December 14, 2022
LETTER OF APPROVAL WITH MODIFICATIONS
Osage Mill Apartments, LLC
Attention: Gilbert Winn, President of Osage Mill MM, LLC
One Washington Mall, Suite 500
Boston, Maryland 02108
RE: Project Name: Osage Mill
Acres Approved: 4.85
Project ID: GASTO-2023-005
County: Gaston, City: Bessemer City
Address: 201 S. 12th Street
River Basin: Catawba
Stream Classification: Other
Submitted By: Todd Poteet, PE, West Consultants, PLLC
Date Received by LQS: November 29, 2022
Plan Type: Revised
Dear Mr. Winn:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable
with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for
Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of
approval,if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of
Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General
Peiuiit. After the form is reviewed and found to be complete,you will receive a link with payment instructions
for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the
Financially Responsible Party shown on the FRO form submitted for this project,you MUST obtain the COC
prior to commencement of any land disturbing activity. The eNOI form may be accessed
at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the
Raleigh central office. If the owner/operator of this project changes in the future, the new responsible
party must obtain a new COC.
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file
at the job site:
North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
4111 Mooresville Regional Office 1610 East Center Avenue,Suite 301 I Mooresville,North Carolina 28115
704-663-1699
sa r
Letter of Approval with Modifications
Osage Mill Apartments, LLC
December 14, 2022
Page 2 of 3
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure
compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented,requiring protection of existing
natural resources and adjoining properties. If,following the commencement of this project, it is determined that
the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution
Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to
the plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality
laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-
disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. You are requested to file an amended form if there is any change in
the information included on the foiui. In addition, it would be helpful if you notify this office of the proposed
starting date for this project.
Your cooperation is appreciated.
Sincerely,
Shannon Leonard
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
Modifications Required for Approval
NCGO1 Fact Sheet
c: Inspection Department
ec: Todd Poteet, PE
Letter of Approval with Modifications
Osage Mill Apartments, LLC
December 14, 2022
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Osage Mill
Project ID: GASTO-2023-005
County: Gaston
1. On Sheet C2, the West side of the embankment for the Skimmer Basin needs to be rotated to the
northwest as much as possible and tie into existing slope (to allow storm drainage installation in next
phase). The diversion berm will need to be installed as shown on the plans to divert flow to upper end
of basin. The skimmer shall discharge towards the tunnel. This basin shall remain intact and functional
throughout all phases of construction (as shown on Sheet C4). The permanent storm drainage (shown
on Sheet C4) shall be temporarily stubbed off into the basin. Positive drainage into basin shall be
provided. Upon receiving approval to remove the basin, the final fill placement and storm drainage can
be completed at that time.
CA r# clo
4)
=, q, c CZ •0
P''''''', tt
CI
CJ •� Z '®
•® M Q� a.)
C.)
Ct �A
itr ice" y ft # f'` +�' . '-
. 4
V' ' Joa CI '
IliIl44
''�/
11 Ct
-4-e a. q�4
t •44
g
a. C�
;go 6' F.0 C
e
CI Ct CC