Loading...
HomeMy WebLinkAboutWQ0045352_TBMNC_BEV_Phase_II_East_Quad_FTSSE_Permit_App_2nd_Submission_20240516•• PROTECTED N(,-Tf.#AW, 06, L'fe DWR Division of Water Resources Z14 Cfofn of Nnrtit V arnlina Department of Environmental Quality Division of Water Resources FAST TRACK SEWER SYSTEM EXTENSION APPLICATION FTA 10-23 & SUPPORTING DOCUMENTATION Application Number:) )QW t 53 J Ito be completed by DWR) All items must be completed or the application will be returned I. APPLICANT INFORMATION: I. Applicant's name: Tovota (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual 0 Corporation ❑ General Partnership ❑ Federal ❑ State/County ❑ Municipal 3. Signature authority's name: K. Scott Walker per I5A NCAC 02T .0106(b) Title: Engineering Manager 4. Applicant's mailing address: 5938 Julian Airport Road City: Lim ` State: NC Zip: 27298-_ 5. Applicant's contact information: i Phone number: (859) 739-6537 Email Address: scott.walker( tovota.com II. PROJECT INFORMATION: ❑ Privately -Owned Public Utility ❑ Other 1. Project name: TBMNC BEV Phase II East Ouad' 2. Application/Project status: ® Proposed (New Permit ❑ Existing Permit/Project If a modification, provide the existing permit number: WQ and issued date: , For modifications, also attach a detailed narrative description as described in Item G of the checklist. If new construction, but part of a master plan, provide the existing permit number: W000 3. County where project is located: Randolph 4. Approximate Coordinates: (Decimal Degrees): Latitude: 35.8947854° Longitude:-079.6335583' 5. Parcel ID (if applicable): 8718029180 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: Professional Engineer: Matthew W Watt' License Number: 037518 Firm: HDR Engineering Inc. of the Carolinas Mailing address: 440 S. Church St. Suite 1200 i City: Charlotte ' State: NC ' Zip: 28202-2075 Phone number: 3( 36) 955-8259 � Email Address: matthew.watt(a)hdrinc.com ' IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: T.Z.Osborne Water reclamation Facility Permit Number: NCO047384 Owner Name: City of Greensboro,/ V. RECEIVING DOWNSTREAM SEWER INFORMATION: 1. Permit Number(s): WQCS00006 ' 2. Downstream (Receiving) Sewer Information: 24" inch � ® Gravity' ❑ Force Main 3. System Wide Collection System Permit Number(s) (if applicable): WQCS00006 Owner Name(s): City of Greensboro, FORM: FTA 10-23 Page 1 of 6 .. PROTECTED M1, WAW VI. - GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑ No ® N/A - 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached? ❑ Yes ❑ No ® N/A � 3. If the Applicant is a Home/Property Owners' Association, has an HOA/POA Operational Agreement (FORM: HOA) and supplementary documentation as required by 15A NCAC 02T.0I 15(c) been attached? []Yes [:]No ®N/A 4. Origin of wastewater: (check all that apply) ❑ Residential (Individually Owned) ❑ Retail (stores, centers, malls) ❑ Car Wash ❑ Residential (Leased) ❑ Retail with food preparation/service ❑ Hotel and/or Motels ❑ School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool/Clubhouse ❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash ® Businesses / offices / factorie4 ❑ Nursing Home ❑ Other (Explain in Attachment) 5. Nature of wastewater: % Domestic % Commercial _ % Industrial (See 15A NCAC 02T .0103(20)) If Industrial, is there a Pretreatment Program in effect? ❑ Yes ❑ No 6. Hasa flow reduction been approved under 15A NCAC 02T .0114(fl? ❑ Yes ® No If yes provide a copy of flow reduction approval letter with this application 7. Summarize wastewater generated by project: Establishment Type (see 02T.0114(f)) Daily Design Flow''" No. of Units Flow gal/ GPD gal/ GPD gal/ GPD gay GPD gal/ GPD gal/ GPD ­ Total IT 0 GPD a See 15A NCAC 02T 0114(b), (d), (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01 l41 shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 0 GPD (per 15A NCAC 02T .0114) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, please indicate why: ❑ Pump Station/Force Main or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line. Please provide supplementary information indicating the approximate [imeframe for permitting upstream sewers with flow. i moo ® Flow has already been allocated in Permit Number: W00040884 Issuance Date: 1/5/2023 ❑ Rehabilitation or replacement of existing sewers with no new flow expected ❑ Other (Explain): FORM: FTA 10-23 Page 2 of 6 '•• PROTECTED %i%4$* VU. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers): 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8" 45 C-900 ➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirements is not allowed and a violation of the MDC VILL PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains): PROVIDE A SEPARATE COPY OF THIS PAGE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 806 i 2. Approximate Coordinates (Decimal Degrees): Latitude: 35.8890785' Longitude:-079.6264383' 3. Total number of pumps at the pump station: 2� 4. Design flow of the pump station: .31'millions gallons per day (firm capacity) ➢ This should reflect the total GPM for the pump station with the largest pump out of service. 5. Operational point(s) per pump(s): 220 jallons per minute (GPM) at 20 feet total dynamic head (TDH) 6. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 6" 2000 C-900 C-900 If any portion of the force main is less than 4-inches in diameter, please identify the method of solids reduction per MDCPSFM Section 2.01C. Lb. ❑ Grinder Pump ❑ Mechanical Bar Screen ❑ Other (please specify) 7. Power reliability in accordance with 15A NCAC 02T .0305(h)(1): ® Standby power source 6r ® Standby pump' ➢ Must have automatic activation and telemetry - 15A NCAC 02T.0305(h)(1)(B): ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day D Must be permanent to facility and may not be portable Or if the pump station has an average daily flow less than 15,000 gallons per day 15A NCACO2T.0305(h)(1)(C): ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - or ❑ Portable pumping unit with plugged emergency pump connection and telemetry: ➢ Include documentation that the portable source is owned or contracted by the applicant and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided as part of this permit application in the case of a multiple station power outage. FORM: FTA 10-23 Page 3 of 6 •• PROTECTED(f31 IX. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers): 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8" 45 C-900 ➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirements is not allowed and a violation of the MDC X. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains): PROVIDE A SEPARATE COPY OF THIS PAGE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 807 ' i 2. Approximate Coordinates (Decimal Degrees): Latitude: 35.89410750 Longitude:-079.6259401° 3. Total number of pumps at the pump station: 2 � 4. Design flow of the pump station: .31'millions gallons per day (firm capacity) ➢ This should reflect the total GPM for the pump station with the largest pump out of service. 5. Operational point(s) per pump(s): 220 gallons per minute (GPM) at 18 feet total dynamic head (TDH) 6. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 8" 2750 C-900 If any portion of the force main is less than 4-inches in diameter, please identify the method of solids reduction per MDCPSFM Section 2.01C. Lb. ❑ Grinder Pump ❑ Mechanical Bar Screen ❑ Other (please specify) 7. Power reliability in accordance with 15A NCAC 02T .0305(h)(1): ® Standby power source or /® Standby pdrnp ➢ Must have automatic activation and telemetry - 15A NCAC 02T.0305(h)(1)(B). ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility and may not be portable Or if the pump station has an average daily flow less than 15,000 gallons per day 15A NCACO2T.0305(h)(1)(C): ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - or ❑ Portable pumping unit with plugged emergency pump connection and telemetry: ➢ Include documentation that the portable source is owned or contracted by the applicant and is compatible with the station. If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided as part of this permit application in the case of a multiple station power outage. FORM: FTA 10-23 Page 4 of 6 2nd Submission - corrected question IX.6. IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(f)): 1. Does the project comply with all separations/alternatives found in 15A NCAC 02T .0305(f) & (g)? ® Yes ❑ No 15A NCAC 02T.0305 contains minimum separations that shall be provided for sewers stems: Setback Parameter* Separation Required Storm sewers and other utilities not listed below (vertical) 18 inches ZWater mains (vertical - water over sewer preferred, including in benched trenches) 18 inches ZWater mains (horizontal) 10 feet Reclaimed water lines (vertical - reclaimed over sewer) 18 inches Reclaimed water lines (horizontal - reclaimed over sewer) 2 feet **Any private or public water supply source, including any wells, WS-I waters of Class I or Class II impounded reservoirs used as a source of drinking water, and associated wetlands. 100 feet "Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water (or tide elevation) and wetlands associated with these waters (see item IX.2) 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches, as well as wetlands associated with these waters or classified as WL. 10 feet Any building foundation (horizontal) 5 feet Any basement (horizontal) 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade (vertical) 36 inches ➢ If noncompliance with 02T.0305( or (g), see Section X.1 of this application *15A NCAC 02T.0305(g) contains alternatives where separations in 02T.0305(f) cannot be achieved. Please check "yes" above if these alternatives are used and provide narrative information to explain. **Stream classifications can be identified using the Division's NC Surface Water Classifications webpage 2. Does this project comply with the minimum separation requirements for water mains? ® Yes ❑ No ® N/A ➢ If no, please refer to 15A NCAC 18C.0906(f) for documentation requirements and submit a separate document, signed/sealed by an NC licensed PE, verifying the criteria outlined in that Rule. 3. Does the project comply with separation requirements for wetlands? ® Yes ❑ No ❑ N/A ➢ Please provide supplementary information identifying the areas of non-conformance. ➢ See the Division's draft separation requirements for situations where separation cannot be met. ➢ No variance is required if the alternative design criteria specified is utilized in design and construction. 4. Is the project located in a river basin subject to any State buffer rules? ❑ Yes Basin name: ® No If yes, does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ❑ Yes ❑ No ➢ This includes Trout Buffered Streams per 15A NCAC 2B.0202 5. Does the project require coverage/authorization under a 404 Nationwide/individual permits ® Yes ❑ No or 401 Water Quality Certifications? ➢ Please provide the permit number/permitting status in the cover letter if coverage/authorization is required. 6. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? ® Yes ❑ No Per 15A NCAC 02T.0I05(c)(6), directly related environmental permits or certification applications must be being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 7. Does this project include any sewer collection lines that are deemed "high -priority?" ❑ Yes ® No Per 15A NCAC 02T.0402, "high -priority sewer" means any aerial sewer, sewer contacting surface waters, siphon, or sewers positioned parallel to streambanks that are subject to erosion that undermines or deteriorates the sewer. Siphons and sewers suspended through interference/conflict boxes require a variance approval. ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permittee's individual System -Wide Collection permit. FORM: FTA 10-23 Page 5 of 6 • — PROTECTED MW I "A First submission. IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(f)): 1. Does the project comply with all separations/alternatives found in 15A NCAC 02T .0305(f) & (a)? 15A NCAC 02T 0305 contains minimum separations that shall be provided for sewers stems: W ® Yes ❑ No Setback Parameter* Separation Required Storm sewers and other utilities not listed below (vertical) 18 inches 'Water mains (vertical - water over sewer preferred, including in benched trenches) 18 inches 'Water mains (horizontal) 10 feet Reclaimed water lines (vertical - reclaimed over sewer) 18 inches Reclaimed water lines (horizontal - reclaimed over sewer) 2 feet **Any private or public water supply source, including any wells, WS-I waters of Class I or Class II impounded reservoirs used as a source of drinking water, and associated wetlands. 100 feet **Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water (or tide elevation) and wetlands associated with these waters (see item IX.2) 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches, as well as wetlands associated with these waters or classified as WL. 10 feet Any building foundation (horizontal) 5 feet Any basement (horizontal) 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade (vertical) 36 inches ➢ If noncompliance with 02T.0305(f) or (g). see Section X. i of this application * 15A NCAC 02T.0305(a) contains alternatives where separations in 02T.0305(f) cannot be achieved. Please check "yes" above if these alternatives are used and provide narrative information to explain. **Stream classifications can be identified using the Division's NC Surface Water Classifications webpag 2. Does this project comply with the minimum separation requirements for water mains? ® Yes ❑ No ® NIA ➢ If no, please refer to 15A NCAC 18C.0906(f) for documentation requirements and submit a separate document, signed/scaled by an NC licensed PE, verifying the criteria outlined in that Rule. 3. Does the project comply with separation requirements for wetlands? ®Yes ❑ No ❑ N!A ➢ Please provide supplementary information identifying the areas of non-conformance. ➢ See the Division's draft separation requirements for situations where separation cannot be met_ ➢ No variance is required if the alternative design criteria specified is utilized in design and construction. 4. Is the project located in a river basin subject to any State buffer rules? ❑ Yes Basin name: ® No If yes, does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ❑ Yes ❑ No ➢ This includes Trout Buffered Streams per 15A NCAC 213.0202 5. Does the project require coverage/authorization under a 404 Nationwide/individual permits ® Yes ❑ No r' or 401 Water Quality Certifications? i�o Please provide the permit number/permitting status in the cover letter if coverage/authorization is required. e" f 6. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? ❑ Yes ® No , Per 15A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications must be being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 7. Does this project include any sewer collection lines that are deemed "high -priority?" [:]Yes ® No Per 15A NCAC 02T.0402, "high -priority sewer" means any aerial sewer, sewer contacting surface waters, siphon, or sewers positioned parallel to streambanks that are subject to erosion that undermines or deteriorates the sewer. Siphons and sewers suspended through interference/conflict boxes require a variance approval. ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permittee's individual System -Wide Collection permit. FORM: FTA 10-23 Page 5 of 6 •• PROTECTED iAVr7AV, X. CERTIFICATIONS: 1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains (latest version), and the Gravity Sewer Minimum Design Criteria (latest version) as applicable? ® Yes ❑ No If no, for projects requiring a single variance, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review to the Central Office. Approval of the request will be issued concurrently with the approval of the permit, and projects requiring a variance approval may be subject to longer review times For projects requiring two or more variances or where the variance is determined by the Division to be a significant portion of the project, the full technical review is required. 2. Professional Engineer's Certification: I, Matthew Watt, attest that this application for TBMNC BEV Phase II East Quad (Professional Engineer's name from Application Item 111.1.) (Project Name from Application Item 11.1) has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. Misrepresentation of the application information, including failure to disclose any design non-compliance with the applicable Rules and design criteria, may subject the North Carolina -licensed Professional Engineer to referral to the licensing board. (21 NCAC 56.0701) North Carolina Professional Engineer's seal, signature, and date: oNa11 3. Applicant's Certification per 15A NCAC 02T .0106(b): I, K. Scott Walker, attest that this application for TBMNC BEV Phase II East Quad (Signature Authority Name from Application Item 1.3.) (Project Name from Application Item 11.1) attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non -discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Signature: ` p" / 1 Date: 4)16 I 202y FORM: FTA 10-23 Page 6 of 6 Trading Post 1. <6 Julian Brady Automotive,, Old 421, Rd i tGreensboro Randolph Mega Site fSh,ioh United Methodist wre, Gologle Earth Greensboro St 1z0 1 mi IR, M.UJGS u.S.MMMNfOf XEIMERIOR r.�e.....w..e VS. flOLCfXY SYRVIV T�WMy Osvrvu.. ���aL" USSTopo uuu� cuwuxaE CIY4X. 51[ I BUSINESS CORPORATION ANNUAL REPORT 11 120n NAME OF BUSINESS CORPORATION: TOYOTA BATTERY MANUFACTURING, INC. SECRETARY OF STATE ID NUMBER: 2322759 STATE OF FORMATION: DE REPORT FOR THE FISCAL YEAR END: 12/31 /2021 SECTION A: REGISTERED AGENT'S INFORMATION 1. NAME OF REGISTERED AGENT: CT Corporation System E - Filed Annual Report 2322759 CA202232100643 11117/2022 12:00 0 Changes 2. SIGNATURE OF THE NEW REGISTERED AGENT: SIGNATURE CONSTITUTES CONSENT TO THE APPOINTMENT 3. REGISTERED AGENT OFFICE STREET ADDRESS & COUNTY 4. REGISTERED AGENT OFFICE MAILING ADDRESS 160 Mine Lake Ct Ste 200 Raleigh, NC 27615 Wake County SECTION B: PRINCIPAL OFFICE INFORMATION 1. DESCRIPTION OF NATURE OF BUSINESS: 160 Mine Lake Ct Ste 200 Raleigh, NC 27615 Battery R&D and Manufacturing Plant 2. PRINCIPAL OFFICE PHONE NUMBER: (469) 786-8361 3. PRINCIPAL OFFICE EMAIL: Privacy Redaction 4. PRINCIPAL OFFICE STREET ADDRESS 5. PRINCIPAL OFFICE MAILING ADDRESS 6565 Headquarters Dr 6565 Headquarters Dr TX 75024 Plano. TX 75024 6. Select one of the following if applicable. (Optional see Instructions) ❑ The company is a veteran -owned small business The company is a service -disabled veteran -owned small business SECTION C::OFFICERS (Enter additional officers in Section E.) NAME: Shinichi Yasui NAME: Sean Suggs NAME: Thihaut De Barros Conti TITLE: Senior Vice President TITLE: President ADDRESS: ADDRESS: TITLE: Secretary ADDRESS: 6565 Headquarters Drive 6565 Headquarters Drive 6565 Headquarters Drive Plano, TX 75024 Plano, TX 75024 Plano, TX 75024 SECTION D: CERTIFICATION OF ANNUAL REPORT. enti S -inichi Yasui Section D must be completed in its entirety by a person/business 11/17/2022 DATE Farts must be signed by an officer listed under Section C of this form. Shinichi Yasui Senior Vice President Print or Type Name of Officer Print This Annual Report'has been filed electronically. MAIL TO: Secretary of State, Business Registration Division, Post Office Box 29525, Raleigh, NC 27626-0525 of Officer