Loading...
HomeMy WebLinkAbout20240697 Ver 1_Site Plan_20240517Z43 1 j37 H r e y S? A 1 silt coo con wirj, 9t, W-- ljia to SAWN Bmwmw PD (a w 'ARV11w) Z �Lt M. .Affl—j­ 1, HOT gas; T p too 2 1.cf py; age Al -�p PEI tyo R) 10"a rr wvv .Lab�a �C" age %Jid 4j rip qv 4. ge , g) wmw Ful p a Se FIMI waner gbsuco C 'CUL �L �h w UN lid tualla., PAU,) Th(% FLq Luc go. Mcess u In tyo R) 10"a rr wvv .Lab�a �C" age %Jid 4j rip qv 4. ge , g) wmw Ful p a Se FIMI waner gbsuco C 'CUL �L �h w UN lid tualla., PAU,) Th(% FLq Luc go. Mcess u In SUFFER NOTIFICATION FORM Pr®]ect Name/address.Is— Owner; Print C0ntractur/aRen`. Print ` rTi, -PLC.Signature The approval is for the purpose and design den your application. Impacts not indicated in the application is a violation of the Buffer Rule. Site specific work should be provided in the application. [15A NCAC 02- I .0506 allid 13A NCAC 02B .0243(8)] Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full pond elevation), unless approved. Exception, tihose trees that are severely undermined along the immediate shoreline can be removed. fvlinirnal shaping ai;u sloping along the immediate shoreline is allowed. [15A NCAC 02B .0243(6)] Benching, grading in the buffer is not allowed. Excessive disturbance of ground cover. [15A NCAC 02B .0243 (6)] ueaches, impervious patios, impervious walkways, etc. are not allowed in the buffer unless specifically approved by the Division. `ihcrc are limitation on size for decks. [15A NCAC 02B .0243(4) and (6)] v"Vork to be conducted from land must indicate an access and indicate any trees that are to be removed. The wort: corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction sr,aterial must be outside the buffer. [15A NCAC 02H .0502 and 15A NCAC 02B .0243 (4), (6), (8)] Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater discharges must ire ac the natural elevation and discharged prior to entering the buffer directed as diffuse or S;17rct flow az non -erosive velocities to the lake. [15A NCAC 02B .0243(5), (6)] i a'ifd1v@#Jje( ' �s, jep- 0y' 1V9 Ac(31i7od8 ---- �� W hereby state that I have been informed of the Catawba L,:E. „ oy work conducted in the buffer, not specifically stated in the application and approved by the Division of Vvaer Resources R is a violation and subject to enforcement. Due diligence will be �r;ruetior, ill be bu It within substantial compliance and intent of the 401 Water Quality Certification and Buffer ules, the approved plan(s) an pecification(s), and other supporting materials. ��- r;�1W