Loading...
HomeMy WebLinkAbout510032_Compliance Evaluation Inspection_20240220A a S -,p Division of Water Resources Facility Number O Division of Soil and Water Conservation O Other Agency pe of Visit: 0-tornliance Inspection Operation Review Q Structure Evaluation Q Technical Assistance ason for Visit: Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access Date of Visit: 2 - Zo s Arrival Time: Departure Time: County: i ,.Ss. VdRegion: Apt) Farm Name: Owner Email: Owner Name: Phone: Mailing Address: Physical Address: 6 It? Ygf PC/� I-�� ks `j PCs Facility Contact: b P,51 % /►, ! Title: Phone: I / � -7 38 - 3.9'$ ly Onsite Representative: Integrator: Certified Operator: Certification Number: Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: Swine Design Current Design Current Capacity Pop. Wet Poultry Capacity Pop. RNLa Layer on - Layer Wean to Finish Wean to Feeder Feeder to Finish 3 39 d z Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other Discharees and Stream ImDactS Pullets Other Poults Design Current Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non-Dai Beef Stocker Beef Feeder Beef Brood Cow 1. Is any discharge observed from any part of the operation? ❑ Yes 125 No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes JRJNo ❑ NA ❑ NE b. Did the discharge reach waters of the State? (if yes, notify DWR) 0 Yes TD-No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes 0-No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes No ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes No ❑ NA ❑ NE of the State other than from a discharge? Page I of 3 511212020 Continued Facili Number: 57 1 - Z Date of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes a. If yes, is waste level into the structural freeboard? ❑ Yes Structure l Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in):� Structure 2 Structure 3 Structure 4 Structure 5 5. Are there any immediate threats to the integrity of any of the structures observed? (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? !o ❑ NA ❑ NE jo'No ❑ NA ❑ NE Structure 6 ❑ Yes �No ❑ NA ❑ NE [:]Yes ID No ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environments rest, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes Fj/No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes El -No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes E�No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? if yes, check the appropriate box below. ❑ Yes ETNo ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or l0 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes O No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes JETNo ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes j/ N ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes jErNo ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? if yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes EfNo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code n Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes E o ❑ NA ❑ NE ❑ Yes -E5 No ❑ NA ❑ NE Page 2 of 3 511212020 Continued Facility Number: 5 4 - 3 -ZDate of Inspection: 2- - 7- 0 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey [:]Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes JENo ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes 0<0 ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes 11 No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes � ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the [] Yes Zf No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ,,�Now ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes �No ❑ NA ❑ NE , 34. Does the facility require a follow-up visit by the same agency? ❑ Yes �No❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility,to better explain situations (use additional pages as necessary). sa'>'V' (Z023' ,f IS-z3 P, 3g� D J U Vr- iPa� % - r 5 I /J '/P3171 /"�/ <4/ 5'd pl egn Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 t Phone: 9 I- 7` l- �'Z J, Date: 1- - 2C " Z +� 511212020