October 19, 2022
LETTER OF APPROVAL WITH MODIFICATIONS
Union County
Attention: Thomas Mann, PE, CIP Program Manager
500 north Main Street, Suite 600
Monroe,North Carolina 28112
RE: Project Name: FY21 Short Water Line Extensions Project Ph. B
Acres Approved: 5.32
Project ID: UNION-2022-079
County: Union, City: Various
Address: Various
River Basin: Catawba
Stream Classification: Other
Submitted By: Jake Berkshire, PE, WK Dickson
Date Received by LQS: October 4, 2022
Plan Type: Revised
Dear Mann:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable
with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for
Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of
approval,if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of
Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General
Permit. After the form is reviewed and found to be complete,you will receive a link with payment instructions
for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the
Financially Responsible Party shown on the FRO form submitted for this project,you MUST obtain the COC
prior to commencement of any land disturbing activity. The eNOI form may be accessed
at deq.nc.gov/NCGO1. Please direct questions about the eNOI form to the Stormwater Program staff in the
Raleigh central office. If the owner/operator of this project changes in the future, the new responsible
party must obtain a new COC.
Title 15A NCAC 4B .0118(a) and the NCGOI permit require that the following documentation be kept on file
at the job site:
North Carolina Department of Environmental Quality l Division of Energy,Mineral and Land Resources
fb Mooresville Regional Office 1 610 East Center Avenue,Suite 301 Mooresville,North Carolina 28115
704-663-1699
Letter of Approval with Modifications
Union County
October 19, 2022
Page2of3
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure
compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented,requiring protection of existing
natural resources and adjoining properties. If, following the commencement of this project, it is determined that
the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution
Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to
the plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality
laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-
disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. You are requested to file an amended form if there is any change in
the information included on the form. In addition, it would be helpful if you notify this office of the proposed
starting date for this project.
Your cooperation is appreciated.
Sincerely,
Shannon Leonard
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
Modifications Required for Approval
NCGO1 Fact Sheet
c: Inspection Department
ec: Jake Berkshire, PE
Letter of Approval with Modifications
Union County
October 19, 2022
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: FY21 Short Water Line Extensions Project Ph. B
Project ID: UNION-2022-079
County: Union
1. Adequate inlet protection shall be provided for the 18" RCP near STA 2+20 on Hayes Rd. (Sheet C.8). If
there is a flowing stream in this location, the line installation shall be conducted in the dry and inlet
protection shall not be installed in a flowing stream.
2. Line installation below 36" RCP near STA 23+95 on Richardson Rd. (Sheet C.10) shall be conducted in the
dry (if a flowing stream).
3. On Paula Lane (Sheet C.11), a minimum 15' undisturbed buffer shall be provided from the top of stream
banks to land disturbance for bore pits near STA 4+20 and STA 4+75.
4. Silt fence (or other adequate measure) shall be provided along the downstream side of the land disturbance
activities which flow away from the R/W.
5. If the 8" Filter Socks are not sufficient for adequate inlet protection, then a larger diameter filter sock shall
be installed,which is adequate for the receiving drainage area. For culverts with a diameter of 18" or larger,
recommend using Filter Socks with a minimum 12" diameter or larger, depending upon the drainage area.
GJ • 43
4) -cam
® r®I
14
�CI
^ vs •
6
oft
.® = en 4)
CI ro)
CCi •
44 .P
•664
4
•
CO 1 v..0 v
r. x: 1 61
' V--- r a) ® : 04, 6
cu
410 yo :, IgZilt -; f
._ 6 i 4J
® v .,� •
•z
000 � •°
too ,M
v CI ® 0E
6 CD • as
C.seco ® Jma 6 CI
too 4'4 • '.-1
� 4a v •
0 64 *a 6 CI