Loading...
HomeMy WebLinkAboutNCC241514_ESC Approval Submitted_20240517 v. R7 sT ]ce.y y� .a. q ROY COOPER li 'R`. � Governor �c ray ELIZABETII S.BISER ' Secretary 4tquvw+, WILLIAM E.TOBY VINSON,JR. NORM CAROLINA Interim Director Environment*cQu ality April 22, 2024 LETTER OF APPROVAL WITH MODIFICATIONS True Homes,LLC Attention: Chris McIntyre 2649 Breckonridge Centre Dr. Monroe,North Carolina 28110 RE: Project Name: Morgan Hills Phl M2 Lots 83-130&226-238 Project ID: STANL-2024-014 Acres Approved: 3.71 County: Stanly City: Albemarle Location: Morgan Road River Basin: Yadkin Pee-Dee Stream Classification: C,Other Submitted By: True Homes Date Received by LQS: April 9, 2024 Plan Type:Revised Dear Mr. McIntyre: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3)years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1,2019, all new construction activities are required to complete and submit an electronic Notice of Intent(eNOI)form requesting a Certificate of Coverage(COC)under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete,you will receive a link with payment instructions for the$120 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future,the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a)and the NCGO1 permit require that the following documentation be kept on file at the job site: . • E North Carolina Department of Environmental Quality I Division of Energy,Mineral,and Land Resources Mooresville Regional Office 1610 East Center Avenue,Suite 301 I Mooresville,North Carolina 28115 Y' 704-235-2100 Letter of Approval with Modifications True Homes,LLC April 22, 2024 Page 2 of 3 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also,this letter gives the notice required by G.S. 113A-61.1(a)of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented,requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project,it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66),this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws,regulations, and rules. In addition,local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form,which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, DocruSIgned by: c oci gl, .Ad4t{irt, ACFA8Q7EC14M83... Michael Maclntyre,PE Assistant Regional Engineer Land Quality Section MM Enclosure: Certificate of Approval Modifications Required for Approval NCGO1 Fact Sheet e: ` North Carolina Department of Environmental Quality I Division of Energy,Mineral,and Land Resources ADE. ) Mooresville Regional Office 1610 East Center Avenue,Suite 301 I Mooresville,North Carolina 28115 704-235-2100 Letter of Approval with Modifications True Homes, LLC April 22,2024 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Morgan Hills Phl M2 Lots 83-130&226-238 Project ID: STANL-2024-014 ,County: Stanly Reviewed by: Michael MacIntyre,PE 1. Many of the lots drain to another adjacent lot,meaning that individual lot erosion control diagrams "A" and"B"must be combined with other suitable diagrams to control sediment. At a minimum, silt fence must be added on all "downstream"property lines as shown in diagrams"C"through"H" 2. Additional measures may be required-The applicant is responsible for the control of sediment on-site. If the approved erosion and sedimentation control measures prove insufficient,the applicant must take those additional steps necessary to stop sediment from leaving this site. [15A NCAC 4B .0115] Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities North Carolina Department of Environmental Quality I Division of Energy,Mineral,and Land Resources Mooresville Regional Office 1610 East Center Avenue,Suite 301 I Mooresville,North Carolina 28115 704-235-2100 i . Fact Sheet on the New gp NCGO1 Permit ' Apq it 201 V�kp� aqn arZa.,Fireiwety The I C;Constructi lPerrr�it{alsd k wp s"I C 01")was renewedon.April 1,2019:The updated permit Qes dot significantly change_the measures-that are required to lae implemented_-on construction sites Ho�nrever, _ ere are or a organizational and technical upd`` t s to the permit as desctibed'below;Most notably;there anew_ • process it which construction sites will gbtaDl of >7 l gpverage under.-a�n.1 CG 1 permitthrough an electronic,Y, process DEMLR worfced with a I?(Oa ave:questiafi3f contact Annette Lucas atAintiette lucas@rl Oter r= C o (9 t )7D7 3G Organizational Updates Acronyms to Know The new permit: COC: Certificate of Coverage, proof of coverage under an NCGO1 permit • Repeats state requirements for E&SC DEMLR: NC Division of Energy,Mineral,and Land Resources Plans and organizes them with federal E&SC: Erosion&Sedimentation Control construction activity requirements; e-NOI: Notice of Intent,application form for the NCG01 permit • Is clearly organized by topic;and e-NOT: Notice of Termination,form for closing out the NCGO1 permit • Has less text and more tables. SWPPP: Stormwater Pollution Prevention Plan,required by the NCGO1 Technical Updates The new permit: • Requires that the E&SC Plan meet SWPPP requirements(p. 2); T • Provides a list of items that must be included in the SWPPP,such as the construction sequence, plans, _ calculations, etc,(p. 2-4);1 • Has updated language on bypasses and upsets that is tailored to construction activities(p. 10); • Puts all timeframes for inspections, record-keeping and reporting in The NCGO1 Process "calendar days"for clarity and The new NCGO1 applies to permits approved on or after April 1)2019. consistency(p. 11 14);2 Permittees will no longer receive a copy of the NCG01 permit in the mail • Changes the inspection frequency with their E&SC Plan approvals and be considered as covered under the (during business hours)to at least permit.Federal rules require that DEMLR receive an NOI on each once per 7 calendar days and after. construction project and issue each construction project its own COC, every storm>1.0 inch (previously 0,5 . inch);3 and Under the new NCG01 process,construction sites will continue to • Excludes weekends,state and federal receive approval for E&SC Plans from either DEMLR or the delegated holidays from normal business hours local E&SC program just like before.After receiving E&SC Plan approval, unless construction activities take permittees will officially obtain coverage under the NCG01 by place (p. 23). completing an e-NOI(available at deci.nc.gov/NCG01). The e-NOI will only take about 20 minutes to fill out and submit on-line. •1 This list is based on website guidance by the DEMLR Sediment Program. Initially,there will be no charge associated with applying for an NCG01 Z The number of calendar days was permit but on or around June 1,2019, DEMLR will begin charging a $100 selected to be as equivalent as annual general permit fee as required per§143-215.3D. possible with the previous permit. DEMLR is working on creating a single application form that will allow an 3 The intent is to provide predictability applicant to simultaneously apply for an E&SC permit and an NCG01 to the inspection schedule. COC.That effort is part of a larger Permit Transformation project at DEMLR.