HomeMy WebLinkAboutNCC241491_ESC Approval Submitted_20240516 NC DEMLR - FROF Application Approval with Modifications Needed CRM:0104161
From: SVC_DoNotReply-DEQPermits(donotreply-deqpermits@deq.nc.gov)
To: d.robertson82@yahoo.com
Date: Tuesday,April 16,2024 at 09:07 AM EDT
\.
4STAT
IwW
',_ti .,_ 417 Cam'
f �2tIAM VIOE,;�
North Carolina Department of Environmental Quality
Division of Energy, Mineral & Land Resources
Land Quality Section
Roy Cooper
Governor
Elizabeth S.Biser
Secretary
William Vinson Jr. (Acting)
Director
04-16-2024
Dean Robertson
322 Farmstead Road
Winston Salem, NC 27107
RE: Project Name: Lot 1 Wynnfall
Acres Approved:0.45
Application ID: PA-004285
Permit Number: DAVID-2024-0131
Address: Hinkle Lane
City: Lexington
County: Davidson
River Basin:Yadkin - Pee Dee
Stream Classification: C:Aquatic Life, Secondary Contact Recreation, Fresh water
Plan Type: New Plan
Dear Dean Robertson,
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with
modifications and nereby issue•tnis Letter or Approval witn Moamcations. i ne 'modirications Kequirea Tor Approval are
listed on the attached page.The Certificate of Approval must be posted at the job site. This plan approval shall expire three
(3)years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A
NCAC 4B.0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent(eNOI)
form requesting a Certificate
of Coverage (COC) under the NCG010000 Construction General Permit.After the form is reviewed and found to be
complete, you will receive a link with payment instructions for the $120 annual permit fee.After the fee is processed, you
will receive the COC
via email.As the Financially Responsible Party shown on the FRO form submitted for this project,you MUST obtain the COC
prior to commencement of any land disturbing activity.TheeNOlform may be accessed atdeq.nc.gov/NCG01. Please
direct questions about the eNOl form totheStormwater Program staff in the Raleigh central office. If the owner/operator
of this project changes in the future,the new responsible party must obtain a new COC.
Title 15A NCAC 4B.0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site:
1_The approved E&SC plan as well as any approved deviation.
2.The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with
the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural
resources and adjoining properties. If, following the commencement of this project,the erosion and sedimentation control
plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General
Statute 113A-51 through 66),this office may require revisions to the plan and implementation of the revisions to insure
compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws,
regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity.
This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility/Ownership Form, which you provided. You are requested to file an amended form if there is any change in
the information included on the form. This permit allows for a land-disturbance, as called for on the application and plan,
not to exceed the approved acres. Exceeding the acreage can be a violation of this permit and may require a revised plan
and additional application fee.
In addition, it would be helpful if you notify this office of the proposed starting date for this project.
General Comments:
1. Please print this email as your Letter of Approval for your NCG010000 Certificate of Coverage application.
2.Please notify this office prior to your pre-construction conference for this project by calling (336)776-9800 and asking to
speak with the Land Quality inspector for your county. Permission must be obtained and granted from NC DEQ DEMLR
prior to the removal of any ESC measures.All additional permits should be obtained, as necessary, prior to beginning
construction. [GS 113A-51, 15A NCAC 4B _0120]
3.Any off-site borrow and waste required for this project must come from a site with an approved erosion control plan, a
site regulated under the Mining Act of 1971, or a landfill regulated by the Division of Solid Waste Management.
Trash/debris from demolition activities or generated by any activities on site must be disposed of at a facility regulated by
the Division of Solid Waste Management or per Division of Solid Waste Management or Division of Water Resources rules
and regulations. [15A NCAC 4B .0110]
4.Additional measures may be required -The applicant is responsible for the control of sediment on-site. If the approved
erosion clnu SCUllllelll'dlionr UUllllul Inedsules piuve IIIsuInureiii, Lire dpplR.diIL IIIUW.tillcC UIUSC dUURFufldl Steps IIeUessdfy lu
stop sediment from leaving this site. [15A NCAC 4B .0115]
5. The NCG01 has a $120 yearly fee and our office often receives closure inspection requests days prior to yearly NCG01
fee payment due dates. Be advised the project requires a closure inspection report by DEMLR prior to filing the Notice of
Termination (NOT)to terminate NCG01 coverage. The closure inspection should not be requested until after the site has
achieved full vegetative stabilization and measures have been removed. The removal of temporary ESC measures,
including basins, requires prior approval. Often, a full growing season is necessary between initial seeding/mulching and
removal of measures. Please plan your construction accordingly to avoid contacting our office prematurely for a closure
inspection. Also be advised you may be asked for representative site pictures prior to a closure inspection. [General
Comment]
Your cooperation is appreciated.
Sincerely,
Nicole Chiles, PE- Assistant Regional Engineer
North Carolina Department of Environmental Quality
Division of Energy, Mineral &Land Resources
Land Quality Section
Attachments: Certificate of Approval
FRO Application Report
North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
-FIE Q4.
Winston-Salem Regional Office 1450 West Hanes Mill Road,Suite 300 I Winston-Salem NC,27105
), 336-776-9800
Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized
state official.
Application Report-Tuesday,April 16,2024 850 AM.pdf
92.2kB
n'J DAVID-2024-0131 Lot 1 Wynnfall.pdf
118.9kB