HomeMy WebLinkAbout310058_Application_20240402State of North Carolina
Department of Environmental Quality
Division of Water Resources
Animal Waste Management Systems
Request for Certification of Coverage
Facility Currently covered by an Expiring Sate Non -Discharge General Permit
On September 30, 2024, the North Carolina State Non -Discharge General Permits for Animal Waste Management Systems will
expire. As required by these permits, facilities that have been issued Certificates of Coverage to operate under these State
Non -Discharge General Permits must apply for renewal at least 180 days prior to their expiration date. Therefore, all applications
must be received by the Division of Water Resources by no later than April 3, 2024.
Please do not leave any question unanswered. Please verify all information and make any necessary corrections below.
Application must be signed and dated by the Permittee.
I .
Certificate Of Coverage Number: AWS310058
2.
Facility Name: King Farms - Hallsville Farms
3.
Permittee's Name (same as on the Waste Management Plan):
Craig King
4.
Permittee's Mailing Address: 126 Garland King Rd
City: Teachev State: NC
Zip: 28464-9736
Telephone Number: 910-285-2692 Ext. E-mail:
5.
Facility's Physical Address: 466 Durwood Evans Rd
City: Beulaville State: NC
Zip: 28518
6.
County where Facility is located: Duplin
7.
Farm Manager's Name (if different from Landowner): Craig
King, Jr
8.
Farm Manager's telephone number (include area code): 910-271-1494 Ext.
9.
Integrator's Name (if there is not an Integrator, write "None"):
Murphy -Brown LLC
10.
Operator Name (OIC): Robert B. Mitchell Jr.
Phone No.: 919-738-3584
OIC #: 16561
11.
Lessee's Name (if there is not a Lessee, write "None"):
12.
Indicate animal operation type and number:
Current Permit: Operations Type
Allowable Count
Swine - Feeder to Finish
5,720
Operation Types:
Swine Cattle
Dry Poultry
Other Types
Wean to Finish Dairy Calf
Non Laying Chickens
Horses - Horses
Wean to Feeder Dairy Heifer
Laying Chickens
Horses - Other
FIEMLLojjBish Milk Cow
Pullets
Sheep- Sheep
eeder to Finish Dry Cow
Turkeys
Sheep - Other
Farrow to Wean Beef Stocker Calf
Turkey Pullet
Farrow to Feeder Beef Feeder
Boar/Stud Beef Broad Cow
Wet Poultry
Gilts Other
Non Laying Pullet
Other
Layers
13. Waste Treatment Lagoons, Digesters and Waste Storage Ponds (WSP): (Fill/Verify the following information.
Make all necessary corrections and provide missing data.)
M
Structure
Name
Structure Type
(Lagoon/Digester/
WSP)
Estimated
Date
Built
Liner Type
(Clay, Synthetic,
Unknown)
Capacity
(Cubic Feet)
Estimated
Surface Area
(Square Feet)
Design Freeboard
"Redline"
(Inches)
I
Lagoon
1/11/1996
Full, clay
1,112,922.00
81,457.00
19.00
Submit one (1) copy of the Certified Animal Waste Management Plan (CAWMP) with this completed and signed
application as required by NC General Statutes 143-215.10C(d), either by mailing to the address below or sending it via
email to the email address below.
The AWMP must include the following components:
1. The most recent Waste Utilization Plan (WUP), signed by the owner and a certified technical specialist, containing:
a. The method by which waste is applied to the disposal fields (e.g. irrigation, injection, etc.)
b. A map of every field used for land application (for example: irrigation map)
c. The soil series present on every land application field
d. The crops grown on every land application field
e. The Realistic Yield Expectation (RYE) for every crop shown in the WUP
f. The maximum PAN to be applied to every land application field
g. The waste application windows for every crop utilized in the WUP
h. The required NRCS Standard specifications
A site map/schematic
Emergency Action Plan
411 Insect Control Checklist with chosen best management practices noted
Odor Control Checklist with chosen best management practices noted
WMortality Control Checklist with selected method noted - Use the enclosed updated Mortality Control Checklist
3!% Lagoon/storage pond capacity documentation (design, calculations, etc.) Please be sure the above table is
accurate and complete. Also provide any site evaluations, wetland determinations, or hazard classifications that may be
// applicable to your facility.
,/8. Operation and Maintenance Plan
If your CAWMP includes any components not shown on this list, please include the additional components with your submittal.
(e.g. composting, digesters, solids separators, sludge drying system, waste transfers, etc.)
I attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that,
if all required parts of this application are not completed and that if all required supporting information and attachments are not
included, this application package will be returned to me as incomplete.
Note: In accordance with NC General Statutes 143-215.6A, and 143-215.613, any person who knowingly makes any false
statement, representation, or certification in any application may be subject to civil penalties up to $25,000 per violation. (18
U.S.C. Section 1001 provides a punishment by a fine of not more than $10,000 or imprisonment of not more than 5 years, or both
for a similar offense.)
Print the Name of the Perm ittee/Landowner/Signing Official and Sign below. (If multiple Landowners exist, all landowners
should sign. If Landowner is a corporation, signature should be by a principal executive officer of the corporation):
Name (Print): c t. Title: 1 0—
Signature: Date: 3
Name (Print):
Signature:
Name (Print):
Signature:
Title:
Date:
Title:
Date:
THE COMPLETED APPLICATION SHOULD BE SENT TO THE FOLLOWING ADDRESS:
E-mail: animal.operations@deq.nc.gov
NCDEQ-DWR
Animal Feeding Operations Program
1636 Mail Service Center
Raleigh, North Carolina 27699-1636
its
PRODUCER: Craig King
Hallsville Farm
LOCATION: 126 Garland King Rd.
Teachey, NO 28464
TELEPHONE: (910) 285 2692
TYPE OPERATION: Feeder to finish
NUMBER OF ANIMALS: 5720
(Design Capacity)
The waste from your animal facility must be land applied at a specified rate to prevent pollution
of surface and/or groundwater. The plant nutrients in the animal waste should be used to
reduce the amount of commercial fertilizer required for the crops in the fields where the waste
is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste
should be analyzed before each application cycle. Annual soil tests are strongly encouraged
so that all plant nutrients can be balanced for realistic yields of the crop to be grown.
Several factors are important in implementing your waste utilization plan in order to maximize
the fertilizer value of the waste and to ensure that it is applied in an environmentally safe
manner. Always apply waste based on the needs of the crop to be grown and the nutrient
content of the waste. Do not apply more nitrogen than the crop can utilize. Soil types are
important as they have different infiltration rates, leaching potentials, cation exchange
capacities, and available water holding capacities. Normally waste shall not be applied to land
eroding at greater than 5 tons per acre per year. With special precautions, waste may be
applied to land eroding at up to 10 tons per year. Do not apply waste on saturated soils, when
it is raining, or when the surface is frozen. Either of these conditions may result in runoff to
surface waters which is not allowed under DEM regulations. Wind conditions should also be
considered to avoid drift and downwind odor problems. To maximize the value of nutrients for
crop production and to reduce the potential for pollution, the waste should be applied to a
growing crop or applied to bare ground not more than 30 days prior to planting. Injecting the
waste or disking will conserve nutrients and reduce odor problems.
The estimated acres needed to apply the animal waste is based on typical nutrient content for
this type of facility. Acreage requirements should be based on the waste analysis report from
your waste management facility. Attached you will find information on proper sampling
techniques, preparation, and transfer of waste samples to the lab for analysis.
This waste utilization plan, if carried out, meets the requirements for compliance with 15A
NCAC 21-1.0217 adopted by the Environmental Management Commission.
Page 1
5,720 animals X 12 (tons) waste/animal/year =
Amount of Plant Available Nitrogen (PAN) Produced Per Year
5,720 animals X 2.3 lbs. PANlanimallyear
Guide Std. 633) _
10,868 (tons) waste/year,
13,156 lbs. PAN/year. (PAN from N.C.
Tech
Applying the above amount of waste is a big job. You should plan time and have appropriate
equipment to apply the waste in a timely manner
The following acreage will be needed for waste application based on the crop to be grown and
surface application:
Table 1: ACRES OWNED BY PRODUCER
Tract Field* Soil Crop Lbs. N Acres Lbs. N Month of
u K1- Tumn Per Acre Utilized Applications
*This N is from animal waste only. if nutrients from other sources such as commercial fertilizer are
applied, they must be accounted for. Nm 1
d expectation,
NOTE: The applicator is cautioned that P and K may be over applied while meeting the N
.-requirements. Beginning in 1996 the Coastal Zone Management Act will require farmers in some
astern counties of North Caroline to have a nutrient management plan that addresses all nutrients.
This plan only addresses Nitrogen.
Page 2
+<+.:v �. .;t;•:•. ii•3:'v '•::it+};� : iti•:n .t:'tv:a'iatvr 'r?'i:. "{.:Yd#:•5:'r,. •xfiv:aa+;x , xuw:ua
���s.g� rt�ffi� h.• ..� °'.'tin...
#.,.tkit..'}#:•..�•'•�!'t+�.,,#�„��... �.. :�� ••.:i "at•����0`^�'a:��� .fix:
..........:.........:,.h.^:;iz's.,,�.........�•s�,..,,........,..,...,„......h,,,w�i.,.,,.....;•:.,...,...,..,,�,•.: ,t.itir.�v..:..s..,.<,..,: •rxt•..
Table 9: ACRES OWNED BY PRODUCER
Pull Soil Crop Lbs. N Acres Lbs. N Month of
if Tvno Per Acre" Utilized Application
1
PAA
Berm. G
235
2,181
512.3
March - Sept.
2
PAA
Berm. G
235
2.80
656
March - Sept.
3
PAA
Berm. G
235
4.45
1045.75
March - Sept.
4
AuB
Berm.(G)
235
2.85
669.75
March - Sept.
5
AuB
Berm. G
235
3.81
895.35
March - Sept.
6
AuB
Berm. G
235
2.05
481.75
March - Sept.
7
AuB
Berm. G
235
0.861
202.1
March - Sept.
8
AuB
Berm. G
235
5.50 _
1292.5
March - Sept.
9
AuB
Berm.(G)
235
0.99
232.65
March - Sept.
10
AuB
Berm.(G)
235
4.09
961.15
March - Sept.
11
AuB
Berm.(G)
235
1.88
441.8
March - Sept.
12
AuB
Berm.(G)
235
3.36
789.6
March - Sept.
13
Au-5
Berm. G
235
7.01
1633.25
March - Sept.
14
AuB
Berm.(G)
235
1.6
378.35
March - Sept
15
AuB
Berm.(G)
235
5.7
1348.9
March - Sept.
16
AuB
Berm.(G)
235
5.3
1247.85
March - Sept.
17
AuB
Berm. G
235
1.7
401.86
March - Sept.
0
OPTIONAL
0
0
1-17
NA
Small
50
56.1
2807
Sept. - April
Grain
0
0
0
to-
0
0
0
a
0
0
0
0
0
0
a
0
0
I V I HL fib. _1 14
Page 10
cable 2: ACRES WITH AGREEMENT OR LONG TERM LEASE
(Agreement with adjacent landowner must be attached)
(Required only if operator does not own adequate land [see
Required Specification 2])
Tract Field Soil Crop Lbs. N Acres Lbs. N Month of
. - . w ___-+ 1 I4.71;- -A Annlirratinn
* See footnote for Table 1.
Totals from above T&es
Acres Lbs. N
Utilized
Table 1 0.00 -
Table 2 56.14 13,193
Total 56.14 13,193
Amount of N Produced 13,156
Surplus or Deficit (37)
NOTE The Waste Utilization Plan must contain provisions for periodic land application of sludge at
agronomic rates. The sludge will be nutrient rich and will require precautionary measures to prevent over
application of nutrient or other elements.
Page 3
v r.irriri;,i�::{.. •tilt. ,. At.:Y}:•i.w:^i::i:::,};•};tt,.};,t }y. y;'; w..ay.11<; tt'x:t•'�/: r...,�ii �ih tSAi''"1Y`4ft} •'h;��.t ,:..ww'� ... .; :t�aK•fk:�
., L, .J;rwk..."...r'•'� �' 2' Y .. 3kK• i�iq�>1Y k \} Y
•}:'. r.}: ti:r a.�u.'�.'•: r � r �3.��� *�, }}. `. � . �s i � ro � ..w.'�r:Y< �� h�`A'� . r2�i.x .ak.'•�'• k k ):�a
: tv�, A,4.24 H•:.� �i7;.. ••} ?. t ,,. :, •' 2.,...w'... s < 3���:tky>;�;•"•
�a�s�;r,4x`�'�v:'�Y.`7cL.��:��w',,<;`.:it���� �c. `s .u�airc�:ftiasCtet:Ya.'.tt�+Y. ..r`:'4?::•:A .
See attached map showing the fields to be used for the utilization of waste water.
Application of Waste by Irrigation
Field Soil Type Crop Application Application
Kin Rate (in/Hr) Amount (In.)
mill .._�®�
THIS TABLE IS NOT NEEDED IF WASTE IS NOT BEING APPLIED BY IRRIGATION, HOWEVER A SIMILAR TABLE WILL
BE NEEDED FOR DRY LITTER OR SLURRY.
Your facility is designed for 180 days of temporary storage and the temporary storage must
be removed on the average of once every 6 MONTHS. In no instance should the volume of
waste being stored in your structure exceed Elevation "see lagoon design.
Call the local Natural Resources Conservation Service (formerly Soil Conservation Service) or Soil
and Water Conservation District office after you receive the waste analysis report for assistance in
determining the amount per acre to apply and the proper application rate prior to applying the
waste.
Narrative of operation;
Acres shown are 'wetted' acres.
Page 4
(P q
REQUIRED SPECIFICATIONS
Animal waste shall not reach surface waters of the state by runoff, drift, manmade
conveyances, direct application, or direct discharge during operation or land application.
Any discharge of waste which reaches surface water is prohibited.
2 There must be documentation in the design folder that the producer either owns or has an
agreement for use of adequate land on which to properly apply the waste. if the producer
does not own adequate land to properly dispose of waste, he/she shall provide a copy of
an agreement with a landowner who is within a reasonable proximity, allowing him/her the
use of the land for waste application. It is the responsibility of the owner of the facility to
secure an update of the Waste Utilization Plan when there is a change in the operation,
increase in the number of animals, method of utilization, or available land.
3 Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop
yields based on soil type, available moisture, historical data, climatic conditions, and level
of management, unless there are regulations that restrict the rate of application for other
nutrients.
4 Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste
may be applied to land that is eroding at 5 or more tons, but less than 10 tons per acre per
year providing grass fitter strips are installed where runoff leaves the field. (See FOTG
Standard 393 - Filter Strip).
5 Odors can be reduced by injecting the waste or disking after waste application. Waste
should not be applied when there is danger of drift from the irrigation field.
6 When animal waste is to be applied on acres subject to flooding, it will be soil incorporated
on conventionally tilled cropland. When applied to conservation tilled crops or grassland,
the waste may be broadcast provided the application does not occur during a season
prone to flooding. (See "Weather and Climate in North Carolina" for guidance.)
7 Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff
does not occur offsite or to surface waters and in a method which does not cause drift
from the site during application. No pending should occur in order to control odor or flies.
a Animal waste shall not be applied to saturated soils, during rainfall events, or when the
surface is frozen.
Page 5
r_
ROY COOPER
Governor
ELIZABETH S. BISER
secretary
RICHARD E. ROGERRS, JR.
Director
Craig King
King Farms - Hallsville Farms
126 Garland King Rd
Teachey, NC 28464-9736
NORTH CAROLINA
Environmental Quality
February 12, 2024
Subject: Application for Renewal of Coverage for Expiring State General Permit
Dear Permittee:
Your facility is currently approved for operation under one of the Animal Waste Operation State Non -Discharge General Permits,
which expire on September 30, 2024. In order to ensure your continued coverage under the State Non -Discharge General
Permits. you must submit an annlication for permit coverage to the Division of Water Resources (DWR) by April 3. 2024.
Enclosed you will find a "Request for Certificate of Coverage for Facility Currently Covered by an Expiring State
Non., ..----..... .,._ ,
-Discharge General Permit." The annlication form must be completed, signed by the Permittee, and returned to the DWR by
ARril 3, 2024.
Mailing Address: NCDEQ-DWR
Animal Feeding Operations Program
1636 Mail Service Center
Raleigh, North Carolina 27699 1636
Email: animal.operationsAdeq.nc.gov
phone: (919) 707 9129
Please note that you must include one (11 copv of the Certified Animal Waste Management Plan (CAWMP) with the
completed and signed application form. A list of items included in the CAWMP can be found on page 2 of the renewal
application form.
Failure to request renewal of your coverage under a general permit within the time period specified may result in a civil penalty.
Operation of your facility without coverage under a valid general permit would constitute a violation of NC G.S. § 143-215.1
and could result in assessments of civil penalties of up to $25,000 per day.
Copies of the animal waste operation State Non -Discharge General Permits are available at
www.deg.nc.gov/animalpermits2024. General permits can be requested by writing to the address above.
If you have any questions about the State Non -Discharge General Permits, the enclosed application, or any related matter please
feel free to contact the Animal Feeding Operations Branch staff at 919-707-9129.
Sincerely,
AJV_�_f�
Michael Pjetraj, Deputy Director
Division of Water Resources
Enclosures: Request for Certificate of Coverage for Facility Currently Covered by an Expiring State Non -Discharge
General Permit
?� ortL Camlius Department otEnrironmmt■] Quabn Division o{tt•at"aso—
_ y3 513 tiortL a ali;turr � trt_I 1636 Alai] 5tn•i[e Gtntlr Ral�ig}4 � arth Catalina 2'b99.1635
�' • If animal production is to be terminated, the owner is responsible for obtaining and
implementing a closure plan to eliminate the possibility of a pollutant discharge.
Sludge Removal:
Rate of lagoon sludge buildup can be reduced by:
• proper lagoon sizing,
• mechanical solids separation of flushed waste,
• gravity settling of flushed waste solids in an appropriately designed basin, or
• minimizing feed wastage and spillage.
Lagoon sludge that is removed annually rather than stored long term will:
• have more nutrients,
• have more odor, and
• require more land to properly use the nutrients.
'- \ Removal techniques:
• Hire a custom applicator.
• Mix the sludge and lagoon liquid with a chopper - agitator impeller pump through large -
bore sprinkler irrigation system onto nearby cropland; and soil incorporate.
• Dewater the upper part of lagoon by irrigation onto nearby cropland or forageland; mix
remaining sludge; pump into liquid sludge applicator, haul and spread onto cropland or
forageland; and soil incorporate.
• Dewater the upper part of lagoon by irrigation onto nearby cropland or forageland;
dredge sludge from lagoon with dragline or sludge barge; berm an area beside lagoon
to receive the sludge so that liquids can drain back into lagoon; allow sludge to
dewater; haul and spread with manure spreader onto cropland or forageland; and soil
incorporate.
Regardless of the method, you must have the sludge material analyzed for waste
constituents just as you would your lagoon water. The sludge will contain different
nutrient and metal values from the liquid. The application of the sludge to fields will be
limited by these nutrients as well as any previous waste applications to that field and crop
requirement. Waste application rates will be discussed in detail in Chapter 3.
When removing sludge, you must also pay attention to the liner to prevent damage.
Close attention by the pumper or drag -line operator will ensure that the lagoon liner
remains intact. If you see soil material or the synthetic liner material being disturbed, you
should stop the activity immediately and not resume until you are sure that the sludge can
t1--N be removed without liner injury. If the liner is damaged it must be repaired as soon as
possible.
Sludge removed from the lagoon has a much higher phosphorus and heavy metal content
than liquid. Because of this it should probably be applied to land with low phosphorus and
metal levels, as indicated by a soil test, and incorporated to reduce the chance of erosion.
Note that if the sludge is applied to fields with very high soil -test phosphors, it should be
applied only at rates equal to the crop removal of phosphorus. As with other wastes,
always have your lagoon sludge analyzed for its nutrient value.
The application of sludge will increase the amount of odor at the waste application site.
Extra precaution should be used to observe the wind direction and other conditions which
could increase the concern of neighbors.
Possible Causes of Lagoon Failure
Lagoon failures result in the unplanned discharge of wastewater from the structure.
Types of failures include leakage through the bottom or sides, overtopping, and breach of
the dam. Assuming proper design and construction, the owner has the responsibility for
ensuring structure safety. Items which may lead to lagoon failures include:
• Modification of the lagoon structure -- an example is the placement of a pipe in the dam
without proper design and construction. (Consult an expert in lagoon design before
placing any pipes in dams.)
• Lagoon liquid levels — high levels are a safety risk.
• Failure to Inspect and maintain the dam.
• Excess surface water flowing Into the lagoon.
• Liner integrity -- protect from inlet pipe scouring, damage during sludge removal, or
rupture from lowering lagoon liquid level below groundwater table.
NOTE: If lagoon water is allowed to overtop the dam, the moving water will soon cause
gullies to form in the dam. Once this damage starts, it can quickly cause a large
discharge of wastewater and possible dam failure.
7
This phut will be ir�rnplernented in the event that aiximal manure or lagoon effluent from your
operation is leaking, overflowing, or running oft: the site:
Step (1) Stop the release or flow of manureleffluent.
Step (2) Assess the extent of the spill and note any obvious damages.
Step (3) Contact appropriate personnel and agencies.
King Farms 91.0-235=2692 (See Ladd & Nutrient Management
phone list attached)
Department of Environmental Management (DEM) Regional Office:
ald--.F95- j 90 t)
DEM after hours emergency: 919-733-3942
Local Emergency Management System: qID - z R' 6-_
Local Natural Resource Conservation Service: 9 le - Z 9z"
Local Cooperative Extension Service:
Local Soil and Water Conservation District:
Local dirt-moving/heavy equipment companies:
� Name Phone It
1. I� /'N 7AOPAv 5 `%/a - Z 66 - �2 6 9 z
2. ,TO r 4 S4 - 2 SS =- -3 S.S7
Local, contract pumping/irrigation equipment companies:
Name Phone #
1.
2.
3.
Step (4) Implement procedures as advised by KF , DEM, and technical assistance
agencies to rectify the damage, repair the system, and reassess ti►e nutrient
management plan to prevent future problems.
0
EMERGENCY ACTION PLAN
Using this outline as guidance, you should develop a specific emergency action plan for
your waste handling system. This plan will be implemented in the event that wastes from
your operation are leaking, overflowing, or running off the site. You should NOT wait
until wastes reach surface waters or leave your property to consider that you have a
problem. You should make every effort to ensure that this does not happen. This plan
should be available to all employees at the facility, as accidents, leaks, and breaks could
happen at any time. Your plan should follow this format:
Stop the release of wastes. Depending on the situation, this may or
may not be possible. Suggested responses to problems are listed below:
a. Lagoon overflow —possible solutions are:
add soil to berm to temporarily increase elevation of dam —any
permanent alteration of the dam should be approved by a
qualified technical specialist
pump wastes to field at an acceptable rate
stop all additional flow to the lagoon (waterers) —hold waste in
house if possible
call a pumping contractor
make sure no surface water is entering lagoon
NOTE: These activities should be started when your lagoon level has exceeded the
temporary storage level.
b. Runoff from waste application field —actions include:
immediately stop waste application
create a temporary diversion or berm to contain the waste on
the field
incorporate waste to reduce further runoff
C. Leakage from the waste distribution system:
pipes and sprinklers —actions include:
— stop recycle (flushing system) pump
— stop irrigation pump
! — close valves to eliminate further discharge
— separate pipes to create an air gap and stop flow
i flush system, houses, solids separators —actions include:
stop recycle (flushing system) pump
stop irrigation pump
make sure no siphon effect has been created
separate pipes to create an air gap and stop flow
d. Leakage from base or Alewall of lagoon. Often these are seepage as
! opposed to flowing leaks —possible action*:
dig a small well or ditch to catch all seepage, put in a
submersible pump, and pump back into lagoon
if holes are caused by burrowing animals,trap or remove
animals and fill holes and compact with a clay type soil
other holes may be likewise temporarily plugged with clay soil
*Lagoon problems require the consultation of an individual
experienced in the design and installation of lagoons for permanent
repair measures.
r--, 2. Assess the extent of the spill and note any obvious damages.
a. Did the waste reach any surface waters?
b. Approximately how much was released and for what duration?
C. Any damage notes, such as employee injury,fish kills, or property
damage?
3. Contact appropriate agencies.
a. During normal business hours, call your DEM regional office, at
910-395-3900, after hours, emergency number: 919-733-3942.
Your phone call should include: your name, facility, telephone
number, the details of incident from item 2 above, the exact
location of the facility, and the location or
direction of movement of the spill, weather and wind
conditions, what corrective measures have been under taken,
and the seriousness of the situation.
b. If spill leaves, of*is likely to leave, property or enters surface
waters, call local emergency management services (EMS) at 910-296-
2160.
C. Instruct EMS to contact local Health Department.
d. Contact local Soil and Water Conservation District
Natural Resources Conservation Service office at 910-296-2121,
and Cooperative Extension Service at 910-296-2143for
advice/technical assistance.
e. If you are a contract swine grower associated with a swine company
integrator, contact the company representative.
r,. 4. implement procedures as advised by DEM and technical assistance
agencies to rectify the damage, repair the system, and reassess the
waste management plan to keep problems with release of wastes from
happening again.
DUPLIN COUNTY COOPERATIVE EXTENSION SERVICE
PO BOX 458
KENANSVILLE, NORTH CAROLINA 28349
910-296-2143
DUPLIN COUNTY SOIL AND WATER CONSERVATION DISTRICT
NATURAL RESOURCES CONSERVATION SERVICE
PO BOX 277
KENANSVILLE, NORTH CAROLINA 28349
910-296-2121
DUPLIN COUNTY EMERGENCY MANAGEMENT SYSTEM
PO BOX 909
KENANSVILLE, NORTH CAROLINA 28349
910-296-2160
DIVISION OF ENVIRONMENTAL MANAGEMENT
127 CARDINAL DRIVE EXT
WILMINGTON, NORTH CAROLINA 28405-3845
910-395-3900
�. INSECT CONTROL CHECKLIST FOR ANIMAL OPERATIONS
Source Cause BMP's to Minimize Odor Site Specific Practices
(Liquid Systems)
Flush Gutters Accumulation of solids {✓) Flush system is designed and operated
sufficiently to remove accumulated
solid* from gutter* as designed.
{) Remove bridging of accumulated solids at
discharge
Lagoons and Pits Crusted Solids {✓) Maintain lagoons, settling basins and
pits where pest breeding is apparent to
minimize the crusting of solids to a depth
of no more than 6-6 inches over more than
30% of surface.
Excessive Decaying vegetation (V)Maintain vegetative control along banks of
Vegetative Growth lagoons and other impoundment's to prevent
accumulation of decaying vegetative matter
along waters edge on Impoundment's perimeter.
(Dry Systems)
Feeders Feed Spillage { ) Design, operate and maintain feed systems (e.g..
bunkers and troughs) to minimize the accumulation
of decaying wastage.
{) Clean up spillage on a routine basis (e.g. 7-10 day
interval during summer; 15-30 day interval during winter).
Feed Storage Accumulation of feed {) Reduce moisture accumulation within and around
residues immediate perimeter of feed storage areas by
insuring drainage away from site and/or providing
adequate containment (e.g., covered bin for
brewer's grain and similar high moisture grain
products).
{) Inspect for and remove or break up accumulated
solids in filter strips around feed storage as needed.
Animal Holding Accumulation of animal {) Eliminate low area that trap moisture along fences
Areas wastes and feed wastage and other locations where waste accumulates and
disturbance by animals is minimal.
() Maintain fence rows and filter strips around animal
holding areas to minimize accumulations of wastes
(i.e. inspect for and remove or break up accumulated
solids as needed).
MIC -- November 11. 1996
10
Dry Manure Handling Accumulations of animal {) Remove spillage on a routine basis (e.g. 7-10 day
Systems wastes Interval during summer; 15-30 days interval during
winter) where manure Is loaded for land application
or disposal.
{) Provide for adequate drainage around manure stockpiles
{) Inspect for and remove or break up accumulated wastes
In filter strips around stockpiles and manure handling
areas as needed.
The issues checked ( ) pertain to this operation. The landowner / integrator agrees to use
sound judgment in applying insect control measures as practical.
I certify the aforementioned insect control Best Management Practices have been
reviewed with me.
1111': /A. Z.- -
(Lan own r Signature)
For more information contact the Cooperative Extension Service, Department of Entomology, Box
7613, North Carolina State University, Raleigh, NC 27695-7613.
AMIC -- November 11, 1996
0
4t
z
m
CL
m
c
etko
W)
-
c
0
O
E
0
.10-
4u
&-
s
c
m
t;
w
a)
E
E
E
0
a
0
0
M
.&-
CL
0.
(U
2
co
u
u
m
0
4v
u u
V)
m
0
ri E
>
th
m :2
c
0
44%tti-f>w
0
0
0
44
C
0
c
a
c
E
id
W
0
4a
(U
E
> CL
lou
CA
mw
4-
w
0
E
0
In
C
Cr
1m C
a)
0
m
tU
us
qn
a
0
E
W
:j
um
0
CL
m
CC
w w
CL
0
= =
U
"
w
co
0
-0
40,
E
0 m
w
z
()
04j
LL
m
'o
Z
U9
'3Wu
-�e
'0-
4A m
E
a"0
=
0 u
IV
41
a
Z
CA
* *
*
*
"0
"0
CL
U
0
0 m
SA
4j
CL P
4v
4�'
m
>
o
a'd
0
c
10 CL
o
o
tA
IV
tw mCL
> W
io- +-
5 t:
.9
-0
c
-0 0
w
a�ooc
a
m
0
v
w
c
M
0 w
-1
'
c
0
M
CL
cr
0
M
08
c m
m
u
0
4�
m
m
3.
m
to
Q
CL
"0
"a
O CL to
0
M 4-h
m
0 w
>
0
M
M
&A
"a m
C W
A
CL 4)
o
41
m
m
44
W
4A
M
r- LWA
u
to
4)
>
0)'0 CL
M
4
M
c
0
c
w 7:
m
L-
CL
m M .-
4- M
v (n
W 4-
M
0 M
o
0
V
v
0
>-
U
Q
E
OD
(U m m—
CL
Carp
0
m
.0
M m
2
S
t
0
46
M
A- m
t!
0 0
E
m
0
•
V
Ma =
.0
4A
>
CL
0
0
E
w
A
O.
u
z
cc
u
Ja
=
0
LU
z
c
0
0
O.
8
E
E
a
u
0
-W
9
IAO
E
m
16
u
4)
m
G.
(A
O
a(A
6 -
44
E L-
m
41
In 0i
m
1102
-C
vv QI
u
z
c
ate'.,0
CE
I-
0
L-
0
0
c
0
%n
E
;P- a
m 0
'a 0
0
m w
0
m
a
r- .5
u
w
4:� E
a
2: m
4�
0
w w
>
CL
0 W
> > C
W
m
34-0
w
+-
0
VI
E
u CL 0 >
d)
M
>
.-
r
0
0
V Aj
M
. 4
CL CL
m
15
m
x
ba
m I
m
0
o
> .0
CL
C
v,
O.
41
CL
0 _
�5 UCO
(LI-)
IA
M3:
CL
1-t
10
u 0
= 'ZI
--
-u CO
4, E "
41
4�
E
m u
4� a
m
-
M a)
(u c
M
:) S 41
r
L.L
41
�_ 0
a%j
11 El
1:1
E] El
0 El
4A
In
M
0 41
(D
* u V; 0
M
to
g
V,
=
r= 2 c
L 0
r_
*--
'
=
0
I-.0
m E *P
0
LU
!9
V)
=
-0
-.E ou M
E
E
0
a:
0
m v
M
4
CL
m
.5
aj
In
E
m
E
I-
c c
(U
m m
E E
CL
O.
0
m m m
0
E
0 IA
to
m 4-
c
s- m
CL o =
0
13 W
:3
0E,22
r- w
+J `0
E
!2.
4A'0
c
0
j-
—
.2
4-a M M
" o
m 0 — W
Q.
— a)
CL
E
'm (U
>
Vf
La
0 > t
0) 0
m
-0
u
0
.0
Lw
IA cu
.
r
-, E
0)
m
E
0
CL
u
m a
M L-
r r r
CL (U
z
Ln — — —
he0
000ri-;
a
0 r-1 0
00
0
i
LL
13
Z
O
in
m
2
(A
m
0
"o
0
40
46
Q)
txo
m
a-
u
0
O
L
G H
G
cr
L
:6
OJ �
CL 41 .o
I M
O O
O
d E a
L L CLC
E
Y= G 4-
m U
Z0��
g
ba
W N
>
I O
arc "a
m 0
Lid a
0>
0000
O O O
a an.
CL c. n.
N
m m w
GG` C G
V
`z
L
Ln
`o
a.aa
L L L
3
ZCr
v
Cr or
L
•�
(J a) 0)
L � L
m R
tio
N
Q•
t!1
L
L
m
0)
G
txo
>
y
C
E 0Q
m To
N �
+' �
OA
4-
O C
01 ��
Q •vas
b++
b
0
h
eta —
y 'a
C
M 0
m
07
>
-0 H >
V Q
L�
ay y0'0
0
IVC +'
O 1
•.�
c a
N
a
— .a
-a
m
42 n
w
o. as
-a
I
w
a
io CILo+
$
s G t„
o
°vt'
y in
4a
0
W
I
Q)
N
Z
�
U'
m
� `G
'�.
O
� Q Q
PC
0
G
w
0
G
0
w
ro
t?
N
3
2
00
m
t41
3
W
N
a
2
♦+
0
OJ
H
4)
.O
G
u
•
8
u
m
L Q.
O
-°a Z'rs
G p �
M V
o
o b a
t - m
dL � N
�— O a
a o 4 I
b L LA CL
m0i" m
u O
❑❑ ❑
rn
0
C
^,
N
h
I
W
}
0
a
n.
Q
to
b
M
tOup
m
CL
CL
u
0 0
CL
E
C
0
r=
M
0 m QW 'MA
W Ln CA
txo 0) V-1
An 4' 0 w 0
-W CL
cdi
,-
m W —
41
0 c >
0 E
.wm Z c
4
u Ln
49 c V4 0
V a
0 0
14� 0
cr
E
u
E 0 "o V J2 j.
0
42
Is .2
0 cr O w
> CL
<
0
0 .0 a
O 4' to 2
MI 12 -2 =
w U) %&. 4
E 0
.2 .0
c 0 o m m
m to
MA 75 — m 0 4' T
0 IA 410 0 m &- m E u 0 C
M M 0 c
0 0
0) 0 E 0
'FL c to >.
E M 0 U 4�
0 %n a c 0
- 4- m to u Ul A U E
M c 0 w -z; o c c — 0 m
J-- 0 W tw m u 0 0 a) 0 U r
E 0 -0 C 0
.p 0 4-1 1- to m 0
0 40 m m 2 40 =1 m — CO 0 "a 0 M
w w CL to w
10 a R? t9 o E
m r 0 0 0 m " 0 .0 ;3 .2
0 11 4n CM W w W m
4� OL 0 U — L. '0 0 0 M — 4� W
0 0 0 W — — . E
LED w 1W - 0 S W CL 0) 0 SP
w o w jj m C u W c
a) CL m CL m 0 tO rr x .- — m to m
10. w -& r- p — 'o v 0 W 0 .0 -0 W --
44 .2 CL I= u t 0 "a a c 0 Ln E
c Lu c w > fA
Q ff -0 jo M w 'A > W 0 0 m 0
- 4) cL. .0
0 m _0 m 1) CL > 0 a 0 CO E w
2
E c6 c a E
o 2 u .9 m c CL C L MID CL .- W w CL a. m
m m M w•W w w M
A sr
.L w Q E E 0
to 2 0 A CD 0 (A 0 tn r- CQL v
:9 \
m z o cl 11 EA 0 13 0 D D 0 0 go 0
0
E 2 Lon
L6
z A aC sa
0 1 2
g
0
u z 0
;Ll
E
W
46
cto
m
CL
W
0
i
O
n
w
0
cb
P
❑ ❑OD ❑00
on : O
aoo ro m ro ro 0 3 0
v�i ram► C. ro C
osDi O �. O
d a o
M °' a)H �' ro
ro -�°a e d c v, CL
cr
�; D
ro a =
d N A O
cr. a O0
0
=r C 0� N
` 0 w {�
n N ro
• N
v
s
O
❑❑❑
❑ ❑
K�
O �
o
h
m �-
�' w Ct
a
m 3 —
Kro
ropc cD H
cD ro
O a IL
o !�'
a Ct
0
3
a=a
F IA
e
o30
c
p
�p
fD � inn
SOT r� w
N � !n'1 V�i
r{311
� ♦ Ci
b
Ro
2c
°°m
0.1
'a
3
fp
c4 °- f 4
y
� O N• G
CO
a' � to �• 3
rr pt
6. a5.
c Q,
3 C
f4 -P m
ti
CL
3
-
cr
dl ,
M
N �
ro
roagro
0
n Q
Cat
CL
O
N N N �
m
41CL, -CL
_L 3
iv O a
g
�.
EL � S.
'o
N 0
0
m
0 o�
a
o c
cli-
w
CR
7
tl
N
.04
4-
CL
E
m
ai
w
LA
41
C
4, E
C %
E
0 'two
8
C tw
Ln
0
cn
rl
ED
41 a W
E Lko E
m 9 Q v
0
E u
=cE w 'x
W
cc
W
dr 0 C
V) r a
41 M @A
U-
L6
Q 41
CL L- c
-0
a
E (u ai CL (U
(u 0 S S E
10
m
0
0 (u L - a
K. 0
0 =
M > M M M -0o
-j C c �: 0 B
0
0 4j
m m
-0 N 20 a
C
0
o 41
tw
m m m
m
r-E
m A
41 CmO
M 4§
U
m m LA
Li- m 3:
0
0.
ay.aU- .-0 "
of 00 a c Ct 2 a)
m 0)
a m o o o
-- -- c 'a 5 -0to c
-S tco 0 m a
2 CC
-Fa
'o C
XL
E
g a p 02
.2 A- crnoNC4
0
tw
Ln A "t 4
w c v A
8 c
t:,
n
&A 4A 41 m m M M
W
u m
E en co w m m m m
c
o
v00 co 00 co Ln Ln 41 41 41 41
IA IA IA IA
u I -
0
cp eo A -b di t t to V)
C C4 eq m m
CD-1
w I
U IA
Vr4 V4 U- U-
C C
WWWWW7 z ZZ51.0
<c <
9 u u u
co ca u
ui uj ui LU L" Z Z Z Z
Z 0
0
rs
u
0
m
Version --November 26, 2028
Mortality Management Methods
indicate which method(s) will be implemented.
When selecting multiple methods indicate a primary versus secondary option.
Methods other than those listed must be approved by the State Veterinarian.
Primary Secondary Routine Mortality
Q Burial three feet beneath the surface of the ground within 24 hours of knowledge of animal
death. The burial must be at least'300 feet from any flowing stream or public body of water
(G.S.106403). The bottom of the burial pit should beat least one foot above the seasonal
high water table. Attach burial location map and plan.
(-'j Landfill at municipal solid waste facility permitted by NC DEQ under GS 15A NCAC
EE !! 1313.0200.
Rendering at a rendering plant licensed under G.S. 106-168.7.
Complete incineration according to 02 NCAC 62C .0102.
A composting system approved and permitted by the NC Department of Agriculture & Con-
sumer Services Veterinary Division (attach copy of permit). If compost Is distributed off -farm.
additional requirements must be met and a permit is required from NC DEQ.
In the case of dead poultry only, placing in a disposal pit of a size and design approved by the
NC Department of Agriculture & Consumer Services (G.S. 106-549.70).
Any method which, in the professional opinion of the State Veterinarian, would make possible
the salvage of park of a dead animal's value without endangering human or animal health.
(Written approval by the State Veterinarian must be attached).
Mass Mortality Plan
Mass mortality plans are required for farms covered by an NPDES permit. These plans are
also recommended for all animal operations. This plan outlines farm -specific mortality man-
agement methods to be used for mass mortality. The NCDA&CS Veterinary Division sup-
ports a variety of emergency mortality disposal options; contact the Division for guidance.
• A catastrophic mortality disposal plan is part of the facility's CAWMP and is activated
when numbers of dead animals exceed normal mortality rates as specified by the State
Veterinarian.
Burial must be done in accordance with NC General Statutes and NCDA&CS Veterinary
Division regulations and guidance.
v Mass burial sites are subject to additional permit conditions (refer to facility's animal
waste management system permit).
o in the event of imminent threat of a disease emergency, the State Veterinarian may enact
additional temporary procedures or measures for disposal according to G.S. 106-399.4.
Signa#ur of FA�wne�Manager Date
Dade
Signature of Technical Specially
REQUIRED SPECIFICATIONS
(continued)
Animal waste shall be applied on actively growing crops in such a manner that the crop is
not covered with waste to a depth that would Inhibit growth. The potential for salt damage
from animal waste should also be considered.
10 Waste nutrients shall not be applied in fall or winter for spring planted crops on soils with a
high potential for leaching. Waste nutrient loading rates on these soils should be held to a
minimum and a suitable winter cover crop planted to take up released nutrients. Waste
shall not be applied more than 30 days prior to planting of the crop or forages breaking
dormancy.
11 Any new swine facility sited on or after October 1, 1995 shall comply with the following:
The outer perimeter of the land area onto which waste is applied from a lagoon that is a
component of a swine farm shall be at least 50 feet from any residential property boundary
and from any perennial stream or river (other than an irrigation ditch or canal. Animal
waste other than swine waste from facilities sited on or after October 1, 1995), shall not be
applied closer than 25 feet to perennial waters. (See Standard 393 - Filter Strips).
12 Animal waste shall not be applied closer than 100 feet to wells.
13 Animal waste shall not be applied closer than 200 feet of dwellings other than those
owned by the landowner.
14 Waste shall be applied in a manner not to reach other property and public right-of-ways.
15 Animal waste shall not be discharged into surface waters, drainageways, or wetlands by
discharge or by over -spraying. Animal waste may be applied to prior converted wetlands
provided they have been approved as a land application site by a "technical specialist".
Animal waste shall not be applied on grassed waterways that discharge directly into water
courses, and on other grassed waterways, waste shall be applied at agronomic rates in a
manner that courses no runoff or drift from the site.
r-- 16 Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall
not be discharged into the animal waste management system.
Page 6
REQUIRED SPECIFICATIONS
(continued)
17 A protective cover of appropriate vegetation will be established on all disturbed areas
(lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced as necessary to
protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc.,
are limited to areas where considered appropriate. Lagoon areas should be kept mowed
and accessible. Berms and structures should be inspected regularly for evidence of
erosion, leakage or discharge.
18 If animal production at the facility is to be suspended or terminated, the owner is
responsible for obtaining and implementing a "closure plan" which will eliminate the
possibility of an illegal discharge, pollution and erosion.
19 Waste handling structures, piping pumps, reels, etc., should be inspected on a regular
basis to prevent breakdowns, leaks and spills. A regular maintenance checklist should be
kept on site,
20 Anima1 waste can be used in a rotation that includes vegetables and other crops for direct
human consumption. However, if animal waste is used on crops for direct human
consumption it should only be applied pre -plant with no further applications animal waste
during the crop season.
21 Highly visible markers shall be installed to mark the top and bottom elevations of the
temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be
managed to maintain the liquid level between the markers. A marker will be required to
mark the maximum storage volume for waste storage ponds,
22 Waste shall be tested within 60 days of utilization and soil shall be tested at least annually
at crop sites where waste products are applied. Nitrogen shall be the rate -determining
element. Zinc and copper levels in the soil shall be monitored and alternative crop sites
shall be used when these metal approach excessive levels. pH shall be adjusted for
optimum crop production and maintained. Soil and waste analysis records shall be kept
for five years. Poultry dry waste application records shall be maintained for three (3)
years. Waste application records for all other waste shall be maintained for five (5) years.
23
Dead animals will be disposed of in a manner that meets North Carolina regulations.
Page 7
f
11
=N-Z
_ i
Name of Farm: Hallsville Farm
Owner / Manager Agreement
I (we) understand and will follow and implement the specifications and the operation and
maintenance procedures established in the approved animal waste utilization plan for the
farm named above. I (we) know that any expansion to the existing design capacity of the
waste treatment and storage system or construction of new facilities will require a new
certification to be submitted to the Division of Environment Management (DEM) before the
new animals are stocked. I (we) also understand that there must be no discharge of
animal waste from this system to surface waters of the state from a storm event less
severe than the 25-year, 24-hour storm. The approved plan will be filed on -site at the farm
office and at the office of the local Soil and Water Conservation District and will be
available for review by DEM upon request.
Name of Facility Owner: Craig King
(Please print)
Signature:
Name of Manager (If different from owner):
Signature:
Name of Technical Specialist: (Please print)
Affiliation:
Address (Agency):
Signature:
Murphy Family Farms
P.O. Sox 759
Rose Hill, NC 28458 C
Date;
Kraig A. Westerbeek
Date'
Page 8
L
s
S.
h.
5r.
h.
A'
S
Tr
2'
R,
Vr
T
F;
f:
1
P
r.t
------------_>Craig King
to nearest residence(other than owner):
farrow to finish).-=--=========- =>
farrow to feeder) . __-___----_-__ = = _====>
(finishing only).-=____________________>
5720
( farrow
(wean to
,Ave weight for other operations(lbs.):>
•.Je volume for sludge accum, (cu. ft.):=>
0
-nent Volume (min. 1 cu. ft./lb.):======>
1.0
it - 24 Hour Rainfall (in.):==_=====T==>
7.5
all in excess of evaporation (in.)=====>
7.0
Age area of buildings & lots (sq. ft.):>
-i of wash water (gallons/day)= ========>
•ary storage period (days):============>
180
lopes (inside lagoon). ==--===--======>
1.5
top length
388
top width (ft.) .-_-----______________>
210
dike elevation (ft.}.________________>
52
of lagoon elevation (ft.):==_________>
34
al high water table(SHWT) elev.(ft.):=>
required volume:=============> 1059231
cu. ft.
design volume:==============> 1112922
cu. ft.
..-Limping el. (> or = to 0.0 ft SHWT>
(> or = to 40.0 ft Min)
.ed minimum treatment volume: 772200
cu. ft.
at stop pumping elevation:-1039788
cu. ft.
pumping elev..===--------------------=>
at start pumping elevation:-1039788
cu. ft.
i volume less 25yr-24hr rain: 1061997
cu. ft.
Verify that temp. storage is adequate:
Req. volume to be pumped:== > 236106
cu. ft.
Actual volume to be pumped:==> 0
cu. ft.
f t .
S
1
f
ft.
t
err .� r■ .K � ,
■ar■t E• ' r � �` ■ i � 1
iMl■run'��p■r� E}=�'� �
iii�urwt C`■Mt� .i- �,..s�� :F�M� =�e r s r f'i �.
��ilii��MAw � 1■�11� 1r�� ce■� � ■! !■
lR+YlaZ zzj■�■t• e1 ■ •1= r■r II�■�''~1 ■r ■ ■>�■
i�ri��vi:•"si i��s�i ii i iri �i�i� w-----------
■rri■ iM�-ii`it—ru■rr i ■�ii r
OPERATION & MAINTENANCE PLAN
Proper lagoon management should be a year-round priority. It is especially important to manage
levels so that you do not have problems during extended rainy and wet periods.
Maximum storage capacity should be available in the lagoon for periods when the receiving crop is
dormant (such as wintertime for bermudagrass) or when there are extended rainy spells such as a
thunderstorm season in the summertime. This means that at the first sign of plant growth in the
later winter / early spring, irrigation according to a fame waste management plan should be done
whenever the land in dry enough to receive lagoon liquid. This will make storage space available in
the lagoon for future wet periods. In the late summer / early fall the lagoon should be pumped down
to the low marker (see Figure 2-1) to allow for winter storage. Every effort should be made to
maintain the lagoon close to the minimum liquid level as long as the weather and waste utilization
plan will allow it.
Waiting until the lagoon has reached its maximum storage capacity before starting to irrigated does
not leave room for storing excess water during extended wet periods. Overflow from the lagoon for
any reason except a 25-year, 24-hour storm is a violation of state law and subject to penalty action.
The routine maintenance of a lagoon involves the following:
Maintenance of a vegetative cover for the dam. Fescue or common bermudagrass
are the most common vegetative covers. The vegetation should be fertilized each
---, year, if needed, to maintain a vigorous stand. The amount of fertilized applied should
be based on a soils test, but in the event that it is not practical to obtain a soils test
each year, the lagoon embankment and surrounding areas should be fertilized with
800 pounds per acre of 10-10-10, or equivalent.
Brush and trees on the embankment must be controlled. This may be done by
mowing, spraying, grazing, chopping, or a combination of these practices. This
should be done at least once a year and possibly twice in years that weather
conditions are favorable for heavy vegetative growth.
NOTE: If vegetation is controlled by spraying, the herbicide must not be allowed to enter the lagoon
water. Such chemicals could harm the bacteria in the lagoon that are treating the waste.
Maintenance inspections of the entire lagoon should be made during the initial filling of the lagoon
and at least monthly and after major rainfall and storm events. Items to be checked should include,
as a minimum, the following:
Waste Inlet Pipes, Recycling Pipes, and Overflow Pipes « took for:
1. separation of joints
2. cracks or breaks
3. accumulation of salts or minerals
4. overall condition of pipes
Lagoon surface -- look for:
1. undesirable vegetative growth
2. floating or lodged debris
Embankment -- look for:
1. settlement, cracking, or "jug" holes
2. side slope stability -- slumps or bulges
3. wet or damp areas on the back slope
4. erosion due to lack or vegetation or as a result of wave action
5. rodent damage
Larger lagoons may be subject to liner damage due to wave action caused by strong
winds. These waves can erode the lagoon sidewalls, thereby weakening the lagoon dam.
A good stand of vegetation will reduce the potential damage caused by wave action. If
wave action causes serious damage to a lagoon sidewall, baffles in the lagoon may be
used to reduce the wave impacts.
Any of these features could lead to erosion and weakening of the dam. If your lagoon has
any of these features, you should call an appropriate expert familiar with design and
construction of waste lagoons. You may need to provide a temporary fix if there is a
threat of a waste discharge. However, a permanent solution should be reviewed by the
technical expert. Any digging into a lagoon dam with heavy equipment is a serious
undertaking with potentially serious consequences and should not be conducted unless
recommended by an appropriate technical expert.
Transfer Pumps -- check for proper operation of:
1. recycling pumps
2. irrigation pumps
Check for leaks, loose fittings, and overall pump operation. An unusually loud or grinding
noise, or a large amount of vibration, may indicate that the pump is in need of repair or
replacement.
NOTE: Pumping systems should be inspected and operated frequently enough so that
you are not completely "surprised" by equipment failure. You should perform your
pumping system maintenance at a time when your lagoon is at its low level. This will
allow some safety time should major repairs be required. Having a nearly full lagoon is
not the time to think about switching, repairing, or borrowing pumps. Probably, if your
lagoon is full, your neighbor's lagoon is full also. You should consider maintaining an
inventory of spare parts or pumps.
• Surface water diversion features are designed to carry all surface drainage
waters (such as rainfall runoff, roof drainage, gutter outlets, and parking lot
runoff) away from your lagoon and other waste treatment or storage
,-• structures. The only water that should be coming from your lagoon is that
which comes from your flushing (washing) system pipes and the rainfall that
hits the lagoon directly. You should inspect your diversion system for the
following:
1. adequate vegetation
2. diversion capacity
3. ridge berm height
Identified problems should be corrected promptly. It is advisable to inspect your system
during or immediately following a heavy rain. If technical assistance is needed to
determine proper solutions, consult with appropriate experts.
You should record the level of the lagoon just prior to when rain is predicted, and then
record the level again 4 to 6 hours after the rain (assumes there is no pumping). This will
give you an idea of how much your lagoon level will rise with a certain rainfall amount
(you must also be recording your rainfall for this to work). Knowing this should help in
planning irrigation applications and storage. If your lagoon rises excessively, you may
have an overflow problem from a surrace water diversion or there may be seepage into
the lagoon from the surrounding land.
Lagoon Operation
Startup:
1. Immediately after construction establish a complete sod cover on bare soil
surfaces to avoid erosion.
2. Fill new lagoon design treatment volume at least half full of water before waste
loading begins, taking care not to erode lining or bank slopes.
3. Drainpipes into the lagoon should have a flexible pipe extender on the end of the
pipe to discharge near the bottom of the lagoon during initial filling or another
means of slowing the incoming water to avoid erosion of the lining.
4. When possible, begin loading new lagoons in the spring to maximize bacterial
establishment (due to warmer weather).
5. It is recommended that a new lagoon be seeded with sludge from a healthy
working swine lagoon in the amount of 0.25 percent of the full lagoon liquid
volume. This seeding should occur at least two weeks prior to the addition of
wastewater.
6. Maintain a periodic check on the lagoon liquid pH. If the pH falls below 7.0, add
agricultural lime at the rate of 1 pound per 1000 cubic feet of lagoon liquid volume
until the pH rises above 7.0. Optimum lagoon liquid pH is between 7.5 and 8.0.
7. A dark color, lack of bubbling, and excessive odor signals inadequate biological
activity. Consultation with a technical specialist is recommended if these
conditions occur for prolonged periods, especially during the warm season.
4
Loading:
The more frequently and regularly that wastewater is added to a lagoon, the better the
lagoon will function. Flush systems that wash waste Into the lagoon several times daily
are optimum for treatment. Pit recharge systems, in which one or more buildings are
drained and recharged each day, also work well.
• Practice water conservation --- minimize building water usage and spillage from
leaking waterers, broken pipes and washdown through proper maintenance and water
conservation.
• Minimize feed wastage and spillage by keeping feeders adjusted. This will reduce the
amount of solids entering the lagoon.
Management:
• Maintain lagoon liquid level between the permanent storage level and the full
temporary storage level.
• Place visible markers or stakes on the lagoon bank to show the minimum liquid level
and the maximum liquid level. (Figure 2-1).
• Start irrigating at the earliest possible date in the spring based on nutrient
requirements and soil moisture so that temporary storage will be maximized for the
summer thunderstorm season. Similarly, irrigate in the late summer / early fall to
provide maximum lagoon storage for the winter.
• The lagoon liquid level should never be closer than 1 foot to the lowest point of the
dam or embankment.
• Don not pump the lagoon liquid level lower than the permanent storage level unless
you are removing sludge.
• Locate float pump intakes approximately 18 inches underneath the liquid surface and
as far away from the drainpipe inlets as possible.
• Prevent additions of bedding materials, long-stemmed forage or vegetation, molded
feed, plastic syringes, or other foreign materials into the lagoon.
• Frequently remove solids from catch basins at end of confinement houses or
wherever they are installed.
• Maintain strict vegetation. rodent. and varmint control near lagoon edges.
• Do not allow trees or large bushes to grow on lagoon dam or embankment.
• Remove sludge from the lagoon either when the sludge storage capacity is full or
before it fills 50 percent of the permanent storage volume.
5
ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
RICHARD E. ROGERS, JR.
Director
Craig King
King Farms - Hallsville Farms
126 Garland King Rd
Teachey, NC 28464-9736
' sr
Q,L1M
NORTH CAROLINA
Environmental Quality
February 12, 2024
Subject: Application for Renewal of Coverage for Expiring State General Permit
Dear Permittee:
APR 0 3 2024
Your facility is currently approved for operation under one of the Animal Waste Operation State Non -Discharge General Permits,
which expire on September 30, 2024. In order to ensure your continued coverage under the State Non -Discharge General
Permits ou must submit an al2clication for Rit coverage to the Division of Water Resources DWR by Aril 3 2024.
Enclosed you will find a "Request for Certificate of Coverage for Facility Currently Covered by an Expiring State
Non-DischgMe General Permit." The application form must be completed, signed by the Permittee and returned to the DWR b
April 3. 2024.
Mailing Address: NCDEQ-DWR
Animal Feeding Operations Program
1636 Mail Service Center
Raleigh, North Carolina 27699 1636
Email: animal.o erations a de .nc. ov
phone: (919) 707 9129
Please note that you must include one 1 cony of the Certified Animal Waste Mana ement Plan CAWMP with the
com leted and siened application form. A list of items included in the CAWMP can be found on a4e 2 of the renewal
application form.
Failure to request renewal of your coverage under a general permit within the time period specified may result in a civil penalty.
Operation of your facility without coverage under a valid general permit would constitute a violation of NC G.S. § 143-215.1
and could result in assessments of civil penalties of up to $25,000 per day.
Copies of the animal waste operation State Non -Discharge General Permits are available at
www.deg.nc.gov/animalRermits2024. General permits can be requested by writing to the address above.
If you have any questions about the State Non -Discharge General Permits, the enclosed application, or any related matter please
feel free to contact the Animal Feeding Operations Branch staff at 919-707-9129.
Sincerely,
Michael Pjetraj, Deputy Director
Division of Water Resources
Enclosures: Rec uest for Certificate of Coverage for Facilii�_ Currently Covered by an Ex irinv_ State Non-Dischar e
General Permit
North Carolina Department ofEnsiromnentalQuality DieisionofWater Resources
L
612NorthSa3lsburrStreeII 1636 Mail SenftaCentgr Raleigh, North Carolina 2^699.16M
r 9193079129
State of North Carolina
Department of Environmental Quality
Division of Water Resources
Animal Waste Management Systems
Request for Certification of Coverage
Facility Currently covered by an Expiring Sate Non -Discharge General Permit
On September 30, 2024, the North Carolina State Non -Discharge General Permits for Animal Waste Management Systems will
expire. As required by these permits, facilities that have been issued Certificates of Coverage to operate under these State
Non -Discharge General Permits must apply for renewal at least 180 days prior to their expiration date. Therefore, all applications
must be received by the Division of Water Resources by no later than April 3, 2024.
Please do not leave any question unanswered Please verify all information and make any necessary corrections below.
Application must be signed and dated by the Permittee.
1. Certificate Of Coverage Number: AWS310058
2. Facility Name: King Farms - Hallsville Farms
3. Permittee's Name (same as on the Waste Management Plan): Craig King
4. Permittee's Mailing Address: 126 Garland King Rd
City: Teachev State: NC
Telephone Number: 910-285-2692 Ext. E-mail:
5. Facility's Physical Address: 466 Durwood Evans Rd
City: Beulaville State: NC
6. County where Facility is located: Duplin
7. Farm Manager's Name (if different from Landowner): Craig King, Jr
8. Farm Manager's telephone number (include area code): 910-271-1494 Ext.
9. Integrator's Name (if there is not an Integrator, write 'None"): Murphy -Brown LLC
10. Operator Name (OIC): Robert B. Mitchell Jr. Phone No.: 919-738-3584
11. Lessee's Name (if there is not a Lessee, write "None"):
12. Indicate animal operation type and number:
Current Permit: Operations Type
Swine - Feeder to Finish
Operation Types:
Swine
Wean to Finish
Wean to Feeder
Farrow to Finish
eeder to Finis
Farrow to Wean
Farrow to Feeder
Boar/Stud
Gilts
Other
Cattle
Dairy Calf
Dairy Heifer
Milk Cow
Dry Cow
Beef Stocker Calf
Beef Feeder
Beef Broad Cow
Other
Allowable Count
5,720
Dry Poultry
Non Laying Chickens
Laying Chickens
Pullets
Turkeys
Turkey Pullet
Wet Poult�
Non Laying Pullet
Layers
Zip: 28464-9736
Zip: 28518
OIC 9: 16561
Other Types
Horses - Horses
Horses - Other
Sheep- Sheep
Sheep - Other
13. Waste Treatment Lagoons, Digesters and Waste Storage Ponds (WSP): (Fill/Verify the following information.
Make all necessary corrections and provide missing data.)
Structure
Name
Structure Type
(Lagoon/Digester/
WSP)
Estimated
Date
Built
Liner Type
(Clay, Synthetic,
Unknown)
Capacity
(Cubic Feet)
Estimated
Surface Area
(Square Feet)
Design Freeboard
"Redline"
(Inches)
1
Lagoon
1/11/1996
Full, clay
1,112,922.00
81,457.00
19.00
Submit one (1) copy of the Certified Animal Waste Management Plan (CAWMP) with this completed and signed
application as required by NC General Statutes 143-215.1OC(d), either by mailing to the address below or sending it via
email to the email address below.
The AWMP must include the following components:
1. The most recent Waste Utilization Plan (WUP), signed b,, the owner and a certified technical specialist, containing:
a. The method by which waste is applied to the disposal fields (e.g. irrigation, injection, etc.)
b. A map of every field used for land application (for example: irrigation map)
c. The soil series present on every land application field
d. The crops grown on every land application field
e. The Realistic Yield Expectation (RYE) for every crop shown in the WUP
f. The maximum PAN to be applied to every land application field
g. The waste application windows for every crop utilized in the WUP
` h. The required NRCS Standard specifications
J . A site map/schematic
Emergency Action Plan
oor4 Insect Control Checklist with chosen best management practices noted
0dor Control Checklist with chosen best management practices noted
t'XMortality Control Checklist with selected method noted - Use the enclosed updated Mortality Control Checklist
Lagoon/storage pond capacity documentation (design, calculations, etc.) Please be sure the above table is
accurate and complete. Also provide any site evaluations, wetland determinations, or hazard classifications that may be
applicable to your facility.
8. Operation and Maintenance Plan
If your CAWMP includes any components not shown on this list, please include the additional components with your submittal.
(e.g. composting, digesters, solids separators, sludge drying system, waste transfers, etc.)
I attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that,
if all required parts of this application are not completed and that if all required supporting information and attachments are not
included, this application package will be returned to me as incomplete.
Note: In accordance with NC General Statutes 143-215.6A, and 143-215.6B, any person who knowingly makes any false
statement, representation, or certification in any application may be subject to civil penalties up to $25,000 per violation. (18
U.S.C. Section 1001 provides a punishment by a fine of not more than $10,000 or imprisonment of not more than 5 years, or both
for a similar offense.)
Print the Name of the Permittee/Landowner/Signing Official and Sign below. (If multiple Landowners exist, all landowners
should sign. If Landowner is a corporation, signature should be by a principal executive officer of the corporation):
Name (Print): s r , Title:
Signature: Date: z -
Name (Print): Title:
Signature: Date:
Name (Print): Title:
Signature: Date:
THE COMPLETED APPLICATION SHOULD BE SENT TO THE FOLLOWING ADDRESS:
E-mail: animal.operations@deq.nc.gov
NCDEQ-DWR
Animal Feeding Operations Program
1636 Mail Service Center
Raleigh, North Carolina 27699-1636
--....... .v.....::.............
.... �'��..°�"���........TI Pam ..:.:........ � .:....:.......::.
PRODUCER: Craig King
Hallsville Farm
LOCATION: 126 Garland King Rd.
Teachey, NC 28464
TELEPHONE: (910) 285 2692
TYPE OPERATION: Feeder to finish
NUMBER OF ANIMALS: 5720
(Design Capacity)
The waste from your animal facility must be land applied at a specified rate to prevent pollution
of surface and/or groundwater. The plant nutrients in the animal waste should be used to
reduce the amount of commercial fertilizer required for the crops in the fields where the waste
is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste
should be analyzed before each application cycle. Annual soil tests are strongly encouraged
so that all plant nutrients can be balanced for realistic yields of the crop to be grown.
Several factors are important in implementing your waste utilization plan in order to maximize
the fertilizer value of the waste and to ensure that it is applied in an environmentally safe
manner. Always apply waste based on the needs of the crop to be grown and the nutrient
content of the waste. Do not apply more nitrogen than the crop can utilize. Soil types are
important as they have different infiltration rates, leaching potentials, cation exchange
capacities, and available water holding capacities. Normally waste shall not be applied to land
eroding at greater than 5 tons per acre per year. With special precautions, waste may be
applied to land eroding at up to 10 tons per year. Do not apply waste on saturated soils, when
it is raining, or when the surface is frozen. Either of these conditions may result in runoff to
surface waters which is not allowed under DEM regulations. Wind conditions should also be
considered to avoid drift and downwind odor problems. To maximize the value of nutrients for
crop production and to reduce the potential for pollution, the waste should be applied to a
growing crop or applied to bare ground not more than 30 days prior to planting. Injecting the
waste or disking will conserve nutrients and reduce odor problems.
The estimated acres needed to apply the animal waste is based on typical nutrient content for
this type of facility. Acreage requirements should be based on the waste analysis report from
your waste management facility. Attached you will find information on proper sampling
techniques, preparation, and transfer of waste samples to the lab for analysis.
�. This waste utilization plan, if carried out, meets the requirements for compliance with 15A
NCAC 21-1.0217 adopted by the Environmental Management Commission,
Page 1
WASTE I.JTILIZATI0IV PLAN"�zi h
Amount of Waste Produced Per Year (gallons U. tons. etc.
5,720 animals X L2 (tons) waste/animal/year = 10,868 (tons) waste/year.
Amount of Plant Available Nitrogen (PAN) Produced Per Year
5,720 animals X 2.� lbs. PAN/animal/year = 13,156 lbs. PAN/year. (PAN from N.C.
Guide Std. 633) _ Tech
Applying the above amount of waste is a big job. You should plan time and have appropriate
equipment to apply the waste in a timely manner
The following acreage will be needed for waste application based on the crop to be grown and
surface application:
Table 1: ACRES OWNED BY PRODUCER
�^. Tract Field* Soil Crop Lbs. N Acres Lbs. N Month of
k1„ Twmn Per Acre Utilized Application
*This N is from animal waste only. If nutrients from other sources such as commercial fertilizer are
applied, they must be accounted for. N must be based on realistic yield exl►gc tion.
NOTE: The applicator is cautioned that P and K may be over applied while meeting the N
requirements. Beginning in ?996 the Coastal Zone Management Act will require farmers in some
astern counties of North Caroline to have a nutrient management plan that addresses all nutrients.
This plan only addresses Nitrogen.
Page 2
:.....
Vn
:.
WA
Table 1: ACRES OWNED BY PRODUCER
Pull Soil Crop Lbs. N Acres Lbs. N Month of
# Type
Per Acre"
Utilized Application
PAA
Berm.(G)
235
2.18
512.3 March - Sept.
2 PAA
f1
Berm.(G)
235
2.80
658 March - Sept.
3 PAA
Berm.(G)
235
4.45
1045.75 March - Sept.
4 AuB
Berm.(G)
235
2.85
669.75 March - Sept.
5 AuB
Berm.(G)
235
3.81
895.35 March - Sept.
6 Au6
Berm.(G)
2351
2.05
481.75 March - Sept.
7 AuB
Berm.(G)
2351
0.86
202.1 March - Sept.
8 AuB
Berm. G)
235
5.50
1292.5 March - Sept.
9 AuB
Berm.(G)
235
0.99
232.65 March - Sept.
10 AuB
Berm.(G)
235
4.09
961.15 March - Sept.
11 AuB
Berm.(G)
235
1.88
441.8 March - Sept.
12 AuB
Berm.(G)
235
3.36
789.6 March - Sept.
13 AuB
Berm.(G)
235
7.0
1633.25 March - Sept.
14 Au6
Serm.(G)
235
1.6
378.35 March - Sept.
15 AuB
Berm.(G)
235
5.71
1348.9 March - Sept.
16 AuB
Berm.(G) 1
2351
5.31
1247.85 March - Sept.
17 AuB
Berm.(G)
235
1.7
401.85 March - Sept.
0
OPTIONAL
0
0
1-17 NA
Small
50
56.1
2807 Sept, - April
Grain
0
0
0
0
q
O V
G V-
A 0 #-
0
0
0
0
0
0
0
0
0
0
0
0
r-
TOTAL 56.i4 13,1y3
Page 10
,� N.
- :WUTILIZATION ASTE n Table 2: ACRES WITH AGREEMENT OR LONG TERM LEASE
(Agreement with adjacent landowner must be attached)
(Required only if operator does not own adequate land [see
Required specification 2])
Tract Field Soil Crop Lbs. N Acres Lbs. N Month of
u 'r.,-- Per Acre* Utilized Application
* See footnote for Table 1.
Totals from above Tables
Acres Lbs. N
Utilized
Table 1 0.00A3,
Table 2 56.14
Total 56,14
Amount of N Produced
Surplus or Deficit
n
NOTE: The Waste Utilization Plan must contain provisions for periodic land application of sludge at
agronomic rates. The sludge will be nutrient rich and will require precautionary measures to prevent over
application of nutrient or other elements.
Page 3
See attached map showing the fields to be used for the utilization of waste water.
Application of Waste by Irrigation
Field Soil Type Crop Application Application
No Rate (In/Hr) Amount (In.
1-3
PAA
Bermuda
0.6
.5-1
4-17
AuB
Bermuda
0.6
.5-1
THIS TABLE IS NOT NEEDED IF WASTE IS NOT BEING APPLIED BY IRRIGATION, HOWEVER A SIMILAR TABLE WILL.
BE NEEDED FOR DRY LITTER OR SLURRY.
Your facility is designed for 180 days of temporary storage and the temporary storage must
be removed on the average of once every 6 MONTHS. In no instance should the volume of
waste being stored in your structure exceed Elevation *see lagoon design.
Call the local Natural Resources Conservation Service (formerly Soil Conservation Service) or Soil
and Water Conservation District office after you receive the waste analysis report for assistance in
determining the amount per acre to apply and the proper application rate prior to applying the
waste,
Narrative of operation:
Acres shown are 'wetted' acres.
11 1
Page 4
WASTE UTILIZATION PLAN? *ak-�6-k'.
REQUIRED SPECIFICATIONS
1 Animal waste shall not reach surface waters of the state by runoff, drift, manmade
conveyances, direct application, or direct discharge during operation or land application.
Any discharge of waste which reaches surface water is prohibited.
2 There must be documentation in the design folder that the producer either owns or has an
agreement for use of adequate land on which to properly apply the waste. If the producer
does not own adequate land to properly dispose of waste, he/she shall provide a copy of
an agreement with a landowner who is within a reasonable proximity, allowing him/her the
use of the land for waste application. It is the responsibility of the owner of the facility to
secure an update of the Waste Utilization Plan when there is a change in the operation,
increase in the number of animals, method of utilization, or available land.
3 Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop
yields based on soil type, available moisture, historical data, climatic conditions, and level
of management, unless there are regulations that restrict the rate of application for other
nutrients.
4 Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste
may be applied to land that is eroding at 5 or more tons, but less than 10 tons per acre per
year providing grass filter strips are installed where runoff leaves the field. (See FOTG
Standard 393 - Filter Strip).
5 Odors can be reduced by injecting the waste or disking after waste application. Waste
should not be applied when there is danger of drift from the irrigation field.
6 When animal waste is to be applied on acres subject to flooding, it will be soil incorporated
on conventionally tilled cropland. When applied to conservation tilled crops or grassland,
the waste may be broadcast provided the application does not occur during a season
prone to flooding. (See "Weather and Climate in North Carolina" for guidance.)
7 Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff
does not occur offsite or to surface waters and in a method which does not cause drift
^ from the site during application. No ponding should occur in order to control odor or flies.
a Animal waste shall not be applied to saturated soils, during rainfall events, or when the
surface is frozen.
Page 5
n WASTE UTILIZATION PLAN;
REQUIRED SPECIFICATIONS
(continued)
9 Animal waste shall be applied on actively growing crops in such a manner that the crop is
not covered with waste to a depth that would inhibit growth. The potential for salt damage
from animal waste should also be considered.
10 Waste nutrients shall not be applied in fall or winter for spring planted crops on soils with a
high potential for leaching. Waste nutrient loading rates on these soils should be held to a
minimum and a suitable winter cover crop planted to take up released nutrients. Waste
shall not be applied more than 30 days prior to planting of the crop or forages breaking
dormancy.
11 Any new swine facility sited on or after October 1, 1995 shall comply with the following:
The outer perimeter of the land area onto which waste is applied from a lagoon that is a
component of a swine farm shall be at least 50 feet from any residential property boundary
'~ and from any perennial stream or river (other than an irrigation ditch or canal. Animal
waste other than swine waste from facilities sited on or after October 1, 1995), shall not be
applied closer than 25 feet to perennial waters. (See Standard 393 - Filter Strips).
12 Animal waste shall not be applied closer than 100 feet to wells.
13 Animal waste shall not be applied closer than 200 feet of dwellings other than those
owned by the landowner.
14 Waste shall be applied in a manner not to reach other property and public right-of-ways.
15 Animal waste shall not be discharged into surface waters, drainageways, or wetlands by
discharge or by over -spraying. Animal waste may be applied to prior converted wetlands
provided they have been approved as a land application site by a "technical specialist".
Animal waste shall not be applied on grassed waterways that discharge directly into water
courses, and on other grassed waterways, waste shall be applied at agronomic rates in a
manner that courses no runoff or drift from the site.
16 Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall
not be discharged into the animal waste management system.
Page 6
,t WASTE UTILIZATION PLAN
REQUIRED SPECIFICATIONS
(continued)
17 A protective cover of appropriate vegetation will be established on all disturbed areas
(lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced as necessary to
protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc.,
are limited to areas where considered appropriate. Lagoon areas should be kept mowed
and accessible. Berms and structures should be inspected regularly for evidence of
erosion, leakage or discharge.
18 If animal production at the facility is to be suspended or terminated, the owner is
responsible for obtaining and implementing a "closure plan" which will eliminate the
possibility of an illegal discharge, pollution and erosion.
19 Waste handling structures, piping pumps, reels, etc., should be inspected on a regular
basis to prevent breakdowns, leaks and spills. A regular maintenance checklist should be
kept on site.
20 Animal waste can be used in a rotation that includes vegetables and other crops for direct
human consumption. However, if animal waste is used on crops for direct human
consumption it should only be applied pre -plant with no further applications animal waste
during the crop season.
21 Highly visible markers shall be installed to mark the top and bottom elevations of the
temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be
managed to maintain the liquid level between the markers. A marker will be required to
mark the maximum storage volume for waste storage ponds.
22 Waste shall be tested within 60 days of utilization and soil shall be tested at least annually
at crop sites where waste products are applied. Nitrogen shall be the rate -determining
element. Zinc and copper levels in the soil shall be monitored and alternative crop sites
shall be used when these metal approach excessive levels. pH shall be adjusted for
optimum crop production and maintained. Soil and waste analysis records shall be kept
for five years. Poultry dry waste application records shall be maintained for three (3)
years. Waste application records for all other waste shall be maintained for five (5) years.
23
Dead animals will be disposed of in a manner that meets North Carolina regulations.
Page 7
TuJj
WASTE UTILIZATION PLAN
"3 a IMI I 11,111111 r, CAN I 139-MT\ ll \
Name of Farm: Hallsville Farm
Owner / Manager Agreement
I (we) understand and will follow and implement the specifications and the operation and
maintenance procedures established in the approved animal waste utilization plan for the
farm named above. I (we) know that any expansion to the existing design capacity of the
waste treatment and storage system or construction of new facilities will require a new
certification to be submitted to the Division of Environment Management (DEM) before the
new animals are stocked. I (we) also understand that there must be no discharge of
animal waste from this system to surface waters of the state from a storm event less
severe than the 25-year, 24-hour storm. The approved plan will be filed on -site at the farm
office and at the office of the local Soil and Water Conservation District and will be
available for review by DEM upon request.
Name of Facility Owner: Craig King
(Please print)
Signature: r Date:
Name of Manager (If different from owner):
Signature:
Name of Technical Specialist: (Please print)
Affiliation
Address (Agency):
Signature:
Murphy Family Farms
P.O. Box 759
Rose Hill, NC 28458
Page 8
Date:
Kraig A. Westerbeek
Date: �o?�
}MO
or: ______________________-------- _====>Craig King
L...
to nearest residence(other than owner):
s.
.farrow to finish).-========---========>
s:
:farrow to feeder):==__________________>
hi
(finishing only) .-==____=============>
5720
s-
(farrow to•wean).-=========--==========>
he...
(wean to feeder) .______________________>
A,
,give Weight for other operations(lbs.):>
St
-,fie volume for sludge accum. (cu. ft.):=>
0
Ti.
Pnent Volume (min. 1 cu. ft./lb.):======>
1.0
2'
:ir - 24 Hour Rainfall (in.):=------=r==>
7.5
R.
'all in excess of evaporation (in.)=====>
7.0
Dr
,:age area of buildings & lots (sq. ft.):>
V,
_i of wash water (gallons/day)==========>
T'
•ary storage period (days.):==___-______>
180
F;
4rd(ft.):____________________________>
1
lopes (inside lagoon).================>
1.5
,:, top length (ft.).____________________>
388
�..
top width
210
7 ;
dike elevation ( ft .) :______________>
52
P
of lagoon elevation (ft.):==_________>
34
.,al high water table(SHWT) elev.(ft.):=>
T
. required volume:=============> 1059231
cu. ft.
�.
design volume:========----==> 1112922
cu. ft.
;,umping -el. (> or = to 0.0 ft SHWT>
(> or to 40.0 ft Min)
.:ed minimum treatment volume: 772200
cu. ft.
�:•
at stop pumping elevation:-1039788
cu. ft.
pumping
'V
at start pumping elevation:-1039788
cu. ft.
1,volume less 25yr-24hr rain:1061997
cu. ft.
P�
verify that temp. storage is adequate:
Req. volume to be pumped:====> 236106
cu. ft.
Actual volume to be pumped:==> . 0
cu. ft.
f'
ft.
.,. ;T. ...,..- .......,.. ..
, .. . ..... , T. r-y.. P � 1 � } - i F: d �'TZ L � � t - ,.1�•rSf-''S�I� '
" t{ : , ,: �-,i 1�i { I t � y L ' i,• � e f ` �r �. •� ' Yt . � � Y `•'�. � _ . � a F Y i � �i,. �-��
i• I (�I. Ir
�t::� L�R,I 1� �, -� L l���� i I �i �f}• i1Y F '�iij: �L.�' :.� r� �I F•��-�1 .` � y
71
AX
r
..``r.:.A;-
�-. - .•• ,..I , I f- i
-
i
_
I I I-._ V�I{•:1 -
I I
-_
17,
1.2
4 14
o.
}t
_
r .-1
.
i
1I Ii
I
Ix
7 7-
77777
--A T:
_
�P
r
.77
•
71
...., y�
, ;I
.�
-
:
....
OPERATION & MAINTENANCE PLAN
Proper lagoon management should be a year-round priority. It is especially important to manage
levels so that you do not have problems during extended rainy and wet periods.
Maximum storage capacity should be available in the lagoon for periods when the receiving crop is
dormant (such as wintertime for bermudagrass) or when there are extended rainy spells such as a
thunderstorm season in the summertime. This means that at the first sign of plant growth in the
later winter / early spring, irrigation according to a farm waste management plan should be done
whenever the land in dry enough to receive lagoon liquid. This will make storage space available in
the lagoon for future wet periods. In the late summer / early fall the lagoon should be pumped down
to the low marker (see Figure 2-1) to allow for winter storage. Every effort should be made to
maintain the lagoon close to the minimum liquid level as long as the weather and waste utilization
plan will allow it.
Waiting until the lagoon has reached its maximum storage capacity before starting to irrigated does
not leave room for storing excess water during extended wet periods. Overflow from the lagoon for
any reason except a 25-year, 24-hour storm is a violation of state law and subject to penalty action.
The routine maintenance of a lagoon involves the following:
Maintenance of a vegetative cover for the dam. Fescue or common bermudagrass
are the most common vegetative covers. The vegetation should be fertilized each
year, if needed, to maintain a vigorous stand. The amount of fertilized applied should
be based on a soils test, but in the event that it is not practical to obtain a soils test
each year, the lagoon embankment and surrounding areas should be fertilized with
800 pounds per acre of 10-10-10, or equivalent.
Brush and trees on the embankment must be controlled. This may be done by
mowing, spraying, grazing, chopping, or a combination of these practices. This
should be done at least once a year and possibly twice in years that weather
conditions are favorable for heavy vegetative growth.
NOTE: If vegetation is controlled by spraying, the herbicide must not be allowed to enter the lagoon
water. Such chemicals could harm the bacteria in the lagoon that are treating the waste.
Maintenance inspections of the entire lagoon should be made during the initial filling of the lagoon
and at least monthly and after major rainfall and storm events. Items to be checked should include,
as a minimum, the following:
Waste Inlet Pipes, Recycling Pipes, and Overflow Pipes -- look for:
1, separation of joints
2. cracks or breaks
3. accumulation of salts or minerals
4, overall condition of pipes
Lagoon surface -- look for:
1. undesirable vegetative growth
2. floating or lodged debris
Embankment -- look for:
1. settlement, cracking, or "jug" holes
2. side slope stability -- slumps or bulges
3. wet or damp areas on the back slope
4. erosion due to lack or vegetation or as a result of wave action
5. rodent damage
Larger lagoons may be subject to liner damage due to wave action caused by strong
winds. These waves can erode the lagoon sidewalls, thereby weakening the lagoon dam.
A good stand of vegetation will reduce the potential damage caused by wave action. If
wave action causes serious damage to a lagoon sidewall, baffles in the lagoon may be
used to reduce the wave impacts.
Any of these features could lead to erosion and weakening of the dam. If your lagoon has
any of these features, you should call an appropriate expert familiar with design and
construction of waste lagoons. You may need to provide a temporary fix if there is a
threat of a waste discharge. However, a permanent solution should be reviewed by the
technical expert. Any digging into a lagoon dam with heavy equipment is a serious
undertaking with potentially serious consequences and should not be conducted unless
recommended by an appropriate technical expert.
Transfer Pumps -- check for proper operation of:
1. recycling pumps
2. irrigation pumps
Check for leaks, loose fittings, and overall pump operation. An unusually loud or grinding
noise, or a large amount of vibration, may indicate that the pump is in need of repair or
replacement.
NOTE: Pumping systems should be inspected and operated frequently enough so that
you are not completely "surprised" by equipment failure. You should perform your
pumping system maintenance at a time when your lagoon is at its low level. This will
allow some safety time should major repairs be required. Having a nearly full lagoon is
not the time to think about switching, repairing, or borrowing pumps. Probably, if your
lagoon is full, your neighbor's lagoon is full also. You should consider maintaining an
inventory of spare parts or pumps.
• Surface water diversion features are designed to carry all surface drainage
waters (such as rainfall runoff, roof drainage, gutter outlets, and parking lot
runoff) away from your lagoon and other waste treatment or storage
structures. The only water that should be coming from your lagoon is that
which comes from your flushing (washing) system pipes and the rainfall that
hits the lagoon directly. You should inspect your diversion system for the
following:
1. adequate vegetation
2. diversion capacity
3. ridge berm height
Identified problems should be corrected promptly. It is advisable to inspect your system
during or immediately following a heavy rain. If technical assistance is needed to
determine proper solutions, consult with appropriate experts.
You should record the level of the lagoon just prior to when rain is predicted, and then
record the level again 4 to 6 hours after the rain (assumes there is no pumping). This will
give you an idea of how much your lagoon level will rise with a certain rainfall amount
(you must also be recording your rainfall for this to work). Knowing this should help in
planning irrigation applications and storage. If your lagoon rises excessively, you may
have an overflow problem from a surface water diversion or there may be seepage into
the lagoon from the surrounding land.
Lagoon Operation
Startup:
1. Immediately after construction establish a complete sod cover on bare soil
surfaces to avoid erosion.
2. Fill new lagoon design treatment volume at least half full of water before waste
loading begins, taking care not to erode lining or bank slopes.
3. Drainpipes into the lagoon should have a flexible pipe extender on the end of the
pipe to discharge near the bottom of the lagoon during initial filling or another
means of slowing the incoming water to avoid erosion of the lining.
4. When possible, begin loading new lagoons in the spring to maximize bacterial
establishment (due to warmer weather).
5. It is recommended that a new lagoon be seeded with sludge from a healthy
working swine lagoon in the amount of 0.25 percent of the full lagoon liquid
volume. This seeding should occur at least two weeks prior to the addition of
wastewater.
6. Maintain a periodic check on the lagoon liquid pH. If the pH falls below 7.0, add
agricultural lime at the rate of 1 pound per 1000 cubic feet of lagoon liquid volume
until the pH rises above 7.0. Optimum lagoon liquid pH is between 7.5 and 8.0.
7. A dark color, lack of bubbling, and excessive odor signals inadequate biological
activity. Consultation with a technical specialist is recommended if these
conditions occur for prolonged periods, especially during the warm season.
4
Loading:
The more frequently and regularly that wastewater is added to a lagoon, the better the
lagoon will function. Flush systems that wash waste into the lagoon several times daily
are optimum for treatment. Pit recharge systems, in which one or more buildings are
drained and recharged each day, also work well.
• Practice water conservation --- minimize building water usage and spillage from
leaking waterers, broken pipes and washdown through proper maintenance and water
conservation.
• Minimize feed wastage and spillage by keeping feeders adjusted. This will reduce the
amount of solids entering the lagoon.
Management:
• Maintain lagoon liquid level between the permanent storage level and the full
temporary storage level.
• Place visible markers or stakes on the lagoon bank to show the minimum liquid level
and the maximum liquid level. (Figure 2-1).
�' • Start Irrigating at the earliest g g possible date in the spring based on nutrient
requirements and soil moisture so that temporary storage will be maximized for the
summer thunderstorm season. Similarly, irrigate in the late summer / early fall to
provide maximum lagoon storage for the winter.
• The lagoon liquid level should never be closer than 1 foot to the lowest point of the
dam or embankment.
• Don not pump the lagoon liquid level lower than the permanent storage level unless
you are removing sludge.
• Locate float pump intakes approximately 18 inches underneath the liquid surface and
as far away from the drainpipe inlets as possible.
• Prevent additions of bedding materials, long-stemmed forage or vegetation, molded
feed, plastic syringes, or other foreign materials into the lagoon.
• Frequently remove solids from catch basins at end of confinement houses or
wherever they are installed.
• Maintain strict vegetation, rodent, and varmint control near lagoon edges.
• Do not allow trees or large bushes to grow on lagoon dam or embankment.
• Remove sludge from the lagoon either when the sludge storage capacity is full or
before it fills 50 percent of the permanent storage volume.
5
�' • If animal production is to be terminated, the owner is responsible for obtaining and
implementing a closure plan to eliminate the possibility of a pollutant discharge.
Sludge Removal:
Rate of lagoon sludge buildup can be reduced by:
• proper lagoon sizing,
• mechanical solids separation of flushed waste,
• gravity settling of flushed waste solids in an appropriately designed basin, or
• minimizing feed wastage and spillage.
Lagoon sludge that is removed annually rather than stored long term will:
• have more nutrients,
• have more odor, and
• require more land to properly use the nutrients.
r Removal techniques:
• Mire a custom applicator.
• Mix the sludge and lagoon liquid with a chopper - agitator impeller pump through large -
bore sprinkler irrigation system onto nearby cropland; and soil incorporate.
• Dewater the upper part of lagoon by irrigation onto nearby cropland or forageland; mix
remaining sludge; pump into liquid sludge applicator; haul and spread onto cropland or
forageland; and soil incorporate.
• Dewater the upper part of lagoon by irrigation onto nearby cropland or forageland;
dredge sludge from lagoon with dragline or sludge barge; berm an area beside lagoon
to receive the sludge so that liquids can drain back into lagoon; allow sludge to
dewater; haul and spread with manure spreader onto cropland or forageland; and soil
incorporate.
Regardless of the method, you must have the sludge material analyzed for waste
constituents just as you would your lagoon water. The sludge will contain different
nutrient and metal values from the liquid. The application of the sludge to fields will be
limited by these nutrients as well as any previous waste applications to that field and crop
requirement. Waste application rates will be discussed in detail in Chapter 3.
When removing sludge, you must also pay attention to the liner to prevent damage.
Close attention by the pumper or drag -line operator will ensure that the lagoon liner
remains intact. If you see soil material or the synthetic liner material being disturbed, you
should stop the activity immediately and not resume until you are sure that the sludge can
6
be removed without liner injury. If the liner is damaged it must be repaired as soon as
possible.
Sludge removed from the lagoon has a much higher phosphorus and heavy metal content
than liquid. Because of this it should probably be applied to land with low phosphorus and
metal levels, as indicated by a soil test, and incorporated to reduce the chance of erosion.
Note that if the sludge is applied to fields with very high soil -test phosphors, it should be
applied only at rates equal to the crop removal of phosphorus. As with other wastes,
always have your lagoon sludge analyzed for its nutrient value.
The application of sludge will increase the amount of odor at the waste application site.
Extra precaution should be used to observe the wind direction and other conditions which
could increase the concern of neighbors.
Possible Causes of Lagoon Failure
Lagoon failures result in the unplanned discharge of wastewater from the structure.
Types of failures include leakage through the bottom or sides, overtopping, and breach of
the dam. Assuming proper design and construction, the owner has the responsibility for
ensuring structure safety. Items which may lead to lagoon failures include:
• Modification of the lagoon structure -- an example is the placement of a pipe in the dam
without proper design and construction. (Consult an expert in lagoon design before
placing any pipes in dams.)
• Lagoon liquid levels -- high levels are a safety risk.
• Failure to inspect and maintain the dam.
• Excess surface water flowing into the lagoon.
• Liner integrity -- protect from inlet pipe scouring, damage during sludge removal, or
rupture from lowering lagoon liquid level below groundwater table.
NOTE: If lagoon water is allowed to overtop the dam, the moving water will soon cause
gullies to form in the dam. Once this damage starts, it can quickly cause a large
discharge of wastewater and possible dam failure.
This p1mi will be implemented in the event that animal manure or lagoon effluent from your
operation is leaking, overflowing, or muning off the site: .
Step (1) Stop the release or flow of manureleffluent.
Step (2) Assess the extent of the spill and note any obvious- damages.
Step (3) Contact appropriate personnel and agencies.
King Faxmg 910-2€35=2692 (See Land & Nrttrient Management
phone list attached.)
Department of Environmental Management (DEM) Regional Office: -
q /d - & 96- - �3 9 o_U
! DEM after hours emergency: 919-733-3942
I
Local Emergency Management System: q/O Z q S 4 / do 0
Local Natural Resource Conservation Service: 91-0
Local Cooperative Extension Service:_ 70 "4 X13,
! Local Soil and Water Conservation District:
Local dirt-movingtheavy equipment companies:
ff",/V.?
ame
1.FWAV S
2. .T'olr ,`✓ Vd A,d 4 So
3.
Local contract pumpinglurigation equipment companies:
Name
Phone tl
2�S- 2 6_9 2
pia - ZQi- 396 7
Phone 9
Step (4) Implement procedures as advised by' KF , DEM, and technical assistance
agencies to rectify the damage, repair the system, and reassess the nutrient
management plan to prevent future problems.
A
EMERGENCY ACTION PLAN
Using this outline as guidance, you should develop a specific emergency action plan for
your waste handling system. This plan will be implemented in the event that wastes from
your operation are leaking, overflowing, or running off the site. You should NOT wait
until wastes reach surface waters or leave your property to consider that you have a
problem. You should make every effort to ensure that this does not happen. This plan
should be available to all employees at the facility, as accidents, leaks, and breaks could
happen at any time. Your plan should follow this format:
Stop the release of wastes. Depending on the situation, this may or
may not be possible. Suggested responses to problems are listed below:
a. Lagoon overflow —possible solutions are:
add soil to berm to temporarily increase elevation of dam —any
permanent alteration of the dam should be approved by a
qualified technical specialist
pump wastes to field at an acceptable rate
stop all additional flow to the lagoon (waterers) —hold waste in
house if possible
call a pumping contractor
make sure no surface water is entering lagoon
NOTE: These activities should be started when your lagoon level has exceeded the
temporary storage level.
b. Runoff from waste application field —actions include:
immediately stop waste application
create a temporary diversion or berm to contain the waste on
the field
incorporate waste to reduce further runoff
C. Leakage from the waste distribution system:
pipes and sprinklers —actions include:
— stop recycle (flushing system) pump
— stop irrigation pump
— close valves to eliminate further discharge
— separate pipes to create an air gap and stop flow
flush system, houses, solids separators —actions include:
— stop recycle (flushing system) pump
— stop irrigation pump
— make sure no siphon effect has been created
separate pipes to create an air gap and stop flow
d. Leakage from base or sidewall of lagoon. Often these are seepage as
opposed to flowing leaks —possible action*:
dig a small well or ditch to catch all seepage, put in a
submersible pump, and pump back into lagoon
if holes are caused by burrowing animals,trap or remove
animals and fill holes and compact with a clay type soil
other holes may be likewise temporarily plugged with clay soil
*Lagoon problems require the consultation of an individual
experienced in the design and installation of lagoons for permanent
repair measures.
2. Assess the extent of the spill and note any obvious damages.
a. Did the waste reach any surface waters?
b. Approximately how much was released and for what duration?
C. Any damage notes, such as employee injury,fish kills, or property
damage?
3. Contact appropriate agencies.
a. During normal business hours, call your DEM regional office, at
910-395-3900, after hours, emergency number: 919-733-3942.
Your phone call should include: your name, facility, telephone
number, the details of incident from item 2 above, the exact
location of the facility, and the location or
direction of movement of the spill, weather and wind
conditions, what corrective measures have been under taken,
and the seriousness of the situation.
b. If spill leaves, or"is likely to leave, property or enters surface
waters, call local emergency management services (EMS) at 910-296-
2160.
C. Instruct EMS to contact local Health Department.
d. Contact local Soil and Water Conservation District
Natural Resources Conservation Service office at 910-296-2121,
and Cooperative Extension Service at 910-296-2143for
advice/technical assistance.
e. If you are a contract swine grower associated with a swine company
integrator, contact the company representative.
4. Implement procedures as advised by DEM and technical assistance
agencies to rectify the damage, repair the system, and reassess the
waste management plan to keep problems with release of wastes from
happening again.
DUPLIN COUNTY COOPERATIVE EXTENSION SERVICE
PO BOX 458
KENANSVILLE, NORTH CAROLINA 28349
910-296-2143
DUPLIN COUNTY SOIL AND WATER CONSERVATION DISTRICT
NATURAL RESOURCES CONSERVATION SERVICE
PO BOX 277
KENANSVILLE, NORTH CAROLINA 28349
910-296-2121
DUPLIN COUNTY EMERGENCY MANAGEMENT SYSTEM
PO BOX 909
KENANSVILLE, NORTH CAROLINA 28349
910-296-2160
DIVISION OF ENVIRONMENTAL MANAGEMENT
127 CARDINAL DRIVE EXT
WILMINGTON, NORTH CAROLINA 28405-3845
910-395-3900
C1
INSECT CONTROL CHECKLIST FOR ANIMAL OPERATIONS
Source Cause
BMP's to Minimize Odor Site Specific Practices
(Liquid Systems)
Flush Gutters Accumulation of solids (✓) Flush system is designed and operated
sufficiently to remove accumulated
oolide from guttero as deeigned.
() Remove bridging of accumulated solids at
discharge
Lagoons and Pits Crusted Solids
Excessive Decaying vegetation
Vegetative Growth
Feeders Feed Spillage
Feed Storage Accumulation of feed
residues
Animal Holding Accumulation of animal
Areas wastes and feed wastage
MIC — November 11, 1996
(✓) Maintain lagoons, settling basins and
pits where pest breeding is apparent to
minimize the crusting of solids to a depth
of no more than 6-8 inches over more than
30% of surface.
(V)Maintain vegetative control along banks of
lagoons and other impoundment's to prevent
accumulation of decaying vegetative matter
along water's edge on impoundment's perimeter.
(Dry Systems)
() Design, operate and maintain feed systems (e.g..
bunkers and troughs) to minimize the accumulation
of decaying wastage.
() Clean up spillage on a routine basis (e.g. 7-10 day
interval during summer; 15-30 day interval during winter).
() Reduce moisture accumulation within and around
immediate perimeter of feed storage areas by
insuring drainage away from site and/or providing
adequate containment (e.g., covered bin for
brewer's grain and similar high moisture grain
products).
() Inspect for and remove or break up accumulated
solids in filter strips around feed storage as needed.
() Eliminate low area that trap moisture along fences
and other locations where waste accumulates and
disturbance by animals is minimal.
() Maintain fence rows and filter strips around animal
holding areas to minimize accumulations of wastes
(i.e. inspect for and remove or break up accumulated
solids as needed).
In
Dry Manure Handling Accumulations of animal () Remove spillage on a routine basis (e.g. 7-10 day
Systems wastes interval during summer; 15-30 days interval during
winter) where manure is loaded for land application
or disposal.
() Provide for adequate drainage around manure stockpiles
() Inspect for and remove or break up accumulated wastes
in filter strips around stockpiles and manure handling
areas as needed.
The issues checked ( ) pertain to this operation. The landowner / integrator agrees to use
sound judgment in applying insect control measures as practical.
I certify the aforementioned insect control Best Management Practices have been
reviewed with me.
(Lan own r Signature)
For more information contact the Cooperative Extension Service, Department of Entomology, Box
r 7613, North Carolina State University, Raleigh, NC 27695-7613.
AMIC -- November 11, 1996
11
N
s(1
�
m
a`
•
v
N
Z
m
CL
�
G
�
•E
d
'vf
L
a
m
c
C
p
O
�
41
C
L-
ai
E
O
?
`
L
0-
3
tio
L
c
a-+
c
f0
E
E
E
O0
Q
0
A
o`
a
Q
a
�
N
m
a
u
a
N
w U
GJ
m
of
u
0 N
m
t
V
uii Y
w
N
�..
.0
a
-
•fU4
O
r.
i"1 'V
m
N
•E
f.
+' N
a
a
a
•e
N
C
m o
+-
o
0
�+
N C
N
C
�_ Y
a
4.
'.
C
V' v
o
a
a
a)
L a
a
d
v.�aai-v
41
O
O
u
00
C
rr a°
0 N
c
m
w
%n
a
a
(u m
`
°
E
{�A
U m
i=
O
a
oc
a a
a u
C
d
L`
IV
Z
.61
o
4-
U
�GJ
C
V
N m
W
H
�nou¢
of
a-°
�O
�z
m
u
o
fl
u
L m
C
°
O O
CL
N
�
,
L
C
CM
V
>
Y
O
N
Y O
Q
O
C
qp
O
,C OO.
tn
C
Q
>
"c
o
bQ
cu
a
a
m
N
m
'�in
O
o
m
EL
°
acp
in
a
;
c
U
m
m
I-
oc
3
n`
U
o
m
ru
Y
a
�
-n
a
'C "O
o
a
a a
0
3 c v
m
0$
p>
L a
N
Q
m 'o
a
>
C
3
O_ a
U
u
O ti
a
m
V m m
u Q
o
i
ro aN
'Q I
a
a
a
a
— += co
a-�«-
CL N
ma
c
0
c v c
a
o
a
4- m
m
M E
3 a
m
a
O co
t
O
EJ
c
o0
O
m
v
O
•t`Lo
ui a
a
CL
C
Q.
O
C.
++ a-
E�
N C
CL CL
C
m
rr
+fO+ L
� a
aW
7
°'
m
c
�•
Al
a
E
cu
ami m
2
t
E
CL
E
0
it
a
�� •�
O
C
G
4 L
O
Vm
d =
to
+�T+
•�
N i
to�
3Q a
`O
� r
e-N
E
O C
.n
r-
0� to . ,
E
vaiLn .0
d
o
° 3
O
Y
Z O v
u a
u
41
a
Z
w
2
Q
o
0
5].
E
Q
O
O v
0
•
0
N
a
C
m
Y
O
U
O
3 o
N �
O E
m O
E
O a O
C u
IN
rn
v
N
L
ui
N
n
I
c
w
O
a
a
a
U
O
Q
Ln
to
m
a
O
n
v
ao
m
tJ
O
-h
CD
im
❑ ❑❑ ❑❑❑❑❑
0A---,o 52" 3A
m m a fD °1 v n c
ID O
a CLM lD N O a fD `C —CL O
o• c Mm N. c
p1 N < S. 3' < CL O
m
CL m
m o -
O O CL
CD o o 0 3 0
m a ° a m
n �, Di 0 ro
r > :3 O a G1
°q o- N n,
CA
0
a
Q
2
N
Vl
eD
—
O
°
O
v
7
C1 p)
°
O
<
m
m
�
v
h
R n.
A a•
�
�
0)
0)m
m
CA
m
N
CA
N
y
d
N
m
O)'
R
rr
N
x
O
c
m
m
ao
a
z
I
r
O
O
a
z
v
z
O
O
O
m
Ln
c
M
a
m
tA
o„
3
�;
'+
,.«
j
L
a'
O
o
of
3 g:
rD
N
m
H
0 Do
- T
O m d N N fl g O y Q. -O N N
N O A
o o
rrD y x
° < ° ,� = s
m ofD,
ro g T o 3� o A<
rt r< Lno(D� m
iD O * > = < < -°
C m to - H nmi : m m
:3 : m o.
6 C •N-r h0 O � �<
° � �* r� o
0°u rr 0
o
-h
0 0
O
+
rr
rr
O
ti,
4
rr
n
C
C
0
=LA
CA
Ln
Ln
O
M
M
N
N
N
O
C
a
i
d
C
C
CA
C
ram+
a�
m
r+
O
N
7'
2
O
c
N1
m
a
z
I
m
m
x
a
z
v
z
m
9
C
m
n
n
O
3
A
N
m
T
sy
CA
ro
m
a
d
fD
I
Q
O
n
O
r+
O
n
S
fD
n
H
V
m
In
3
'r
z
O
••
C
z
L
LS.
Y
u
al
t
u
O
C
0
u
L
O
.O
O
d
(v
bo
m
c
y
m
E
m
3L
:QJ
�3
IA
c
0
E
�J i
13
O
ai
0
O
CL
m
.a
O
v
a
E
� C
'O O
C bb
3 c
co c
c ai
:n C-
O �
`u 4-tJ
v
o
m
+-t
C
0 >
a
u
N -0
V
X
to
•
O
Y
V,
O
C
'^
c
cr
�
n
�
E
0
`u
CL
O
O
N
>
N C
4,
H
O
o
[0
Q
to
E
O i�
X
L
L
O. C
O
d
E >
E
42
C
+-' O
L
L
0
a41
��',,
�F,
oL��Uo
a
g
CA
Z
N
W
tW
1
O
Z
O
m
U
N
N
�
o>
M
L
Ln
N
n
I
w
O
a
a
Q
N
co
io io
coo
0
0 0
o
Q
Q O_
41
C
N
o.
�
a a
\
p
"t
-
co
CD
u
a
Q. CL
41
N
Z
c
t
c c
,�H'
-a
s
W
Q
Ln
aaa
.�
m
y41
3
m
v
1
q)
N
L_
•�
N
N aj
m
Ncr
v-
CMG
u
N
tuo
•
•
• •
•
•
m
a
A
r
CL
u
IA
ai
I-
u
d
'a
qp
�-
a.
Ln
`
° a�
C
-°
A
°
v
V
'a0
aJ 4)
�,
O
G7 Q.
�
O n
+�
.Q
L O
c
v
a
coo ao °
co o
cn
"O -0
3
c
c
O
O
a
N
'G
+O+ `
faG
of V N
m
+O
N
OC
cry
.O
0
i
Y, y O
IJ
i
C
N
L
E I
0
-0
aIA v
id
0 I
aL
-0 a A
0>
E
O
o°
O
+r Ln
IA n
A
CU
O
_
N �'
v W
N Cu m
4-+
++
m
aac,.E41
ms
o�
J?.a a`,
o
�.E
`o"
Y3g
°E
°
»o
2
�»
�o
❑®
❑❑
❑❑❑❑❑
i
El
El
❑
J
0
W
W
W
N
w
Z
f°
Z
a
'v
m
H
o
�.
O
E
O
Q
o
a
o
b
0
a
o
_
♦
♦
♦
=
♦
♦
N
0
z
0
v
a
a
O
°_
0
a
A
V
a
r
0
Z
d
N
c
C
m
O
r+
IASD CD
a
c
CD r*
o .*
0 3
V
m
Q.
O
n 0,
rD n 0
orq
G1
t�D
r G
3 Q- ,
a
V.,
03 n
"O m O
O
Q 0
O m
7
rr 3
0 3
0 G
m
M
0 d
n
-0 O
O
Q.
a
y
a rND
fD
CA
,0-
rD
S
A
rrDD O
Q:
v
'a
c%
N �rr
0
s
ro
E =
a
cu P
Z
N O
m
� �
m
N
O
v
X
o m
I-.
N 3
�
00
�
N
m
im
OW C C C j r+ �? D— m O_
'+ (D O a CI r+ n 3 7 S
C3 C rD
0 -0 p G p < Oq m 00 4) O-
m < N rD _ a ro 0 ro� fD a ao m
NO A m rD m �� ID
N N O r�D N m -w
-s C n
i rb cr Cr o X a;.o a °a 0 �. m
-0 m Cr fD c °' `D �, ro o rD do (D v
NCL
m lD Day d4 N uNi O !D M< p q N O O—
rD CU O N -. G• rt C O ni S
(D
N 00 ? O a m O° 'C s 0 °' n rt 0 Do
rr) 3 0 A r+ 0 (' M N G y O-
0 rD rSD 3 n 3 CrD rD �, C
0 D w
O (�D a ➢J OA 0i 0 (nD rr
rD
a ram_+, C C C O O
a. 0- O ,� y m O
aa' :t o O (A 3 3
L < � N m _
M C d
V p bO p' 0o
O m 3
3
V
no,
rD
r+
S
d
3
(D
A
01
7
m
a
rD
a
0
O
r*
N
(D
Q
Q
C�
•
0
rr
m
G)
D,
LA
•
O C
1
O m
m rt
7 G
a
M
m
oc
0 o
A
0 M
�► a
�«
m
C
m
Q.
s
O
0
Z
Vil
m
O
�a
G)
m
C
C
m
d
AD
CA
0
m
T
0
0
3
0
N'
m
a
O
1
P*
V
m
n
�v
m
3
z
0
N
n
r
�
d
u
o
0
h
u
H
L
a
�
=
a
�
o
m L 0
O
W
C
>
m 1 a O
a
Q C
r o n
c
c
a s
CL
uaf G y1
O
w
a
IAO ?
a
c
a
m
v o s.
C NILA 'L
CL 00
t a
�
+L+
�
aoos
E
-0-0 > fl
cpe
'A
E
C
aamu L
a .°
p
-po>�
cr
9 m a d
v
` I
auac
• • •
•
• •
Cl.
a �
6. a
N
o
T 1�
'� F N
(AO
Y C
m�
c m
Qp C
m
C
„
yd
V
mtA
+'
G .O
G�1
f�
O Ou
a oN u
u -0
O.
w
t
a
mm
C C
M O
a
Gan4
V
•
E
O G
>m o
tip fl
u u
ao
•ice+
G
a
C O a
ai
m
3 u
a s in
VI 0- CL
v u
.+
V
r
E 'O3
Q .u'p'-
pH acoao
.
>
CL
a u o.
w
c O M o.
a
C
O$m
CA. +
a
m= m
c u-
44
w
aO M
N
G
C%
ap.•
w Q u u N
W
w h
j
m O
R w
bb >,
o
4 IA
1
c "- .. c
o c
c -av a
Q.
o
-p a
�, ... a� _
c +r m
o m
na a
O C a
s a
c
o
m
L
c
a
c
(U CA w-C
Lo
L `~
e [i 3
v01i
u O
b�A
W
OCL
4:
S c
LL +r a
» O
F- Q
W
+:
u
a
F
pH
w
o
a
tWu
'a°
c
v
z
..1
O
N
A
g
H
d
m
cm
0
0
Q Z Z Z Z Z m m m M m n D
n n D D D D D=
p a)Z Z Z Z m m m m m I K
7a �0 a yi
N N vi n w N N O pw0 N
-" ro rt a w w w 9 a4
n N v, 00 00 00 D ro
vi cn w cn
0 a0)aaSs0000W
K m ro I I I ro r�D
7 N 0-1 N d rt rro+
0iCL cm.
I I la
CM aq 7 a N 000 W N M (OD O rprt
N N O 10 G' O
cr
Q I l l l m p p v'
D 5 04 rL Q- ' - � a v
� K x ro ro C 0 0 0 a> > ro
7 7 O an N
O C V, ro 7 N p� p) O
ro
m m eb N O -4
o
N 010 ro '0 3 d W SL O
ro M a0 O
m cEc C C ro
p O C r
Ln
au Ol 01 r
N Q ni v W <
O g
0 ° 3 f D �D as
3 o D 3 3 o m
N Q h 0= 3 Kpr 3
-nT VOi N C
rt 7 r, � ui
O ro O 0. = �
n
ro p =- :3 ro ro N
M �+ -i
O 3 c o
o Q
N m m m
' oa �'
k b* D
LM d °o a)
0 0 -4 Q'
N
o ,�
oroi O
3 as
o d C
rt
ro
O
n rt
ro
m
Q.
7
on
LA
m
M
C
ro
O
0 PA
o c
'D CL
ro
� p
rt
. ov
<
m
n
ro
7
O'
Ln
2
ro
I-l� w w w w w
p n ro ro ro ro ro
G. CL
C C G C C C
0 0 0 C-c-afl.a
< < < C C C C C
Z
v
LA•
0
0
v
rt
CD
fD
O
C
m
W
r-
m
m
m
u
a
Version —November 26, 2019
Indicate which method(s) will be Implemented.
When selecting multiple methods indicate a primary versus secondary option.
Methods other than those listed must be approved by the State Veterinarian,
Primary Secondary Routine Mortality
Buriai three feet beneath the surface of the ground within 24 hours of knowledge of animal
death. 'The burial must be at least'300 feet from any flowing stream or public body of water
(G.S.106-403). The bottom of the burial plt should be at least one foot above the seasonal
high water table. Attach burial location map and plan.
Landfill at municipal solid waste facility permitted by NC DEQ under CS 15A NCAC
13D .0200,
Rendering at a rendering plant licensed under G.S. 106-168.7.
Complete incineration according to 02 NCAC 62C .4102.
A composting system approved and permitted by the NO Department of Agriculture & Con-
sumer Services Veterinary Division (attach copy of permit). If compost is distributed off -farm,
additional requirements must be met and .a permit is required from NC DEQ,
in the case of dead poultry only, placing in a disposal pit of a size and design approved by the
NC Department of Agriculture & Consumer Services (G.S. 106-649.70).
Any method which, in the professional opinion of the StGate'Veterinarian, would make possit,ie
(._. l•Y1r_ the salvage of part of a dead animal's value without endangering human or animal health.
(Written approval by the State Veterinarian must be attached).
Mass filly ailty Plan
Mass mortality plans are required for farms covered by an NPDES permit. These plans are
also recommended for all animal operations. This plan outlines farm specific mortality man-
agement methods to be used for rnass mortality. The NCDA&CS Veterinary Division suer --
ports a variety of emergency mortality disposal options; contact the Division for guidance.
0 A catastrophic mortality disposal plan is part of the facility's CAWMP and is activated
when numbers of dead animals exceed normal mortality rates as specified by the State
Veterinarian.
m Burial must be done in accordance with NC General Statutes and NCDA&CS Veterinary
Division regulations and guidance.
e Kass burial sites are subject to additional permit conditions (refer to facility's animal
waste management system permit),
0 In the event of imminent threat of a disease emergency, the State Veterinarian may enact
,additional temporary procedures or measures: for disposal according to G.S. 106-399.4.
f Farm i�wr7�r I1 an<f er Date
aignatur. p /
F)Ignature of'fechnlcal Speciali\S� Date