Loading...
HomeMy WebLinkAbout20160051 Ver 1_Shoreline Stabilization_20160113State of North Carolina •;T c •: Department of Environment and Natural Resources Division of Water Resources Loli - Division of Water Resources 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization FORM: SSGP 10-2013 Shoreline Stabilization Application Form Three copies of the application (including attachments) and the application fee should be sent to: Division of Water Resources 401 & Buffer Permitting Unit 1617 Mail Service Center 2 0 1 60 0 5 1 Raleigh, NC 27699-1617 tQ- I. Applicant Information [15A NCAC 02H .0502(a)1. Owner Information 1 3 2016 Name: _ i DEw Mailing Address: G5 FFER PERMITTIN 2 Telephone Number: 7 c -'?'SQ- (02JFax Number: E-mail Address:j and (2 c I&rn �:�, + Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter (a form can be downloaded here: http://www.saw.usace.army.mil/Portals/59/docs/regulatory/regdocs/Permits/SAMPLE AGENT AUTH ORIZATION FORM.pdf) must be attached if the Agent has signed this application form. Name: A/4 ► ke / n . \ I S r" Compar Mailing Telephone Number.% Fax Number: E-mail Address: Lkt!m.kd.,<- c f= r %�J c, � Person to receive the Certification Approval: 4J II. Project Information [15A NCAC 02H .0502(a) & (b)] 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, FORM: SSGP 10-2013 Page 1 of 3 etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) �r`1�/ County: Jcc— Nearest Town: �� N�� ('(TO r t1. Subdivision name or site address (include phase/lot number): �— Directions to site - please include road names and numbers, landmarks, etc.: Latitude (in decimal degrees) -5-;-77,7 '/ 7 Longitude (decimal degrees) 9(-, 5. Describe the,5' d use or condition of the site at the time of this application (residential, ev , c.): 6. Property size (acres): 7. Lake/ river/ ocean adjacent to property: 8. Describe proposed work (include discussion as to how qq hardeff ning of shoreline has been avoided, or why it is necessary): S /a,:;,,\ h a, C : o, , 2 S * A,Ae 9. Will work be conducted from land? �— From water? ❑ 10. Total amount of disturbance (including all excavation, backfill, rip rap, retaining walls, etc.) below the normal pool lake level/ Normal Water Level in square feet or acres: 11. Total amount of disturbance (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) above the normal pool lake level/ Normal Water Level and 50 feet land -ward in square feet or acres: 12. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feat landward to be impacted (number of trees, for instance): 1iC.l'L Owner/Agent's Signature* Printed Name Date [15A NCAC 02H .0502(f)I Agent's signature is valid only if an authorization letter from the owner is provided. FORM: SSGP 10-2013 Page 2 of 3 Full Pond/ Normal Water Level SI Lake (At Full Pond/ Normal Water Level) Please approximately sketch the following information on this plan (provide dimensions for each item, such as 10 ft x 100 ft) *: 1. All proposed vegetation clearing 2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation 3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation 4. Location of any proposed structures such as buildings, retaining walls, docks, etc. 5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation 6. Location of construction access corridors FORM: SSGP 10-2013 Page 3 of 3 Shoreline Erosion.jpg r 4" Z—ba 1/4/16, 6:44 PM about:blank Page 1 of 1 I: 4q Z—ba 1/4/16, 6:44 PM about:blank Page 1 of 1