HomeMy WebLinkAboutNCC203126_NOT Closeout Documents_20240515 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 1628 Mail Service Center, Raleigh,NC 27699 (919) 791-4200
County: Johnston Project: Academy Pointe 1-2&5-9 River basin: Neuse
Person financially responsible:Academy Point,LLC-Reid Smith,Managing Project#: JOHNS-2021-001
Member
Address: 114 W Main St Ste 102,Clayton,NC 27520
1. Project Location: Rosemary Street,Clayton
Pictures: No
2. Weather and soil conditions: Sunny,dry,workable Initial inspection: No
3. Is site currently under notice of violation? Yes
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): Title:
Inspection report: Sent Report Date given/sent: June 05,2023
9. Corrective action needed:
10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional
self-monitoring or self-inspections are required.Project is in compliance and released under
the SPCA.Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities(NCG01)must be requested by the permittee via a Notice of
Termination(NOT).The NOT is available at:
https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence
must be uploaded as part of completing the NOT process.
Reported by: Lauren Garcia Others present:
Date of inspection: June 02,2023 Time arriving on site: 4:00 PM Time leaving site: 4:20 PM
cc: