HomeMy WebLinkAboutNCC231026_Annual Fee NOD Letter (2024 Fee)_20240516 ROY COOPER
Govemor
ELIZABEIH S.BISER t�.
Secretary
WILLIAM E.TOBY VINSON,JR NORTH CAROLINA
Interne Director EnWonmental Quality
5/16/2024
MHB Development, LLC
Attn: Michael Morrison
208 Forest Oaks Drive
Clayton, NC 27527-6943
Subject: Notice of Deficiency-Failure to Pay Annual Fee
Invoice No. NCC231026-2024
Dear Permittee:
You are receiving a Notice of Deficiency because the annual fee of$120 for coverage under NPDES General Stormwater Permit
NCG010000 for Construction Activities has not been paid as required by N.C. General Statute 143-215.3D(a)(4).The annual fee
was billed on 4/1/2024 and was due on 5/1/2024.The annual fee applies to the following construction site:
Berea Farms Subdivision
107 Berea Church Road, Four Oaks, NC 27524, Elevation Township, NC
Johnston County
Certificate of Coverage No. NCC231026
NC Reference No. NCG01-2023-1026
If the project was closed out prior to the invoice due date, please request a Notice of Termination. Follow the instructions on the
NPDES Construction Program website(deq.nc.gov/NCG01). If the project was not closed out or sold prior to the invoice due date,
please pay the permit fee using the Stormwater ePayment website(deq.nc.gov/SW-ePayments).
Failure to address this deficiency within 30 calendar days could result in the issuance of a Notice of Violation and potential civil
penalty assessment of up to$25,000 per day for failing to maintain permit coverage. If you have any questions or concerns,
please contact Kieu Tran at kieu.tran@deq.nc.gov.
Sincerely,
William E.Vinson,Jr., PE,CPESC,CPM
Interim Director
Division of Energy, Mineral,and Land Resources
D_E Q� Nrnlh Cara7ina Deparlmenl of Cnvroament:J Qwlily Drvisirr ul Cnrryy.Mineral urwl Lancf Frsorrccs
Sl2 Nur R,Salisbury Slrrel I Iol2 Mail Se s,ceCmter Rork iyh.Nurlh Caroline Tiboo I612