HomeMy WebLinkAboutNCC241545_Site Plan or Location Map_20240520 �\ �\ MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION
---- �� ` �� \ General-All measures will be inspected and corrections made after runoff producing rainfalls,or at least once per week minimum. The builder will insure that the construction activities on any particular lot do not adversely affect any of the installed erosion control
/ measures, If lot construction dictates,measures will be relocated on the lot to insure that the potential for sedimentation runoff is eliminated as much as possible. Silt fences and gravel construction entrances will be maintained as suggested in the erosion control
i- \ �� - manual.Sodding,seeding and mulching will be maintained to insure proper ground stabilizing cover.
_ o��~ o _ \ __ . Gravel Construction Entrance-The gravel pad should remain in a condition to prevent mud or sediment from leaving the construction site.This may require periodic topdressing with 2-inch stone.After each rainfall,inspect any structure used to trap sediment and clean it
"re // ��` /_ out as necessary. Immediately remove all objectionable materials spilled,washed,or tracked onto public roadways.
�� a,ssa = �� "' Silt Fence-Sediment fences should be inspected at least once a week and after each rainfall event.Any repairs should be made immediately. Damaged or decomposed fabric should be replaced promptly.Any sediment deposits that build up against the fence should be
�` _J i ```\� removed and disposed of properly to insure that the removed sediment does not wash back against the fence.Adequate storage volume should be provided for behind the fence at tall times.Take care to not undermine the fence during cleanout operations.
'r7b e'°� - _ _� / X Sodding-The sod should be properly maintained to insure that the grass take holds in the areas being secured.The sod should be watered as necessary to maintain adequate moisture in the root zone and prevent dormancy of the sod.The sod should not be mowed to
alk
q. eTf'� / / close,since this could inhibit adequate growth and stabilization of the root bed.The sod should be limed and fertilized as per soil type recommendations and type of grass recommendations when and if possible.
o -' i // -- 1 Grassing and Mulching-The area to receive grassing and mulching should be properly fertilized and limed as necessary as an initial step in soil preparation. Once the grassing has been placed,the area should be maintained as needed to insure that all areas are
.� / i I I '� germinating propedy. Any bare areas should be repaired, and reseeded as soon as possible. If the time of year does not permit the establishment of a permanent grass,then a temporary grassing should be used until the growing season permits the use of a
9 / , - \ ` Permanent grass.
• -Bas -=�_ewer'.
�- �� 1 ( Wattles Wattles shall be inspected after significant rainfall events.Rills or gullies upslope of the wattle and any undercutting is to be repaired.Sediment deposits that impair the filtration capability of the wattle shall be removed when the sediment reaches one-third of the
1 I\ \ wattles functional freeboard height.Removed sediment shall be deposited within the project in such a way that the sediment is not subject to erosion by wind or water.
��i �\ �` \ , Reinforced Silt Fence Outlet-Remove sediment deposits as necessary to provide adequate storage volume for the next rain to reduce pressure on the fence/outlet.Take care to avoid undermining the fence during cleanout Remove and replace stone as necessary as it
®$ _ /- \ ` Mihr\
Z becomes clogged with sediment Remove all fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been property stabilized.
MONTROge ROAD 9R-1215 v -
` , aR,2,4 - V/ /
v °.fro° • \ \� - / //// / CONSTRUCTION SCHEDULE
I-obmin an newaaary ermr6 and plan.ppmvala.Eroaroa aria sediment cono-oge&sc7 pemrn aria a cercinpam pe Coverage
illkl
\/) \ • / (CDC)must be obtained before any land disnubing activities occur.A copy of the E&SC permit,the COC and a bath copy of the DATE: PAGE:
�y¢ $' \ / \ �1 _ e� I I I ( ///// // plan must be kept on site,preferably inapermim box,and accessible during inspection.
( Z Install gravel construction entrances first,then silt fences,reinforced sill fame
P.P.and watfif3
o y� (\ 3.Finis3h clearing and grubbing any necessary areas on the lots w they are stated.
m ) /// 4.Begin l"tgmdmg and excavation 'A° •B• °C° •D• 'E° "F' "G' •H•
I) Begin or continue with house coM ¢don activities. p
5n a7 ^I // 6.Finish all rough grading and house construction. q 11 P p % i I P , e % %
7.Insm^Idriveway walks and patios 1f ¶ I ll
d'� ) LV........r.j.„,
8.Begl Me grading of Iota r ll O ✓l ✓� �' �'$C o I 1[ l / // / 9.Final grassing,mulching soil stabilizing of lot. most cases this will involve We installation of sod on the lot.The silt fence will a e a e e a , e HOUS
yS' nI p0 / / in glare pow melnt aodaea or g<aaaingn'oh�>'�Cana rake ho�a�wn measures g 4 4 ll ll =o �G House's Hoses nvvcc
o / tilt / / 10 Thew sh ll d If pe fees s endsedrm 1 and compleM Me followin
• a /� /� comb d If f fo d h DEMLR websne �g OA• �..fa a �R
/� htrps//e=dieq. g bo✓d- gy I and lend resources/ er prognm/npdea conswetion program.
Ag 5R-t7a s0// / / TwelveM f completep f shall be keg d availablef pectin at all times It is recommended a Ir b ,t.Up1Y,7:,R0 3�� / copy be kept p box.Ref:OS. 3 a.don gh G.S. 3 $ CAC O0A.0101 through 13A G LCURB NLEr�EDGE OF CURB AY Notes:ROB AT SRO rWAY O ai AV O AY �ROA AY
• // / "^\ n Activities.
II.SIf GeneralNCACpwdo1M P ns for erosion a NCO 010000 NPDB5f C b performed least once every seven calendar days and
VICINITY MAR' 1 I din h f ry greater Me I inch.Any ne dad p shall be made immediately W maintain measures a If needed,Tree Protection fencing should be installed along the buffer zone wetland
N.T.S.
I / designed.All ESC b minis specified in the c details on this Om Arun gauge shall be installed LEGEND
boundary and/or around protected trees,proWd rig a radius of at least 1.25 feet for each
' / at the project site for monitoring. N men orwnkaameler.
J 777��� 1 / / I 12.Inspatian and foal acceptance leWrs.When the project is complete,the perm.a shall wnmet DENT-It to close out the E&SC 2.Install Silt Fence on the low elevation sides of each lot.Install Silt Fence outlets shown on
\ I \\ \ \ 1 ' / s/ / / plan.After DersnLR informs the pemunee of the projen close ou0 vie i�npxtion repoa,the perminee shell visit p- :stall
and field adjusted,If necessary,for placement at low points.If lots are
tlg \\\ \ / / Nleg,ncgov/NCG01^to submit an electronic Notice of teminatron(e-HOT),A SIM annual general permit fee will be charged strOi FENcemo contiguous and have different land owners or builders.each lot should have individual Silt
a31/ writ the a-NOT has been filled out. Fences.
/ SILT FENCE OUTLET ® 3.Install required Silt Fence within,0 feet of property Inc to ensure there is no conflict with
CONSTRUCTION as4-_ 9uire grope y
II(/ ENTRANCEseptics stem.It is the res onsibilit of the builder to ensure Inc inslallagon of sediment
\\ �� 1 ( r \ CURB INLET = Canot measures does not impact Inc septic system and repair area(sl.
1.
\ „ \ \ \\ d.At least one Construction s dedicated
I is to be installed per lot.
GROUND STABILIZATION l- A"SELF-INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY NCGS 5.Waste bins and other areas dedicated for managing building material waste shall be at
I 3/ \ 1,3A-54.,"IS AVAILABLE FOR USE.IT CAN BE COMPLETED BY HAND OR COMPLETED AS AN least 50 feet away from storm drain inlets or drainage ditches unless it can be shown that
SITE AREA STABILIZATION ., - EXCEL SPREADSHEET. no other alternative exists.If this separation cannot be achieved,these areas must be
EXCEPTIONS \ \ AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED EROSION AND contained behind Silt Fence.
DESCRIPTION TIME FRAME \ \ \ SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE.RULE 15A NCAC 04B. B.sediment from
m the of disturbances should be protected;streets should be swept when
PERIMETER DIKES, 7DAYS NONE \ 0131 MEASURE ORPRACTICE HOWNNNHACLPY ACCOMPLISHEDTHE
6D EROSION
GNND DATING sdowsmtenconiturbanessiryild besent.
1 EACH MEASURE OR PRACTICE SHOWN ON A COPY OF THE APPROVED EROSION AND V C{nNronmen allPeg 7.Details for Silt Fence,Silt Fence Outlets,Construction Entrances and other measures are
SWALES,DITCHES 8 1.1. SEDIMENTATION CONTROL PLAN OR BY COMPLETING,DATING AND SIGNING AN INSPECTION provided on additional sheets.Erosion and sediment control details are not drawn to scale.
SLOPESrcc��T'v�n"T^"'a Z2020 TYPICAL LOT LAYOUT WITH CURB AND GUTTER
REPORT THAT LISTS EACH MEASURE,PRACTICE OR DEVICE SHOWN ON THE APPROVED
HIGH QUALITY 7 DAYS NONE I t 1 EROSION AND SEDIMENTATION CONTROL PLAN.'
WATER ZONES / /I/
(HQW) J �� JIM //II"
SLOPES STEEPER 7DAYS IF SLOPES ARE 10'
THAN 3:1 OR LESS IN LENGTH 01
AND ARE NOT /
STEEPER1DAYS
ARE 2:1, / / // //
14 DAYS g5 ///
ALLOWED /
SLOPES 3:1 OR 14 DAYS 7 DAYS FOR / / / 12 / / / ---1 ..................)/ SODDING
FLATTER SLOPES GREATER Lot Plan IA r / DATE: PAGE:
THAN 50'IN LENGTH .a, /ALHERARAS14 DAYS NTFOR / *16/1/
I (-°:;i:-- / / /THANQWONS) l\ / � ' TOOL FOR NCS3He DOWN niE
alal
FLATTER THAN 4:1 HQW ZONES M.MD TRUM NGHEws
a / 441).7I
\ \ aME uTwapcpaaacnv. a .00Ai: /l
DATE: an soaawanm PAGE: INN asp\ \ I �(///' Qs)' /I I_4 � 5p�. re ro'
FLOW�y a•�I F a•�l sr e Arw to be t. 1 . \\� I I I 1 _ �w rw
II III smk4glr_B , eeaub1h tlafor \ ) \ \ \ I I I . ... . .. .....
/ � si
tr 11 2.x2' .r. II..„'Y aomrryvdmwm,mo. / I \ \I \ _^ _.i 7..P.7.�4v.'r - _
M gar
StekeS
9m N m,t ogee nmaa
s II should he ram ee parallelm \ \1 1 \ tlII
,,.••' •1 Y s
SECTION beyond rof atne 2 / 40 \ I \ \ \ II t I e Mm. e a�r ) 3 ..
SECTION ,rststs.eat areas should m Ina toots.,a am m 41111.1
I \ \ \ \\ \ 1�lli I / '¢fY �f7 °eDMOW WHEN THE SOD Is
land met ee runoff from B eameenammthe t 1 wrmw isa Titer apla 142, 23 ! _-z:r: +°N
SOI
500N AS THE
slit sock/mere),
Ia. 00cac rum / APPEARANCE OF GOOD SOD Construction: Maintenance:
WWW IuIJIould be ddven
/ 1.Clear the entrance and exit area of all vegetation,roots,and other objectionable 1.Per NCG-01 Inspect at least once a week and after each 1 inch or
sock/watre.stakes should winch x 2 inch cross section ee Maces et a silt
materal and properly grade it. greater rainfall:make any required repairs immediately.
Trench into Ire con soadwameia Dlaeain aarnch / •P / za 2.Place the gravel to the specific grade and dimensions shown on the plans,and 2.Maintain the gravel pad in a contlition to prevent mud or seMment
smooth It. from leaving the construction site.This may require periodic
Wo.Mulch or Compost around a Min. S. bra bteuwtr« / / I I wmxpenpxT 3.Provide drainage to Carry water to a sediment trap or other suitable outlet. topdressing with 2 inch stone.
To 1/2 Wight of log uNTaENCHEOINsruunoN pavement)has / / 11.04A,
' / J I ) y oor u 4.Use ge°textlle fables In order to Improve stablllty of the foundation In locations 3.Immediately remove all objectionable materials spilled,washed or
„ ,,,w,e„w„p,ww,pm,,,e „eon,,,,,,,,�_ off I n'aZe'e h^n Ms / MN° OS/ // / / I -n u v. „z.iac subject to seepage or high water taNe. tracked onto public roadways.
ISOMETRIC VIEW rap MAINTENANCE baneaet eklyanaare / / / 'ro osesm.unr
r « m1. mHm / / //// III CONSTRUCTION ENTRANCE/EXIT
m Dmrewheas° ovens wrnm rm a naadad to allow eaf°c e°e.flow,as - _� NNW
, / // o. ro
__ J m General Erosion Control Notes
shcetFIwoy /wave moth tom* Om ml aN hlo hPM 3/ rlswmj s ba"«I�earew ced If �o // �� / , /�// / / / /� ,j 1.Only the areas shown shall be disturbed.
arger diameter or a different rk 'Reinstall if damaged or dislodged
e Tr.a.ah Rm jai✓... iail°v,° I item,zs,sr„,„,,in,,,,,p e -/ / 2.Ail mulched
soon
areas shall be possibe and maintained
disturbance is / // / Z mulched a oo asrpi possible and w f s neaure Ws been permeeete and mly sstabe areail.e1a / / until pemanent cove sestablished.
SILT SOCK/WATTLE FOR PERIMETER AND INLET PROTECTION
( (----------- ---- --'`=,.., ffialiallail i / //
DATE: Wire Fence Filter Fabric PAGE: I ^ 111"ingi:
/ P
s«I Fan ' sMay.Extra acre gt ab"c wnMutwire fen Wire Fence W.LT Max.Standard SWeeth.linc w•wire fence , Backfillirench \ I / 'Or /
•
!.r: Steel Post ....
end Comp.
thoroughly i NNW,
, /�//4 FENCE
} / DATE: PAGE:
�' � " /� / ' //i - PAGE 1 of 2
warenpe, ?,a.� I , , fBLT
C. \ I I I a / / ac- /��/ / /� / TOTAL DISTURBED ACREAGE:0.48 ACRES
��_ / �/ LOT EROSION CONTROL PLAN
1 rer Fabric =en°e;o-e am / \ \ I \ i �/ /� / /� BG ET ETDPG LOT 12
1.2.Esediment NesEren roeace; °�azaa; eDoertM1emb dIHIh f RDaBBE SECTION I �� ��/� � '� /� WRTHEEF�EEDaT HIDDEN
may impound masarwemranananncedoesn preeed24instructure)� ((ç
/ STEEL F VALLEY
new.ry,3,Construct the filter..
urely omen continuous
rah onyatat to the MO of Coe wmareater m
4.S standard svengt.ter fabric by wire mesh fastened securely m the upslope ale h .Extend Maintenance: I I \ \m. \/avoid joints,When joints are c , // / / HaeowARE CLOTH FRon7 vlEw �F FOR
the Mrs mesh support to the bottom of the Wn..Fes.n the Mre reinforce..side of the fence post.Wire or plastic zip.should have a minimum SO pound.nsilea maamummere Ida. pw""rh should he driv inch or en Ma"moor areamemrenwaat least peeawee aaaaewately. r� • ,\ \ I
greaterBURY WIRE
0 When a wire mesh support fence is used,space pow 0.Should theI rainfall. ettya ooaoorepairs • _ WAaHED aTDNE _ CLOTHINTRENCHDREAM FINDERS
ERDF47STEELFENCETER s.
fasten.e round a minimum of 24 \/ \ ('/'/
/, �securely into the 7.Excavate the 6.Extra strength pprde / 1 \ / / \ 8.;,�...1 oN GaouND NOTES:
OHardware cloth and gra�el should overlay the silt fence at least l2 HOMES, LLC
8. along the bottom and aide of doe trench. r.°conch II \ . 1[ d rR- ,. I / .'.� •o°°°NNN°a :'I "`he`. QUEWHIFFLE TOWNSHIP HOKE COUNTY
S.m.Don critinot.cal
upslope from the
barrier.brim'pieced over.filter fabric are compact Thorough wmpeNon of me beckfill Is drainage area has been proper0 a stabilize
I \ // \ .•.o.•:06 I 2.stone outets should be placed on low elevation areas of silt fence
Ttfan I I and NTENAbased°"field conditions. SCALE: 1"=120' APRIL 2024
\ MAINTENANCE
\ \ BURY PARE FENCE AND B RV er OF UPPER EDGE HARD H aLTERmeacNTRENCHF' Per NCG-01 Inspect outlet ornyt lest once a week drape am each 1 iaMly.hoc GRAPHIC SCALE
\NGEnvi,.n e lel,ws greeter stolen event Comentaccu any required reps rs 6 inches. 120 0 60 120 240 480
SILT FENCE \ \ \ \ BE IDNYIEw 2 Keshenshfeeofd when sadmentvideadequamulation exceetls6riches.
3.Keep mesh free of debris to provide adequate flow. =
\ 4.Remove sediment when half of stone outlet is covered.
1 \�\ , ) 5.Replace stone as needed to facilitate tie-watering. IN FEET
4°1'4
_WC-EnVI II tal.lpeM ( )
) __ 1 SILT FENCE OUTLET 1 inch = 120 ft
MOORMAN,KIZER&REITZEL,INC.115 BROADFOOT AVE.FAYETTEVILLE,N.C.28305
\ \ \ 1 \ I \ I I I /// / i - ` PHONE(910)484-5191 FAX(910)484-0388 LICENSE#F-0106
LAST SAVED:4/24/2024 3:40 PM LAST PLOTTED:4/24/2024 4:14 PM PLOTTED SY:Dennis Gilbert FILENAME:G\CURRENT JOSS\H&H CONSTRUCTORS\24-1367-02HIDDENVALLBOEC\PLANS\EC-LOTI2.13.