Loading...
HomeMy WebLinkAbout310136_Application_20240313State of North Carolina Department of Environmental Quality Division of Water Resources Animal Waste Management Systems Request for Certification of Coverage Facility Currently covered by an Expiring Sate Non -Discharge General Permit On September 30, 2024, the North Carolina State Non -Discharge General Permits for Animal Waste Management Systems will expire. As required by these permits, facilities that have been issued Certificates of Coverage to operate under these State Non -Discharge General Permits must apply for renewal at least 180 days prior to their expiration date. Therefore, all applications must be received by the Division of Water Resources by no later than April 3, 2024. Please do not leave any question unanswered. Please verify all information and make any necessary corrections below. Application must be signed and dated by the Permittee. 1. Certificate Of Coverage Number: AWS310136 2. Facility Name: Pig Patch, LLC 3. Permittee's Name (same as on the Waste Management Plan): Westly Dail 4. Permittee's Mailing Address: 805 E NC 24 Hwy City: Kenansville State: NC Telephone Number: 910-290-0304 Ext. E-mail: 5. Facility's Physical Address: 120 Bill McKay Farm Ln City: Kenansville State: NC 6. County where Facility is located: Duplin 7, Farm Manager's Name (if different from Landowner): 8. Farm Manager's telephone number (include area code): 9. Integrator's Name (if there is not an Integrator, write "None"): Murphy -Brown LLC 10. Operator Name (OIC): John D. Garner Phone No.: 910-381-0292 11. Lessee's Name (if there is not a Lessee, write "None"): 12. Indicate animal operation type and number: Current Permit: Operations Type Allowable Count Swine - Feeder to Finish 3,672 Operation Tyves: Swine Cattle Dry Poultry Wean to Finish Dairy Calf Non Laying Chickens Wean to Feeder Dairy Heifer Laying Chickens Farrow to Finish Milk Cow Pullets Feeder to Finish Dry Cow Turkeys Farrow to Wean Beef Stocker Calf Turkey Pullet Farrow to Feeder Beef Feeder Boar/Stud Beef Broad Cow Wet Poultry Gilts Other Non Laying Pullet Other Layers Zip: 28349 Zip: 28349 OIC #: 17203 Other Types Horses - Horses Horses - Other Sheep- Sheep Sheep - Other 13, Waste Treatment Lagoons, Digesters and Waste Storage Ponds (WSP): (Fill/Verify the following information. Make all necessary corrections and provide missing data.) Structure Name Structure Type (Lagoon/Digester/ WSP) Estimated Date Built Liner Type (Clay, Synthetic, Unknown) Capacity (Cubic Feet) Estimated Surface Area (Square Feet) Design Freeboard "Redline" (Inches) LAGOON #1 Lagoon 10/1/1989 Full, clay 499,200.00 57,064.00 19.00 Submit one (1) copy of the Certified Animal Waste Management Plan (CAWMP) with this completed and signed application as required by NC General Statutes 143-215.14C(d), either by mailing to the address below or sending it via email to the email address below. The CAWMP must include the following components: 1. The most recent Waste Utilization Plan (WUP), signed by the owner and a certified technical specialist, containing: a. The method by which waste is applied to the disposal fields (e.g. irrigation, injection, etc.) b. A map of every field used for land application (for example: irrigation map) c. The soil series present on every land application field d. The crops grown on every land application field e. The Realistic Yield Expectation (RYE) for every crop shown in the WUP f. The maximum PAN to be applied to every land application field g. The waste application windows for every crop utilized in the WUP h. The required NRCS Standard specifications 2. A site map/schematic 3. Emergency Action Plan 4. Insect Control Checklist with chosen best management practices noted 5.Odor Control Checklist with chosen best management practices noted 6. Mortality Control Checklist with selected method noted - Use the enclosed updated Mortality Control Checklist 7. Lagoon/storage pond capacity documentation (design, calculations, etc.) Please be sure the above table is accurate and complete. Also provide any site evaluations, wetland determinations, or hazard classifications that may be applicable to your facility. 8. Operation and Maintenance Plan If your CAWMP includes any components not shown on this list, please include the additional components with your submittal. (e.g. composting, digesters, solids separators, sludge drying system, waste transfers, etc.) I attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that, if all required parts of this application are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. Note: In accordance with NC General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application may be subject to civil penalties up to $25,000 per violation. (18 U.S.C. Section 1001 provides a punishment by a fine of not more than $10,000 or imprisonment of not more than 5 years, or both for a similar offense.) Print the Name of the Permittee/Landowner/Signing Official and Sign below. (If multiple Landowners exist, all landowners should sign. If Landowner is a corporation, signature should be by a principal executive officer of the corporation): Name (Print): yt!/$,,ts�� �! � Title: Signature: i✓�iil"'� "''C/� Date: ju/�to Name (Print): Title: Signature: Date: Name (Print): Title: Signature: Date: THE COMPLETED APPLICATION SHOULD BE SENT TO THE FOLLOWING ADDRESS: E-mail: animal.operations@deq.nc.gov NCDEQ-DWR Animal Feeding Operations Program 1636 Mail Service Center Raleigh, North Carolina 27699-1636 Nutrient Management Plan For Animal Waste Utilization This plan has been prepared for: Pig Patch, LLC (31-136) Westley Dail 805 E NC 24 Highway Kenansville, NC 28349 (910) 290-0304 04-03-2023 This plan has been developed by: Ronnie G. Kennedy Jr. Agriment Services, Inc. PO Box 1096 Beulaville, NC 28518 252-5 -' eveloper Signature Type of Plan: .Nitrogen Only with Manure Only Owner/Manager/Producer Agreement I (we) understand and agree to the specifications and the operation and maintenance procedures established in this nutrient management plan which includes an animal waste utilization plan for the farm named above. I have read and understand the Required Specifications concerning animal waste management that are included with this plan. Signature (owner) Signature (manager or producer) Date This plan meets the minimum standards and specifications of the U.S. Department of Agriculture - Natural Resources Conservation Service or the standard of practices adopted by the Soil and Water Conservation Commission. Plan Approved By: finical Specialist Signature Date 711587 Database Version 4.1 Date Printed: 04-03-2023 Cover Page 1 Nutrients applied in accordance with this plan will be supplied from the following source(s): Commercial Fertilizer is not included in this plan. S7 Swine Feeder -Finish Lagoon Liquid waste generated 3,403,944 gals/year by a 3,672 animal Swine Finishing Lagoon Liquid operation. This production facility has waste storage capacities of approximately 180 days. Estimated Pounds of Plant Available Nitrogen Generated per Year Broadcast 6136 Incorporated 7363 Injected 7363 Irrigated 6136 Max. Avail. PAN (lbs)* Actual PAN Applied (lbs) PAN Surplus/ Deltcit (lbs) Actual Volume Applied (Gallons) Volume Surplus/ Deficit (Gallons) Year 1 6,136 8522 -2,386 4,728,093 -1,324,149 Year 2 6,136 9859 -3,723 5,469,779 -2,065,835 Note: In source ID, S means standard source, U means user defined source. * Max. Available PAN is calculated on the basis of the actual application method(s) identified in the plan for this source. 711587 Database Version 4.1 Date Printed: 04-03-2023 Source Page 1 of I Narrative 4/3/2023 This plan changes pivot crop to corn/wheat/soybeans and adds Tract 4216 Field 2 to be applied by honey wangon tanks or aerway if needed. Tract 4216 Field 2 is owned by grower. 30lbs PAN may be applied to small grain cover crop after removal of soybeans and before planning corn. Thus, the corn crop would need its PAN reduced by any waste applications that accrued on previous cover crop. If no applications accrue on cover crop, reduction is not required. Small Grain cover crop application window will be Sept. to March. 711587 Database Version 4.1 Date Printed: 04-03-2023 Narrative Page 1 of 1 The table shown below provides a summary of the crops or rotations included in this plan for each field. Realistic Yield estimates are also provided for each crop in the plan. In addition, the Leaching Index for each field is shown, where available. Planned Crops Summary Tract Field Total Acres Useable Acres Leaching Index (LI) Soil Series Crop Sequence RYE 4216 2 24.83 24.00 N/A Craven Com, Grain 115 bu. Wheat, Grain 60 bu. Soybeans, Manured, Double Crop 34 bu. 4224 Pivot 15.9 15.90 N/A Craven Com, Grain 115 bu. Wheat, Grain 60 bu. Soybeans, Manured, Double Crop 34 bu. 4224 Sub F1A 1.31 1.31 NIA Norfolk Small Grain Overseed 1.0 Tons Hybrid Bermudagrass Hay 6.5 Tons 4224 Sub F 1 B 2.27 2.27 N/A Norfolk Small Grain Overseed 1.0 Tons Hybrid Bermudagrass Hay 6.5 Tons 4224 Sub F2 6.20 6.20 NIA Craven Com, Grain 115 bu. Wheat, Grain 60 bu. Soybeans, Manwed, Double Crop 34 bu. PLAN TOTALS: 50.51 49.68 LI Potential Leaching Technical Guidance <2 Low potential to contribute to soluble None nutrient leading below the root zone. >= 2 a& Moderate potential to contribute to Nutrient Management (590) should be planned. <_ 10 soluble nutrient leaching below the root zone. High potential to contribute to soluble Nutrient Management (590) should be planned Other conservation practices that improve nutrient leaching below the root zone. the soils available water holding capacity and improve nutrient use efficiency should be > 10 considered. Examples are Cover Crops (340) to scavenge nutrients, Sod -Based Rotations (328), Long -Term No -Till (778), and edge -of -field practices such asFilter Strips (393) and Riparian Forest Buffers (391). 711587 Database version 4.1 Date Printed 4/3/2023 PCS Page 1 of 1 NOTE: Symbol * means user entered data. s. r. 0.- 0 4) C C r 0 fl E 0 0 ed 42 > 0 CL, E -0 4. >1 o 3- t cd 4- C :3 to 0 42 0 9 0 V 0 .0 0 L) 0 0 19 o o •ct• 0- b o 0 bo 0 w N 0 &. 4. Q o CL cr. 7R 9 F. =S 4� O) r-- +0 5 0 t ba > E H4) cc T -Z t. as 70 2A s 0 a 0 0 a 0 0 Q Q CD "a CL C: LO to t- C.ern 00 ea CD a, ON Ch In W) �o CD CD� ::� C� ::! C� CD �o C> C rz c C q CD q CD 0 .0 (D CD R C) R C= R R CP g "R A� C'I' 'In Cc! �6 16 %0 In 'n 0% in Ch 4 v� C14 N b a ob 4 ob b to 40 Ao ob E E t E CD C. z CI CD CD CD 10 C, CD, GCIi Z < z 13 g M.r C4 en C, 1>91 1>01 V 10 > C, o Si g 10 %0 c cn a 0 0 0 L) u z Z I z ul C11 wr- o 0 Gn 0 0 w 44 lu U. LL lu CA C4 w eq f4 1w 00 M a, IT 4= 0 408 Go r- rn h fn eq r- C, eq %0 w 10 ww ci z =1 O 0 O O O O 4> 0 z < C4 t4 CD, CD .0 en u O. e -2 O a q 0 C� 0 - v Nr C4 wl 10 10 �o %0 In zo 0 z z z I u I u ❑ cn co Qn w on 4n En Cq LU co C4 to co cn V 2 41 E as CV N O O yVJ O i5 z 11 The Irrigation Application Factors for each field in this plan are shown in the following table. Infiltration rate varies with soils. If applying waste nutrients through an irrigation system, you must apply at a rate that will not result in runoff. This table provides the maximum application rate per hour that may be applied to each field selected to receive wastewater. It also lists the maximum application amount that each field may receive in any one application event. Irrigation Application Factors Tract Field Soil Series Application Rate (inchesthour) Application Amount (inches) 4216 2 Craven 0.40 1.0 4224 Pivot Craven 0.40 1.0 4224 Sub F I A Norfolk 0.50 1.0 4224 Sub FIB Norfolk 0.50 1.0 4224 Sub F2 Craven 0.40 1.0 711587 Database Version 4.1 Date Printed 4/3/2023 1AF Page 1 of l The following Lagoon Sludge Nitrogen Utilization table provides an estimate ofthe number of acres needed for sludge utilization for the indicated accumulation period. These estimates are based on average nitrogen concentrations for each source, the number of animals in the facility and the plant available nitrogen application rates shown in the second column. Lagoon sludge contains nutrients and organic matter remaining after treatment and application of the effluent. At clean out, this material must be utilized for crop production and applied at agronomic rates. In mast cases, the priority nutrient is nitrogen but other nutrients including phosphorous, copper and zinc can also be limiting. Since nutrient levels are generally very high, application of sludge must be carefully applied. Sites must first be evaluated for their suitability for sludge application. Ideally, effluent spray fields should not be used for sludge application. If this is not possible, care should betaken not to load effluent application fields with high amounts of copper and zinc so that additional effluent cannot be applied. On sites vulnerable to surface water moving to streams and lakes, phosphorous is a concern. Soils containing very high phosphorous levels may also be a concern. Lagoon Sludge Nitrogen Utilization Table Crop Maximum PA-N Rate lbtac Maximum Sludge Application Rate 1000 gal/ac Minimum Acres 5 Years Accumulation Minimum Acres 10 Years Accumulation Minimum Acres 15 Years Accumulation Swine Feeder -Finish Lagoon Sludge - Standard Corn 120 bu 150 14.69 41.25 82.50 123.75 Hay 6 ton R.Y.E. 300 29.38 20.62 41.25 61.87 Soybean 40 bu 160 15.67 38.67 77.34 116.01 11 711587 Database Version 4.1 Date Printed: 04-03-2023 Sludge Page 1 of 1 The Available Waste Storage Capacity table provides an estimate ofthe number of days of storage capacity available at the end of each month of the plan. Available storage capacity is calculated as the design storage capacity in days minus the number of days of net storage volume accumulated. The start date is a value entered by the user and is defined as the date prior to applying nutrients to the first crop in the plan at which storage volume in the lagoon or holding pond is equal to zero. Available storage capacity should be greater than or equal to zero and less than or equal to the design storage capacity of the facility. Ifthe available storage capacity is greater than the design storage capacity, this indicates that the plan calls for the application of nutrients that have not yet accumulated. Ifavailable storage capacity is negative, the estimated volume of accumulated waste exceeds the design storage volume of the structure. Either of these situations indicates that the planned application interval in the waste utilization plan is inconsistent with the structure's temporary storage capacity. Available Waste 19torace f'.anacity Source Name I Swine Feeder -Finish Lagoon Liquid Design Storage Capacity (Days) Start Date 9/1 180 Plan Year Month Available Storage Capacity (Days) 1 1 35 1 2 65 1 3 98 1 4 133 1 5 167 1 6 I80 1 7 158 1 8 136 1 9 143 1 10 144 1 11 147 1 12 179 2 1 180 2 2 18o 2 3 180 2 4 180 2 5 180 2 6 180 2 7 I80 2 8 180 2 9 180 2 10 151 2 11 123 2 12 94 * Available Storage Capacity is calculated as of the end of each month. 711587 Database Version 4.1 Date Printed: 04-03-2023 Capacity Page I of I Required Specifications For Animal Waste Management 1. Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste that reaches surface water is prohibited. 2. There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of the waste, he/she shall provide evidence of an agreement with a landowner, who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the waste production facility to secure an update of the Nutrient Management Plan when there is a change in the operation, increase in the number of animals, method of application, receiving crop type, or available land. 3. Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based upon soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of applications for other nutrients. 4. Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land eroding at more than 5 tons per acre per year but less than 10 tons per acre per year provided grass fitter strips are installed where runoff leaves the field (see USDA, MRCS Field Office Technical Guide Standard 393 - Filter Strips). 5. Odors can be reduced by injecting the waste or by disking after waste application. Waste should not be applied when there is danger of drift from the land application field. 6. When animal waste is to be applied on acres subject to flooding, waste will be soil incorporated on conventionally tilled cropland. When waste is applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding (see "Weather and Climate in North Carolinas' for guidance). 711587 Database Version 4.1 Date Printed: 4/3/2023 Specification Page I 7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor and flies. 8. Animal waste shall not be applied to saturated soils, during rainfall events, or when the soil surface is frozen. 9. Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. 10. Nutrients from waste shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste/nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11. Any new swine facility sited on or after October 1,1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and canal. Animal waste, other than swine waste from facilities sited on or after October 1,1995, shall not be applied closer that 25 feet to perennial waters. 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14. Waste shall be applied in a manner not to reach other property and public right-of-ways. 711587 Database Version 4.1 Date Printed: 413l2023 Specification Page 2 15. Animal waste shall not be discharged into surface waters, drainageways, or wetlands by a discharge or by over -spraying. Animal waste may be applied to prior converted cropland provided the fields have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharge directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 17. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage, or discharge. 18. If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution, and erosion. 19. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be kept on site. 20. Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption, it should only be applied pre -plant with no further applications of animal waste during the crop season. 21. Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. 711587 Database Version 4.1 Date Printed: 4/3/2023 Specification Page 3 22. Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate -determining nutrient, unless other restrictions require waste to be applied based on other nutrients, resulting in a lower application rate than a nitrogen based rate. Zinc and copper levels in the soils shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted and maintained for optimum crop production. Soil and waste analysis records shall be kept for a minimum of five years. Poultry dry waste application records shall be maintained for a minimum of three years. Waste application records for all other waste shall be maintained for five (5) years. 23. Dead animals will be disposed of in a manner that meets North Carolina regulations. 711587 Database Version 4.1 Date Printed: 4/3/2023 Specification Page 4 Crop Notes The following crop note applies to field(s): 2, Pivot, Sub F2 Corn l: CP, Mineral Soil, low -leachable In the Coastal Plain, corn is normally planted when soil temperatures reach 52 to 55 degrees fahrenheit. Review the Official Variety "green book" and information from private companies to select a high yielding variety with the characteristics needed for your area and conditions. Plant 1-2" deep. Plant populations should be determined by the hybrid being planted. Increase the seeding rate by 10% when planting no -till. Phosphorus and potassium recommended by a soil test can be broadcast or banded at planting. When planting early in cool, wet soil, banded phosphorus will be more available to the young plants. An accepted practice is to apply 20-30 lbs/acre N and 20-30 lbs/acre phosphorus banded as a starter and one-half the remaining N behind the planter. The rest of the N should be applied about 30-40 days after emergence. The total amount of N is dependent on soil type. When including a starter in the fertilizer program, the recommended potassium and any additional phosphorus is normally broadcast at planting. Plant samples can be analyzed during the growing season to monitor the overall nutrient status of the corn. Timely management of weeds and insects are essential for corn production. The following crop note applies to field(s): Sub F1A, Sub FI B Bermudagrass Coastal Plain, Mineral Soil, Moderately Well Drained. Adaptation: Well -adapted. In the Coastal Plain, hybrid bermudagrass sprigs can be planted Mar. 1 to Mar. 31. Cover sprigs I" to 3" deep (1.5" optimal). Sprigs should be planted quickly after digging and not allowed to dry in sun and wind. For Coastal and Tifton 78 plant at least 10 bu/ac in 3' rows, spaced 2' to 3' in the row. Generally a rate of 30 bu/ac is satisfactory to produce full groundcover in one or two years under good growing conditions. Tifton 44 spreads slowly, so use at least 40 bu/ac in 1.5' to 2' rows spaced V to 1.5' in row. For broadcast/disked-in sprigs use about 60 bu/ac. Soil test for the amounts of lime, phosphorus, potassium and micronutrients to apply preplant and for annual maintenance. Apply 60 to 100 Ib/ac N in the establishment year in split applications in April and July. For established stands apply 180 to 240 lb/ac N annually in split applications, usually in April and following the first and second hay cuts. Reduce N rates by 25% for grazing. Refer to NCSU Technical Bulletin 305 Production and Utilization of Pastures and Forages in North Carolina for more information or consult your regional agronomist or extension agent for assistance. 711587 Database Version 4.1 Date Printed: 04-03-2023 Crop Note Page 1 of 2 The following crop note applies to field(s): Sub FIA, Sub FIB Small Grain: CP, Mineral Soil, medium leachable In the Coastal Plain, oats and barley should be planted from October 15-October 30; and rye from October 15-November 20. For barley, plant 22 seed/drill row foot and increase the seeding rate by 5% for each week seeding is delayed beyond the optimum time. See the seeding rates table for applicable seeding rate modifications in the current NCSU "Small Grain Production Guide". Also, increase the initial seeding rate by at least 10% when planting no -till. Oats should be planted at 2 bushels/acre and rye at 1-1 1/2 bushels/acre. Plant all these small grains at 1-1 1/2" deep. Adequate depth control is essential. Review the NCSU Official Variety "green book" and information from private companies to select a high yielding variety with the characteristics needed for your area and conditions. Apply no more than 30 lbs/acre N at planting. Phosphorus and potash recommended by a soil test can also be applied at this time. The remaining N should be applied during the months of February -March. The following crop note applies to field(s): 2, Pivot, Sub F2 Wheat: Coastal Plain, Mineral Soil, low -leachable In the Coastal Plain, wheat should be planted from October 20-November 25. Plant 22 seed/drill row foot at 1-1 1/2" deep and increase the seeding rate by 5% for each week seeding is delayed beyond the optimum time. See the seeding rates table for applicable seeding rate modifications in the current NCSU "Small Grain Production Guide". Also, increase the initial seeding rate by at least 10% when planting no -till. Adequate depth control when planting the wheat is essential. Review the NCSU Official Variety "green book" and information from private companies to select a high yielding variety with the ,1111 characteristics needed for your area and conditions. Apply no more than 30 lbs/acre N at planting. Phosphorus and potash recommended by a soil test can also be applied at this time. The remaining N should be applied during the months of February -March. The total N is dependent on the soil type. Plant samples can be analyzed during the growing season to monitor the nutrient status of the wheat. Timely management of diseases, insects and weeds are essential for profitable wheat production. The following crop note applies to field(s): 2, Pivot, Sub F2 Double -Crop Soybeans, Coastal Plain: Mineral Soil, low -leachable Double -crop soybeans should be planted as early in June as possible with planting completed by July 4th. When no -tilling soybeans in small grain straw, it is essential to manage the straw to achieve adequate plant populations. Review the NCSU Official Variety "green book" and information from private companies to select a high yielding variety with the characteristics needed for your area and conditions. Plant 24 seed/row foot for 7-8" drills; 4-6 seed/row foot for 15" rows; 6-8 seed/row foot for 30" rows and 8-10 seed/row foot for 36" rows. Increase the seeding rate by at least 10% for no -till planting. Seeding depth should be 1-1 1/2" and adequate depth control is essential. Phosphorus and potash recommended for the soybeans can be applied to the wheat in the Fall. Soybeans produce their own nitrogen and are normally grown without additions of nitrogen. However, applications of 20-301bs/acre N are sometimes made at planting to promote early growth and vigor. Tissue samples can be analyzed during the growing season to monitor the overall nutrient status of the soybeans. Timely management of weeds and insects is essential for profitable double crop soybean production. 711587 Database Version 4.1 Date Printed: 04-03-2023 Crop Note Page 2 of 2 I N C\j 0 N Q ui T— LOo I I (D LJ I-- < n ^n T— C) n < Ci ca C4 Wil I I II Go V E m IL 0 N ry N m c6 C d m N 3 �� l] ¢ O Q C j Q T .. •c rV U cv c ` a0 L Ian E J f6 c .9 N O U O C O O d O 4- f0 �tI�nO1 a L C Q O ti N E x 0 E z q w U 2 m 0 p .>Im VI E m 9 i y I t`- Gi 0 d� 00 r# N N rl O O CD N N w N 0 >4 in O A Vi © H N 0: W rq ri 4-J {U N 0 4) t[i t[S r r-q A A 04 tt1 •r-I P Fl 44 0 o a tp O $4 O � rl 41 � v coo W O O 'b 4 O O 2 $4 a a' $4 a x i.i a C4 O Q cn C.U' N i R [m 4 V u O w o 0 QI oc +� tI ` E4 Nd o W I w 0. y 0 oi a oo vi o co I to M I S m to I r! to i y 0 O t7 � � W 13 FZ �. •C w W .. I 4 0 ,a b W � 94 14 *1 a H V rl 7 ti w J4 w w a At va +i MMrn N N a< Il rp rat y a a o �- =1 C5 00 t 0 .r G .. .. a.. o c a r Im *, H 1 W M fl+ S ix a.' 1 C! 14 j E+ a 0 oP li I C W u C a � U b�tg4M, ; a C4 4) M M N 4) y q c q N l^i j *� tIi S m $4 d 5 s1 ai y W t O 14 CO 4 f ? AA 41 01 t a tp 0 Y cn w y C6 vin YA FI 146 OrNi�r F. fps' z W F F Z �ZCL ++ M C. C O M to PC 34 Ix ps 4 O o a U m as 01 A, o IN > ? z a Z V q O e>4 o �r � o a a Si U e }. . p C y gin a to A. IV- iu 00 j 1 1 f i 1 I (r1 � f 1 C 1 1 G N t•+ �H o as =A�v w; i � �� � ►Q1+ i_ i v0i a a aW k 1 D 0 a= �u0toc4oil 1 N k � .i •.i � M 0 D O.'4 1 w07GI 11�CxC10•A N1434 1 to 916 r-1 0 E l c`oc4 ,l V A .t 1 m0uaC/ u ro ri eo •.+ 1 �aama� en -+ do ec N O cq I .,ara en as Q r3 ,. o V• 0-1 N N N N C O M OD O� Os N t0 N N N N 0 0' V? 4q 1 e7, o.r1 0 rdrenE vraer wo jj4juu*to , A ,Sprinkler Order No 11410090 Dealer Benchmark Bifts.&Irrig. Customer PIG PATCH, LLC Field Name Valley Standard Pivot 7000 Machine Setup Sorlulder Chart .'I Dist Spk Nozzle Color Spk Wear Drop Regulator No From No Size Model Pad Length Pivot (in) (ft) 1 5.3 Gauge 2 14.3 Plug 3 23.3 Plug Sprinkler ----------------------------------- : Nelson Rotator Assembly 4 32.3 1 16 Lavender TR3000 D4- Green 116 5 41.3 Plug 6 50.2 2 16 Lavender TR3000 D4- Green 124 7 59.2 Plug 8 68.2 3 17 Lavender/Gray TR3000 D4 - Green 130 9 77.2 plug 10 86.2 4 19 Gray/Turquoise TR3000 D4- Green 134 11 94.6 plug 12 103.0 5 21 Turq/Yellow TR3000 D4- Green 135 ("111 111.4 plug - . 119.9 6 23 Yellow/Red TR3000 D4-Green 134 15 128.9 Plug 16 137.9 7 25 Red/White TR3000 D4- Green 131 17 146.9 Plug 18 155.9 8 26 White TR3000 D4 - Green 126 19 164.8 Plug 20 173.8 9 28 Blue TR3000 D4 - Green 119 21 182.8 Plug Sprinkler : ------------------------ Nelson Spray ffi 22 191.8 10 29 Blue/Dark Brown PC - D3000 170 Blue 84 23 200.8 Plug 205.5 Tower Number : 1 Soan Lenath(ft) : 204.7 24 210.1 11 31 Dk Brown/Orange PC -D3000 170 Blue 84 25 219.1 Plug Sprinkler : ----------------------------------- Nelson Rotator Assembly 26 228.1 12 32 Orange TR3000 D4- Green 115 237.1 Plug 246.1 13 33 Orange/Dk Green TR3000 D4- Green 125 254.6 Plug 30 263.0 14 33 Orange/Dk Green TR3000 D4- Green 131 31 271.4 Plug 32 279.9 15 35 Dk Green/Purple TR3000 D4-Green 135 ka,ren t Order No 11410076 'Sprinkler Order No 11410080 Dealer Benchmark Bldgs. & Irrip, Customer PIG PATCH, LLC Field Name Aft, Valley Standard flyat 7090 Machine Setup Sprinkler Chart Dist Spk Nozzle Color Spk Wear Drop Regulator No From No Size Model Pad Length Pivot (in) (ft) 33 288.9 Plug 34 297.9 16 37 Purple/Black TR3000 D4 - Green 136 35 306.9 Plug 36 315.9 17 38 Black TR3000 D4- Green 134 37 324.3 Plug 38 332.8 18 38 Black TR3000 D4 - Green 131 39 341.2 Plug 40 349.7 19 40 Dk Turquoise TR3000 D4 - Green 124 41 358.7 Plug 42 367.7 20 41 Dk Turq/Mustard TR3000 D4 - Green 115 43 376.7 Plug Sprinkler: Nelson Spray ------------------------ 44 385.7 21 36 Purple PC - D3000 170 Blue 84 45 389.5 B.P, j!!- 1 Tower Number - 2 Span Lenathfftl : 184.6 394.6 22 32 Orange PC - D3000 170 Blue 84 am Sprinkler : Senninger Spray --------------------------- 47 398.2 23 is Dark Brown D lonal 399.2 Overhana Soan Lenath(ftl : 9.1 Sprinkler : Nelson Endgan ------------------------- 48 399.2 24 0.9 I SR100 Primary Fndgun Arc Settings: Forward Angle: 45 Reverse Angle: 95 ry Z I al i ua 3.3 W U h >n d m 0 z Ia E CA a Oi U to q a +o M 0 m Ci tV V" 0 !i is la W a N m m N a Ia M .-I M 0 M �'� r o o a► o $4 D N N M k I v Ili N ip t Ai o �N-i v w N N M N I W m m m 0i if Qt N N M Iq r» o +a n a v 0 m o m o a o 0 0 H o o 00 coo a M w p� 0 0 0 0 0 0 0 0 0 o a 0 o N a to a H o 0 o a o uq Ci uj o cq o N ui tV o r: fi't 0 C� w 0 v v M M N N rt H H H x N N a k u1 N M ep sr ui to a• w ca o M CO n CS lY v t0 iID r4 r4 H H H N N n M v x w M u 0 E p, E" Aa M N Ot N thI rNt .Mi rNi � 0D to 4i dpl rn m W 0} N M v Ili 1p t► a m O N 0 h 0 �� 0 0 0 O O O O O O ri e-1 ri ei N 0 m en +� o a o w e C 4J RC 0 V W a Cl Q. v O 0C H O w N O � v 2 o I" c v tO Ln a a .-4 .t l C C U J.i > x H °' w _ w � ! U. v o vt N lc o u 0 C vi W V 0 C U SSA re 0 o a 9 to cnuaM C0ti 0 or scOi sii Li OOv a ro44 � is ti a a 44 V u +Oi 01CL oatoiol sic�Dtl19 a AJ O�EG a.as4 o 11-100 u 0a 44 0v � tr ss +i m u 002 W W °� °.4 u so 3 c > Q 4FL NC aI w zs u mmvc »i u al +I uudo0 >iDuA, cC .c o ma� �y C arol Oi a°ioC o1ou� »i tl 0 O Aj ►"is'�u p, a 0 V a 0«4 a v 't a 14 HAi UC. a1 ro W ri U 7 0k jj u W C N 1 0 W w +1 0 C V o.+rou c01roA u 0e u ra V ix �+ 0 avin C o p u O E m P -4 .-I aato ma - arc Ou. o c" ?_0,r Aj 10 f E a0.+t' au .JOEaI� 14 ,q sa c .0 S M O ro n NG. 14 O Operator. -==================================>William McKay Dist. to nearest residence(other than owner): .,. ws (farrow to finish):====================> �,ws (farrow to feeder):====================> head (finishing only):======================> 3672 sows (farrow to wean):======================> head (wean to feeder):======================> Ave. Live Weight for other operations(lbs.):> Storage volume for sludge accum. (cu. ft.):=> Treatment Volume (min. 1 cu. ft.jlb.):======> 1.0 25 Year - 24 Flour Rainfall (in.):===========> 7.5 Rainfall in excess of evaporation (in.)=====> 7.0 Drainage area of buildings & lots (sq. ft.):> Volume of wash water (gallonsfday)==========> Temporary storage period (days):============> 135 Freeboard(ft.):____________________________> 1 Side slopes (inside lagoon):================> 2.4 Inside top length (ft.):____________________> 365 Inside top width {ft.):_____________________> 188.5 Top of dike elevation (ft.};==______________> 36.2 Bottom of lagoon elevation (ft.}:==_________> 21.8 Seasonal high water table(SHWT) elev.(ft.):=> Total required volume:=============> 669650 cu. ft. Actual design volume:==============>670749.55 cu. ft. Stop pumping el. (> or = to 0.0 ft SHWT> 32.5 (> or = to 27.8 ft Min) Required minimum treatment volume: 495720 cu. ft. Volume at stop pumping elevation: 501459 cu. ft. Start pumping elev..________________________> 34.5 Volume at start pumping elevation: 625068 cu. ft. ,.tual volume less 25yr-24hr rain: 627748 cu. ft. ;PE: Verify that temp. storage is adequate: Req. volume to be pumped:====> 130928 cu. ft. Actual volume to be pumped:==> 123610 cu. ft. ft. W ft. ft. 46 h,11 ly- NAME: Bill Mckay � : Kenansvi\|e, N. C. _ TYPE AND SIZE Topping Hogs ' OF OPERATION 2448 CLASS 111 DESIGNED BY Jjmmy Vinson DATE 10-1-87 APPROVED BY Jimmy Vinson DATE 10-1-87 PERMAMENT STORAGE 2448 Hogs x 135 |bs per hog- 1 Cu Ft per |b' 330480 Cu Ft TEMPORARY STORAGE 330480 |bs of animal x 1.35 cu. ft. of waste per day 80307 Cu Ft per 10vv .os of animal wt. x 180 days RAINFALL L�SS EVAPORATION 7" X 60300 sq. ft. surface area per 12"per ft 35175 Cu Ft RAINFALL - 25 YR. 1 DAY STORM 7.5" X '60300 sq. ft. of surface area per 12" per ft. 37688 Cu Ft *�^ TOTAL STORAGE NEEDED 483649 Cu Ft � ' 17913 Cu Yds TOTAL STORA6E AVAILABLE 499200 Cu Ft 18489 Cu Yds AMOUNT OF FILL DIKE ' 150333 Cu Ft PAD 143500 Cu Ft TOTAL --------- 293833 Cu Ft SETTLEMENT 10% 29383 Cu Ft TOTAL AMOUNT OF FILL --------- 323216 Cu Ft 11971 Cu Yds CUT TO FILL RATIO TOTAL EXCAVATION 428960 Cu Ft 15887 Cu Yds 1.3: 1 NAME: Bill Mckay �o� r DEPTH [AREA OF TOP + AREA OF BOTTOM * 4 X AREA OF MIDSECTION] VOLUME= --------- -------------------------------------------------- 6.0 27 DEPTH [ L X W + L X W + 4 X L X W ] VOLUME = --------- --------------------------------------6 27 - 12.0 [ 325 X 170 + 265 X 110 + 4 X 295 X 1401 VOLUME= --------- ------------------------------------------------- 6.0 27 12.0 [ 2496001 VOLUME = --------- -------- 6.0 27 499200.0 CU. FT. VOLUME = --------- 27.0 VOLUME = 18488.9 CU.YDS. 60300.0 sq.ft. . . � 483649.1 cu ft. needed SIDE SLOPES 2.5:1 NAME: Bill Mckay L_EDIN8 SPECIFICATIONS AREA TO BE SEEDED APPLY THE FOLLOWING USE THE SEED MIXTURE INDICATED (X) (X) ( ) ( ) ( > ( ) 4000 LBS. 8-8-8 FERTILIZER 8 TONS DOLOMITIC LIMESTONE 400 BALES SMALL GRAIN STRAW 200 LBS. FESCUE GRASS 140 LBS. OATS 200 LBS. BAHIA GRASS 16 LBS. WEEPING LOVE GRASS 48 LBS. HULLED BERMUDA GRASS 80 L8S' UNHULLED 8ERMUDA GRASS DIVERT ALL WATER TO A STABLE OUTLET � THE NEAREST RESIDENCE IS 15C_)0 FT. T.B.M. 50.0 ft. ELEVATION DESCRIPTION Top of bolt head of gate post NAME: Bi|| Mckay . f""ROXIMATE NITROGEN CONTENT THAT WILL BE PRODUCED PER YEAR NITROGEN (N) - 0.48 LBS PER 1000 LBS OF ANIMAL WT. X 365 DAYS (N) - 0.48 x 330480 x 365 __________________________________ 10O0 (N) -57900.096 LBS IT IS ESTIMATED THAT APPROXIMATELY 25 % OF THE NITROGEN WILL BE AVAILABLE FOR USE AS FERTILIZER THE FOLLOWING AMOUNT CAN BE APPLIED ON THE LAND 14475.024 LBS. IF APPLIED AT THE RATE OF 200 LBS PER ACRE ON CROPLAND ( 72.37512 ACRES WILL BE NEEDED TO TAKE CARE OF THE EFFLUENT. IF APPLIED AT THE RATE OF 400 LBS PER ACRE ON PASTURELAND (COASTA 36.18756 ACRES WILL BE NEEDED TO TAKE CARE OF THE EFFLUENT. BEFORE ANY EFFLUENT IS APPLIED TO THE LAND IT SHOULD BE ANALYZED DETERMINE THE EXACT NUTRIENT CONTENT. THE NCDA LABORATORY {w RALEI6H IS MAKING SOME TEST ON A LIMITED BASIS. YOU SHOULD CONTACT AGRONOMIC SERVICES DIVISION NCDA, BLUE RIDGE ROAD CENTER RALEI8H N.C. 27611 PHONE: 919-733-2655 WHEN APPLYING THE EFFLUENT TO CROPLAND IT SHOULD BE DISK AND A COVER CROP SEEDED OR A ROW CROP PLANTED TO PREVENT EROSION SOME OF THE EFFLUENT COULD BE USED FOR IRRIGATION PURPOSES DURING THE GROWING SEASON. 36 AC OF LAND AVAILABLE FOR APPLICATION OF EFFLUENT BEGIN PUMPING THE EFFLUENT WHEN ' THE FLUID LEVEL REACHES 33.0 ft. elev. ------------------------------ DO NOT LOWER THE FLUID ANY LOWER THAN 5.0 ft. ------------------------------ THE EFFLUENT SHOULD BE APPLIED AT A RATE THAT WILL NOT CAUSE ANY RUNOFF ONTO SURROUNDING AREAS OR LEACHING INTO THE GROUND WATER FIF-COMMENDED APPPLICATION RATE IS 0.5 INCHES PER HOUR AND THE �-{IMUM RECOMMENDED APPLICATION AMOUNT IS 1 INCH PER IRRGATION ` w w I I w q to Tj 77 -T -77 -7—:77- x =::Jand rz A - - - ----------- J - - - - z-1 E E L 77 7 ; r--f— N) nil ailMW a am now= MIME ax�mi Most �sump" MEMERE am 0 So i I Mw INS a ■Oaa an Am no OEM HER Ems an ME nwom M MAIN son" Runs H �s=00 NIN mass own" ..... RE.rIm Mason mem""Sman on magamunwas slam M WE an a as on HUNIM "won ENORMOUS a MUSHM" me MCI �ann� IN 111 0 ME on as a amazing MPRItu IM am" MEMO mum ME a ■ffla 010 0 mm�ml�l 0 RJR IN a a's 0 OR a as no 0 . I - slaloms "ON Inman a., Bill almoll �"""Malligam am minsenNnN a 8 wll/ am ME mom =180. a sommumn ERIC n a mass r a" BLOOM an RJR Im a lamp am oil 0 Sao m so 111IF3 a mm -1- t zr 01 �11 CO r M I ft) 4 11 1.6 J tr w¢� IM, \ y' .IZ44 2.6 Q}1. ,� - .a 41 Ia6 p 41 TO COMiM , U 13 912 4i 2s � LT2? '1 LTL a 1713 �- $ GrytK upQ}i ...6 p 1.8�` - � Pollen ` • d2, Cabin i 12l4 3ZS4 FU'tl i]I 1714 Srmh 171]24 w ��' ° t .9 - � IL42 it+ � NS1 �11 =•�� 1` A!1 a r ,y 7T7 � 1.9 fN 3Z91 lIS: {? t.t 111 ` 171� «1 l I719iuL JO 4r 1]M 3,4 ? 1727 S 741 ^S TN k •° .4C C 3 Aii: St'24. IN 70 ;, A fC 3 �•ss Sxf YLLLE 111s � c 24 l0 ' a •.@ 39 ,)AN I 720 9W Ir 24 73 --''A .'' S.Wr. n. i I. y3 �r0 6 7981 t ✓:1 B Hadley 1.5 A 1702 a � ` 8 '1 •6 A 177s r �s 1737 HalhPilte '{!ih. .1962 .�4 a 1802 i i� N 1433 01606 ! J J f 1� 1981 7 L�,Zpopfl 1721.6 1. �6 , tool ro 'lowF] low � leas r S Jr� 19 1 IP6a 196 7° _ t.l ,fI g JT 7 r IA _ d •8 `� $Jatack-. 1sW 4 .�11r 1407 n >493 '�- Q9inm SIo --1 1713 jQ57 � 192a N O �J h t.i le 2 ••p n 17 ISO? 2.3 i 1910 '4 •° till $ 19 ///13 h .6 1914 1e00 Cedar Fork. 18101 +SS - •�'� F"' y a Ive4 o:• x A teal 1s t• b 1.3 Cedar Fork 1•6 loll yy y\ i 1933 111 11102 C7Pek �' N Betiwl :J Z s2 T•T 0 S .7 A' Qw L an Y^t YlTI3 .ttl 1967 bba 15 , 1 '•] 9" 1402 \`� lelb ` I821 Fouaalntawn 2 I711 Mein ;.. ` to a '� 117 1.3 tots .-, exz 4 31' Js 2 11, .'a j;•�•,� GRff11EVER$ ielT J 1713 SD 4iN .9 w'170P. 4)7v:•~i_ 1.11Ii1QUa1i111 III let) .t I82. A)41 18]tY 'e•(1. n t814 .{ Isis ;K !J ,,\ I` 819 180t •�� b ' M ,''� �`rv� 1949 970 1'p J' let] 1.9 i 1.2 It's tit, .@ •--Is \ J , }'•� 1.t t713 �}: 1715 1825 FQ e,4, 'J d M 5 r 1947 ♦� rea/ }:.., lei t Creek 41 • J4 .J 1$20 r . Z 1827 1977 0 96ak b 2.t 181a r .4. t90 { 5 . 1.0 1?W. EP.S 3939 R1YER 1P '. .�. ti 1 -i • Q w � 2i y ti j l i wQ• 4 .( +`t�°T 1414.9 '6 lon 1 1626 r 1944 } 2.4 0 .4 1974 ..945 ,M1 3 o-19777 1909 jy2t fez] t3 v @• q im v 1E2Lt Pin Hook CYP- 197S 107 �-"�' ~A 1977 � -. 1024 y. N G O LA 8 r 7 yo�c tt • s� ; GAM E L A N dso - :.:. :.,:" KEY TO COUMY P It „ li O O_p C O U 9 N T Y A. R EMBEOM AWS310136 W System Calibration Information presented in manufacturers charts are based on average operation conditions with relatively new equipment. Discharge rates and application rates change over time as equipment gets older and components wear. In particular, pump wear tends to reduce operating pressure and flow. With continued use, nozzle wear results in an increase in the nozzle opening which will increase the discharge rate while decreasing the wetted diameter. You should be aware that operating the system differently than assumed in the design will alter the application rate, diameter of coverage, and subsequently the application uniformity. For example, operating the system with excessive pressure results in smaller droplets, greater potential for drift, and accelerates wear of the sprinkler nozzle. Clogging of nozzles can result in pressure increase. Plugged intakes or crystallization of mainlines will reduce operating pressure. Operating below design pressure greatly reduces the coverage diameter and application uniformity. For the above reason, you should calibrate your equipment on a regular basis to ensure proper application rates and uniformity. Calibration at least once every three years is recommended. Calibration involves collecting and measuring flow at several locations in the application area. Any number of containers can be used to collect flow and determine the application rate. Rain gauges work best because they already have a graduated scale from which to read the application amount without having to perform additional calculations. However, pans, plastic buckets, jars, or anything with a uniform opening and cross-section can be used provided the liquid collected can be easily transferred to a scaled container for measuring. For stationary sprinklers, collection containers should be located randomly throughout the application area at several distances from sprinklers. For traveling guns, sprinklers should be located along a transect perpendicular to the direction of pull. Set out collection containers 25 feet apart along the transect on both sides of the gun cart. You should compute the average application rate for all nonuniformity of the application. On a windless day, variation between containers of more than 30 percent is cause for concern. You should contact your irrigation dealer or technical specialist for assistance. `Reprinted for Certification Training for Operations of Animal Waste Management Systems Manual N AWS310136 OPERATION & MAINTENANCE PLAN Proper lagoon management should be a year-round priority. It is especially important to manage levels so that you do not have problems during extended rainy and wet periods. Maximum storage capacity should be available in the lagoon for periods when the receiving crop is dormant (such as wintertime for bermudagrass) or when there are extended rainy spells such as a thunderstorm season in the summertime. This means that at the first sign of plant growth in the later winter / early spring, irrigation according to a farm waste management plan should be done whenever the land in dry enough to receive lagoon liquid. This will make storage space available in the lagoon for future wet periods. In the late summer / early fall the lagoon should be pumped down to the low marker (see Figure 2-1) to allow for winter storage. Every effort should be made to maintain the lagoon close to the minimum liquid level as long as the weather and waste utilization plan will allow it. Waiting until the lagoon has reached its maximum storage capacity before starting to irrigated does not leave room for storing excess water during extended wet periods. Overflow from the lagoon for any reason except a 25-year, 24-hour storm is a violation of state law and subject to penalty action. The routine maintenance of a lagoon involves the following: • Maintenance of a vegetative cover for the dam. Fescue or common bermudagrass are the most common vegetative covers. The vegetation should be fertilized each year, if needed, to maintain a vigorous stand. The amount of fertilized applied should be based on a soils test, but in the event that it is not practical to obtain a soils test each year, the lagoon embankment and surrounding areas should be fertilized with 800 pounds per acre of 10-10-10, or equivalent. Brush and trees on the embankment must be controlled. This may be done by mowing, spraying, grazing, chopping, or a combination of these practices. This should be done at least once a year and possibly twice in years that weather conditions are favorable for heavy vegetative growth. NOTE: If vegetation is controlled by spraying, the herbicide must not be allowed to enter the lagoon water. Such chemicals could harm the bacteria in the lagoon that are treating the waste. Maintenance inspections of the entire lagoon should be made during the initial filling of the lagoon and at least monthly and after major rainfall and storm events. Items to be checked should include, as a minimum, the following: Waste Inlet Pipes, Recycling Pipes, and Overflow Pipes -- look for: 1. separation of joints 2. cracks or breaks 3. accumulation of salts or minerals 4. overall condition of pipes Lagoon surface ~~look for: 1. undesirable vegetative growth 2. floating Vrlodged debris Embankment --Umok for: 1. settlement, cracking, or"jug^holes 2. side slope stabi|hv—G|UnOpS or bulges 3. wet mrdamp areas mnthe back slope 4. erosion due Uolack orvegetation oraoaresult ufwave action 5. rodent damage Larger lagoons may be subject to liner damage due to wave aotkxl ouuemd by ainono winds. These waves can erode the lagoon sideVm3Us, thereby weakening the lagoon dam' Agmmd stand of vegetation will reduce the oot*nUm| donla8m caused by wave action' If wave action causes serious damage to a lagoon sidewall, baffles in the lagoon may beused toreduce the wave impacts. Any of these features could lead toerosion and weakening of the dam. Uyour lagoon has any ofthese features, you should call anappropriate expert familiar with design and construction of waste lagoons. You may need to provide m temporary fix if there is a threat ofGwaste discharge. HPweVe[, apermanent solution should bereviewed b»the technical expert. Any digging into m lagoon dam with heavy equipment is serious undertaking V����U�Uvmehouoconsequences and should not bamoOdu�ed unless recommended by an appropriate technical expert. � ~ potentially Transfer Pumps ~~ check for proper operation of: 1. recycling pumps 2. irrigation pumps Check for leaks, loose fittings, and overall pump operation. Amunusually loud mrgrinding noise, or a large amount of vibration, may indicate that the pump is in need of repair or NOTE: Pumping should be inspected and operated frequently enough so that you are not completely "surprised" bvequipment failure. You should perform your pumping system maintenance adatime when your lagoon in at its kovv level. This will allow some safety time should major repairs be required. Having o nearly full lagoon is not the time to think about avvtuhing, nmpeihng, or borrowing pumps. Probably, if your lagoon is full, your neighbors lagoon is full also. You should consider maintaining on inventory Vfspare parts orpumps. * Surface water diversion features are designed Uocarry all surface drainage waters (such as rainfall nuMoff, roof drainage, gutter outlets, and parking lot runoff) away from your lagoon and other waste treatment or storage structures. The only vvabmr that should be coming from your |m0uon is that which comes from your flushing (washing) system pipes and the rainfall that hits the |ggVnn directly. You should inspect your diversion system for the following: 1. adequate vegetation ` 2' diversion capacity 3' ridge berm height Pig Patch, LLC AWS310136 Identified problems should be corrected promptly. It is advisable to inspect your system during or immediately following a heavy rain. If technical assistance is needed to determine proper solutions, consult with appropriate experts. You should record the level of the lagoon just prior to when rain is predicted, and then record the level again 4 to 6 hours after the rain (assumes there is no pumping). This will give you an idea of how much your lagoon level will rise with a certain rainfall amount (you must also be recording your rainfall for this to work). Knowing this should help in planning irrigation applications and storage. If your lagoon rises excessively, you may have an overflow problem from a surface water diversion or there may be seepage into the lagoon from the surrounding land. Lagoon Operation Startup: 1. Immediately after construction establish a complete sod cover on bare soil surfaces to avoid erosion. 2. Fill new lagoon design treatment volume at least half full of water before waste loading begins, taking care not to erode lining or bank slopes. 3. Drainpipes into the lagoon should have a flexible pipe extender on the end of the pipe to discharge near the bottom of the lagoon during initial filling or another means of slowing the incoming water to avoid erosion of the lining. 4. When possible, begin loading new lagoons in the spring to maximize bacterial establishment (due to warmer weather). 5. It is recommended that a new lagoon be seeded with sludge from a healthy working swine lagoon in the amount of 0.25 percent of the full lagoon liquid volume. This seeding should occur at least two weeks prior to the addition of wastewater. 6. Maintain a periodic check on the lagoon liquid pH. If the pH falls below 7.0, add agricultural lime at the rate of 1 pound per 1000 cubic feet of lagoon liquid volume until the pH rises above 7.0. Optimum lagoon liquid pH is between 7.5 and 8.0. 7. A dark color, lack of bubbling, and excessive odor signals inadequate biological activity. Consultation with a technical specialist is recommended if these conditions occur for prolonged periods, especially during the warm season. Loading: The more frequently and regularly that wastewater is added to a lagoon, the better the lagoon will function. Flush systems that wash waste into the lagoon several times daily are optimum for treatment. Pit recharge systems, in which one or more buildings are drained and recharged each day, also work well. 4 r1, Pig Patch, LLC AWS310136 • Practice water conservation --- minimize building water usage and spillage from leaking waterers, broken pipes and washdown through proper maintenance and water conservation. • Minimize feed wastage and spillage by keeping feeders adjusted. This will reduce the amount of solids entering the lagoon. Management: • Maintain lagoon liquid level between the permanent storage level and the full temporary storage level. • Place visible markers or stakes on the lagoon bank to show the minimum liquid level and the maximum liquid level. (Figure 2-1). • Start irrigating at the earliest possible date in the spring based on nutrient requirements and soil moisture so that temporary storage will be maximized for the summer thunderstorm season. Similarly, irrigate in the late summer 1 early fall to provide maximum lagoon storage for the winter. • The lagoon liquid level should never be closer than 1 foot to the lowest point of the dam or embankment. • Don not pump the lagoon liquid level lower than the permanent storage level unless you are removing sludge. • Locate float pump intakes approximately 18 inches underneath the liquid surface and as far away from the drainpipe inlets as possible. • Prevent additions of bedding materials, long-stemmed forage or vegetation, molded feed, plastic syringes, or other foreign materials into the lagoon. • Frequently remove solids from catch basins at end of confinement houses or wherever they are installed. • Maintain strict vegetation, rodent, and varmint control near lagoon edges. • Do not allow trees or large bushes to grow on lagoon dam or embankment. • Remove sludge from the lagoon either when the sludge storage capacity is full or before it fills 50 percent of the permanent storage volume. • If animal production is to be terminated, the owner is responsible for obtaining and implementing a closure plan to eliminate the possibility of a pollutant discharge. Sludge Removal: Rate of lagoon sludge buildup can be reduced by: 5 AWS310136 • proper lagoon sizing, • mechanical solids separation of flushed waste, • gravity settling of flushed waste solids in an appropriately designed basin, or • minimizing feed wastage and spillage. Lagoon sludge that is removed annually rather than stored long term will: • have more nutrients, • have more odor, and • require more land to properly use the nutrients. Removal techniques: • Hire a custom applicator. • Mix the sludge and lagoon liquid with a chopper - agitator impeller pump through large - bore sprinkler irrigation system onto nearby cropland; and soil incorporate. • Dewater the upper part of lagoon by irrigation onto nearby cropland or forageland; mix remaining sludge; pump into liquid sludge applicator; haul and spread onto cropland or forageland; and soil incorporate. • Dewater the upper part of lagoon by irrigation onto nearby cropland or forageland; dredge sludge from lagoon with dragline or sludge barge; berm an area beside lagoon to receive the sludge so that liquids can drain back into lagoon; allow sludge to dewater; haul and spread with manure spreader onto cropland or forageland; and soil incorporate. Regardless of the method, you must have the sludge material analyzed for waste constituents just as you would your lagoon water. The sludge will contain different nutrient and metal values from the liquid. The application of the sludge to fields will be limited by these nutrients as well as any previous waste applications to that field and crop requirement. Waste application rates will be discussed in detail in Chapter 3. When removing sludge, you must also pay attention to the liner to prevent damage. Close attention by the pumper or drag -line operator will ensure that the lagoon liner remains intact. If you see soil material or the synthetic liner material being disturbed, you should stop the activity immediately and not resume until you are sure that the sludge can be removed without liner injury. If the liner is damaged it must be repaired as soon as possible. Sludge removed from the lagoon has a much higher phosphorus and heavy metal content than liquid. Because of this it should probably be applied to land with low phosphorus and metal levels, as indicated by a soil test, and incorporated to reduce the chance of erosion. Note that if the sludge is applied to fields with very high soil -test phosphors, it should be applied only at rates equal to the crop removal of phosphorus. As with other wastes, always have your lagoon sludge analyzed for its nutrient value. [�'��o ���"' | A �^ / ���� 4WS310136 The application mfsludge will increase the amount ofodor mdthe waste application site. Extra precaution should be used to observe the wind direction and other conditions which could increase the concern of neighbors. Possible Causes of Lagoon Failure Lagoon hai|un*e result in the unplanned discharge of wastewater from the structure. Types offailures include leakage through the bottom or sidas, uvertopph1g, and breach ofthe dam. Assuming proper design and construction, the owner has the responsibility for ensuring structure safety. Items which may lead to lagoon fai|Vnmo include: • Modification ofthe lagownotructure—anmxmmple is the placement ofapipe in the dam without proper design and construction. an expert in lagoon design before placing any pipes in dams.) ° Lagoon liquid levels — high levels are asafety risk. ° Failure toinspect and maintain the dam. ° Excess surface water flowing into the lagoon. � Liner integrity — protect from inlet pipe arouhn0, damage during sludge removo, or rupture from lowering lagoon liquid level below groundwater table. \ NOTE: If lagoon water is allowed to overtop the dam, the moving water will soon cause gullies to form in the dam. Once this damage starts, it :an quickly cause 8 large discharge ofwastewater and possible dam failure. W s DIVISION OF WATER QUALITY (DWQ) EMERGENCY MANAGEMENT SERVICES (EMS) SOIL AND WATER CONSERVATION DISTRICT (SWCD) NATURAL RESOURCES CONSERVATION SERVICE (NRCS) COOPERATIVE EXTENSION SERVICE (CES) AWS310136 (910) 796 - 7215 (910) 296 - 2160 (910) 296 - 2120 (910) 296 - 2121 (910) 296 - 2143 This plan will be implemented in the event that wastes from your operation are leaking, overflowing or running off site. You should not wait until wastes reach surface waters or leave your property to consider that you have a problem. You should make every effort to ensure that this does not happen. This plan should be posted in an accessible location for all employees at the facility. The following are some action items you should take. 1. Stop the release of wastes. Depending on the situation, this may or may not be possible. Suggested responses to some possible problems are listed below. A. Lagoon overflow - possible solutions are: a) Add soil to berm to increase elevation of dam. b) Pump wastes to fields at an acceptable rate. c) Stop all flow to the lagoon immediately. d) Call a pumping contractor. e) Make sure no surface water is entering lagoon. B. Runoff from waste application field -actions include: a) Immediately stop waste application. b) Create a temporary diversion to contain waste. c) Incorporate waste to reduce runoff. d) Evaluate and eliminate the reason(s) that cause the runoff. e) Evaluate the application rates for the fields where runoff occurred. C. Leakage from the waste pipes and sprinklers - action include: a) Stop recycle pump. b) Stop irrigation pump. c) Close valves to eliminate further discharge. d) Repair all leaks prior to restarting pumps. D. Leakage from flush systems, houses, solid separators - action include: a) Stop recycle pump. b) Stop irrigation pump. c) Make sure siphon occurs. d) Stop all flaw in the house, flush systems, or solid separators. E. Leakage from base or sidewall of lagoon. Often this is seepage as opposed to flowing leaks - possible action: a) Dig a small sump or ditch from the embankment to catch all seepage, put in a submersible b) pump, and pump back to lagoon. If holes are caused by burrowing animals, trap or remove animals and fill holes and compact with a clay type soil. Pig Patch, LLC AWS310136 c) Have a professional evaluate the condition of the side walls and the lagoon bottom as soon as possible. 2. Assess the extent of the spill and note any obvious damages. a. Did the waste reach surface waters? b. Approximately how much was released and for what duration? c. Any damage notes, such as employee injury, fish kills, or property damage? d. Did the spill leave the property? e. Does the spill have the potential to reach surface waters? f. Could a future rain event cause the spill to reach surface waters? g. Are potable water wells in danger (either on or off the property)? h. How much reached surface waters? 3. Contact appropriate agencies. a. During normal business hours call your DWQ regional office; Phone #, After hours, emergency number: (919) 733-3942. Your phone call should include: your name, facility number, telephone number, the details of the incident from item 2 above, the exact location of the facility, the location or direction of the movement of the spill, weather and wind conditions. The corrective measures that have been under taken, and the seriousness of the situation. b. If the spill leaves property or enters surface waters, call local EMS phone number. c. Instruct EMS to contact local Health Department. d. Contact CE's phone number, local SWCD office phone number and the local NRCS office for advice 1 technical assistance phone number. 4. If none of the above works call 911 or the Sheriffs Department and explain your problem to them and ask the person to contact the proper agencies for you. 5. Contact the contractor of your choice to begin repair or problem to minimize offsite damage. a. Contractors Name: Agriment Services, Inc. b. Contractors Address: Pa Box 1096, Beulaville, NC 28518 c. Contractors Phone: (252) 568-2648 6. Contact the technical specialist who certified the lagoon (NRCS, Consulting Engineer, etc.) a. Name: Geno Kennedy b. Phone: (910) 289-0395 7. Implement procedures as advised by DWQ and technical assistance agencies to rectify the damage, repair the system, and reassess the waste management plan to keep problems with release of wastes from happening again. va Pig Patch, LLC INSECT CONTROL CHECKLIST FOR ANIMAL OPERATIONS AWS310136 Source Cause BMP's to Minimize Odor Site Specific Practices (Liquid Systems) Flush Gutters Accumulation of solids (,/) Flush system is designed and operated sufficiently to remove accumulated solids from gutters as designed. (� Remove bridging of accumulated solids at discharge _ Lagoons and Pits Crusted Solids ( ) Maintain lagoons, settling basins and pits where pest breeding is apparent to minimize the crusting of solids to a depth of no more than 6-8 inches over more than 30% of surface. Excessive Decaying vegetation (V)Maintain vegetative control along banks of Vegetative Growth lagoons and other impoundment's to prevent accumulation of decaying vegetative matter along water's edge on impoundment's perimeter. (Dry Systems) Feeders Feed Spillage (} Design, operate and maintain feed systems (e.g.. bunkers and troughs) to minimize the accumulation of decaying wastage. { } Clean up spillage on a routine basis (e.g. 7-10 day interval during summer; 15-30 day interval during winter). Feed Storage Accumulation of feed { } Reduce moisture accumulation within and around residues immediate perimeter of feed storage areas by insuring drainage away from site and/or providing adequate containment (e.g., covered bin for brewer's grain and similar high moisture grain products). () Inspect for and remove or break up accumulated solids in filter strips around feed storage as needed. Animal Holding Accumulation of animal { } Eliminate low area that trap moisture along fences Areas wastes and feed wastage and other locations where waste accumulates and disturbance by animals is minimal. (} Maintain fence rows and filter strips around animal holding areas to minimize accumulations of wastes (i.e. inspect for and remove or break up accumulated solids as needed). MIC — November 11. 1996 10 Dry Manure Handling Accumulations of animal {) Remove spillage on a routine basis (e.g. 7-10 day Systems wastes interval during summer; 15-30 days interval during winter) where manure is loaded for land application or disposal. {) Provide for adequate drainage around manure stockpiles {) Inspect for and remove or break up accumulated wastes in filter strips around stockpiles and manure handling areas as needed. The issues checked (4 pertain to this operation. The landowner / integrator agrees to use sound judgment in applying insect control measures as practical. 1 certify the aforementioned insect control Best Management Practices have been reviewed with me. (Landowner Signature) For more information contact the Cooperative Extension Service, Department of Entomology, Box 7613, North Carolina State University, Raleigh, NC 27695-7613. AMIC — November 11, 1996 11 Pig Patch, LLC AWS310136 SWINE FARM WASTE MANAGEMENT ODOR CONTROL CHECKLIST Source Cause BMP's to Minimize Odor Site Specific Practices _ Farmstead Swine production (,/)Vegetative or wooded buffers: (.,/)Recommended best management practices; (Y/)Good judgment and common sense Animal body Dirty manure ( Dry floors surfaces covered animals Floor surfaces Wet manure -covered (,/)Slotted floors; floors (;/)Waterers located over slotted floors; ( )Feeders at high end of solid floors; (,/ Scrape manure buildup from floors; (f )Underfloor ventilation for drying Manure collection Urine (,()Frequent manure removal by flush, pit pits recharge or scrape Partial microbial (vlUnderfloorventilation decomposition Ventilation Volatile gases (,()Fan maintenance; exhaust fans Dust (,/)Efficient air movement Indoor surfaces Dust (,()Washdown between groups of animals ( )Feed additives; ( )Feeder covers; ( )Feed delivery downspout extenders to feeder covers Flush Tanks Agitation of recycled ( )Flush tank covers lagoon liquid while tanks { )Extend fill lines to near bottom of tanks are filling with anti -siphon vents Flush alleys Agitation during waste ( )Underfloor flush with underfloor water conveyance ventilation Pit recharge Agitation of recycled ( )Extend recharge lines to near bottom of points lagoon liquid while pits pits with anti -siphon vents are filling Lift stations Agitation during sump ( )Sump tank covers tank filling and drawdown Outside drain Agitation during waste ( )Box Covers collection or water conveyance junction boxes End of drain Agitation during waste ( )Extend discharge point of pipes pipes at lagoon water underneath lagoon liquid level Lagoon surfaces Volatile gas emissions (,/)Proper lagoon liquid capacity Biological mixing (,/)Correct lagoon startup procedures Agitation (,/)Minimum surface area -to -volume ratio (✓)Minimum agitation when pumping f )Mechanical aeration Irrigation sprinkler High pressure agitation (,/)Irrigate on dry days with little or no wind nozzles Wind draft (,()Minimum recommended operation pressure (,()Pump intake near lagoon liquid surface ( )Pump from second -stage lagoon AMOC — November 11, 1996 12 Storage tank or Partial microbial basin surface decomposition Mixing while filling Agitation when emptying( )Bottom or midlevel loading )Tank covers )Basin surface mats of solids )Proven biological additives or oxidants AWS310136 Settling basin Partial microbial decom- ( )Extend drainpipe outlets underneath liquid surface position Mixing while filling level Agitation when emptying ( )Remove settled solids regularly Manure, slurry or Agitation when spreading ( )Soil injection of slurry/sludges sludge spreader Volatile gas emissions ( )Wash residual manure from spreader after use outlets ( )Proven biological additives or oxidants Dead animals Carcass decomposition (,!)Proper disposition of carcasses Dead animal Carcass decomposition ( )Complete covering of carcasses in burial pits disposal pits ( )Proper location t construction of disposal pits Incinerators Incomplete combustion ( )Secondary stack burners Standing water improper drainage (,/)Farm access road around facilities maintenance Microbial decomposition of away from taij%Wzmatter _ Manure tracked Poorly maintained access (,!)Farm access road maintenance onto public roads roads from farm access Additional Information: Available From: Swine Manure Management 0200 Rule / BMP Packet NCSU-County Extension Center Swine Production Farm Potential Odor Sources and Remedies, EBAE Fact Sheet NCSU-BAE Swine Production Facility Manure Management:Pit Recharge —Lagoon Treatment:EBAE128-88NCSU-BAE Swine Production Facility Manure Management:Underfloor Fluse-Lagoon Treatment 129-88NCSU-BAE Lagoon Design and Management for Livestock Manure Treatment and Storage; EBAE103-83NCSU-BAE Calibration of Manure and Wastewater Application Equipment EBAE Fact Sheet NCSU-BAE Controlling Odors from Swine Buildings; PIH-33 NCSU-Swine Extension Environmental Assurance Program: NPPC Manual NC Pork Producers Assoc Options for Managing Odor; a report from the Swine Odor Task Force NCSU Agri Communication Nuisance Concerns in Animal Manure Management: Odors and Flies; PR0101, Florida Cooperative Extension 1995 Conference Proceedings The issues checked (✓) pertain to this operation. The landowner 1 integrator agrees to use sound judgment in applying odor control measures as practical. I certify the aforementioned odor control Best Management Practices have been reviewed with me. (Landowner Signature) 13 co CY) CIQ C) < 0 4J Z m E - w CL Qi i. m a u (U -C Y 4- 0 4T O E 140- 0 tio u E 0 u 0 41 -0 0 "a CL a. oYui cc) tA di w V) 3 E m> L6 uj 4a 41 tA C 1.4 0 4- 41 0 c u w 0 0 -@ 4- 40 0 4-J in C: > m 0 :3 cr 'n (U a M w w f0 E dA m 0 u (U 0 u uj tA w m 0 E (A u mo U -0 V) a. to CC (D 4) M V 0 w o , o CL -I--ca E LL 0 4A 1 - a) 41 = 0 L. Z o U- 4"j 6 4� — >• 41 a 0 m c c: 0 -a m Z U. u C: -0 X m W iz o - < z cn r4 Ln r,4 'A u u uj uj P > 0 W- CL < Q 0 Qj 41 $A 0 > > 0 O 0 M -a 41 "a CL CL 0 U t 0 m CL CL 4, tA m .�:r m vi r- -- 41 u .- -C c u — - m :3 CL > 0 LL" 11-- :3 c Q) 4� CL , p c 120 rL M >- a) 'a %A t 41 0 S o w *P t E w w m O. > :a :3 r- -0 0 M CL 0 0 'D c u tO -a (U w 0 4Wl E m V) 41 0 +1 M L- C (D 4, E 4' IA -F 0 0 " m 0. .3 M C 'A 0 :3 0 _0 :3 IA 0 w IA rr w M 41 W a) 41 r- cr W 0 tp ,n a " U o (U .— :3 L- 0 CL m >- -C > -19 "o m 41 w 4w -§ L- r r m 4) a) 1= CL 4, w u 0 41 > m 41 W E > 0) 0 m m (1) t 13 m CL 0 E #A IA m w CL w w V) > m M m O M cCL V 0 41 -0 13 C A! 0 Q) 0 CL m E m t o M -0 0 0 tA M 41m r0 .0 E 0 0 w " 4A m L- > bo #A c > (D ()j 0 IA u .— M Qj E IM :3 0 V, M 0 Z; m 0 -0 u c u 41 m m M -a t CL 'T :3 9) .0 — 4� 13 C tA E -0 0 (n 0 N 0 CL E t o > 0 �! "0 m c 2 ad to < c 2 :Ll w 0- W co CL 0 c li " c w m Fu 41 co a T u C 41 co a. 41 CL " w 4- _0 E us U 0 Z 0 m M c CL m W M 0 M CL 41 X 0 0 W E 0 2 c C 0 a. 4, o 41 u 0 El E] 0 ❑ 1:1 El z LU c 0 .2 m z u m Q 0 0 0 0 cu IA < uj w CL n CL 'A E CL m 0 E m 2 m w 0 u W < U. IV, U 4� ca CL relo (D CV) CV) IA V) M ram[ aL :t 0 Z CL IA 40 E E 0 (A 0 4-0 0 C w 0 M E 0 M 0 0 0 w C -a0 E M c M 41 41 W M v E M 0 L6 4A c M rn Ln r4 Ui Ui 0 ric CL 0- CL .r- c E .0 41 co bD U m E S 41 0 a_ -6 vs -E — c m m tto 0 w (U E E 0 C u U 4.1 cu m u m m E E > > w cL Vf 0 U- m CL > 0 r-LA C sin 0 M m M 0 0 W u 4) E $- 0 4) 4 4 4 0 .c Q Q IM w Lon 0 0 0 m CL 0 0 m -2!- 0 0 V) _0 0 tO 4� E > c 0 zu; 4) 0 41 0 Iz C: m 0 r_ (U 1- 0 m r- >� M 0 41 > 41 4, 0 0 m 0) .2 41 M 4) o- 0 -a 4) m m CA 0 0 E 0 0 0 2 cr a m CA w 41 (A M a) (U > - 4) -0 — 41 0 E w (U c CL > C > Ln 0) 4) 0 0)O CL > (V 0 IA $- 0 4-1 u 0 > E m -C 4, V) Ci) 4- L- 0 0 m 0 = w (U 41 a > 41 4-1 L-n 4' 4� > m o c m (U 0 = 0 CL M 0 0 C CA tA E 0-0>=:3 (U > V) -��s 4� n 4^ r .1 4- C 0 0. > (U CL LU ' W 0 4- +1 tn M 41 �7 t- o m c 4� M 0 X U. 0 4) :3 -2 bo +1 m m 0 4' co0 1= c -0 r- > w 41 m (U -0 M 0 41 x 0. 0 It -2�- > o L, 'M - :2 a :3 , ii 0 U ca (A = cu E (5 E 0 4- 0 4) > -FU 4, E at 0 W — w 4- a — CL u -0 CL m u M -C (U m m m D. m .2 0 m 0 41 (A Ln 4A LU LL u 0 1tA z tun (U 41 cc 0 z ❑F Fl F] Fl El F El F n El El D El 0 0 0 El El < z x LU O 0 q 0 4a 4- 76 vi M LA. 1 'a 'A 2 z -0 0 m Z 4) (D (mA > w (A -x U 0 m 0 Q) am E CO cc 4+ E CA (D M t 41 0 4A -C 0 t 0 m V) u g E w #A c 0 Q) 3 "0 M (1) tio U: 0 CL -0 E < M "a 0 c 0 0 X X V) IN u CL m n 13 0 1 E w tw m c E U. fA E E 0 u F rn O r4 I Ln r-4 LLJ 0 cc 0- CL > > > Ul) 00 0 0 0 w ti CL a a 0 41 Q cl 0. 0 o m m m 41 CL CL CL m 41 m z .r- x 4 t t t (D Ln rl m m m CL a CL c m ,a M (D a) 41 4� 41 41 m "0 Q) a' rr 0* :3 cu w a) m w m m m m 0 0 cc m CJ a, bo 0 0 m m %A M u x M 'a m ba 0 (A ." m CL 4 w 4.1 c w tn U (U w 4) 0 0 0 > > 41 0 E 0 CU :2 41 0 ar a4 w 0 E E L- 41 0 M 10 0 0 m O O C0 00 -0 m lu 0 m 0, M W 41 a) > 0 0 W u 0 Ul 'a U 0 0 Ln tn w CL w w > 0 w 41 In u-0 (u CL M t- a. E -6 0" '>n 0. 4T W ca 4-1 +' 4� 0 (A co 0 = w FU CL m -C > CL 0 4T 'a m _ r p 75 S tO vL " 41 E 41 4A E W W +1 u 0) w W th 0 .S 2 3: C 4. W 0 0 41 a: U- =) D 0 Ln 0 'A .2 =) to :) 0 0 Z El 0 1:11:11:1 El 0 El 00 1:1 .j ui z uj uj U. w 0 VI w z m cc L9 z 0: (A m Q u 4 -a co (U m < co tn 0 0 M to A IA 0 0 "a < :j E 5 :3 0 0 < 0 n o X * * • X * + V) M Ln O ui 0 CL .2 4� m w E :3 u 0 m 0 tw m V4 (U -0 0 (A "a 0 co OD m 0 V4 0 CL E w 4� Q m 0 u 5 > 4) :3 0 z 0 vs C: u Lim -Z m a 0 4- 0 +1 41 w 73 0 c m .0 C: a,. .2 +, 0 m C 0 m Q >. 0 (U w CL m CL 'D 41 E m 0 D 0 a cr w I= 70 (u > CL er w < 4A w m 0- c 0 0 w tko 0 0i =(U m M (u 4� E (U E ow 0 a 0 > 4) .— 0 -2 41 0 5 -0 m 4- w 0 M m E M V (U w 4� -0 0 > w 6 4� o 4� u vs u 41 4� 0 I o E E E 4! a 0 C (u w 4- CL m CL CL E U c w > 0 m $A 0 w u 0 C- -4C' 0 41 4.- 0 a- m 0) tD w 0 > 0 u C u Ln c r m — = (U 0 0 M U = OD 0 0 c (u t m m 0 w CL 12 to 0 m u - 0 a m — o 0 4) 0 0 UG to OL m r 4) 0 E .@w — m 0 't 4, - 41 r- — 0 4- L- 0. M 0 u 0 DD M (U " 0 m w M 41 0 E 0 0 > o V) o M m e- CL M 4- 4- w Qj w 0 0 w w U 0 M -5 — W W :a 41 W (n — w 0. CL M C 7a 0 -- IA E .- -Y c U L- 0 0) (U a m CL m 0 0 -0 to r r (U X — — 0 -0 m tw "a M 40 w r_ (A .- m E 4- u — L- 41 0 (V CL u 'D cu m w E 'A 0- -0 4� 4� 0) 75 0).Ln> 0 — c M = W mEo L E m OU 4(.0 m m r kn CL CL C"L CL — W Qj CL M M LA cr m w m w 0 " w w 0 0 0 w 0 -C 4� w E E0 = :3 0 w CL 4J a uj x D c[W c 5 m o M 0. LL r 0 El 11 El 0 El 0 0 El El El 0 El ED Z El 13 El 0 z 0 Vl LJ IA tio _0 0 0 O z 0 c C o 4.0 ul u C 0 0 m 0 E w to m C m U) tg to LL sv to me, E E 0 u F, 0 .r- 0 -0 d) 0 bD m L- 4- 0 (L) 0 0 c > 4' "a 0 " 0 .0 a) L- 4� CL 0 c CL iA- 0 c u 0 V) tko cu 0 0. c m Q m to ll�r c r4 c c W > 4� U 4J — " M U v:Ll m Z! 4� ' -E a) O 0) c > m (U M41 E CL 0 0 0 u 4J 0 0 vi tn cr- 0 (U 'A 0 41 0 -0 E 0 0 0 c !t C c 0 41 u -0 CL CU c = 'C: 41 m 0 m > c +1 m r -0 41 CA u — CL E 0 E 0 M 0 *Fa ' 3: 'A CL r w (A I ba > m 0 U — > 0 mCL a) u 0 V) c 0 >M- c) -0 E , c. 7,- aCL — E m :3 +,nj 41 41 CL on Cm to 0) tio tA m 3 u (A M m 41 m 0) u fA 0) (A (A S E -o & m. > W >0 CL CL C m (U 0 0 > m m m CL u 0- 0 > Wm m 4� 0 0 :3 00 :3 M tw V) 41 0 CL E 0 U U a 0 C 0 ba to "a) a CL a CL 1 c 0 " 0 m U M m = L. 5 E L- 13 .- 0- 2 U a CL 4t > > 0 z (L) 41 r u 1A cm > 0) c c (1) ML- CL -M m L- M Cl) u 0 -C C 4) L a Cr W = W W 41 4� " N 4� A m CL 0 c w w M CL M M 0 LL r 0 _ LL 41 W 0 0 (A 4� D 0 0 El 13 El El El n El 0 m 41 L. 0 0 00 u zl- 0 m u a U CL u m c M 0 0 C . . cu :E 4� 41 Go 0) t).O a to ru m > -0 U U 0) -0 W tn CL Q. 4) L->--00 "mmcO a) M — 0 o -D aW > — .(U 41 "a 0 m uE*au 'OL-Mcw " CL = 0 0 — .0— p CCL = *r_ 0 41 h-- L 41 CL 41 M ac m ai 0 E CL > 0 :3 m on t 41 41 m E C - M — " 'A u " L. 4Lj oc"omuwwwwoco -a CL 0 M IS .a m m E w M CL u w o 0 u < D a D 0 0 Fl El 0 0 0 0 w 4- 0 Ln m CL m w U 41 E m , P 0 D 3 %A -0 0 <U Ln 41 cr- CU 41 > > > > 0 0 0 0 > 41 w w bo w 0 m m m m L- (U 0 0 0 w 0 u u u u u 0 a.->- c c c c c c c O O 0 C (V 0 tab aj aj 4; d0 0 4A Ul 0 :) "X,.Uimmmmm"u"uu"u"uw m u 3 3 3 0" U 3: z 3: 3: 3: 3: 3: 3: 3: 3: a: z .6.1 c Q) 41 E 41 M o @ c 4� LW 0 P. . o r _j 4E boos CL m 0 w -j z W d" U: o �'V o E m o w w u cc .0 c 4. rl a M 0 U 4) or- 3; = 'i CL E -11 w (u CL u tQ) 0 0 E E < (OA 0 � W " , M W W r (D to bn M , 0 M > M M -0 z :D C C 3 0 m m cu "0 4- —M Z, m 0 " c c w w c 41 -0 0 E M M C 0- 0 M (U m �EO to E 4-1 C 41 M m LA 4 0 to a Ul W r-m000=3 < tjo D 0 0 0 (U m u= p 0 0 41 0 r o w w m m m o V) 04- tlo m t --j LA (A 41 41 E cj en 00 00 W CO 00 00 to Ln V m o6 A Ob -u +j c M 0v-1 N N m m M Ln v-4 r-I LL LL ui LU ui yj ui co to co co co < < w w w w w ao p a. 4) u 0 u Ln (n C) O re 0- OJ U 0 L- - U- -ld 41 (U E 0 -00 -0 0 0 4.1 a 0 0 0 E 00 0) to m no cu m41 C E E =L m 4- n — 41 a- W m M 3: (A t 0 W , " w m W 41-0 77 w 5; w -0 w c e c -a .- — - m MIU: vo)- E "o I I . C -0 cn 0 N r-I < 0 Ln oo rq ct c w rn C Ln *Eb -0 r M M M M M u M m m m m 0 4� can � 44 4� to 12 au 16 OR 0: 3 c c zzzzmo LI) *;j 3 ra zzzzzo to m 0- IN M Pig Patch, LLC AWS310136 Version —November 26, 2018 Mortality Management Methods Indicate which method(s) will be implemented. When selecting multiple methods indicate a primary versus secondary option. Methods other than those listed must be approved by the State Veterinarian. Primary Secondary Routine Mortality Q D Burial three feet beneath the surface of the ground within 24 hours of knowledge of animal death. The burial must be at least 300 feet from any flowing stream or public body of water (G.S.106-403). The bottom of the burial pit should be at least one foot above the seasonal high water table. Attach burial location map and plan. ElLandfillat municipal solid waste facility permitted by NC DEQ under GS 15A NCAC 13B .0200. QQ Rendering at a rendering plant licensed under G.S. 106-168.7. Complete incineration according to 02 NCAC 52C .0102. D ❑ A composting system approved and permitted by the NC Department of Agriculture & Con- sumer Services Veterinary Division (attach copy of permit). If compost is distributed off -farm, additional requirements must be met and a permit is required from NC DEQ. Q ❑ In the case of dead poultry only, placing in a disposal pit of a size and design approved by the NC Department of Agriculture & Consumer Services (G.S. 106-549.70). Q ❑ Any method which, in the professional opinion of the State Veterinarian, would make possible the salvage of part of a dead animal's value without endangering human or animal health. (Written approval by the State Veterinarian must be attached). QMass Mortality Plan Mass mortality plans are required for farms covered by an NPDES permit. These plans are also recommended for all animal operations. This plan outlines farm -specific mortality man- agement methods to be used for mass mortality. The NCDA&CS Veterinary Division sup- ports a variety of emergency mortality disposal options; contact the Division for guidance. • A catastrophic mortality disposal plan is part of the facility's CAWMP and is activated when numbers of dead animals exceed normal mortality rates as specified by the State Veterinarian. • Burial must be done in accordance with NC General Statutes and NCDA&CS Veterinary Division regulations and guidance. • Mass burial sites are subject to additional permit conditions (refer to facility's animal waste management system permit). • In the event of imminent threat of a disease emergency, the State Veterinarian may enact additional temporary procedures or measures for disposal according to G.S. 106-399.4. Signature of Farm Owner/Manager Signature of Technical Specialist 3/13/2024 Date 3/13/2024 Date W DEVICES TO AUTOMATICALLY STOP IRRI(I-",ATION EVENTS STATE GENERAL PERMIT' S' The State of North Carolina has issued State General Permits for aniTnal facilitie.. to operate in North Carolina. ese Permits meet both State and EPA requirements and provide coverage for the folloWliv-4 Types of facilities, • AWG100000 -Swine Facilities • AWG200000 = Cattle Facilities • AW0300000 poultry Facilities with a liquid waste management system these Gel eral You have recently been issued a Certificate of Coverage (COC) to operate your anirfial :facility under one of Pennits. Condition 11.24 of each of these Permits reads as follows: The Perinittee shall: a. install, operate, and maintain devices on all irrigation pumps/equiptneiii designed to automatically stop irrig I �Ition activities during precipitation; or 1 under the supervision!of an b. commit to provide for the presence of the OIC, a designated backup 01C, 01 a person 01C or designated backup 01C at all times during the land application of waste 60 that in case of a precipitation event, the irrigation activities will be -stopped immediately. This cominji.,I)t-ilt n-iu&t be submitted in writing to the Division on a form supplied by, or approved by, the Division. [G.S. § 90"l -4,11 Installation of devices or submission of alternate documentation shall be completed within 12 months of the issuance of the COC for this General Permit, The Perntittee shall Ifl,1111aiLl such devices according to the manufacturer's instructions and warranties, This Condition does not apply to manure spreaders I or other equipment pulled by manned vehicles, [15A MUC 02T.0108(b)] Please check the box below that indicates your commitment to do one of the following. Within twelve (12) months of the effective date of a COC issued under this permit, I shall install, operate and maintain devices on all irrigation pumps/equipment designed to automatically %tOP ilTiation activities during precipitation. This condition does not apply to manure spreaders Or other equipment pulled by manned vehicles. I will commit to provide for the presence of the Operator in Charge (01C_), [lie designated backup 01C, Or a Pffs0l' under the supervision of an 01C or backup 01C at all times during the Lind VP4060" Ofw"te. "1 certify under penalty of law that this document was prepared under my direc(lo" of supervision in accordance with a system designed to assure that qualified personnel property gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly 'V5P')nsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant, penalties for submitting false information, including the possibility of tines and imprisonment for knowing - violations," 9 4A _24-1 Factitty Name Ive 5 4w_ Nary 0yqner/Perbifttee Nozat and Title (type or print) Mail to: Animal Feeding Operations 1636 Mail Service Center Raleigh, NC 276"-1636 Permit Number 57- ;2-6 Date Date DTASIE 1-22-2020