Loading...
HomeMy WebLinkAboutNCC241513_ESC Approval Submitted_20240517 ROY COOPER Governor a ' � ELIZABETH S.BISER Secretary DOUGLAS R.ANSEL Interim Director "=i`i1 7t'CAlA N..NA Eswirontttento!Quality December 14, 2022 LETTER OF APPROVAL WITH MODIFICATIONS Osage Mill Apartments, LLC Attention: Gilbert Winn, President of Osage Mill MM, LLC One Washington Mall, Suite 500 Boston, Maryland 02108 RE: Project Name: Osage Mill Acres Approved: 4.85 Project ID: GASTO-2023-005 County: Gaston, City: Bessemer City Address: 201 S. 12th Street River Basin: Catawba Stream Classification: Other Submitted By: Todd Poteet, PE, West Consultants, PLLC Date Received by LQS: November 29, 2022 Plan Type: Revised Dear Mr. Winn: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval,if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Peiuiit. After the form is reviewed and found to be complete,you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project,you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources 4111 Mooresville Regional Office 1610 East Center Avenue,Suite 301 I Mooresville,North Carolina 28115 704-663-1699 sa r Letter of Approval with Modifications Osage Mill Apartments, LLC December 14, 2022 Page 2 of 3 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented,requiring protection of existing natural resources and adjoining properties. If,following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land- disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the foiui. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, Shannon Leonard Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NCGO1 Fact Sheet c: Inspection Department ec: Todd Poteet, PE Letter of Approval with Modifications Osage Mill Apartments, LLC December 14, 2022 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Osage Mill Project ID: GASTO-2023-005 County: Gaston 1. On Sheet C2, the West side of the embankment for the Skimmer Basin needs to be rotated to the northwest as much as possible and tie into existing slope (to allow storm drainage installation in next phase). The diversion berm will need to be installed as shown on the plans to divert flow to upper end of basin. The skimmer shall discharge towards the tunnel. This basin shall remain intact and functional throughout all phases of construction (as shown on Sheet C4). The permanent storm drainage (shown on Sheet C4) shall be temporarily stubbed off into the basin. Positive drainage into basin shall be provided. Upon receiving approval to remove the basin, the final fill placement and storm drainage can be completed at that time. CA r# clo 4) =, q, c CZ •0 P''''''', tt CI CJ •� Z '® •® M Q� a.) C.) Ct �A itr ice" y ft # f'` +�' . '- . 4 V' ' Joa CI ' IliIl44 ''�/ 11 Ct -4-e a. q�4 t •44 g a. C� ;go 6' F.0 C e CI Ct CC