel Stress Lining S75 Straw S75 Straw with Net
Swale Flow (sf) Flow (ft) (ft) (cfs) (fps) (ft) (lb/sf) Type P300 P300 Polypropylene
EXAMPLE 1.83 sf 4.93 ft 1 0.37 ft 4.67 cfs 2.56 ft/sec 4.68 ft 0.49 lb/sf S75 Straw P550 P500 Polypropylene
PH4-SW-18 1 5.00 sf 8.32 ft 0.60 ft 18.37 cfs 3.67 ft/sec 8.00 ft 0.67 lb/sf S75 Straw Riprap A Class A Riprap
PH4-SW-19 1.75 sf 5.16 ft 0.34 ft 7.91 cfs 4.52 ft/sec 5.00 ft 1.09 lb/sf S75 Straw Riprap B Class B Riprap
PH4-SW-20 5.00 sf 8.32 ft 0.60 ft 17.05 cfs 3.41 ft/sec 8.00 ft 0.58 lb/sf S75 Straw Riprap 1 Class 1 Riprap
PH4-SW-21 5.00 sf 8.32 ft 0.60 ft 25.00 cfs 5.00 ft/sec 8.00 ft 1.25 lb/sf S75 Straw
PH-SW-22 5.00 sf 8.32 ft 0.60 ft 18.54 cfs 3.71 ft/sec 8.00 ft 0.69 lb/sf S75 Straw
11 11 1 ' 1
Minimum Bottom Side Top Channel Channel
Depth Width Slope Width Slope Lining
Swale (ft) (ft) (ft) %
PH4-SW-18 1.00 ft 2.00 ft 3:1 8.00 ft 1.08% I S75 Straw
PH4-SW-19 1.00 ft 2.00 ft 3:1 8.00 ft 3.50% S75 Straw
PH4-SW-20 1.00 ft 2.00 ft 3:1 8.00 ft 0.93% S75 Straw
PH4-SW-21 1.00 ft 2.00 ft 3:1 8.00 ft _ 2.00% S75 Straw
PH-SW-22 1.00 ft 2.00 ft 3:1 8.00 ft 1.10% S75 Straw
Intensity information tab should be updated per local requirements, current setting is from NOAA website for the project area.
indicates example user inputted data, do not delete.
indicates user provided data, all else is calculated.
-1.111
Riprap Velocity Dissipator Pads DATE
May, 2024
PROJECT NAME
Brookwood Subdivision - Phase 4 TSB-18.01
nit
LOCATION PROJECT NO
BY
r -11Moore County, North Carolina TDB
CHECKED BY
PAP
I
STORM DESIGN: 25 Year
BACKGROUND: Use the E&S Control Planning & Design Manual, Section 8.06.
REFERENCE: (NCDEHNR, 1993)
Dissipator Pipe Size (D-o) Apron Calculated Max Stone Diameter Apron Thickness
Pad FES No. Flow d-50 Length 3*D-o Width
Inches Feet g Feet Inches Feet Inches
1 PH4-FES-03 18 in. 1.50 ft. 5.60 cfs 0.4 ft. 9 ft. 4.50 ft. 10.50 ft. 0.60 ft. 7 in. 0.90 ft. 11 in.
2 PH4-FES-08 30 in. 2.50 ft. 30.75 cfs 0.5 ft. 16 ft. 7.50 ft. 18.50 ft. 0.75 ft. 9 in. 1.13 ft. 14 in.
3 PH4-FES-10 48 in. 4.00 ft. 232.70 cfs 1.6 ft. 26 ft. 12.00 ft. 30.00 ft. 2.40 ft. 29 in. 3.60 ft. 43 in.
4 POND 4 FES 15 in. 1.25 ft. 6.11 cfs 0.3 ft. 8 ft. 3.75 ft. 9.25 ft. 0.45 ft. 5 in. 0.68 ft. 8 in.
5 SW-13 18 i n. 1.50 ft. 4.77 cfs 0.3 ft. 9 ft. 4.50 ft. 10.50 ft. 0.45 ft. 5 i n. 0.68 ft. 8 i n.
6 SW-14 12 in. 1.00 ft. 2.64 cfs 0.2 ft. 6 ft. 3.00 ft. 7.00 ft. 0.30 ft. 4 in. 0.45 ft. 5 in.
7 SW-15 24 in. 2.00 ft. 11.14 cfs 0.4 ft. 15 ft. 6.00 ft. 17.00 ft. 0.60 ft. 7 in. 0.90 ft. 11 in.
8 SW-16 24 in. 2.00 ft. 11.92 cfs 0.4 ft. 15 ft. 6.00 ft. 17.00 ft. 0.60 ft. 7 in. 0.90 ft. 11 in.
9 SW-17 12 in. 1.00 ft. 1.50 cfs 0.2 ft. 6 ft. 3.00 ft. 7.00 ft. 0.30 ft. 4 in. 0.45 ft. 5 in.
Apron Construction Dimensions Riprap TERMINOLOGY:
Pad Length Width 3*D-o Thick Class
1 9 ft. 11 ft. 5 ft. 18in. B Q25 = 25-Year Design Storm, Peak Discharge, (cfs)
2 16 ft. 19 ft. 8 ft. 18in. 1 d-50 = Mean Stone Diameter of Rip-Rap, (ft.)
3 26 ft. 30 ft. 12 ft. 36in. 2 L-a = Length of Rip-Rap Apron, (ft.)
4 8 ft. 10 ft. 4 ft. 12in. A 3*D-o = Width of Rip-Rap Apron @ Pipe Outlet, (ft.)
5 9 ft. 11 ft. 5 ft. 12in. A W = Width of Rip-Rap Apron @ End of Apron, (ft.)
6 6 ft. 7 ft. 3 ft. 12in. A d-max = Maximum Stone Diameter of Rip-Rap, (ft. & in.)
7 15 ft. 17 ft. 6 ft. 18in. B Thickness = Thickness of Rip-Rap Apron With Filter Fabric, (ft. &in.)
8 15 ft. 17 ft. 6 ft. 18in. B
9 6 ft. 7 ft. 3 ft. 12in. A
-1.111
Riprap Velocity Dissipator Pads DATE
May, 2024
PROJECT NAME
Brookwood Subdivision - Phase 4 TSB-18.01
LOCATION PROJECT NO
BY
r �� Moore County, North Carolina TDB
CHECKED BY
PAP
I
STORM DESIGN: 25 Year
BACKGROUND: Use the E&S Control Planning & Design Manual, Section 8.06.
REFERENCE: (NCDEHNR, 1993)
Dissipator Pipe Size (D-o) Apron Calculated Max Stone Diameter Apron Thickness
Pad FES No. Flow d-50 Length 3*D-o Width
Inches Feet g Feet Inches Feet Inches
1 SW-18 36 in. 3.00 ft. 7.87 cfs 0.6 ft. 20 ft. 9.00 ft. 23.00 ft. 0.90 ft. 11 in. 1.35 ft. 16 in.
2 SW-19 18 i n. 1.50 ft. 6.74 cfs 0.3 ft. 9 ft. 4.50 ft. 10.50 ft. 0.45 ft. 5 i n. 0.68 ft. 8 i n.
3 SW-20 36 in. 3.00 ft. 6.23 cfs 0.6 ft. 20 ft. 9.00 ft. 23.00 ft. 0.90 ft. 11 in. 1.35 ft. 16 in.
4 SW-21 36 in. 3.00 ft. 3.63 cfs 0.6 ft. 20 ft. 9.00 ft. 23.00 ft. 0.90 ft. 11 in. 1.35 ft. 16 in.
5 SW-22 36 in. 3.00 ft. 1.04 cfs 0.6 ft. 20 ft. 9.00 ft. 23.00 ft. 0.90 ft. 11 in. 1.35 ft. 16 in.
6
7
8
9 I
Apron Construction Dimensions Riprap TERMINOLOGY:
Pad Length Width 3*D-o Thick Class
1 20 ft. 23 ft. 9 ft. 18in. 1 Q25 = 25-Year Design Storm, Peak Discharge, (cfs)
2 9 ft. 11 ft. 5 ft. 12in. A d-50 = Mean Stone Diameter of Rip-Rap, (ft.)
3 20 ft. 23 ft. 9 ft. 18in. 1 L-a = Length of Rip-Rap Apron, (ft.)
4 20 ft. 23 ft. 9 ft. 18in. 1 3*D-o = Width of Rip-Rap Apron @ Pipe Outlet, (ft.)
5 20 ft. 23 ft. 9 ft. 18in. 1 W = Width of Rip-Rap Apron @ End of Apron, (ft.)
6 d-max = Maximum Stone Diameter of Rip-Rap, (ft. & in.)
7 Thickness = Thickness of Rip-Rap Apron With Filter Fabric, (ft. &in.)
8
9
\ \ /,\ ,, i % '�i / I o pU '_ a -'— I=—`
I I :�\ \ i' x�' I B�/O l 1
\ . 5) �J%` O x REVISIONS
a E D SYM. DESCRIPTION DATE BY
J \ ;;:".\"+.,�,_ 1 , it l / A +'- '..1...,....•.0'.
\ \ 1 I o-0I ''
\ $`. .� �/ �. r• / / �m \\ ,.__.,,, \ \' __ ?P/'k ' dui°•
< 4 C
/ �o ¢/.. \ r 'it 1; < — ------- �i \ '
\ // / ?� \ / ,j •
\ J_;; r \ i \ I N `\ - //_i tom— `i�'� \ \ - u i In' In
>` .43' _� ,,\\ i h I \ \ \ \i \ \ ---__ ', \r \ \v / N \ i - ,- - 'a IN
/--, / fl.7 m01OOt
•
\ \ et\ \ .\ / !\ \ \ `\ G - / \ 4--\---Z \ _ r j \ �i 1r :1/':2
-1_ \\ \' �
\\ \ • \ / \ \\ \\ \\\ 0 0 \ \ \\ \ \\ N.\ \� \�-- -\ - --1 _FRS \o N ' __,�.--N.'i' / -, / ,./-----„ \v ,y \�\ \ \\\,_... I — ill .'7:3 '41-rjjk:i
w Q v v
Ili
'116
\ \ \ A \\n a32 / \ \ \ \_v.' / \\- \ \ \\ \\\ _��C/ NN _�� _-�--' l,r \ \\\ \\ �_' J` - , \ \\� \\ \ --- J\:\
�� /' / \ \ \ N \\\\\ � \ r \ \\ \ _ '' /- ,> \ �-^, \'\ \ow a9.ozwi�'sF / mi0
\ \ \ o / / \ \ \ �( l '/•i \\ ®\ 44° \ �\\ \ '-- \ \\\ '�kto/ --\\ \ \ \ \\\ 11
\ \ \ \ / % •\ \s, \\ \ 1 ---` --\ � \ \ \ \ \• \ \��� — r \ '! \ N \ \ ��i / \ \ \ \\ I / L--_�'/ t
\ \ I\ ,1 %I \ tia i j / \\ G \I I 1 1 0 —_--- -- '— _ y / ' — ----/� // /
\ \ I \ \ % i \\------ `\ \� \\ F \ • \ _ 43 T—_ \ \\ \�\\ \ / \ \\� — �T \ l I l / % / , / rtl
1 j 1 _ ;l T
a � � e/// /— _=__ \\I I 1 I i i \ \\� \\\ a, \'------- �' \.\ \\ \ \ ��.. // l / I l / ®� /i�i'f I' Jam__ i W V
1 ' \I : 0,1. / /I /-- \ \I \ — -- - - +— 1 I �\ \ _ ' \ \ . \ \T1 \\ _.�� 1l l I / / / / / _- /� // Z
_I-- \ I i / i 1 ---4 1 1 \ \"I ---i--, / .\\— �\ \ \. \ \ `�\ // l I / / ( i�\\ i� // _ / C:
-�.- \ \I I 1 _4 -- f /�--->e \ ,v 1 \ \'' - ✓ / / � _.. - _— ` _-`'�\ \\ )i \\ \ \i / i/ / / / 1 \` — Tr —® / / J
CZ? �I f'1 a
1 I Ny. ' \ 1 I / �q/ // / \ ti \ \ _\ \I /A r. �_�'/ ,. / //' . )` -/ / `„." ��`�• T \ \\\\ \• ,\\ \ / Ill�/ / ^X V M 95.&53.72 5F ---- %
\ 1 / / / —`-. ' \ III"`,I'I • \ / PH4 Sllo2
+- r v / v F 1 -'( \--- I1,f I / / /• i' i �_; \\ \ \ h// -/_ i` \I ring /T —
\ \ = 1 1 F � G \__ \ Iltk 'yItl t /- i /' /.// / 7 // --\ \ as \ \ / { /`, i — —
< \1 ,L / --7--s / 7 I \ 1 1 \ Al ."ti /' . > f / ---_ _") \\ 11 /�
1 CD Xe / 1 1 \�, \ '1\ 1\ / / / / •/ / i EXISTING WETLANDS / �� 1
_ _A -A ;�/ - V // / /' / /.• o i i % / / / // / i A/�'a'j. i t� .—yt5�-�--y/� I!_.q
\ {
V a, AV r lr,ly / A\. i i �• !l •l' YI f % % % / % / % / �aao-- A i// °�M / '/� ���i� ® ---
-
a \ r l-1 0 /' , 1 '-` \l\\' 1 / \\ \ I / / / -_ --/ ',/ \ \. � i-- _ i � 0
-� \ \ �\ ' / 7� '1, \r- \ _ 4t2 I \ \ h /� / / I /\ ��/ �- �\ `� "�" 7____________----------'
_ aao-- �\
a \ \ • . / \ I -/ / / __, 1 PH4- �is / '1 /I \v �.. J-�— -- �_ --_ �\
•
`'� \ \\ \ 7\\ ---' / .,..-;,-,__.1_,, ,� \ \\ \470— _%'- .� �4 Ii/.. / �/ / / _ / t j ow Dk;9n.i9 sF/ \I / .:,\......----"`,/ /jo3�9�jaoli \\\ / % j / / i/ A \ \ �� _/i • / ./ / /r /‘ / ^i \ O 4q� 435�434.4 -\ �\
%�,( ' / ---- /../ o / �/ / '1 \ % \PHa-a\�a - •1 436 / //��/JJJJJJ
/ } / 1 ~ ✓ / 111 I`y W 29.853.49 SF ✓ \\\
\ / / i� \ 406.-- /.; ./ j/ / / \ /\ '/ \ \ o ea ws, • / \ \ _-436--' \
/ / �c."P \V v, 1, _
\ 9' / •/ - 'J �'` /�` \ / /— / e �42 a\. / I \�, / w]]a19a4 sf_ \ / / i \ \
3 \ '1----___ —/" i // 400\/ / r o \\ / / \ CO ' I / l / n us. �� H4 / /- i/ / \\ \ \ --- --\\ \\ \ ^
\_I i / ✓ � / — / � �M 10,950.SJ SF \ \ �-
.4- _ _ i/ • /1 / / / / t� \,' oA az.a9v]o sF�\ / I d __1 �. _ —��/ _ //� / %% / \ \ \ / / \\ \\ \ W
/. / / / 4- �/ v . �v I "_i t / / / / A Ate_ //
I j /. / / 4t s9 �� — -
T -a02--- _ice ' / ./•J / / / / D,z,6za.z6 sF 12 \• \ \ �• �� _ / / / / \ \ \ Q
I --too % i %/ l I / / f i C°s \\ \ i� \ \ ROW ,i �'4 / / /// �� \ \ \ \\ / /'--�\ \\ \\ \\\ 2
— ■ � d j/i i//' / I 1 I I / '7' \\\ PH ofi � '/_ 60 PU --`��� ' �,-' // / //, / \ \ \ \ i \\ \\ \\ \-- W
y
i `, D 5 SOS.l4 SF \ - � H4 Sw 1' " / / / \ \
r
•
%//i i i / ice— I I 1 / / / \`���, �\ o \ ` i �i //� '- �i 4'OT / / / / % \ \\ \ \ --- \\\ \ \ Z Z_
ate. v, A
4.
cf. / i �r,� �f >�,o `� \` 92\ 'AH4 sw-0� 1 �// �✓/,--� _`__\�\\\ i /--�\\ / I /^\ \ I ��� \\
4. J/ sF - rt
/// \ / ow no.t9e.79 sF �G \ j �x y , '� '/ 4 / ' i \ `a \ I \
/ / _ {. Yam' y/ r/ v �/ / // / v v V v = / / v / / / A I ��
/ i -\ 1`��'' T-432- _ / /� \ \ /
/ / / / /\ / II PH4-SW-20,I V / `, , \\ /Y \ / Y x > >� > — / / / / \ \ \ \ / l 47 _/ / / /� \ I / \ \
/ / ,. 6 , 15.6]].az SF I I�• i 94 \ ` ' \ \/ ` / , ,. _ / / / / / \ \ \ \__ / /-\ sue`--/ / / • \ \\ \ \ i / \ O
/ e^ / � l t.0 ecs. �. �� �i� r �� / / / /1 A A V --_ / / vv _ // / \ 1 i a/e. mow'
/,,- / PX4-9w-12� I/ M36,a28.65 SF \ / / Y / \ / / / \ \ \ /_--__�✓/"�
/// / ow nsnse a\ I \ Q iY s w X -420 / \ /'-\ /'�\ \ \
I
/
nsem sF ` , \t ` y y` /X> / / / i • ---ato__— / �— \�\\�\` .--'���_— -- \\ \ 1 1 / i /� ) N z°
\:'
0]9 yi /•. \! '�� r(sT
8 `` \ �, / �• --__�_ - / 1 1 I // / / \i CI .4 I > \ 1 ��I � ow zs.o]s.a sf :-... / / / / / / --- / i —— 400------...Ni _ +L l l i I \ 1 c
' / x ` � i� / \C os]wcs i / %%% // / _—_____ _' /-'--_ \ _ --1__ T I I I �h / — \� i O 2
, ...,. .,./ i.Ii .. \4� �' ___ �s\ �\ ®// \! /X%i / %%//%/� -400-- EXISTING WETLANDS\_ —i��/ / , / llll%1i i� \ / ` O CL v
\ // oc t.zea.z sF-I �, 'I L_ , k ` / ` % • / / / / /%//i� 394 .� ----- -- �-�.. / / %%11l I /.l
i
' \ V\\ 7 / I I atzu.fie Si I � om\ „ . / / / • ----- �1. \ , - r'IY
\ \\ \ CO 1 \99 ?tl '\\�-=L , `r-_y' / /// i / /i/%7i i / / I n / // 00 i '�_.- _---' /• / l 1 l
\ \ �\�\\ I / , I _ 11 11\\ �1\\ ; _-� _ / / 'i /%i i/ / / ▪/ \ _ 96"' / / / / - / / / l C GO o ]o eo tzo
\\ \ \ / / a \I vx. w-ts -"/ / / // / / / / / 3 / // //- / / / II \ I 1 1 1
_ \ \ \\ \ J 1 It. 1-_ T \ } --'a:lu.l95.n SF /i/ /i/// //i / / // i / I /' ice// / / / -- i / l 1. \ DATE May,2024
\_�\ w-1] \ L� / �� _ I ,� _ �_ 4.z�nc5. "/'/ / i/ //i j// / -y_� �i �/ / / i / / / II \GRAPHIC SCALE IN FEET
\\ w:Too SF 'y' /___ ?i. v\ \1 ` i V' //i i,--_.7 / // 7 / i i//-- --- \ -- -- / 6' i /� ----'— / / ( )
.fio ncs. III_ --- \ ' / / / // / / /' / 40 / - / 1 FULL SIZE SHEET 22"x34" DESIGNED: TDB
\ \\ \4, ----+ 1�- - -- ---_-. / \/i /////i // i / I / / / /„ ---1''%� __-_ ........ / / / / / i \ DRAWN: TDB
9 /
m `\\\\��. \\ \ / 1III, _ i/ \ j i� �i//_i�/ j / b9ryi//ii/ // -__- h_� - - / i ....-"I"-------------------' / / CHECKED: PAP
—\ \ lam\ / / ///' / / / / / .. / / / - \ /0 7/ / / / `
-- vA _410-- _ / .` / / / ��� / _i / ��
\\ \ __400 =�� i �� / / /// // / / / / / /�� -- / /� �� CALL 811 BEFORE YOU DIG