Loading...
HomeMy WebLinkAbout20160017 Ver 1_Approval Letter_20160129Water Resources ENVIRONMENTAL 6UALrrY January 29, 2016 Piedmont Natural Gas Attn: Jason Brown 4720 Piedmont Row Dr. Charlotte NC 28210 PAT MCCRORY C inventor DONALD R. VAN DER VAART Seereatty S. JAY ZIMMERMAN Director DWR # 16-0017 Forysyth County Subject: APPROVAL OF 401 WATER QUALITY CERTIFICATION WITH ADDITIONAL CONDITIONS Line 328 Pipeline Relocation Dear Mr. Brown: You have our approval for the impacts listed below for the purpose described in your application dated December 23, 2015, received by the Division of Water Resources (Division) December 29, 2015, with subsequent information on January 25, 2016. These impacts are covered by the attached Water Quality General Certification Number 3884 and the conditions listed below. This certification is associated with the use of Nationwide Permit Number 12 once it is issued to you by the U.S. Army Corps of Engineers. Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non -Discharge, and Water Supply Watershed regulations. This approval requires you to follow the conditions listed in the enclosed certification(s) or general permit and the following additional conditions: 1. The following impacts are hereby approved provided that all of the other specific and general conditions of the Certification are met. No other impacts are approved, including incidental impacts. [15A NCAC 02H .0506(b) and/or (c)] Type of Impact Amount Approved (units) Permanent Amount Approved (units) Temporary Stream Site S1 0 (linear feet) 37 (linear feet) Site S2 0 (linear feet) 30 (linear feet) 404/401 Wetlands Site W1 0.03 (acres) 0 (acres) 450 W. Hanes Mill Road, Suite 300, Winston-Salem, North Carolina 27105 Phone: 336-776-9800 \ FAX: 336-776-9797 \ Customer Service 1-877-623-6748 Internet: www.ncdenr.gov - www.ncwater.org Piedmont Natural Gas DWR# 16-0017 401 APPROVAL Page 2 of 3 This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of the Certification. If you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate fee. If the property is sold, the new owner must be given a copy of this approval letter and General Certification(s)/Permit/Authorization and is responsible for complying with all conditions. [15A NCAC 02H .0507(d)(2)] 3. The PNG Line 328 Relocation has been determined to be secondary to NCDOT project TIP U-2579 (Winston Salem Northern Beltway; Section C) by the US Army Corps of Engineers (USACE). Impacts for this project shall be cumulative to the impacts associated with referenced NCDOT permit. This approval and its conditions are final and binding unless contested. [G.S. 143-215.5] This Certification can be contested as provided in Articles 3 and 4 of General Statute 150B by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH) within sixty (60) calendar days. A petition form may be obtained from the OAH at ht_tp://www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-3000 for information. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday between 8:00am and 5:00pm, excluding official state holidays). The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: If sending via US Postal Service: If sending via delivery service (UPS, FedEx, etc): Office of Administrative Hearings Office of Administrative Hearings 6714 Mail Service Center 1711 New Hope Church Road Raleigh, NC 27699-6714 Raleigh, NC 27609-6285 One (1) copy of the petition must also be served to DENR: Sam Hayes, General Counsel Department of Environment and Natural Resources 1601 Mail Service Center Raleigh, NC 27699-1601 Piedmont Natural Gas DWR# 16-0017 401 APPROVAL Page 3 of 3 This letter completes the review of the Division under section 401 of the Clean Water Act. Please contact Sue Homewood at 336-776-9693 or sue,homewood@ncdenr.gov if you have any questions or concerns. Sincerely, Sherri V. Knight, P. E. Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ— WSRO Enclosures: GC 3884 cc: Amy James, Kleinfelder, Inc. (via email) John Thomas, USACE Raleigh Regulatory Field Office (via email) DWR WSRO 401 file DWR 401 & Buffer Permitting Unit file