HomeMy WebLinkAbout20221170 Ver 2_More Info Received_20240514From: Steve Trowell
To: Meilinaer, Michael J
Cc: tnash(obcrowderusa.com; Hair, Sarah E SAW <Sarah. E. Hair(ausace.army. mil> (Sarah.E.Hair(obusace.army.mil);
Bodnar, Greaa
Subject: [External] Re: Morris Landing at Little Point LLC DWR#2022170v2, SAW-2022-02179, PA-1191
Date: Tuesday, May 14, 2024 8:26:09 PM
Attachments: mage001.g_ng
You don't often get email from stevejtrowell@gmail.com. Learn why this is im op rtant
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the
Report Message button located on your Outlook menu bar on the Home tab.
Mike:
The modification of the existing Major CAMA/Dredge and Fill permit and associated Corps
RGP 291 and DWR 401 GC was for the excavation of an upland basin for the construction of
a boat ramp. The maintenance excavation was already permitted (0.56 acres). The location of
the proposed boat ramp necessitated the relocation of the permitted bulkhead alignment in a
landward direction, reducing the open water filling from the permitted bulkhead and
increasing the open water excavation equally. The open water filling for the bulkhead was
reduced from 1,004 ft2 to 298 fe. The ten slip pier and the associated impacts were already
permitted. Shifting the bulkhead alignment allowed the reorientation of two slips that were
"side to" the bulkhead so that the lifts were outside the federal project. When the bulkhead
was shifted landward, the orientation of the two slips changed to perpendicular.
I hope this helps you to determine the "new" impacts resulting from this modification.
Steve Trowell
(252) 402-4015
On Tue, May 14, 2024 at 11:45 AM Meilinger, Michael J <Michael.Meilingern.deq.nc.gov>
wrote:
I wanted to confirm the new impacts for this project, could you please let us know if any
impacts that are listed below are not correct.
Open Water Impacts
Boat Basin and channel access — Approximately 0.56 acres maintenance
excavation, final depth of -4 Mean Low Water
Fill for bulkhead - Approximately 0.007 acres (298 sq.ft.)
Docking Facility incorporation — 0.098 acres (4,270 sq.ft.)
Addition of 15'x20' boat ramp, construction methodology submitted on April 29,
2024.
Docking facility of 10 slips with boat lifts.
i If you have any additional questions, please feel free to contact me.
Michael Meilinger
Environmental Specialist II
NC DEQ DWR Wilmington Regional Office
Office Phone: 910-796-7341
NORTH CAROLINA
Department of Environmental Quality
Email correspondence to and from this address is subject to the North
Carolina Public Records Law and may be disclosed to third parties.
Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to
third parties by an authorized state official.