Loading...
HomeMy WebLinkAbout20240436 Ver 1_USACE Correspondence_20240513Baker, Caroline D From: Lawrence, Jennifer L CIV USARMY CESAW (USA) <Jennifer.L.Lawrence@usace.army.miI> Sent: Monday, May 13, 2024 10:39 AM To: Kiker, Taylor Cc: Tyler Sibley; Munzer, Olivia; Pitner, Andrew; Edwards, Matt; Rosenfeld, Jordan; Barajas, Gabby; Wooten, Samantha; Dailey, Samantha J CIV USARMY CESAW (USA); chris.tinklenberg@kimley-horn.com Subject: [External] RE: SAW-2024-00559 Kaori University RAI response Follow Up Flag: Follow up Flag Status: Flagged CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Good morning Taylor, After internal review and discussions with WRC, the Corps has determined that this design for the above reference project does not meet the terms and conditions of the Nationwide Permit. More specifically, the proposed piped culvert installations would not allow for aquatic life passage as outlined in general condition 2 and regional condition 9 of the Nationwide Permits. The multitude of 90-degree angles would prevent any type of aquatic passage between reaches. Further, your permit application provided very little avoidance and minimization. Please provide a detailed explanation as to why units 1-5 cannot be eliminated to facilitate either use of the existing culvert or installation of a typical culvert. Please also provide an explanation as to why the existing —40OLF culvert cannot be daylighted and why the proposed SCM cannot be designed in a manner to allow for aquatic life passage in this reach. Let me know if you have any questions or would like to set up a call to discuss matters further. Thank you, Jennifer Lawrence, PWS (she/her) Regulatory Specialist, Charlotte Regulatory Field Office U.S. Army Corps of Engineers, Wilmington District 8430 University Executive Park Drive, Suite 615 Charlotte, NC 28262 Email: Jennifer.L.Lawrence@usace.army.mil Cell: (980)392-9980