Loading...
HomeMy WebLinkAboutNCC203719_NOT Supporting Documents_20240514 1(tg CITY OF ROCKY MOUNT ROCKY MOUNT Erosion Control Site Inspection Report PUBLIC WORKS THE CENTER OF IT AL, Project: OLD MILL STREAMS PH1 Date: 5-8-2024 Location: HALIFAX RD Time: 1:30 PM Responsible Party: DR HORTON Weather& Site Conditions: PC 80 On-Going Activities at Time of Inspection: Contact Made With (Employee/Employer:) Site currently under NOV Site currently under CNOV S & E Permit Issued by CRM Copy of Approved Plan On-Site Rain Guage Provided NPDES Records available On-Site Measures implemented per Plan Modifications approved by CRM Is the site in compliance with S.P.C.A.? Yes n Non If no, check violations below: _ Failure to take all reasonable No Approved Plan measures Failure to follow approved plan Inadequate Buffer Zone Failure to submit revised plan Graded slopes and fills too steep Failure to provide adequate ground _ cover Unprotected exposed slopes Insufficient measures to retain Failure to maintain erosion control sediment on site measures Other(describe) Has off-site sedimentation occurred since last inspection? Yes n No ✓ Degree if yes: Corrective Measures Needed: Deadline: FINAL INSPECTION COMPLETE FOR CLOSEOUT FOR DR HORTON. GREG ROANE