HomeMy WebLinkAbout20161220_I-5000 4C meeting minutes (Gaston County)_20160113
Hood, Donna
From:Dan.Robinson@kimley-horn.com
Sent:Wednesday, January 13, 2016 10:26 AM
To:Zerman, William S; Billings, Amy A; Patel, Janaki H; Clelland, Terry L; Staley, Mark K;
Dagnino, Carla S; Barrett, William A; Sealy, Stephen G;
steven.l.kichefski@usace.army.mil; marella_buncick@fws.gov; Hood, Donna
Cc:Dan.Robinson@kimley-horn.com; bryan.vickery@kimley-horn.com;
Tom.Gray@kimley-horn.com
Subject:I-5000 4C meeting minutes (Gaston County)
Attachments:I5000_4C meeting minutes_REV 1-13-16.pdf
Hello All,
th
Attached are the meeting minutes for the I-5000 4C meeting held on December 9, 2015. I apologize for the delay in
sending out, but we held them until we received some additional information in early January. Please review the
meeting minutes and respond back to me with any edits.
Thanks,
Dan
Right-click here to download pictures. To help protect your privacy, Outlook
prevented automatic download of this picture from the Internet.
http://www.kimley-
horn.com/communication/signature/KimleyHorn_LG_LOGO_RGB_PRIMARY_96dpi
.jpg
Dan Robinson, P.E. (NC, SC, GA), CFM
Kimley-Horn
|
3001 Weston Parkway, Cary, NC 27513
|
Direct: 919-677-2178 Mobile: 919-632-6807
1
Subject:
Team Members:
Draft Minutes from Interagency Permit Drawings (4C) Review Meeting on
December 9, 2015 for I-5000 in Gaston County
Donna Hood — NC DEQ/DWR
Marella Buncick — USFWS
Steve Kichefski USACE
Participants:
Bill Zerman — NCDOT Hydraulics
Amy Billings — NCDOT Hydraulics
Janaki Patel — NCDOT Hydraulics
Dan Robinson — Kimley-Horn and Associates
Bryan Vickery — Kimley-Horn and Associates
Terry Clelland — NCDOT SMU
Mark Staley — Roadside Environmental Unit (REU)
Carla Dagnino — Natural Environment Section
(NES)
Bill Barrett — Natural Environment Section (NES)
Sealy — NCDOT Utilities
The meeting began with Dan Robinson calling it to order and providing a quick recap of the
previous 4B meeting held on July 17, 2013. He then proceeded to go through the 4C permit
drawings site by site.
Gen eral Com m en ts:
• NA
Sh eet 5:
• Site 1— This site appears on both sheet 5 and 6 and is located downstream of the
3@8'x9' RCBC extension. It was discussed relative to the 2'lateral base ditch that flows
north along —RPA- over the proposed floodplain bench. It was suggested that the ditch
be modified to have a flatter slope as it enters the proposed floodplain bench and flat
section of ditch be armored with riprap instead of PSRM to minimize velocities. In
addition it was suggested that Detail 22 and 23 be modified to show a blend of class I and
II riprap in the proposed floodplain bench instead of core fiber matting.
• Site 1- Impacts associated with this site were discussed and determined that they would
remain as shown on the summary sheet. Steve noted that he may revisit this site and
determine if bank stabilization would be more applicable than channel improvements. It
was also noted that 1:1 mitigation for this site was likely — Steve verified this information
by email on 1/OS/2016.
• Site 1- It was noted that Structures Design unit is evaluating this triple RCBC extension
length. Structures also noted that there may need to be 5' of extension before the culvert
can be skewed. It was noted that hopefully the culvert length would not change as the
Culvert Survey Reports have been sealed and a CLOMR had been completed.
• Site 2 — No Comments
• Site 3— It was recommended to add Temporary Construction Easement (TCE) on both
sides (north and south) of this site to cover the temporary stream impacts in surface
waters shown and quantified on the plans.
I-5000 4C Meeting Minutes
• Site 4 — No Comments
Sh eet 6:
• Site 1— See above notes from Sheet 5.
• Site 5- It was noted to extend limits of temporary stream impacts to surface waters to the
limit of the existing TDE (south of proposed 3@8'x10'RCBC).
• Site 5— It was noted on the summary sheet to modify the channel improvement
designation to bank stabilization. No mitigation required for this impact.
• It was noted that the utility access road that parallels —RPD- should have the note
modified to include geotextile fabric under the proposed class A riprap instead of PSRM.
Sh eet 8:
• Site 6— It was noted on the summary sheet to modify the channel improvement
designation to bank stabilization. No mitigation required for this impact.
Sh eet 9:
• Site 7 - No comments.
• Site 8 — No comments
• Site 9 — No comments
• There was a question concerning the need for any easements to construct/maintain the
proposed outfall ditches that are contained in Site 7, 8, and 9. NCDOT hydraulics unit
staff was going to coordinate with NCDOT roadway staff (Brian Key) to discuss this
question along with any other updates on the plans. Kimely-Horn received email
co�respondence and microstation files on 12/17/15 from NCDOT that confirmed all the
sites on PSH 9, (site 7, 8,9) are all in PDE's.
MEETING ADJOURNED
I-5000 4C Meeting Minutes 2