HomeMy WebLinkAbout20071779 Ver 1_More Info Letter_20071106Michael F. Easley, Governor
~ <
November 6, 2007
William G. Ross 1r., Secretary
North Carolina Department of Environment and Natural Resources
Coleen H. Sullin, Director
Division of Water Quality
CERTIFIED MAIL: RETURN RECEIPT REQUESTED
Cert. # 7007 0220 0003 1484 7425
Mr. Ross I Beebe
170 Hawks Pond Road
New Bern, NC 28560
Subject Property Lot (Tax PIN) K06-76, DB 452,P 110, off Florence Road (SR1324)
Moore Creek, Neuse River Basin
REQUEST FOR ADDITIONAL INFORMATION
Dear Mr. Beebe:
DWQ Project # 07-1779
Pamlico County
On October 17, 2007, the Division of Water Quality (DWQ) received your application dated October 12, 2007
to impact 0.02 acres of wetlands and 25 feet of streams to construct the proposed driveway stream crossing.
The DWQ has determined that your application was incomplete and/or provided inaccurate information as
discussed below. On November 2, 2007, Roberto Scheller of this Office conducted an on-site review of the
area for the proposed stream crossing. At the time of the visit the cannel was inundated with water from bank
to bank as a result of wind tide. Fish were also noted forging in the subject channel at the time of the site visit.
It has been determined by the Division of Marine Fisheries (DMF) that the subject channel is part of a Primary
Nursery Area (PNA) and fill in this area is prohibited. Therefore, it will be necessary to bridge this feature from
bank to bank. The DWQ requires this additional information in order to process your application to impact
protected wetlands and/or streams on the subject property. Therefore, unless we receive the additional
information requested below, we will have to move toward denial of your application as required by 15A NCAC
2H .0506 and will place this project on hold as incomplete until we receive this additional information. Please
provide the following information so that we may continue to review your project.
Additional Information Requested:
1. It is requested that a new PCN be submitted showing total wetland impacts, buffer impacts and bridge
impacts (if any). It is also requested that detailed plans for bridge construction also be submitted.
Please respond in writing within three weeks of the date of this letter by sending this information to Mr. Roberto
Scheller of the DWQ Washington Regional Office. If we do not hear from you within three weeks, we will
assume that you no longer want to pursue this project and we will consider the project as withdrawn.
This letter only addresses the application review and does not authorize any impacts to wetlands, waters or
protected buffers. Please be aware that any impacts requested within your application are not authorized (at
North Carolina Division of Water Quality Internet; www.ncwaterquality.or~
943 Washington Square Mall Phone: 252-946-6481
Washington, NC 27889 FAX 252-946-9215
An Equal OpportunitylAffirmative Action Employer-50% Recycledl10% Post Consumer Paper
One
No Carolina
atura!!r~
this time) by the DWQ. Please call Roberto Scheller at 252-948-3940 if you have any questions regarding or
would like to set up a meeting to discuss this matter.
incerel ,
.___ ~.
AI Hodge/Superviso~1
Division of Water Quality
Washington Regional Office
cc: Hood Richardson, PA
Tracey Wheeler, USACE Washington Field Ofiā¢ice
Maria Dunn, Fish & Wildlife
Sean McKenna, DMF
Cyndi Karoly, DWQ Central Office
File Copy
Filename: 07-1779