Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Blackbird Wetland Ledger 050924
Transaction Credits Released Credits Debited Current Credits Number To Bank From Bank Credit Balance Reserved Purchaser Project Permit Number Closing Date HUC 1 2.350 2/26/21 2 2.350 8/20/21 3 0.420 Ashton Raleigh Residential, LLC The Point SAW ‐ 2008 ‐ 00871 8/24/21 3020201 4 1.400 The Trustees of Wake Tech Community College Wake Tech East Campus DWR# 20210475 8/26/21 3020201 5 0.800 Highland Ridge, LLC Highland Ridge Subdivision SAW-2021-00541 8/31/21 3020201 6 0.320 Duke Energy Progress, LLC Project Walter/Duke Energy/ Garner Rock Quarry Substation SAW-2018-01747 12/3/21 3020201 7 0.460 Johnston County Reedy Creek Wastewater Pump Station and Force Main SAW-2021-00930 12/28/21 3020201 8 1.570 3/23/22 9 0.780 Eastfield Associates, LLC Eastfield Crossing / Providence Boulevard SAW-2018-00045 3/28/22 3020201 10 0.520 Scannell Properties, LLC Junction Road and Ferrell Road Site SAW-2021-00350 4/7/22 3020201 11 0.320 DR Horton - Terramor LLC Winston Pointe SAW-2021-02303 6/3/22 3020201 12 0.980 EV Benson Land LLC Crosspoint Logistics Center SAW-2021-01506 6/27/22 3020201 13 0.270 Piedmont Natural Gas Company, Inc. PNG Line 142 Natural Gas Pipeline / Wake and Johnston Counties SAW-2021-01288 7/12/22 3020201 14 1.570 1/30/23 15 0.880 Investors Title Insurance Company / BRD Land & Investment Candence Meadows SAW-2021-00606 4/3/23 3020201 16 0.690 RBV 231, LLC Browning Stables SAW-2022-01606 6/16/23 3020201 17 2.352 11/13/23 18 0.220 Lennar Carolinas - Raleigh Division, Michael Taylor Parker Ridge SAW-2021-02532 3/14/24 3020201 19 0.246 Bradley Stancil Hampton Meadows Subdivision SAW-2023-00708 3/22/24 3020201 20 0.526 Lennar Corporation – Raleigh Division, Eric Blocher Rolesville Crossing SAW-2023-01457 5/9/24 3020201 Total 10.192 8.832 1.360 0.000 Credits Released: Task 3 NEU-CON UMBRELLA WETLAND AND STREAM MITIGATION BANK BLACKBIRD WETLAND CREDIT LEDGER (HUC 03020201) Thursday, May 9, 2024 Riparian Wetland Credits Released: Task 1 Credits Released: Task 2 Credits Released: Task 4 Credits Released: Task 5