Loading...
HomeMy WebLinkAbout310060_Application_20240401 State of North Carolina Department of Environmental Quality Division of Water Resources Animal Waste Management Systems Request for Certification of Coverage Facility Currently covered by an Expiring Sate Non-Discharge General Permit On September 30, 2024? the North Carolina State Non-Discharge General Permits for Animal Waste Management Systems will expire. As required by these permits, facilities that have been issued Certificates of Coverage to operate under these State Non-Discharge General Permits must apply for renewal at least 180 days prior to their expiration date. Therefore, all applications must be received by the Division of Water Resources by no later than April 3,2024. Please do not leave any question unanswered Please verify all information and make any necessat:v corrections below. Application iuust be signed and dated by the Permittee. I. Certificate Of Coverage Number: AWS310060 2. Facility Name: Sunshine Nurseries 3. Pennittee's Name(same as on the Waste Management Plan): M and A Phillips LLC 4. Pennittee's Mailing Address: 517 Abner Phillips Rd City: Warsaw State: NC Zip: 28398-8524 Telephone Number: 910-271-2290 Ext. E-mail: attphillips1957(ti),gmail.com 5. Facility's Physical Address: 275 And 277 Revelle Rd City: Warsaw State: NC Zip: 28399 6. County where Facility is located: Du lin 7. Farm Manager's Name(if different from Landowner): Marshall 11 Philli is 8. Farm Manager's telephone number(include area code): 910-290-0111 Ext. 9. Integrator's Name(if there is not an Integrator,write"None"): Maxwell Foods LLC 10. Operator Name(OIC): Marshall H. Phillips Phone No.: 910-290-0111 OIC 9.: 29714 11. Lessee's Name(if there is not a Lessee,write"None"): 12. indicate animal operation type and number: Current Permit: Operations Type Allowable Count Swine-Wean to Feeder 11.200 Operation Types: Swine Cattle Dry Poultry Other Types Wean to Finish Dairy Calf Non Laying Chickens 1-forses-Horses Wean to Feeder Dairy Heifer Laying Chickens Horses-Other Farrow to Finish Milk Cow Pullets Sheep-Sheep Feeder to Finish Dry Cow Turkeys Sheep-Other Farrow to Wean Beef Stocker Calf Turkey Pullet Farrow to Feeder Beef Feeder Boar/Stud Beef Broad Cow Wet Poultry Gilts Other Non laying Pullet Other Layers 13. Waste Treatment Lagoons, Digesters and Waste Storage Ponds(WSP):(FilliVerify the following information. Make all necessary corrections and provide missing data.) Structure Type Estimated Liner Type Estimated Ucsign Freeboard Structure (Lagoon"Uigesteri bate {Clay,Synthetic, Capacity Surface Area "Redline" Name WSP) Built Unknown) (Cubic Feet) (Square Feet) (Inches) hi Lagoon 10'2311991 Full,clay 298,742.00 38,525.00 19.00 42 Lagoon 4/19/1993 Full,clay 265,923.00 42,966.00 19.50 i Submit one (1) copy of the Certified Animal Waste Management Plan (CAWMP) with this completed and signed application as required by NC General Statutes 143-215.1OC(d), either by mailing to the address below or sending it via email to the email address below. The CAWMP must include the following components: 1. The most recent Waste Utilization Plan (WUP),signed by the owner and a certified technical specialist, containing: a. The method by which waste is applied to the disposal fields(e.g.irrigation, injection,etc.) b. A map of every field used for land application(for example: irrigation Wrap) c. The soil series present on every land application field d. The crops grown on every land application field e. The Realistic Yield Expectation(RYE)for every crop shown in the WUP f. The maximum PAN to be applied to every land application field g. The waste application windows for every crop utilized in the WUP h. The required NRCS Standard specifications 2. A site map/schematic 3. Emergency Action Plan 4. Insect Control Checklist with chosen best management practices noted 5. Odor Control Checklist with chosen best management practices noted 6. Mortality Control Checklist with selected method noted-Use the enclosed updated Mortality Control Checklist 7. Lagoon/storage pond capacity documentation(design,calculations,etc.) Please be sure the above table is accurate and complete. Also provide any site evaluations,wetland determinations,or hazard classifications that may be applicable to your facility. 8. Operation and Maintenance Plan If your CAWMP includes any components not shown on this list,please include the additional components with your submittal. (e.g.composting,digesters,solids separators,sludge drying system,waste transfers,etc.) I attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that, if all required parts of this application are not completed and that if all required supporting information and attachments are not included,this application package will be returned to me as incomplete. Mote: In accordance with NC General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application may be subject to civil penalties up to $25,000 per violation. (Is U.S.C. Section 1001 provides a punishment by a fine of not more than$10,000 or imprisonment of not more than 5 years,or both for a similgir offense.)nn Yti�F A,,A,,((w Pkc t li— Print the Name of the Pennitt /Landowner/Signing Official and Sign below.(If multiple Landowners exist,all landowners shoe ld sign. If L ndo`wner is/a corporati ,signature s u/ld,be by a principal executive officer of the corporation): J", i� �!" Title. d09 Signature: Date: L --- Name(Print): Title: Signature: Date: Name(Print): Title: Signature: Date: THE COMPLETED APPLICATION SHOULD BE SENT TO THE FOLLOWING ADDRESS: E-mail: animal.operations@deq.nc.gov NCDEQ-DWR Animal Feeding Operations Program 1636 Mail Service Center Raleigh,North Carolina 27699-1636 ROY COOPER 4 4 Governor ELIZABETH S.BISER Secretary RICHARD E.ROGERS,JR. NORTH CAROLINA Director Environmental Quality February 12,2024 M and A Phillips LLC Sunshine Nurseries 517 Abner Phillips Rd Warsaw,NC 28398-8524 Subject: Application for Renewal of Coverage for Expiring State General Permit Dear Permittee: Your facility is currently approved for operation under one of the Animal Waste Operation State Non-Discharge General Permits, which expire on September 30.. 2024. In order to ensure your continued coverage under the State Non-Discharge„General Permitsyou must submit an application for permit coverage to the Division of Water Resources DWR by Aril 3 2024. Enclosed you will find a "Request for Certificate of Coverage for Facility Currently Covered by an Expiring State Non-Discharge General Permit."The application form must be completed,signed by the Permittee,and retttrned to the DWR by. April 3,2024. Mailing Address: NC'DEQ-DWR Animal Feeding Operations Program 1636 Mail Service Center Raleigh,North Carolina 27699 1636 Email: animal.operations( deq.nc.gov phone:(919)707 9129 Please note, that you must include one (1) copy of the Certified Animal Waste Management Plan (CAWNIP) with the completed and signed application form. A list of items included in the CAWMP can be found on page 2 of the renewal anniication form. Failure to request renewal of your coverage under a general permit within the time period specified may result in a civil penalty. Operation of your facility without coverage under a valid general permit would constitute a violation of NC G.S. § 143-215.1 and could result in assessments of civil penalties of tip to$25,000 per day. Copies of the animal waste operation State Non-Discharge General Permits are available at www.deg.ne.gov/anima]Wrmits2024. General permits can be requested by writing to the address above. if you have any questions about the State Non-Discharge General Permits,the enclosed application,or any related matter please feel free to contact the Animal Feeding Operations Branch staff at 919-707-9129. Sincerely, K� i Michael Pjetraj,Deputy Director Division of Water Resources Enclosures: Re guest for Certificate ofCoverage for Facility Currently Covered by an Expiring State Non-Discharge General Permit NortliCaralina Department ofEaviraarotuttlQuality Divi'si9aelMterReioarces �� �.� a12 earth Salishun•Stret4 1b3b JtailSeni.eC e.¢tkr Ra]ti_=h,�artlt C:aralina"b99.1435 ....�..._.J._.«. ./ .r. D19'F3129 Swine Farm Waste Management — Odor Control Checklist Permit No.: `/— 0060 Date: �( l INSTRUCTIONS FOR USE Owner Signature: ♦ Odor Control Checklist is required by General Statute 143-215.10C(e)(1) ♦ Check any/all the BMPs you will implement on this facility. Items checked/selected become a requirement of the CAWMP. ♦ Items in bold or pre-selected are required. ♦ Add any site-specific details related to the selected BMPs ♦ Include any other odor control measures not listed ♦ NOTE: Not all BMPs may be cost-effective for every facility. Evaluate each BMP prior to selecting for your facility. Cause/Source BMP Option to Minimize Odor Comments Site Specific Practices FARMSTEAD ♦ Swine Production �laintain vegetative or wooded buffers at or •Traps dust and gases, provides dilution near property boundary and visual screening • May require third party input/approval ♦ Improper drainage rade and landscape so water drains away • Reduce odors and vectors that occur fr facilities and prevent ponding with stagnant conditions aintain farm access roads and prevent traffic • Prevents spillage during transport and in waste application area tracking of waste onto public roads ❑ Other BMPs—please describe MORTALITY MANAGEMENT ♦ Carcass ® Dispose of mortality using method approved • Required by statute and permit Decomposition by NCDA&CS State Veterinarian. Manage • May require third party input/approval According to CAWMP(Mortality Management Checklist)and permit(s). ❑ Put carcasses in refrigerated (or freezer)dead boxes within 24 hours for short-term mortality storage. ♦ Incomplete Incineration ❑ Use incinerators with secondary burners for Reduce odors by complete incineration complete combustion. ❑ Other BMPs—please describe Swine AMOC Page 1 of 6 APPROVED—7/25/2019 Swine Farm Waste Management --Odor Control Checklist Permit No.: Cause/Source BMP Option to Minimize Odor Comments Site Specific Practices HOUSE/ BARN—WASTE HANDLING ♦ Flush tanks ❑ Install flush tank covers a Pit-flush systems ♦ Odorous Gases ❑ F h pits at least 4 times per day a Pit-flush systems ♦ Partial microbial Empty pits at least once every 7 days a Pit-recharge or"pull-plug" systems decomposition ❑ Underfloor flush with pit ventilation ♦ Agitation of wastes ❑ Install/extend fill lines to near bottom of tanks with anti-siphon vents ❑ tnstall covers on outside waste collection or junction box ❑ Install sump tank covers for lift stations ♦ Ammonia ❑ Flush/recharge with treated effluent ❑ Treat waste in pits with proven biological or a Monitor for any solids accumulation in pit chemical additive ❑ Other BM Ps—please describe HOUSE/BARN—FLOOR AND INDOOR SURFACES ♦ Manure covered floors ❑ Scrape manure from alleys into pens daily a Will move with other manure via pits ❑ instaIl fully slotted floor system ❑ Install waterers over slotted floor area ❑ Install feeders at high end of solid floors •Where applicable ♦ Odorous Gases ❑ Scrape manure buildup from floors and walls a Aids in animal cleanliness ❑ Keep floors dry a Aids in animal cleanliness ❑ install underfloor ventilation for drying ❑ Replace bedding/scrape at frequency to a Solid floor/bedding systems keep bedding dry ❑ Other BM Ps—please describe Swine AMOC Page 2 of 6 APPROVED—7/25/2019 Swine Farm Waste Management —Odor Control Checklist Permit No.: da Cause/Source BMP Option to Minimize Odor Comments Site Specific Practices HOUSE/BARN—VENTILATION ♦ Dust CI fans regularly—specify frequency ♦ Volatile/odorous gases cient air movement Fnstall temperature and humidity sensors to control ventilation ❑ Treat barn exhaust • Examples: biofilters,wet scrubbing, windbreaks • May reduce ventilation rate depending on method ❑ Other BMPs—please describe HOUSE/BARN—FEED ♦ Dust ❑ Install feed covers ♦ Adsorbed Gases ® Keep outdoor feed storage covered except • Required by rule 15A NCAC 02D.1802 When necessary to add/remove feed ❑ Minimize free-fall height of dry feed ❑ Install feed delivery downspout extenders to the feed covers ❑ Remove spoiled/unusable feed on regular basis ❑ Feed pellets instead of dry meal • May require third party input/approval ❑ Use feed additives • May require third party input/approval ♦ Ammonia ❑ Use feed-reduced crude protein diet • May require third party input/approval ❑ Other BMPs—please describe HOUSE/BARN—GENERAL ♦ Dust V Install temperature and humidity sensors •Maintain relative humidity at 40 to 65% ♦ Odorous Gases to control ventilation ❑ Use ultraviolet light to treat indoor air ❑ Use indoor or outdoor electrostatic space •Can be used to treat exhaust air charge system ❑ Other BMPs—please describe Swine AMOC Page 3 of 6 APPROVED—7/25/2019 Swine Farm Waste Management—Odor Control Checklist Permit No.: Cause/Source BMP Option to Minimize Odor Comments Site Specific Practices LAGOON/WASTE STORAGE STRUCTURE ♦ Volatile Gases ® Maintain proper lagoon volume •Sufficient liquld volume/depth is required for proper anaerobic treatment ❑ Minimize free-fall height of waste from discharge pipe to lagoon surface ❑ Extend discharge point of pipe to below lagoon * Use caution not to scour or damage lagoon liner liquid level ❑ Maintain proper surface area-to-volume ratio ❑ Use correct lagoon start-up procedures ❑ Aerate for odor control ® Manage sludge levels based on annual sludge survey as required by permit ❑ Keep spilled feed or foreign debris out of lagoon to prevent excess sludge accumulation ❑ Install/use solids separation system ❑ Use proven biological or chemical additives + Monitor for any increase in rate of solids accumulation ❑ Use permeable lagoon covers(not a digester) ❑ Use impermeable lagoon cover or • Methane can be flared if not utilized anaerobic digester ❑ Other BMPs—please describe LAND APPLICATION ♦ Odorous gases ® Perform land application in accordance with CAW MP ♦ Wind drift ® Pump intake near lagoon surface •Required by rule 15A NCAC 02D.1802 ❑ Pump from second stage lagoon ❑ Follow good neighbor policy •Avoid application on known weekends, special days,or holidays/eves if possible ❑ Operate at minimum recommended pressure ❑ Increase setbacks beyond those required by statute, rule, or permit Swine AMOC Page 4 of 6 APPROVE©—7/25/2019 Swine Farm Waste Management—Odor Control Checklist Permit No.: r 00 b v Cause/Source BMP Option to Minimize Odor Comments Site Specific Practices LAND APPLICATION(CONTINUED Apply during favorable wind conditions, • Recommend checking predicted average hourly (es cially for traveling guns or impact wind speed within 24 hours prior to s rinklers) anticipated start F practical,apply waste on sunny days • Allows for vertical dissipation of odor r than cool, overcast days possible,apply waste mid-morning to •Allows for better vertical dissipation of odor late-afternoon ❑ For traveling guns,use taper-ring or taper-bore • Less odor and drift than ring nozzles nozzles ❑ For traveling guns,use largest-available nozzle that provides acceptable application uniformity 7❑ R lace impact sprinklers with low-drift nozzles n center pivots and linear move systems. Use hose-drag system ❑ Use injection method for waste application ❑ Other BMPs—please describe SLUDGE DISPOSAL ♦ Odorous gases Transport sludge in covered vehicles or tankers ❑ Apply in thin,uniform layers •Speeds drying and prevents ponding ❑ Incorporate land-applied sludge as soon as •Required within 48 hours or prior to next rain event, practical after application,and in accordance whichever is first,for conventionally tilled with permit. bare soils ❑ Use injection method for sludge application ❑ Dewater sludge prior to application ❑ Use alternatives to land application,such as compost,gasification,energy generation, etc. ❑ Other BMPs—please describe Swine AMOC Page 5 of 6 APPROVED—7/25/2019 ADDITIONAL INFORMATION AVAILABLE FROM: Air Management Practices Assessment Tool(AMPAT) www.extension.iastate.edu/ampat/ AHG-538-A Certification Training for Animal Waste Management Systems:Type A NC Division of Water Resources EBAE 103-83—Lagoon Design and Management for Livestock Manure Treatment and Storage www.bae.ncsu.edu EBAE 128-88—Swine Production Facility Manure Management: Pit Recharge-Lagoon Treatment www.bae.ncsu.edu EBAE 129-88—Swine Production Facility Manure Management: Underfloor Flush-Lagoon Treatment www.bae.ncsu.edu EBAE Fact Sheet—Calibration of Manure and Wastewater Application Equipment www.bae.ncsu.edu EBAE Fact Sheet—Swine Production Farm Potential Odor Sources and Remedies www.bae.ncsu.edu NC MRCS Standard 359—Waste Treatment Lagoon www.nres.udsa.gov NC NRCS Standard 380—Wind break/Shelterbelt Establishment www.nres.udsa.gov NC MRCS Standard 422—Hedgerow Planting www.nres.udsa.gov NC MRCS Standard 442—Sprinkler System www.nres.udsa.gov Nuisance Concerns in Animal Manure Management: Odors and Flies; PRO107 1995 Conference Proceedings Florida Cooperative Extension Service Options for Managing Odor: A Report from the Swine Odor Task Force NC State University Swine AMOC Page 6 of 6 APPROVED—7/25/2019 i OPERATION & MAINTENANCE PLAN Proper lagoon management should be a year-round priority. It is especially important to manage levels so that you do not have problems during extended rainy and wet periods. Maximum storage capacity should be available in the lagoon for periods when the receiving crop is dormant(such as wintertime for bermudagrass) or when there are extended rainy spells such as a thunderstorm season in the summertime. This means that at the first sign of plant growth in the later winter/ early spring, irrigation according to a farm waste management plan should be done whenever the land in dry enough to receive lagoon liquid. This will make storage space available in the lagoon for future wet periods. In the late summer/early fall the lagoon should be pumped down to the low marker (see Figure 2-1) to allow for winter storage... Every.effort should be made to maintain the.lagoon close to the minimum liquid level as long as the weather and waste utilization plan will allow it. Waiting until the lagoon has reached its maximum storage capacity before starting to irrigated does not leave room for storing excess water during extended wet periods. Overflow from the lagoon for any reason except a 25=year,24-hour storm is a violation of state law and subject to penalty action. The routine maintenance of a lagoon involves the following: • "Maintenance of a vegetative cover for the dam. Fescue or common bermudagrass are the:most common vegetative covers. The vegetation should be fertilized each year, f��tided,-.to_-maintain a vigorous stand. The amount of fertilized-applied --,-- - - should= bas°ed on a soils testi but in,the-.event that it is not.practical to:obtain a"' -- _. soils J6% :each year;-the lagoon embankment' and surrounding areas.-should,.be- feitiiize�l "800 pounds per acre of 10-10-10, or equhi alent '=Y.. MOW - • Brush �iid trees on•the embankment must:be controlled. This'.may be done by a... :. mowing„`spraying, grazing, chopping;' or a combination of these practices....This should :be done at least once,a year and possibly twice in years that weather conditions are favorable for heavy vegetative growth. •�--�=• NOTE: If vegetation is:.contralled. by sprayingz'the herbicide must not be allowed to enter the:lagoon': . _. g .water.:-Such chemicals.-could harm the bacteria in the lagoon that are Treating the waste. Maintenance inspectiorjs-of the entire lagoon should be made during the initial filling of the lagoon acid'at least monthly and after major rainfall and storm events. Items to be checked should include, as a minimum,the following: 'w Was filet Pipes;Recycling Pipes;and Overflow Pipes lookfor; ,:�.••.,,.�..�,;r,.. z, - } 1. separation of joints 2_ cracks or breaks ='± 3. acKumulation of salts or minerals 4. o condition of pipes . r <" 4� .. y. , 1 1 - •`s . 2 . "F.':.vti..ei..:.e.,r..n.n-�+iflS:e•iw,..-...- -.r..�:. ,..w_,,..., Lagoon surface -- look for: 1. undesirable vegetative growth 2. floating or lodged debris Embankment -- hook for: 1. settlement, cracking, or"jug" holes 2. side slope stability -- slumps or bulges 3. wet or damp areas on the back slope 4. erosion due to lack or vegetation or as a result of wave action 5. rodent damage Larger lagoons may be subject to liner damage due to wave action caused by strong winds. These waves can erode the lagoon sidewalls, thereby weakening the lagoon dam. A good stand of vegetation will reduce the potential damage caused by wave action. If wave action causes serious damage to a lagoon sidewall, baffles in the lagoon may be used to reduce the wave impacts. Any of these features could lead to erosion and weakening of the darn., if your lagoon has any of these features, you should call an appropriate expert familiar with design and- construction of waste lagoons. You may need to provide a temporary;fix_if there.is a threat of a waste discharge. However, a permanent solution should be reviewed by the technical expert. Any:-.digging, into .a.lagoon dam with heavy equipment%:is_a serious - undertaking with potentially serious=-consequences and should not be'coriducted*uhless =Y recommended by an appropriate-technical,expert Transfer Pumps`-- check for proper operation of: 1. recycling pumps, 2. irrigation pumps' Check for leaks, loose fittings,-and overall pump operation..An unusually loud or grinding noise, or a large amount of vibration, may indicate that the pump is in need of repair or replacement. NOTE: Pumping systems should be inspected and operated frequently enough so that you are .not..completely- "surprised" by. equipment failure.. You should perform,your pumping system mainteriance, at. a time when your lagoon is at_its low. level.. This.will allow some safety time should major repairs be required. Having a nearly full lagoon is not the time to think about switching, repairing, or borrowing pumps. Probably, if your lagoon is full, your neighbor's lagoon is full also. You should consider maintaining an inventory of spare parts or pumps. ® Surface water diversion features are designed to carry all surface drainage waters (such as rainfall runoff, roof drainage, gutter outlets, and parking lot runoff) away from your lagoon and other waste treatment or storage structures. The only water that should be coming from your lagoon is that which comes from your flushing (washing) syslem pipes and the rainfall that hits the lago:.p d You should inspect your diversion system for the follow[ngf ,>, �a 1. adequate vegetation 2. diversion capacity 3. ridge berm height 3 Identified problems should be corrected promptly. It is advisable to inspect your system during or immediately following a heavy rain. If technical assistance is needed to determine proper solutions, consult with appropriate experts. You should record the level of the lagoon just prior to when rain is predicted, and then record the level again 4 to 6 hours after the rain (assumes there is no pumping). This will give you an idea of how much your lagoon level will rise with a certain rainfall amount (you must also be recording your rainfall for this to work). Knowing this should help in planning irrigation applications and storage. If your lagoon rises excessively, you may have an overflow problem from a surface water diversion or there may be seepage into the lagoon from the surrounding land. Lagoon Operation Startup: 1. Immediately after construction establish a complete sod cover on bare soil surfaces to avoid erosion. 2. Fill new lagoon design treatment volume at least half full of water before waste loading begins, taking care not to erode lining or.bank slopes._ 3. Drainpipes-into.the is oon should ha: _ g ve a_flexible,pipe extender._on the.end of the pipe-,to discharge.near,the bottom_ of,the..lagoon during,,initial.filling;-or another:..;-_ means of.slowing the incoming.water_to avoid erosion of the lining. 4. When possible,-.begin loading new lagoons in the spring to maximize bacterial establishment (due-to warmer weather): 5. It is recommended "that " new- lagoon be seeded with sludge from a healthy working `swine lagoon in the amount of 0.25 percent of the full lagoon liquid volume' This seeding should occur-at-least, two'weeks"prior to 'the addition-of wastewater, 6. Maintain a periodic check on the'lagoon liquid pH. If the pH falls below 7.0, add agricultural lime at the rate of 1 pound per 1000 cubic feet of lagoon liquid volume until the pH rises above 7.0:- Optimum lagoon liquid pH is between 7.5 and 8.0: 7. A dark color, lack of bubbling, and excessive odor signals inadequate biological activity. Consultation with a technical specialist is recommended if these conditions occur for prolonged periods, especially during the warm season. Loading: The more frequently and regularly ttjat-wastewater is added to a lagoon, the better the lagoon will function. Flush systems'#that wash waste into the lagoon several times daily are optimum for treatment. Pit recharge systems, in which one or more buildings are drained and recharged each day, also work well. 4 ® Practice water conservation --- minimize building water usage and spillage from leaking waterers, broken pipes and washdown through proper maintenance and water conservation. ® Minimize feed wastage and spillage by keeping feeders adjusted. This will reduce the amount of solids entering the lagoon, Management: ® Maintain lagoon liquid level between the permanent storage level and the full temporary storage level. Place visible markers or stakes on the lagoon bank to show the minimum liquid level and the maximum liquid level. (Figure 2-1). Start irrigating at the earliest possible date in the spring based on nutrient requirements and soil moisture so that temporary storage will be maximized for the summer thunderstorm season. Similarly, irrigate in the late summer / early fall to provide maximum lagoon storage for the winter. ® The lagoon liquid level. should never be'.closer than 1 foot to the lowest,point of the dam or , jjCo-.. ® Don not pump the lagoon Aiquid level lower than the permanent storage IeVel unless you are removing sludge.. _ ® Locate float pump intakes approximately 18 inches underneath the liquid surface and as far away`from the-drainpipe inlets 'as°possible: Prevent additions of bedding`materials'; long-stenimetl forage or vegetation, molded feed, plastic syringes;or other foreign materials into the lagoon. ® Frequently remove_ solids from catch basins,. at_end. of confinement houses or wherever they.' installed ® Maintain strict vegetation, rodent, and varmint control near lagoon edges. Do not allow trees or large bushes to grow on lagoon dam or embankment. ® Remove sludge from the lagoon either when the sludge storage capacity is full or before it fills 50 percent of the permanent storage volume. © If animal production is to be terminated, the owner is responsible for obtaining and implementing a closure plan to eliminate the possibility of a pollutant discharge. vlo- Sludge Removal: Y = zs Rate of lagoon sludge buildup can be reduced by: 5 o proper lagoon sizing, ® mechanical solids separation of flushed waste, • gravity settling of flushed waste solids in an appropriately designed basin;or • minimizing feed wastage and spillage. Lagoon sludge that is removed annually rather than stored long term will: • have more nutrients, • have more odor, and • require more land to properly use the nutrients. Removal techniques: • Hire a custom applicator. • Mix the sludge and lagoon liquid with a chopper-agitator impeller pump through large- bore sprinkler irrigation system onto nearby cropland; and soil incorporate. • Dewater.the upper part.of lagoon by irrigation onto nearby cropland or forageland; mix remaining sludge;.pump into liquid sludge applicator; haul and spread onto cropland or for grid soil incorporate: : - • bewatei.6f i'Ilupper part oV lagoon by' irrigation onto nearby.cropland or forageland dredgesludge from lagoon with dragline or sludge barge; berm an area beside lagoon to receive the sludge so that liquids can drain back into lagoon; allow sludge to dewater; haul,and.spread with.manure spreader onto cropland or forageland;.and sail incorporate Regardless :of,,the method, you..-.must have. the sludge. material analyzed for waste constituents just. as you would your lagoon water. The sludge will contain`different nutrient and metal values from the liquid. The application of the sludge to fields will be limited by these nutrients as well as any previous wastd'applications to that field,and crop_ requirement..Waste application rates will be discussed in detail in Chapter 3. When removing_,.sludge, you must also pay attention to the liner to prevent damage. Close attention by the pumper or drag-line operator will ensure that the lagoon liner remains intact. If you see soil material or the synthetic liner material being disturbed, you should stop the activity immediately and not resume until you are sure that the sludge can be removed without liner injury. if the liner is damaged it must be repaired as soon as possible. Sludge removed from the lagoon has a much higher phosphorus and heavy metal content than liquid. Because of this it should probably be applied to land with low phosphorus and metal levels, as indicated by a soil test, and incorporated to reduce the chance of erosion. Note that if the sludge is applied to fields with very high soil-test phosphors, it should be applied only at rates equal to the crop removal of phosphorus. As with other wastes, always have your lagoon sludge analyzed for its nutrient value. 6 The application of sludge will increase the amount of odor at the waste application site. Extra precaution should be used to observe the wind direction and other conditions which could increase the concern of neighbors. Possible Causes of Lagoon Failure Lagoon failures result in the unplanned discharge of wastewater from the structure. Types of failures include leakage through the bottom or sides, overtopping, and breach of the dam. Assuming proper design and construction, the owner has the responsibility for ensuring structure safety. Items which may lead to lagoon failures include: O Modification of the lagoon structure -- an example is the placement of a pipe in the dam without proper design and construction. (Consult an expert in lagoon design before placing any pipes in dams.) U Lagoon liquid levels— high levels are a safety risk. C Failure to inspect and maintain the dam. O Excess surface water flowing into the•lagoon. Liner in#egr�ty ='protect from:inlet pipe' scounrtg; damage`during sludge removal, or` • rupture from lowering lagoon liquid leVel below groundwater table. NOTE: If lagoon water"is-allowed to overtop the dam, the moving-water will soon cause'-" gullies to form in the dam Once this damage'starts', it can-'quickly cause a large discharge of wastewater and possible dam failure 7 aw.VlaiRl'Wf`1.if-nYirwiw..a:ViAwirrr. .... .............vuPn:w.... .. ._...... Version—November 26,2018 Mortality Management Methods Indicate which methods) will be implemented, When selecting multiple methods indicate a primary versus secondary option. Methods other than those listed must be approved by the State Veterinarian. Primary Secondary Routine Mortality a Burial three feet beneath the surface of the ground within 24 hours of knowledge of animal death. The burial must be at least 300 feet from any flowing stream or public body of water (G.S.106-403). The bottom of the burial pit should beat least one foot above the seasonal high water table.Attach burial location map and plan. Q ❑ Landfill at municipal solid waste facility permitted by NC DEQ under GS 15A NCAC 13B .0200. Rendering at a rendering plant licensed under G.S. 106-168.7. Complete incineration according to 02 NCAC 52C .0102. A composting system approved and permitted by the NC Department of Agriculture &Con- sumer Services Veterinary Division (attach copy of permit). If compost is distributed off-farm, additional requirements must be met and a permit is required from NC DEQ, a In the case of dead poultry only, placing in a disposal pit of a size and design approved by the NC Department of Agriculture&Consumer Services (G.S. 106-549.70). a Any method which, in the professional opiniontof the State Veterinarian, would make possible the salvage of part of a dead animal's value without endangering human or animal health. (Written approval by the State Veterinarian must be attached). aMass Mortality Plan Mass mortality plans are required for farms covered by an NPDES permit. These plans are also recommended for all animal operations. This plan outlines farm-specific mortality man- agement methods to be used for mass mortality. The NCDA&CS Veterinary Division sup- ports a variety of emergency mortality disposal options; contact the Division for guidance. A catastrophic mortality disposal plan is part of the facility's CAWMP and is activated when numbers of dead animals exceed normal mortality rates as specified by the State Veterinarian. Burial must be:done in accordance with NC General Statutes and NCDA&CS Veterinary Division regulations and guidance. • Mass burial sites are subject to additional permit conditions(refer to facility's animal waste management system permit). • In the event of imminent threat of a disease emergency, the State Veterinarian may enact additional temporary procedures or measures for disposal according to G.S. 106-399.4, 2 // 5 natur r ner/ManageC Date 3 2 � Signature of Techni al Specialist Date i i SWINE FARM WASTE MANAGEMENT ODOR CONTROL CHECKLIST Source Cause BMP's to Minimize Odor Site Specific Practices Farmstead Swine production (✓)Vegetative or wooded buffers: (✓)Recommended best management practices; (V)Good judgment and common sense Animal body Dirty manure ()Dry floors surfaces covered animals Floor surfaces Wet manure-covered (✓)Slotted floors; floors (✓)Waterers located over slotted floors; (✓)Feeders at high end of solid floors; (✓)Scrape manure buildup from floors; ( )Underfloor ventilation for drying Manure collection Urine (✓)Frequent manure removal by flush,pit pits recharge or scrape Partial microbial ( )Underfloor ventilation decomposition Ventilation Volatile gases (. Fan maintenance; exhaust fans Dust (✓)Efficient air movement.- Indoor surfaces Dust (✓)Washdown between groups of animals ( )Feed additives; { )Feeder covers; ( .)Feed delivery downspout extenders to feeder covers . Flush Tanks Agitation of recycled ( )Flush tank covers lagoon liquid while tanks ( )Extend fill lines to near bottom of tanks are filling with anti-siphon vents Flush alleys Agitation during waste ( )Underfloor flush with underfloor water conveyance ventilation Pit recharge Agitation of recycled {)Extend recharge lines to near bottom of points lagoon liquid while pits pits with anti-siphon vents are filling Lift stations Agitation during sump ( )Sump tank covers tank filling and drawdown Outside drain Agitation during waste ( )Box Covers collection or water conveyance junction boxes End of drain Agitation during waste ( )Extend discharge point of pipes pipes at lagoon water underneath lagoon liquid level Lagoon surfaces Volatile gas emissions (✓)Proper lagoon liquid capacity Biological mixing (✓)Correct lagoon startup procedures Agitation ( )Minimum surface area-to-volume ratio (v)Minimum agitation when pumping ( )Mechanical aeration ( )Proven biological additives Irrigation sprinkler High pressure agitation (✓)Irrigate on dry days with little or no wind nozzles Wind draft . (✓)Minimum recommended operation pressure (✓)Pump intake near lagoon liquid surface ( )Pump from second-stage lagoon AMOC--November 11, 1996 12 .............. ...:: .. •4b•Mt'i#18":44¢, .�r,.x rs�vnY..•_...�....:. ......:.r..war.as... Storage tank or Partial microbial ( )Bottom or midlevel loading basin surface decomposition Mixing while ( )Tank covers filling Agitation when emptying( )Basin surface mats of solids ( )Proven biological additives or oxidants Settling basin Partial microbial decom- ( )Extend drainpipe outlets underneath liquid surface position Mixing while filling level Agitation when emptying ( )Remove settled solids regularly Manure,slurry or Agitation when spreading ( )Soil injection of slurry/sludges sludge spreader Volatile gas emissions ( )Wash residual manure from spreader after use outlets ( )Proven biological additives or oxidants Dead animals Carcass decomposition ( )Proper disposition of carcasses Dead animal Carcass decomposition ( )Complete covering of carcasses in burial pits disposal pits ( )Proper location/construction of disposal pits Incinerators Incomplete combustion ( )Secondary stack burners Standing water improper drainage (,,)Farm access road maintenance around facilities Microbial decomposition of away from facilities organic matter Manure tracked Poorly maintained access (,,')Farm access road maintenance onto public roads. roads from farm access Additional Information: ;;y,{-,,:_•;,._ Available From: Swine Manure Management 0200 Rule/BMP Packet :4„_,r.-. NCSU-County Extension Center Swine Production Farm Potential Odor Sources and Remedies,EBAE Fact Sheet NCSU-BAE Swine Production Facility Manure.Management-Pit Recharge--Lagoon Treatment:EBAE128-88NCSU-BAE Swine Production Facility Manure Manag@meni:Underfloor Fluse-Lagoon Tfeatment.129-88NCSU-BAE- Lagoon Design and Management for Livestock Manure Treatment and Storage:.EBAE'103-83NCSU-BAE Calibration of Manure and Wastewater Application Equipment EBAE Fact Sheet NCSU-BAE Controlling Odors from Swine Buildings;PIH-33- ;. ;; �..,,;;,;;, ,;;,,;;;•, -.:, NCSU swine Extension Environmental Assurance Program: NPPC Manual NC Pork Producers Assoc Options for Managing Odor a report from-the Swine Odor Task Force:" ==: -'- - -- — p g g po _NCSU.Agri:Communication Nuisance Concerns in Animal Manure Management--.Odors and,Flies;PR0101, ,:. .:..::- Florida Cooperative Extension 1995 Conference Proceedings The issues checked ( -)-pertain to this operation:a.-The landowner/integrator agrees to use sound judgment in applying odor"-control measures as practical. I certify the aforementioned odor control Best Manage ent Practices ave een reviewed with me. ( a Wner ignature) 13 INSECT CONTROL CHECKLIST FOR ANIMAL OPERATIONS Source Cause BMP's to Minimize Odor Site Specific Practices j (Liquid Systems) i Flush Gutters Accumulation of solids (✓)Flush system is designed and operated sufficiently to remove accumulated solids from gutters as designed- Remove bridging of accumulated solids at discharge - I Lagoons and Pits Crusted Solids (✓)Maintain lagoons,settling basins and pits where pest breeding is apparent to i minimize the crusting of solids to a depth of no more than 6-8 inches over more than 30%of surface. Excessive Decaying vegetation (✓)Maintain vegetative control along banks of Vegetative Growth lagoons and other impoundment's to prevent accumulation of decaying vegetative matter along water's edge on impoundment's perimeter. (Dry Systems) Feeders Feed Spillage () Design.,operate and maintain feed systems(e.g.. -bunkers-and troughs)to minimize the accumulation of decaying wastage., 1.3 ;r- "^'"'"`='"()"Clean'up'spillAge on a roufin'e hasis'(e.g.7-10 day interval during summer;15-30 day interval during winter), Feed Storage Accumulation of feed ().Reduce.moisture accumulation within and around residues_,_.•_ immediate perimeter of feed storage areas by ----,_`insuring drainage away from site and/or providing adequate containment(e.g•,_covered bin for brewers grain and similar high moisture grain • .---products). " {).Inspect for and remove or break up accumulated solids in filter strips around feed storage as needed. Animal Holding - Accumulation of animal.: (} Eliminate low area that trap moisture along fences Areas wastes and feed wastage and other locations where waste accumulates and ---- ---- disturbance by animals is minimal. () Maintain fence rows and filter strips around animal -, holding areas to iinimize ac+umula'tioris of wastes (i.e.inspect for and remove or break up accumulated solids as needed). WC—November 11, 1996 10 .._sMacirTyiKFVxfi:Y�r':+:.s.:d+Mrti.�.".,,yr...-..r.....::RC77R'^ff.:,t.,,..._...................a-.. ._.._.,,........,._...__•__,._..... Dry Manure Handling Accumulations of animal {)Remove spillage on a routine basis(e.g.7-10 day Systems wastes interval during summer-,15-30 days interval during winter)where manure is loaded for land application or disposal. ()Provide for adequate drainage around manure stockpiles ()Inspect for and remove or break up accumulated wastes in filter strips around stockpiles and manure handling areas as needed. The issues checked () pertain to this operation. The landowner/integrator agrees to use sound judgment in applying insect control measures as practical. I certify the aforementioned insect control Best Management Practices have been reviewed with me. ( a ow r Signature) For more information contact the Cooperative Extension Service, Department of Entomology, Box 7613, North Carolina State University, Raleigh, NC 27695-7613. AMIC -- November 11, 1996 ],1 EMERGENCY ACTION PLAN 'HONE NUMBERS DIVISION OF WATER QUALITY (DWQ) 1a IS- EMERGENCY MANAGEMENT SERVICES (EMS) 10 - 22k.- �L\Le SOIL AND WATER CONSERVATION DISTRICT (SWCD) qt5 - ac tom- Aka-0 NATURAL RESOURCES CONSERVATION SERVICE (NRCS) _C�t0 - ag 6-ak'1-0 COOPERATIVE EXTENSION SERVICE (CES) This plan will be implemented in the event that wastes from your operation are leaking, overflowing or running off site. You should not wait until wastes reach surface waters or leave your property to consider that you have a problem. You should make every effort to ensure that this does not happen. This plan should be posted in an accessible location for all employees at the facility. The following are some action items you should take. 1. Stop the release of'wastes.•Deperiding on the situation this may or may not be possible. Suggested responses to some possible problems are listed below. A. Lagoon overflow-possible solutions are. a) , Add soil to berm to increase elevation of dam. b) Pump wastes to fields'at an acceptable rate:" - c) Stop all flow to the lagoon immediately: _ d) Call a pumping contractor e) Make sure no surface water is entering lagoon. B. Runoff from waste application field-actions include: a) Immediately stop waste application. b) Create a temporary diversion to contain waste. c) Incorporate waste to reduce runoff. d) Evaluate and eliminate the reason(s)that cause the runoff. e) Evaluate the.application rates for the fields where runoff occurred. ` C. Leakage from the waste pipes and sprinklers-action include: a) Stop recycle pump. b) Stop irrigation pump. c) Close valves to eliminate further discharge. d) Repair all leaks prior to restarting pumps. D. Leakage from flush systems, houses,solid separators-action include: a) Stop recycle pump. b) Stop irrigation pump. c) Make sure siphon occurs. d) Stop all flow in the house,flush systems, or solid separators. E. Leakage from base or sidewall of lagoon. Often this is seepage as opposed to flowing leaks- possible action: a) Dig a small sump or ditch from the embankment to catch all seepage, put in a submersible pump,and pump back to lagoon. b) If holes are caused by burrowing animals,trap or remove animals and fill holes and compact with a clay type soil. c) Have a professional evaluate the condition of the side walls and the lagoon bottom as soon as possible. 8 2. Assess the extent of the spill and note any obvious damages. a. Did the waste reach surface waters? b. Approximately how much was released and for what duration? c. Any damage notes, such as employee injury, fish kills, or property damage? d. Did the spill leave the property? e• Does the spill have the potential to reach surface waters? f. Could a future rain event cause the spill to reach surface waters? g. Are potable water wells in danger(either on or off the property)? h. How much reached surface waters? 3. Contact appropriate agencies. a. During normal business hours call your DWQ regional office; Phone #, After hours, emergency number: (919) 733-3942. Your phone call should include: your name, facility number, telephone number, the details of the incident from item 2 above, the exact location of the facility, the location or direction of the movement of the spill, weather and wind conditions. The corrective measures that have been under taken, and the seriousness of the situation. b. If the spill leaves property or enters surface waters, call local EMS phone number. c. instruct EMS to contact local Health Department. d. Contact CE's phone number, local SWCD office phone number and the local NRCS office for advice/technical assistance phone number. 4. If none of the above works call.911 or the.Sheriff's Department and explain your problem to - them and ask the person to contact the proper-agenciesJor your• 5. Contact the contractor of your choice tc begin repair or problem to minimize offsite damage. a. Contractors Name Murphy Brown; LLQ- b. Contractors Address: P.O. Sox 856, Warsaw, NC 28393 c. Contractors Phone-. (916)293-3434 6. Contact the technical specialist who certified the p lagoon (NRCS, Consulting Engineer, etc.) a. Name: Kraig Westerbeek b. Phone: (910)293-5330 7. Implement procedures as:advised by DWQ and technical assistance agencies to rectify the damage, repair the system', and reassess the waste management plan to keep problems with release of wastes from happening again. 9 U. S. Department of Agriculture NC-ENG-34 Soil Conservation Service September 1980 File Code: 210 HAZARD CLASSIFICATION DATA SHEET FOR DAMS Landowner (� ;rr_�e Qr m s County Community or Group No. Conservation Plan No. Estimated Depth of Water to Top of Dam /l- Ft. Length of Flood Pool Ft. Date of Field Hazard Investigation Evaluation by :reach of flood plain downstream to the point of estimated minor effect from sudden dam failure. _ Est, E ev. st.. evatzon Kind of :Improvements: of Breach Reach: Length: Width: Slope: Land Use . Improvements Above :Floodwater Above flood Plain: .Flood Plain Ft. . Ft. Ft. Ft. 1 2 ' 3 ' Describe potential for loss of life and damage to existing or probable future downstream improvements from a sudden breach n o Hazard Classification of Dam aN b, c) (see NEM-Part 520.21) Dam Classificatior �i ,I IV, Y) � ,.�: , �� ?. . Date ,) name (title) By � � ,� ti tl e r Concurred By �_ f Date name title NOTE: 1. Instructions on reverse side. 2. Attach additional sheets as needed. 77 1\\ j �!Ys 1 I " -r I Q_ ! I . I . .. t- .�•�_t 1�•:�1 i,t1 Y.�_1•.1-T•7 • I _.;...'...._.I..._i- 1-a_w._L-. ..1. �• ... .� li I :i:�.� I} .r... : I I i I Ir I 1 • ' ._.-U/S/ I _ .- -- -�-` _-• -' ,^ :�: .. �•I-"�--*-�-t.�....! j-- F -I_ _•I' _ -..r.'jI_.i_"' 7__�•1_i--� 'i �.;�-�`'"• —:_-•---- 1 I � 1 ISiO£S . . . . . : « _.:.. . ' L. lv� f �✓ _}_ ..; ± i I I_ - : i 1 I _ Pi ....-.....—.__.}—._ 1 —• --'�--•-•••---_.__--L 1 1 1-. . . . . . I . •_—__ ' •�� C _ �i� -`-� 1 NrL.. .f.i , E�CA�hYigr�'l172:- � '95: : -• i : j : i �� • j�'�_:Etl_S3.p.. j SS 7 _f-.AT.r :.Ii__�' _ _•✓/�S/._�-.�--.---�-� / / 1_ .I .�( S•1;r•..! r - I . 1 1 I is t...•j 1L'.c�rGs. =�l�- C�r"ei•.1 e. :4 _•S-�l ._:.._`_ _1 ��icrL2_�hs �ti.it.�:.-StT..� V• �•Q�'-i_•�•7•c�� - �.. ...,: « . ....• � I i � ! i-1_.:.._--.1_..—,�is:�.ct�s..t~ L_-G,:��ro Y- (W• H-i.+1. _ : - _. ..� r--•-• �:i lam- 1 :a�, I stir: i_�;_I�Y__l�Ir..r- .CMI� U.S. bEf ARTMF.NT Of AGRICULTURE SCS-EIIG•538 SOIL CONSERVATION SERVICE Rey. 5.70 SOIL INVESTIGATION TO DETERMINE SUITABILITY OF PROPOSED POND SITE DIS'1 acr FARmF11'S NAME _ COUN'rY DATE WORK UNrr S. C. S. PI[OTO SIIF F 1' NO- WAT£RSIIED ARF.A AfEASUREMENTS CROPGAND_ACRES PASTURE ACRES ^_— ---- ACRES POND GLASS WORK UNIT CONSERVA'1'lUi:1ST WOODLAND ACRES TOTAL ADE (Approx. scale I"= feet) WRE SKETC11 OF PROPOSED POND SHOWIcNn tnt WHERErBORI fe. line of dam dIdearivon ketch.Locate f4fe"c" nP f I• I ` `t -tz SL BORING NUMBER AND PROFILE SHOW pla6e and list darn-sire and spillway borings first-rhnr pondrd area and bortnw Pit borings-sevarare with unNcu r a e.I)FVr I tCnnlrnucJ an barA urhere necessary) Show water(able riec.+lions on darts-site borings. — _ 1� 15 16 17 18 19 20 21 22 23 ` SCALF. ; 2 3 4 5 6 7 8 9 10 11 12 ~13 SIGNATURE & ""I'LE 1;()RlNG ?`!ADD By_1 I r i Ire o 1*_ fC' I I 1 � a d• 1 O T-17 _ I._ __ - 4-A -A--1 - j'i !;;yam• 41 k • AT -Ai lip ..... ....• . A-A. L. pip ..... gar, --A -4- T-1 t i--' - -1 I A:J AN 12 +4 L Lil L %A I a I L i Lj L IK-f! J IT t Hl L Wk. _j � 1 5. TEMPORARY STORAGE REQUIRED DPAIWAGE AREA; Lagoon(top of dike) Length •Wtdth 340.0 12010 40800,0 square foes Badings(roof and tot water) 0.0 square feet Deccribo this aroe. TOTAL DA 40800.0 8quate feet Design temporary s►=06 AeiOd to be riod to b' 0 180 drys. W Volume at waste produced Feces&urine production in oalJday per 135 Ib,ALW 1.37 Volurne 16MM Ibs.ALW1135)be.ALW' 1,37 gaftly 180 days Voturne■ 30M gals,or 41026.736 cubic fact 8R. Voluma of wash water This la the amount of fresh water used for wsashing m�that rrvotimote of fresh water ucod for a hush uyet " the lagoon water are accounted for In SA. Volume= 0.0 gallo"Iday" 180 days storagO 48 gallons Per GF Volume= 0.0 cubic feet 5C. Volume of ravftl In amuse of 6Vapwalw Use podod of limo y""rainfall oxopedS evaporotlen by largest amount_ 180 days©XCIM rainfall 7.0 lnohas Volume 1.0 in' DA/12 IrEchae W toot Vok,m 23OM cubic feet r i O"fator; Circle Q Hq Farm County-, Dvptln Data: 10123/91 Distance to nearest resldrnc$(other ftn owrw): t 500 te6t 1. AVERAGE LIVE WEIGHT(ALW) x T Ibt. 0 Iles 0 sours(twow m finish) X 141 41 lb 0 sours(farrow to feoft> s. b0 n 0 I0 104 o bod(Finithin only) x 135 lba, _ 0 Ibs 0 sews(fa-TOW to w6an) x 433 lh. w . 5600 tread*-%r►to faedc� x 30lbs_ 198000 ]bt 0 Deaesibs other Tole!Average Llve Weight 1b8004 lbs 2. MINtWAl REQUIRED TREATMENT VOLUME OF LAGOON Volumes i 600M it*,ALW x Treatment vokrmq(CF)/h ALW -trreatmertf Voklrrle(GF Ab,ALW F 1 CFAb.ALW yplurne= 10000 cubic feel 3- STORAGE VOLUME FOR SLUD05 ACCUMULATION Volume= 0 Cublo fwt 4. TUTAL OESIGNF-D VaLUMITr Inside top 1$A0 1200 Inside top wtdlh(feet)- w •�-.-� _. 12 49 Top of dike etevstiarl(t8et)-----' 37 Bottom of bapoon atavatlon 37 Freeboard(fleet) -- 1 Sides slop%"Ids Total design volume using prismoidal formula SSIEND, SSjE*NDZ 6SJSIDl;1 S"IDEZ LENGTH WIDTH DEPTH 2.5 2.5 2.5 2.5 3'Ko 116.0 11.0 AREA OF TOP LENGTH*WIDTH= 336,0 115.0 38525 (AREA OF TOP) AREA OF DQTTOM LENGTH*WIDTH= 280.0 60.0 113800 (AE2EA OF BOTTOM) AREA OF MIDST CTION LENGTH'WIDTH"4 307.5 675 107e25 (AREA pF WIDSSCTICN'4) CU.FT.a]AREA TOP i(40AREA MIDSECTION)+AREA BOTTOM] 9 18800,0 HJ$ 1.6 313526.0 107U6 Total Omsigned Volume Avallable 798742 CU.FT, 4�1 5D. Volume of 25 year-24 hour storm Volume- 7.0 inches 112 inche$per foot'DA Volume= 23Wo.0 cubic feet f TOTAL REQUIRED TFIMORARY STORAGE SA. 41027 cubic feet 5&, 0 outk feet 5C, 23800 C&C f4 tt 5D, 23800 GUbia feet TOTAL 85027 cubic feet 6, SUMMARY TCmpCFUY st➢rage 180 days Rainfall in exc S Of MOPOrationo�O�r�=x=} 7 Indtos / 2,5 year-24 b^eroinfaltMPIER-14 »d=a.." T i d s/C I're� ♦ r&"TR ��as9a==p(�-2� 7SllFe Rae �7 1 fw 1� Sldle�sJepee----t---�IIRi:���w..n�_�vfW�a:= n2.5 :1 Ineldelop th..�ave7.i•nsrmmr.aaa�7.RgRau�Y 340 feat Inslcie top 120 fec Top of dike�EVAtlOtlrrrw�r»rU�•�•arrr�r.rwrsU 49 feet Bottom of lagoon 37 feet Torsi required voltusar " ,a......,.x.,.......> 256627 ou.ft_ ActA d9Elgn •���> 208742 Cu.ft, Seasoned high watertatAe olovatlon(SHWT)wss> 44 feet Stop PUM060 @iQrV•tsw..� .—aa-r�:al.asi Rcvsca�z> 45 foAt 'must be>or=to die SHWT 44 feet Mt18t b0>or a to min.req.treatment el.=> 43 feet Required mbdmum treatment voluM9-7-=- !t m' 188000 cu.ft. Volume e1 atop pumping %9 N7 cLi•ft' Start pun*ng 47.3 feet Mutt be at bottom of fr"bosrd&25 yr,rt Moll Actual vobxne leas 25 yr.-24 hr, rainfall=m> 274W2 cu.ft Voume*I!tort pumping 272323 CU.ft. F2equlrw volume to be pumped'a' W77 cu.ft Actual votwna planned to be 70256 cu.R Mil_thicknM of soil liner when required=v> 1175 feet 7. DESIGNED BY: APPROVED DY, 4� DATE; DATE: NOTE-SEE ATYA�JC�H�ED WASTE UTILIZATION PLAN 1 1 f COMrutE1�IT5: 1� r!G.., �� 0.f �✓ CN� nd__�_�p j !a,��°y v 5D. Volume of 25 year - 24 hour storm Volume = 7 .5 inches / 12 inches per foot * DA Volume = 28875 . 0 cubic feet TOTAL REQUIRED TEMPORARY STORAGE 5A. 41027 cubic feet 5B. 0 cubic feet 5C. 26950 cubic feet 5D. 28875 cubic feet TOTAL 96852 cubic feet 6. SUMMARY Total required volume 264852 cubic feet Total design volume avail. 265923 cubic feet Min. req. treatment volume plus sludge accumulation 168000 cubic f At elev. 47 . 5 feet ; Volume is 168314 cubic feet (end pumping) Total design volume less 25yr-24hr storm is 237048 cubic feet At elev. 49.2 feet ; Volume is 232567 cubic feet (start pumping Seasonal high water table elevation 47. 0 feet 7 . DESIGNED BY: � �'� APPROVED BY: • C . S`� j DATE: � /!5N-3 DATE: 7 f 3 NOTE: SEE ATTACHED WASTE UTILIZATION PLAN SCS DOE'S NOT CERTIFY THAT EXCAVATION AND FILL VOLUhIES ARE CORRECT o, 1<1 s �. i • �rator.Circle Q Nursery #County: Duplin Date: 04/19/93 o' Distance to nearest residence (other than owner) : 2600.0 feet 1. STEADY STATE LIVE WEIGHT 0 sows ( farrow to finish) x 1417 lbs. = 0 lbs 0 sows ( farrow to feeder) x 522 lbs. = 0 lbs 0 head ( finishing only) x 135 lbs. = 0 lbs 0 sows ( farrow to wean) x 433 lbs. = 0 lbs 5600 head (wean to feeder) x 30 lbs. = 168000 lbs `i'O`i'AL STEADY STATE LIVE WEIGHT (SSLW) = 168000 lbs 2 . MINIMUM REQUIRED TREATMENT VOLUME OF LAGOON Volume = 168000 lbs. SSLW x Treatment Volume(CF) /lb. SSLW Treatment Volume(CF) /lb. SSLW= 1 CF/lb. SSLW Volume = 168000 cubic feet 3 . STORAGE VOLUME FOR SLUDGE ACCUMULATION Volume = 0. 0 cubic feet ; "Owner requests no sludge storage. Sludge will be removed as needed. " 4. TOTAL DESIGN VOLUME Inside top len 440. 0 feet ; Inside top width 105. 0 feet Top of dike -elevat on 51.0 feet Freeboard 1.0 fee ; Side slopes 3.0 : 1 (Inside lagoon) `Total design a oon iquid level at elevation 50.0 feet Bottom of lagoon elevation 41.0 feet Seasonal high water table elevation 47 .0 feet Total design volume using prismoidal formula SS/END1 SS/END2 SS/SIDE1 SS/SIDE2 LENGTH WIDTH DEPTH 3 .0 3.0 3 .0 3.0 434.0 99.0 9.0 AREA OF TOP LENGTH * WIDTH = 434.0 99.0 42966.0 (AREA OF TOP) AREA OF BOTTOM LENGTH * WIDTH = 380.0 45 .0 17100.0 (AREA OF BOTTOM) AREA OF MIDSECTION LENGTH * WIDTH * 4 407 .0 72.0 117216. 0 (AREA OF MIDSECTION * 4) CU. FT. _ [AREA TOP + (4*AREA MIDSECTION) + AREA BOTTOM] * DEPTH/6 42966.0 117216.0 17100.0 1• VOLUME OF LAGOON AT TOTAL DESIGN LIQUID LEVEL = 265923 CU. FT. . 1 SS v TEMPORARY STORAGE REQUIRED DRAINAGE AREA: Lagoon (top of dike) Length * Width = 440.0 105 .0 46200. 0 square feet Buildings (roof and lot water) Length * Width = 0. 0 0. 0 0. 0 square feet TOTAL DA 46200.0 square feet Design temporary storage period to be 180 days. 5A. Volume of waste produced Approximate daily production of manure in CF/LB SSLW 0.00136 Volume = 168000 Lbs. SSLW * CF of Waste/Lb. /Day * � 180 days Volume = 41027 cubic feet Volume of wash water This is the amount of fresh water used for washing floors or volume of fresh water used for a flush system. Flush systems that recirculate the lagoon water are accounted for in 5A. Volume = 0.0 gallons/day * 180 days storage/7 .48 gallons per CF Volume = 0. 0 cubic feet 5C. Volume of rainfall in excess of evaporation Use period of time when rainfall exceeds evaporation by largest amount . 180 days excess rainfall = 7 .0 inches Volume = 7 .0 in * DA / 12 inches per foot Volume = 26950.0 cubic feet 6/19/2020 NUTRIENT UTILIZATION PLAN Grower(s): M and A Phillips, LLC Farm Name: Sunshine Nurseries;AWS310060 County: Duplin Permit Capacity: Farrow to Wean Farrow to Feeder Farrow to Finish Wean to Feeder 11200 Wean to Finish Feeder to Finish Gilts Boars Storage Structure: Anaerobic Lagoon Storage Period: >180 days Application Method: Irrigation The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface water and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner: 1. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. 2. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and available water holding capacities. 3. Normally waste shall be applied to land eroding at less than 5 tons per acre per year. Waste may be applied to land eroding at 5 or more tons per acre annually, but less than 10 tons per acre per year providing that adequate filter strips are established. 4. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DWR regulations. 5. Wind conditions should also be considered to avoid drift and downwind odor problems. 6. To maximize the value of the nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied not more than 30 days prior to planting a crop or forages breaking dormancy. Injecting the waste or disking will conserve nutrients and reduce odor problems. 1 of 11 This plan is based on the waste application method shown above. If you choose to change methods in the future,you need to revise this plan. Nutrient levels for different application methods are not the same. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. In some cases you may want to have plant analysis made,which could allow additional waste to be applied. Provisions shall be made for the area receiving waste to be Flexible so as to accommodate changing waste analysis content and crop type. Lime must be applied to maintain pH in the optimum range for specific crop production. This waste utilization plan,if carried out, meets the requirements for compliance with 15A NCAC 21-11.0217 adopted by the Environmental Management Commission. AMOUNT OF WASTE PRODUCED PER YEAR (gallons,W,tons,etc.): Capacity Type Waste Produced per Animal Total Farrow to Wean 3203 gal/yr gal/yr Farrow to Feeder 3861 gal/yr gal/yr Farrow to Finish 10478 gal/yr gal/yr 11200 Wean to Feeder 191 gal/yr 2,139,200 gal/yr Wean to Finish 776 gaVyr gal/yr Feeder to Finish 927 gaVyr gal/yr Gilts 1015 gaVyr galtyr Boars 2959 gaVyr gal/yr Total 2,139,200 gallyr AMOUNT OF PLANT AVAILABLE NITROGEN PRODUCED PER YEAR (Ibs): Capacity Type Nitrogen Produced per Animal Total Farrow to Wean 3.84 Ibs/yr Ibs/yr Farrow to Feeder 6.95 Ibs/yr lbs/yr Farrow to Finish 18.86 Ibs/yr lbs/yr 11200 Wean to Feeder 0.34 Ibs/yr 3,808 Ibs/yr Wean to Finish 1.4 Ibs/yr Ibs/yr Feeder to Finish 1,67 Ibs/yr lbslyr Gilts 1.83 Ibs/yr lbslyr Boars 5.33 Ibs/yr lbstyr Total 3,808 I bstyr Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. LAND UTILIZATION SUMMARY The following table describes the nutrient balance and land utilization rate for this facility Note that the Nitrogen Balance for Crops indicates the ratio of the amount of nitrogen produced on this facility to the amount of nitrogen that the crops under irrigation may uptake and utilize in the normal growing season. Total Irrigated Acreage: 69.21 Total N Required 1st Year: 12529.78 Total N Required 2nd Year: 0.00 Average Annual Nitrogen Requirement of Crops: 12,529.78 Total Nitrogen Produced by Farm: 3,808.00 Nitrogen Balance for Crops: (8,721.78) The following table describes the specifications of the hydrants and fields that contain the crops designated for utilization of the nitrogen produced on this facility. This chart describes the size, soil characteristics,and uptake rate for each crop in the specified crop rotation schedule for this facility. 2of11 n d mrn � M � o^o N N O F U Q V V 'ct V N C Z 0 0 0 o N a `D J z b 0 0 O a wuoi o `� 0 7 N m 0 O M � N N f U� Q � Z O f/1 � J� a o c z 0 0 o c � N a a o� U y N O — Q Q Q Q Q N N N U U U)0 0 0 0 0 0 � U o U > > > > CL N U U U U N N N 100 N H O z V V V 7 N O N p 0 0 0 0 ry O M Q � 7 2 v y W J Q C O a c � 0 7 m m m m U Z r r n r rn M O � � o00o ri 3 a o a on o b o 0 0 0 0 U y .6 w w o f N} m m m m V O` � � k b c c c c p <n •'' v In H Q a n n m l 0 d LL LL LL LL � Q Z N w n 7 o d ° m ° E r U b U O c c c ` y 0 0 0 0 CL U U 0 > U U) O U > O « — 4) Y Y Y Y O U Y y Y C O O O 't p Vl 0 0 0 0 « d 0 {p p E c z z z z z = z m o w Z U a, O) 1, p > CcxN o��' vi ri a C ai w ro N U N M m V N (p m U d a 2 N H O O N Q CO N c c hQ '^ Q2 O p U U o a U N m N N ` C C C S ` C O > ¢ i S > s 2 O w � L N O� H _ Q O Z � a J Z� O � m N R a O 5 N 2 v as J U� Q 2� m CO Oc U c 2 N _ a o ,o U o c N m - EQ a o m U 9 � O � U N Z C O w m a N o� F O = a m G � C J ai0 m �+ J� fl.C O U w m r a G o 02 m m- E CL Q o m U �U CL m O H �F C O jy m m o u_ R a �a a 0 .Q ti a � � This plan does not include commercial fertilizer. The farm should produce adequate plant available nitrogen to satisfy the requirements of the crops listed above. The applicator is cautioned that P and K may be over applied while meeting the N requirements. In the future, regulations may require farmers in some parts of North Carolina to have a nutrient management plan that addresses all nutrients. This plan only addresses nitrogen. In interplanted fields(i.e. small grain, etc, interseeded in bermuda), forage must be removed through grazing, hay,and/or silage. Where grazing, plants should be grazed when they reach a height of six to nine inches. Cattle should be removed when plants are grazed to a height of four inches. In fields where small grain, etc, is to be removed for hay or silage, care should be exercised not to let small grain reach maturity, especially late in the season (i.e. April or May). Shading may result if small grain gets too high and this will definitely interfere with stand of bermudagrass. This loss of stand will result in reduced yields and less nitrogen being utilized. Rather than cutting small grain for hay or silage just before heading as is the normal situation,you are encouraged to cut the small grain earlier. You may want to consider harvesting hay or silage two to three times during the season, depending on the time small grain is planted in the fall. The ideal time to interplant small grain, etc, is late September or early October. Drilling is recommended over broadcasting. Bermudagrass should be grazed or cut to a height of about two inches before drilling for best results. CROP CODE LEGEND Crop Code Crop Description-Harvested As I A Barley Grain Crop B Grazed Hybrid Bermudagrass Pasture/Grazed C Hybrid Bermudagrass Hay Hay B/C Comb. Hybrid Bermudagrass Graze/Hay Combination D Corn-Grain Grain Crop E Corn-Silage Silage F Cotton Cotton Lint G Grazed Fescue Pasture/Grazed H Fescue Hay Hay I Oats Grain Crop J Rye Grain Crop K Grazed Overseed Pasture/Grazed (Seeded in Bermudagrass) L Overseed Hay Hay(Seeded in Bermudagrass) M Grain Sorghum Grain Crop N Wheat Grain Crop O Soybean Grain Crop P Pine Trees Pine Trees S Small Grain Grain Crop/Hay(After Grain Crop) CC Cover Crop Not Harvested; Burned/Disked In Acres shown in the preceding table are considered to be the usable acres excluding required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in the tables. See attached map showing the fields to be used for the utilization of animal waste. 4 of 11 SLUDGE APPLICATION: The following table describes the annual nitrogen accumulation rate per animal in the lagoon sludge Farm Specifications PAN/ r/animal Farm Total/ r Farrow to Wean 0.8 Farrow to Feeder 0.96 Farrow to Finish 3.9 11200 Wean to Feeder 0.07 784 Wean to Finish 0.27 Feeder to Finish 0.34 Gilts 0.39 Boars 0.55 The waste utilization plan must contain provisions for periodic land application of sludge at agronomic rates. The sludge will be nutrient rich and will require precautionary measures to prevent over application of nutrients or other elements. Your production facility will produce approximately 784 pounds of plant available nitrogen per year and will accumulate in the lagoon sludge based on the rates of accumulation listed above. If you remove the sludge every 5 years, you will have approximately 3920 pounds of plant available nitrogen to utilize. Assuming you apply this PAN to hybrid bermuda grass hayland at the rate of 300 pounds of nitrogen per acre,you will need 13 acreas of land. If you apply the sludge to corn at a rate of 125 pounds per acre, you will need 31.36 acres of land. Please note that these are only estimates of the PAN produced and the land required to utilize that PAN. Actual values may only be determined by sampling the sludge for plant available nitrogen content prior to application Actual utilization rates will vary with soil type, crop, and realistic yield expectations for the specific application fields designated for sludge application at time of removal. APPLICATION OF WASTE BY IRRIGATION; The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs. This rate is limited by initial soil moisture content,soil structure, soil texture,water droplet size,and organic solids. The application amount should not exceed the available water holding capacity of the soil at the time of irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the crop. If surface irrigation is the method of land application for this plan, it is the responsibility of the producer and irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in the preceding table. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. "This is the maximum application amount allowed for the soil assuming the amount of nitrogen allowed for the crop is not over applied. In many situations,the application amount shown cannot be applied because of the nitrogen limitation. The maximum application amount shown can be applied under optimum soil conditions. Your facility is designed for>180 days of temporary storage and the temporary storage must be removed on the average of once every 6 months. In no instance should the volume of the waste stored in your structure be within the 25 year 24 hour storm storage or one foot of freeboard except in the event of the 25 year 24 hour storm. It is the responsibility of the producer and waste applicator to ensure that the spreader equipment is operated properly to apply the correct rates to the acres shown in the tables. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. I Call your technical specialist after you receive the waste analysis report for assistance in determining the amount of waste per acre and the proper application prior to applying the waste. 5 of 11 Application Rate Guide The following is provided as a guide for establishing application rates and amounts. Soil Application Rate Application Amount Tract Hydrant Type Crop inlhr * inches T2227 P1 Norfolk Corn 0.5 1 T1625 P2 Norfolk Corn 0.5 1 T2227 A Norfolk Corn 0.5 1 T2227 B Norfolk Corn 0.5 1 listed above are for co mal Crops-Soybeans Any Any Norfolk Soybeans 0.5 1 )nal Crops-Cover Cro Any Any Norfolk Cover Crop 0.5 1 I; PAN amount applied starting PAN ri I 6of11 Additional Comments: This plan dated 6/19/2020 revised to reflect the additional pivot on T1625 and also updates the production and application rates to match those on the NCSU Nutrient Management website. 1 i 7of11 NUTRIENT UTILIZATION PLAN CERTIFICATION Name of Farm: Sunshine Nurseries; AWS310060 Owner: M and A Phillips, LLC Manager: Owner/Manager Agreement: I/we understand and will follow and implement the specifications and the operation and maintenance procedures established in the approved animal waste nutrient management plan for the farm named above. I/we know that any expansion to the existing design capacity of the waste treatment and/or storage system, or construction of new facilities, will require a new nutrient management plan and a new certification to be submitted to DWR before the new animals are stocked. I/we understand that I must own or have access to equipment, primarily irrigation equipment, to land apply the animal waste described in this nutrient management plan. This equipment must be available at the appropriate pumping time such that no discharge occurs from the lagoon in the event of a 25 year 24 hour storm. I also certify that the waste will be applied on the land according to this plan at the appropriate times and at rates which produce no runoff. This plan will be filed on site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by NCDWR upon request. Name of Facility Owner: M and A Phillips, LLC Signature: Date Name of Manager(if different from owner): Signature: Date Name of Technical Specialist: M. Kevin Weston Affiliation: Private Address: 237 A.I. Taylor Road Richlands, NC 28574 Telephone: (910) 290-3300 Signature: -7° Date 8of11 NUTRIENT UTILIZATION PLAN REQUIRED SPECIFICATIONS 1 Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. 2 There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. if the producer does not own adequate land to properly dispose of the waste, he/she shall provide evidence of an agreement with a landowner, who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the waste production facility to secure an update of the Nutrient Utilization Plan when there is a change in the operation, increase in the number of animals, method of application, recieving crop type, or available land. 3 Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based upon soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of applications j for other nutrients. 4 Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land eroding at more than 5 tons per acre per year but less than 10 tons per acre per year provided grass filter strips are installed where runoff leaves the field (See USDA, NRCS Field Office Technical Guide Standard 393 - Filter Strips). 5 Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the land application field. 6 When animal waste is to be applied on acres subject to-flooding, waste will be soil incorporated on conventionally tilled cropland. When waste is applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding (See "Weather and Climate in North Carolina" for guidance). 7 Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor and flies. 8 Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. 9of11 NUTRIENT UTILIZATION PLAN REQUIRED SPECIFICATIONS 9 Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. 10 Nutrients from waste shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste/nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11 Any new swine facility sited on or after October 1, 1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and canal. Animal waste, other than swine waste from facilities sited on or after October 1, 1995, shall not be applied closer than 25 feet to perennial waters. 12 Animal waste shall not be applied closer than 100 feet to wells. 13 Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14 Waste shall be applied in a manner not to reach other property and public right-of-ways. 15 Animal waste shall not be discharged into surface waters, drainageways,or wetlands by discharge or by over-spraying. Animal waste may be applied to prior converted cropland provided the fields have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharge directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16 Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be } discharged into the animal waste management system. 10 of 11 } NUTRIENT UTILIZATION PLAN REQUIRED SPECIFICATIONS 17 A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage, or discharge. 18 If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. 19 Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks and spills. A regular maintenance checklist should be kept on site. 20 Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption, it should only be applied pre-plant with no further applications of animal waste during the crop season. 21 Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. 22 Waste shall be tested within 50 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate-determining nutrient, unless other restrictions require waste to be applied based on other nutrients, resulting in a lower application rate than a nitrogen based rate. Zinc and copper levels in the soil shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted and maintained for optimum crop production. Soil and waste analysis records shall be kept for a minimum of five years. Poultry dry waste application records shall be maintained for a minimum of three years. Waste application records for all other waste shall be maintained for a minimum of five years. 23 Dead animals will be disposed of in a manner that meets North Carolina regulations. } 11 of 11 aqi^.. 1 .t. s� '! -;•7�1 t'• '�a [y ,{ .,�• 3�kY�i:its AIRWAY WETTED B=4..15 ACRES y� • PIVOT WETTED ACRES = 25.59 .I� GUN_ARC ► � fife 'I :i •'��t�ro _ ., t IIJ i f - `' f, AIRWAY WETTED , A=S..J�i ACRES - . END; GUN ARC s 1 ��ra •', II• � 11 t �,i�''.z' .:� � � /f" Y /�A 4.. fir- � �`d3 . u,.1 ~ f .?��,•YFK {:'�� f,! 9 +fv f T i ...... 10.4 9 •F 1. y ml W in C 3 d � N N N `u V a®� l . w d o 3 7 b � m o N t O 9G O C. m n�mo o � H anon i oa D e c Z e N p O !T B oa s N dad" � �N -m R R I O n � o a r x ro tt J L. O �.. N N/F n p QUINN FARMS, INC. CO DEED. BOOK 1.092, .PAGE 104 p TRACT THREE Q` O . .. Q ��� %� s Lu o �°` p U7 Q '6' LLi O� C pc r r 20`�A1 O z OO� �� 2ph qCi z 0 �\O� � 2�3•,3 t . X 33.97 Ac.+_ o WETTED AREA N = 464,321.85 `� • E = 2,277,568.08' -y N 88'11'48" W s` 11, '1-129.88' •� d;r� , 7r�� M �� N/F' ^, ."� KERRY HALL and t � PIL 25 d t. -t Y�1p = Mo, a C o � nmi b � _ N 7 � m N y Z n 0 7 7 n �3 � ro y 'O 0 N O 7 F o 0 nn�n m boJ._ N p O tl m N G p d O O O O O. Py d3mb' 4na -1 pob ? � !N Vol IQa N F+ W lP lD '9 O O u !n •Fj N 61 W J l7 ` n F; 0 V � � f z �z z z z z , r I, n = ro I U. S. Department of Agriculture NC-ENG-34 Soil Conservation Service September 1980 File Code: 210 HAZARD CLASSIFICATION DATA SHEET FOR DAMS Landowner (� ;rr_�e Qr m s County Community or Group No. Conservation Plan No. Estimated Depth of Water to Top of Dam /l- Ft. Length of Flood Pool Ft. Date of Field Hazard Investigation Evaluation by :reach of flood plain downstream to the point of estimated minor effect from sudden dam failure. _ Est, E ev. st.. evatzon Kind of :Improvements: of Breach Reach: Length: Width: Slope: Land Use . Improvements Above :Floodwater Above flood Plain: .Flood Plain Ft. . Ft. Ft. Ft. 1 2 ' 3 ' Describe potential for loss of life and damage to existing or probable future downstream improvements from a sudden breach n o Hazard Classification of Dam aN b, c) (see NEM-Part 520.21) Dam Classificatior �i ,I IV, Y) � ,.�: , �� ?. . Date ,) name (title) By � � ,� ti tl e r Concurred By �_ f Date name title NOTE: 1. Instructions on reverse side. 2. Attach additional sheets as needed. �.. .�--�i- ;� 1. • � -- - - - ._ °' __....._._..._._. '_.. .. . _ _..._...__ .�.. - -•---.._._... ---- ----�----I_4 _......_ i �l i -� i�l.��-' ..•� `1_....__..:...._. ..._ � _ ? . .. .. ... .._.__ � ...... . .".._ jam• ---jay :`� : : : V. ' : _:y.:... i ..: u : :..: i :.: :. t. . . I •" : : � ice. :.:._`_:..::.: :. ; � . - •�t- .• - -'__:...- :..: •• :. : •I :.: ..: ' p:. :.:�..:. . _`� ��_, •. . : : � .. : •..� ... E .... :. :. .. : .�:�rJ;- --.�: ::- :..._._ _ .. .�_�_.:—:__-! � 16. Ml iw _ . ... .... _•::J....i_.� . ... .. . ... .... . .. . _ � - -XA ,�� - . •l---•t:�_ ...._�. - III r.l.i. •r-j--�I -f '-+.,•--i' •._.+;A -�" -1 �" :•: -- - :j i:.c i.;.E-t.•i- •�}-' Y.I•_....!-I'- _i. - -- •� i"^1: ..a: _�".��.I fA ��:_ -i�:_)�_� _G _,..... . mil_ - _j'_r--!-} !-;_�_j_!_ _a_�.!_;t.•�(-; !^I_�_•!-i_ - �- , ! i_! �--1-�.. j �.h?_T._! k `il--- -i , �- �s "' r•, •! -`-,- r•,--i�-i"!•j_ I •, _� r- r3-fir r y ! � i F:�.. .. Ir :S I '. '..�. , � :_Q1.4ti :__• ! i. _,. ..i.j :_r-l.t.�_i .l I'�• � I...h._I_.. � •*•• i ,i .t . tq j .!" ;.�!.wI ! ... ,_.Vl. � .� i 1_�..F_ ! ; �!'� ' �•�.:-� i.• � �"_�" �-I !• ' �. .i..i I. _i... . ._ L ' iii tj Imo' - ' 1 U.S. bEf ARTMF.NT Of AGRICULTURE SCS-EIIG•538 SOIL CONSERVATION SERVICE Rey. 5.70 SOIL INVESTIGATION TO DETERMINE SUITABILITY OF PROPOSED POND SITE DIS'1 acr FARmF11'S NAME _ COUN'rY DATE WORK UNrr S. C. S. PI[OTO SIIF F 1' NO- WAT£RSIIED ARF.A AfEASUREMENTS CROPGAND_ACRES PASTURE ACRES ^_— ---- ACRES POND GLASS WORK UNIT CONSERVA'1'lUi:1ST WOODLAND ACRES TOTAL ADE (Approx. scale I"= feet) WRE SKETC11 OF PROPOSED POND SHOWIcNn tnt WHERErBORI fe. line of dam dIdearivon ketch.Locate f4fe"c" nP f I• I ` `t -tz SL BORING NUMBER AND PROFILE SHOW pla6e and list darn-sire and spillway borings first-rhnr pondrd area and bortnw Pit borings-sevarare with unNcu r a e.I)FVr I tCnnlrnucJ an barA urhere necessary) Show water(able riec.+lions on darts-site borings. — _ 1� 15 16 17 18 19 20 21 22 23 ` SCALF. ; 2 3 4 5 6 7 8 9 10 11 12 ~13 SIGNATURE & ""I'LE 1;()RlNG ?`!ADD By_1 I r i Ire o 1*_ fC' I I 1 � a d• 1 O T-17 _ I._ __ - 4-A -A--1 - j'i !;;yam• 41 k • AT -Ai lip ..... ....• . A-A. L. pip ..... gar, --A -4- T-1 t i--' - -1 I A:J AN 12 +4 L Lil L %A I a I L i Lj L IK-f! J IT t Hl L Wk. _j � 1 5. TEMPORARY STORAGE REQUIRED DPAIWAGE AREA; Lagoon(top of dike) Length •Wtdth 340.0 12010 40800,0 square foes Badings(roof and tot water) 0.0 square feet Deccribo this aroe. TOTAL DA 40800.0 8quate feet Design temporary s►=06 AeiOd to be riod to b' 0 180 drys. W Volume at waste produced Feces&urine production in oalJday per 135 Ib,ALW 1.37 Volurne 16MM Ibs.ALW1135)be.ALW' 1,37 gaftly 180 days Voturne■ 30M gals,or 41026.736 cubic fact 8R. Voluma of wash water This la the amount of fresh water used for wsashing m�that rrvotimote of fresh water ucod for a hush uyet " the lagoon water are accounted for In SA. Volume= 0.0 gallo"Iday" 180 days storagO 48 gallons Per GF Volume= 0.0 cubic feet 5C. Volume of ravftl In amuse of 6Vapwalw Use podod of limo y""rainfall oxopedS evaporotlen by largest amount_ 180 days©XCIM rainfall 7.0 lnohas Volume 1.0 in' DA/12 IrEchae W toot Vok,m 23OM cubic feet r i O"fator; Circle Q Hq Farm County-, Dvptln Data: 10123/91 Distance to nearest resldrnc$(other ftn owrw): t 500 te6t 1. AVERAGE LIVE WEIGHT(ALW) x T Ibt. 0 Iles 0 sours(twow m finish) X 141 41 lb 0 sours(farrow to feoft> s. b0 n 0 I0 104 o bod(Finithin only) x 135 lba, _ 0 Ibs 0 sews(fa-TOW to w6an) x 433 lh. w . 5600 tread*-%r►to faedc� x 30lbs_ 198000 ]bt 0 Deaesibs other Tole!Average Llve Weight 1b8004 lbs 2. MINtWAl REQUIRED TREATMENT VOLUME OF LAGOON Volumes i 600M it*,ALW x Treatment vokrmq(CF)/h ALW -trreatmertf Voklrrle(GF Ab,ALW F 1 CFAb.ALW yplurne= 10000 cubic feel 3- STORAGE VOLUME FOR SLUD05 ACCUMULATION Volume= 0 Cublo fwt 4. TUTAL OESIGNF-D VaLUMITr Inside top 1$A0 1200 Inside top wtdlh(feet)- w •�-.-� _. 12 49 Top of dike etevstiarl(t8et)-----' 37 Bottom of bapoon atavatlon 37 Freeboard(fleet) -- 1 Sides slop%"Ids Total design volume using prismoidal formula SSIEND, SSjE*NDZ 6SJSIDl;1 S"IDEZ LENGTH WIDTH DEPTH 2.5 2.5 2.5 2.5 3'Ko 116.0 11.0 AREA OF TOP LENGTH*WIDTH= 336,0 115.0 38525 (AREA OF TOP) AREA OF DQTTOM LENGTH*WIDTH= 280.0 60.0 113800 (AE2EA OF BOTTOM) AREA OF MIDST CTION LENGTH'WIDTH"4 307.5 675 107e25 (AREA pF WIDSSCTICN'4) CU.FT.a]AREA TOP i(40AREA MIDSECTION)+AREA BOTTOM] 9 18800,0 HJ$ 1.6 313526.0 107U6 Total Omsigned Volume Avallable 798742 CU.FT, 4�1 5D. Volume of 25 year-24 hour storm Volume- 7.0 inches 112 inche$per foot'DA Volume= 23Wo.0 cubic feet f TOTAL REQUIRED TFIMORARY STORAGE SA. 41027 cubic feet 5&, 0 outk feet 5C, 23800 C&C f4 tt 5D, 23800 GUbia feet TOTAL 85027 cubic feet 6, SUMMARY TCmpCFUY st➢rage 180 days Rainfall in exc S Of MOPOrationo�O�r�=x=} 7 Indtos / 2,5 year-24 b^eroinfaltMPIER-14 »d=a.." T i d s/C I're� ♦ r&"TR ��as9a==p(�-2� 7SllFe Rae �7 1 fw 1� Sldle�sJepee----t---�IIRi:���w..n�_�vfW�a:= n2.5 :1 Ineldelop th..�ave7.i•nsrmmr.aaa�7.RgRau�Y 340 feat Inslcie top 120 fec Top of dike�EVAtlOtlrrrw�r»rU�•�•arrr�r.rwrsU 49 feet Bottom of lagoon 37 feet Torsi required voltusar " ,a......,.x.,.......> 256627 ou.ft_ ActA d9Elgn •���> 208742 Cu.ft, Seasoned high watertatAe olovatlon(SHWT)wss> 44 feet Stop PUM060 @iQrV•tsw..� .—aa-r�:al.asi Rcvsca�z> 45 foAt 'must be>or=to die SHWT 44 feet Mt18t b0>or a to min.req.treatment el.=> 43 feet Required mbdmum treatment voluM9-7-=- !t m' 188000 cu.ft. Volume e1 atop pumping %9 N7 cLi•ft' Start pun*ng 47.3 feet Mutt be at bottom of fr"bosrd&25 yr,rt Moll Actual vobxne leas 25 yr.-24 hr, rainfall=m> 274W2 cu.ft Voume*I!tort pumping 272323 CU.ft. F2equlrw volume to be pumped'a' W77 cu.ft Actual votwna planned to be 70256 cu.R Mil_thicknM of soil liner when required=v> 1175 feet 7. DESIGNED BY: APPROVED DY, 4� DATE; DATE: NOTE-SEE ATYA�JC�H�ED WASTE UTILIZATION PLAN 1 1 f COMrutE1�IT5: 1� r!G.., �� 0.f �✓ CN� nd__�_�p j !a,��°y v 5D. Volume of 25 year - 24 hour storm Volume = 7 .5 inches / 12 inches per foot * DA Volume = 28875 . 0 cubic feet TOTAL REQUIRED TEMPORARY STORAGE 5A. 41027 cubic feet 5B. 0 cubic feet 5C. 26950 cubic feet 5D. 28875 cubic feet TOTAL 96852 cubic feet 6. SUMMARY Total required volume 264852 cubic feet Total design volume avail. 265923 cubic feet Min. req. treatment volume plus sludge accumulation 168000 cubic f At elev. 47 . 5 feet ; Volume is 168314 cubic feet (end pumping) Total design volume less 25yr-24hr storm is 237048 cubic feet At elev. 49.2 feet ; Volume is 232567 cubic feet (start pumping Seasonal high water table elevation 47. 0 feet 7 . DESIGNED BY: � �'� APPROVED BY: • C . S`� j DATE: � /!5N-3 DATE: 7 f 3 NOTE: SEE ATTACHED WASTE UTILIZATION PLAN SCS DOE'S NOT CERTIFY THAT EXCAVATION AND FILL VOLUhIES ARE CORRECT o, 1<1 s �. i • �rator.Circle Q Nursery #County: Duplin Date: 04/19/93 o' Distance to nearest residence (other than owner) : 2600.0 feet 1. STEADY STATE LIVE WEIGHT 0 sows ( farrow to finish) x 1417 lbs. = 0 lbs 0 sows ( farrow to feeder) x 522 lbs. = 0 lbs 0 head ( finishing only) x 135 lbs. = 0 lbs 0 sows ( farrow to wean) x 433 lbs. = 0 lbs 5600 head (wean to feeder) x 30 lbs. = 168000 lbs `i'O`i'AL STEADY STATE LIVE WEIGHT (SSLW) = 168000 lbs 2 . MINIMUM REQUIRED TREATMENT VOLUME OF LAGOON Volume = 168000 lbs. SSLW x Treatment Volume(CF) /lb. SSLW Treatment Volume(CF) /lb. SSLW= 1 CF/lb. SSLW Volume = 168000 cubic feet 3 . STORAGE VOLUME FOR SLUDGE ACCUMULATION Volume = 0. 0 cubic feet ; "Owner requests no sludge storage. Sludge will be removed as needed. " 4. TOTAL DESIGN VOLUME Inside top len 440. 0 feet ; Inside top width 105. 0 feet Top of dike -elevat on 51.0 feet Freeboard 1.0 fee ; Side slopes 3.0 : 1 (Inside lagoon) `Total design a oon iquid level at elevation 50.0 feet Bottom of lagoon elevation 41.0 feet Seasonal high water table elevation 47 .0 feet Total design volume using prismoidal formula SS/END1 SS/END2 SS/SIDE1 SS/SIDE2 LENGTH WIDTH DEPTH 3 .0 3.0 3 .0 3.0 434.0 99.0 9.0 AREA OF TOP LENGTH * WIDTH = 434.0 99.0 42966.0 (AREA OF TOP) AREA OF BOTTOM LENGTH * WIDTH = 380.0 45 .0 17100.0 (AREA OF BOTTOM) AREA OF MIDSECTION LENGTH * WIDTH * 4 407 .0 72.0 117216. 0 (AREA OF MIDSECTION * 4) CU. FT. _ [AREA TOP + (4*AREA MIDSECTION) + AREA BOTTOM] * DEPTH/6 42966.0 117216.0 17100.0 1• VOLUME OF LAGOON AT TOTAL DESIGN LIQUID LEVEL = 265923 CU. FT. . 1 SS v TEMPORARY STORAGE REQUIRED DRAINAGE AREA: Lagoon (top of dike) Length * Width = 440.0 105 .0 46200. 0 square feet Buildings (roof and lot water) Length * Width = 0. 0 0. 0 0. 0 square feet TOTAL DA 46200.0 square feet Design temporary storage period to be 180 days. 5A. Volume of waste produced Approximate daily production of manure in CF/LB SSLW 0.00136 Volume = 168000 Lbs. SSLW * CF of Waste/Lb. /Day * � 180 days Volume = 41027 cubic feet Volume of wash water This is the amount of fresh water used for washing floors or volume of fresh water used for a flush system. Flush systems that recirculate the lagoon water are accounted for in 5A. Volume = 0.0 gallons/day * 180 days storage/7 .48 gallons per CF Volume = 0. 0 cubic feet 5C. Volume of rainfall in excess of evaporation Use period of time when rainfall exceeds evaporation by largest amount . 180 days excess rainfall = 7 .0 inches Volume = 7 .0 in * DA / 12 inches per foot Volume = 26950.0 cubic feet