HomeMy WebLinkAboutWQ0043673_Emails_20230710Baker, Caroline D
From: Thomas, Zachary T
Sent: Monday, July 10, 2023 12:07 PM
To: Ethan Averette
Cc: Wilson, Susan A; Vinson, Scott; Robson, Dorothy M; Hall, Michael
Subject: RE: [External] RE: Emily Garden's Phase 1 Sewer Application
Attachments: Sewer Permit Application - Emily Gardens Phase 1.docx; Emily Gardens Phase 1
FTSE.pdf
Hi Ethan,
If Pine Level is the applicant, and Pine level is going to own the infrastructure that's described in the application (and will
be included in the permit that's issued to Pine Level), then they need to be the one to sign the application X.3.
Since it's going to a downstream PS owned by JoCo, and to the JoCo plant, you will need to submit two FTSE's:
• One signed by JoCo that describes the downstream PS and WWTP.
• One from Pine Level that may not include any PS... but is still stating that Pine Level's Collection System can
handle the new flow.
I have shifted over to a different program area in the RRO, and I am not currently reviewing Fast Tracks at this time. I
have cc'd a few folks in the office that are currently reviewing these so that they are in the loop if this one is assigned to
them once the application and fee have been submitted.
If you have any questions, please let me know.
Thank you,
Zach Thomas
Environmental Program Consultant, Division of Water Resources
North Carolina Department of Environmental Quality
Office: (919) 791-4255
zachary.thomas@deq.nc.gov "Please note my new email address"
Raleigh Regional Office
1628 Mail Service Center
Raleigh, NC 27699-1628
Email correspondence to and from this address is subject to the North Carolina Public Records Law
and may be disclosed to third parties.
From: Ethan Averette <eaverette@stocksengineering.com>
Sent: Monday, July 10, 2023 10:10 AM
To: Thomas, Zachary T <zachary.thomas@deq.nc.gov>
Subject: [External] RE: Emily Garden's Phase 1 Sewer Application
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Also, to preliminarily remove confusion on the submittal, here is the application and FTSE I am referencing. Thanks for
your help,
Sincerely,
Ethan Averette, P.E.
Stocks Engineering, PA
ENGINEERING
Vese nin j f4e `Future ... %c(a�
801 East Washington St. * PO Box 1108 * Nashville, NC 27856
0: 252-459-8196 M: 919-725-4213
www.stocksengineering.com
From: Ethan Averette
Sent: Monday, July 10, 2023 10:06 AM
To: Thomas, Zachary T <zachary.thomas@ncdenr.gov>
Subject: Emily Garden's Phase 1 Sewer Application
Zach,
Good Morning, I have a quick question about how the sewer application for Emily Garden's should be submitted since
the town of Pine Level and Johnston County have finally reached agreement on sewer allocation. Since Pine Level does
not operate the lift station that our flow gravity's to, Johnston County has filled out and signed the FTSE for the flow
from their lift station to the WWTP. Can Pine Level as the applicant who grants allocation sign the sewer application
under X.3? Also, Does Pine Level need to fill out a FTSE if they only own a small portion of gravity line between the
extension and the Johnston County pump station?
Sorry for the confusion on my part. This project has changed so many times I can't remember what you have requested
in the past. Thanks,
Sincerely,
Ethan Averette, P.E.
Stocks Engineering, PA
ENGINEERING
Vese nin j f4e `Future ... %c(a�
801 East Washington St. * PO Box 1108 * Nashville, NC 27856
0: 252-459-8196 M: 919-725-4213
www.stocksengineering.com
From: Thomas, Zachary T
Sent: Monday, September 12, 2022 3:37 PM
To: PUBLICWORKS@PIN ELEVEL.ORG; mstocks@stocksengineering.com; depclerk@pinelevel.org;
chandra.farmer@iohnstonnc.com
Cc: Robinson, Jason <jason.t.robinson@ncdenr.gov>; Kurtz, Cassidy <Cassidy.Kurtz@ncdenr.gov>
Subject: WQ0043673 - Emily Gardens Phase I (Pine Level/Johnston Co)
Good Afternoon,
During the review of the sewer extension application for Emily Gardens Phase I, the following questions have come up:
1. Section V1.2 states an answer of 'yes' to applicant is developer and include DOA. Since the applicant is listed as
Pine Level (municipality), please confirm that the Town will be the applicant/permittee and that the answer
should be 'no' and was marked yes in error.
2. The provided FTSE has been signed by Jeff Holt, Pine Level Mayor, and not by a representative of the receiving
treatment system indicated as Central Johnston County Regional WWF (NC0030716). Please confirm the
receiving facility and submit an updated FTSE form that includes a signature from a representative of Johnston
County to indicate notification/acceptance of this additional flow.
3. We would like to confirm that there are no downstream pump stations that this new extension will be flowing
into.
Please let me know if you have any questions.
Thank you,
Zach Thomas
Environmental Program Consultant
Raleigh Regional Office
Water Quality Regional Operations
NCDEQ— Division of Water Resources
Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has
adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or
are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to
appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your
requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging
time.
919.791.4255 Office **NEW NUMBER**
zachary.thomas@ncdenr.gov
1628 Mail Service Center
Raleigh, NC 27699-1628
e:,---D E Q
Email correspondence to and from this address is subject to the North Carolina Public Records Law
and may be disclosed to third parties.