Loading...
HomeMy WebLinkAbout20240313 Ver 1_More Info Received_20240502 (4)Axiom Environmental, Inc. 218 Snow Avenue, Raleigh, North Carolina 27603 919-696-3045 Axiom Environmental, Inc. May 5, 2024 Mr. Anthony Scarbraugh U.S. Army Corps of Engineers 2407 West Fifth Street Washington, NC 27889 Mr. Robert Tankard NC Division of Water Resources 943 Washington Square Mall Washington, NC 27889 RE: Nationwide Permitting Application, NWP 3, Maintenance and associated General Water Quality Certification 4132; Trent River drainage basin, New Bern, NC. USACE Action ID: SAW-2020-02243 Tables 1 & 2 Table 1. Trent River project activity summary Type of Associated Project Activity Permit Potential Type of Site Required Jurisdictional Impact if applicable) Feature Backfill material, compact, and TR-W63 Permanent, TR-W66 1-lA install vegetative stabilization. NWP-3 Temporary Install culvert outlet protection. (Dewatering) TR-NWW-71 Backfill material, compact, and Permanent, 1-111 install vegetative stabilization. NWP-3 TR-W64 Temporary (Dewatering) Remove and replace riprap, backfill TR-NWW-li Permanent, erosional areas, compact, and install NWP-3 TR-NWW-67 Temporary vegetative stabilization. Install (Dewatering) 1-2 culvert outlet protection. TR-NWW-68 Site access and equipment movement Riparian Buffer of within Limits of Disturbance. Buffer TR-NWW-li Temporary Authorization Saw cut & remove undermined curb & gutter and asphalt. Remove undermined 1-3 riprap. Regrade eroded areas, backfill, Non -regulated TR-W71 None compact & replace riprap, curb/gutter, in -kind above OHWM . Table 1. Trent River project activity summary (continued) Type of Permit Associated Project Activity Required Potential Type of Site (if applicable) Jurisdictional Impact Feature Regrade slope, backfill erosional Permanent, area, and install vegetative NWP-3 TR-NWW-li Temporary stabilization. Install culvert outlet (Dewatering) protection. 1-4 Regrade slope, backfill erosional area, compact, and install vegetative Non -regulated TR-NWW-li None stabilization above OHWM). Backfill erosional area, compact, and install vegetative stabilization (above Non -regulated TR-NWW-9i None OHWM). Remove uprooted trees and associated root balls, backfill Permanent, 1-5 erosional area, compact, and replace NWP-3 TR-NWW-64 Temporary riprap. Install vegetative (Dewatering) stabilization. Remove and replace riprap and asphalt debris. Backfill erosional Permanent, 1-6 areas and install vegetative NWP-3 TR-W61 Temporary stabilization. (Dewatering) Install culvert outlet protection. Regrade slope, backfill erosional area, 1-7 compact, and install vegetative Non -regulated TR-W62 None stabilization above OHWM). Regrade eroded areas, backfill, 1-8A compact, and install vegetative Non -regulated TR-NWW-2i None stabilization above OHWM). Remove and replace 15 linear feet of 15-inch CMP. Regrade slope, Permanent, 1-813 backfill erosional area, compact, NWP-3 TR-NWW-2p Temporary and install vegetative stabilization. (Dewatering) Install culvert outlet protection. Backfill erosional area, compact, and 1-9 install vegetative stabilization (above Non -regulated TR-NWW-121 None OHWM). Remove and replace riprap. Backfill erosional areas and install vegetative Non -regulated TR-W46 None 1-10 stabilization (above OHWM). Regrade slope, backfill erosional area, compact, and install vegetative Non -regulated TR-W50 None stabilization above OHWM). Regrade slope, backfill erosional TR-NWW-lp Permanent, 1-12 area, compact, and install vegetative NWP-3 Temporary stabilization. TR-NWW14i (Dewatering) Table 1. Trent River project activity summary (continued) Type of Permit Associated Project Activity Required Potential Type of Site (if applicable) Jurisdictional Impact Feature Regrade slope, backfill erosional area, 1-13 compact, and install vegetative Non -regulated TR-NWW-lp None stabilization above OHWM). Backfill erosional area, compact, Permanent, and install vegetative stabilization. NWP-3 TR-NWW-60 Temporary Install culvert outlet protection. (Dewaterin ) 1-14 Backfill erosional area, compact, and install vegetative stabilization (above Non -regulated TR-W43 None OHWM). Remove riprap, backfill erosional TR-NWW-lp Permanent, areas, replace riprap. Install NWP-3 Temporary vegetative stabilization. TR-W35 (Dewatering) Site access and equipment Riparian Buffer of TR- 1-15 movement within Limits of Buffer NWW-1 p Temporary Disturbance. Authorization Backfill erosional areas and install vegetative stabilization (above Non -regulated TR-NWW-lp None OHWM). Regrade slope, backfill erosional area, and install vegetative stabilization Non -regulated TR-NWW-17i None above OHWM . 1-16 Backfill erosional area and install vegetative stabilization (above Non -regulated TR-W37 None OHWM). 1-17A Remove and replace approximately 4 Non -regulated N/A None linear feet of 30-inch RCP. Remove and replace concrete apron and slope protection. Regrade slope, 1-17A backfill erosional area, compact, and Non -regulated TR-NWW-20i None install vegetative stabilization (above OHWM). Backfill erosional area, compact, and 1-17B install vegetative stabilization (above Non -regulated TR-NWW-21i None OHWM). Regrade slope, backfill erosional Permanent, 1-19 area, compact, and install vegetative NWP-3 TR-W24 Temporary stabilization. (Dewaterin ) Regrade slope, backfill erosional area, compact, and install vegetative Non -regulated TR-NWW-3i None stabilization above OHWM . 1-21 Remove and replace riprap. Backfill erosional area, compact, and install Non -regulated TR-NWW-3i None vegetative stabilization (above OHWM). Table 1. Trent River project activity summary (continued) Type of Permit Associated Project Activity Required Potential Type of Site (if applicable) Jurisdictional Impact Feature Regrade slope, backfill erosional area, 1-22 and install vegetative stabilization Non -regulated TR-NWW-3i None above OHWM . Remove and replace existing headwall. Remove and replace 16 linear feet of 60-inch RCP. Remove Permanent, and replace riprap and geotextile NWP-3 TR-NWW-lp Temporary underlayment. Backfill erosional (Dewatering) areas, compact and install vegetative stabilization. 1-23 Remove and replace concrete slope drain. Regrade slope, backfill erosional area, compact, and install Non -regulated TR-NWW-lp None vegetative stabilization (above OHWM). Remove and replace concrete apron. Regrade slope, backfill erosional area, Non -regulated TR-W32 None and install vegetative stabilization above OHWM . Backfill erosional area, compact, Permanent, 1-24 and install vegetative stabilization. NWP-3 TR-NWNV-6p Temporary Install culvert outlet protection.(Dewatering) Remove and replace wooden fence. 1-25 Backfill erosional area, compact, and Non -regulated TR-NWW-22i None install vegetative stabilization (above OHWM). Regrade slope, backfill erosional Permanent, 1-26 area and install vegetative NWP-3 Lawson Creek- Temporary stabilization. Install culvert outlet p (Dewatering) protection. Remove uprooted trees and associated 1-28 root balls, backfill erosional area, Non -regulated TR-W 19 None compact, and install vegetative stabilization above OHWM . Regrade slope, backfill erosional Permanent, 1-29 area, compact, and install vegetative NWP-3 TR-W19 Temporary stabilization. Install culvert outlet (Dewatering) protection. Remove and replace riprap. Remove concrete debris. Backfill TR-NWW-4i Permanent, 1-30 erosional area, compact, and install NWP-3 Temporary vegetative stabilization. Install TR-W10 (Dewatering) culvert inlet and outlet protection. Table 1. Trent River pro'ect activity summary (continued) Type of Permit Associated Project Activity Required Potential Type of Site (if applicable) Jurisdictional Impact Feature Regrade slope, backfill erosional area, 1-31 compact, and install vegetative Non -regulated TR-NWW-4i None stabilization above OHWM). Remove and replace riprap and 4 linear feet of 18-inch RCP. Backfill Permanent, erosional area, compact and install NWP-3 TR-NWW-38 Temporary vegetative stabilization. Install (Dewatering) 1-33 culvert outlet protection. Remove and replace riprap. Permanent, Backfill erosional area, compact, NWP-3 TR-NWW-38 Temporary and install vegetative stabilization. (Dewatering) Install culvert outlet protection. Remove and replace riprap. Regrade slope, backfill erosional Permanent, 1-34 area, compact, and install vegetative NWP-3 TR-NWW-4p Temporary stabilization. Install culvert outlet (Dewatering) protection. Remove and replace 9 linear feet of 15-inch RCP. Backfill erosional Permanent, 1-35 area, compact, and install vegetative NWP-3 TR-W17 Temporary stabilization. Install culvert outlet (Dewatering) protection. Remove and replace riprap and undermined pavement. Backfill 1-37A erosional area, compact, and install Non -regulated Lawson Creek-p None vegetative stabilization (above OHWM). Remove and replace crushed concrete 1-37C debris, backfill erosional area, Non -regulated Lawson Creek-p None compact, and install vegetative stabilization above OHWM . Backfill erosional area, compact, and 1-37D install vegetative stabilization (above Non -regulated Lawson Creek-p None OHWM). Remove and replace riprap, backfill Permanent, erosional area, compact and install NWP-3 TR-NWW-Sp Temporary vegetative stabilization. Install (Dewatering) 1-39 culvert outlet protection. Regrade slope, backfill erosional area and install vegetative stabilization Non -regulated TR-NWW-5p None above OHWM . Projects identified in bold in Table 1 are anticipated to require authorization. Anticipated impacts associated with specific project activities are provided in Table 2 below. Due to the potential overlap of temporary project activities (e.g., temporary inlet protection and dewatering), total impacts may be less than the sum of individual activities within each site. Table 2. Total Impacts for the Trent River drainage basin Associated Project Potential Reason for Impact Type of Impact Impact Amount Site* Jurisdictional Feature <0.000 acre Culvert outlet protection Permanent 5 linear feet 19 square feet 19 cubic feet <0.000 acre TR-W63 Wetland fill Permanent 3 linear feet 3 square feet 3 cubic feet 0.002 acre Channel dewatering Temporary 18 linear feet MA 106 s uare feet <0.000 acre Wetland fill Permanent 4 linear feet 3 square feet TR-W66 3 cubic feet 0.001 acre Channel dewatering Temporary 13 linear feet 59 square feet <0.000 acre TR-NWW-71 Channel dewatering Temporary 10 linear feet 10 square feet 0.001 acre Wetland fill Permanent 15 linear feet 31 square feet 1-113 TR-W64 31 cubic feet 0.005 acre Channel dewatering Temporary 32 linear feet 214 s uare feet Table 2. Total Impacts for the Trent River drainage basin (continued) Associated Project Potential Reason for Impact Type of Impact Impact Amount Site* Jurisdictional Feature 0.001 acre Culvert outlet protection Permanent 10 linear feet 36 square feet TR-NWW-li 36 cubic feet 0.001 acre Channel dewatering Temporary 14 linear feet 40 square feet 0.001 acre TR-NWW-67 Channel dewatering Temporary 12 linear feet 1-2 49 square feet 0.001 acre TR-NWW-68 Channel dewatering Temporary 12 linear feet 46 square feet 0.014 acre Neuse River Site access and activity — Zone 1 Temporary 179 linear feet Riparian Buffer of 595 square feet TR-NWW-li 0.152 acre Site access and activity — Zone 2 Temporary 495 linear feet 6,618 s are feet 0.001 acre Culvert outlet protection Permanent 8 linear feet 40 square feet 1-4 TR-NWW-li 40 cubic feet 0.004 acre Channel dewatering Temporary 22 linear feet 178 s uare feet <0.000 acre Stream fill Permanent 13 linear feet 5 square feet 1-5 TR-NWW-64 5 cubic feet 0.001 acre Channel dewatering Temporary 33 linear feet 32 square feet Table 2. Total Impacts for the Trent River drainage basin (continued) Associated Project Potential Reason for Impact Type of Impact Impact Amount Site* Jurisdictional Feature 0.001 acre Culvert outlet protection Permanent 8 linear feet 33 square feet 33 cubic feet <0.000 acre 1-6 TR-W61 Wetland fill Permanent 2 linear feet 1 square foot 1 cubic foot 0.002 acre Channel dewatering Temporary 20 linear feet 83 square feet <0.000 acre Culvert outlet protection Permanent 7 linear feet 11 square feet 1-813 TR-NWW-2p 11 cubic feet 0.022 acre Channel dewatering Temporary 76 linear feet 962 s uare feet 0.022 acre TR-NWW-lp Stream fill Permanent 375 linear feet 970 square feet 970 cubic feet 1-12 0.059 acre TR-NWW-lp Channel dewatering Temporary 293 linear feet 2,575 s are feet 0.005 acre TR-NWW-14i Channel dewatering Temporary 19 linear feet 197 s uare feet <0.000 acre Culvert outlet protection Permanent 3 linear feet 3 square feet 1-14 TR-NWW-60 3 cubic feet <0.000 acre Channel dewatering Temporary 13 linear feet 13 square feet Table 2. Total Impacts for the Trent River drainage basin (continued) Associated Project Potential Reason for Impact Type of Impact Impact Amount Site* Jurisdictional Feature 0.001 acre TR-NWW-lp Stream fill Permanent 24 linear feet 55 square feet 55 cubic feet <0.000 acre TR-W35 Wetland fill Permanent 4 linear feet 8 square feet 8 cubic feet 0.006 acre 1-15 TR-NWW-lp Channel dewatering Temporary 25 linear feet 253 s uare feet 0.002 acre TR-W35 Channel dewatering Temporary 10 linear feet 106 s uare feet 0.049 acre Neuse River Site access and activity — Zone 1 Temporary 220 linear feet Riparian Buffer of 2,117 square feet TR-NWW-lp 0.004 acre Site access and activity — Zone 2 Temporary 16 linear feet 179 s uare feet 0.001 acre Wetland fill Permanent 26 linear feet 22 square feet 1-19 TR-W24 22 cubic feet 0.003 acre Channel dewatering Temporary 46 linear feet 145 s uare feet 0.001 acre Stream fill Permanent 27 linear feet 53 square feet 1-23 TR-NWW-lp 53 cubic feet 0.004 acre Channel dewatering Temporary 21 linear feet 170 s uare feet 0.001 acre Culvert outlet protection Permanent 5 linear feet 25 square feet 25 cubic feet 0.001 acre 1-24 TR-NWW-6p Stream fill Permanent 21 linear feet 30 square feet 30 cubic feet 0.004 acre Channel dewatering Temporary 30 linear feet 153 square feet Table 2. Total Impacts for the Trent River drainage basin (continued) Associated Project Potential Reason for Impact Type of Impact Impact Amount Site* Jurisdictional Feature 0.001 acre Lawson Creek-p Culvert outlet protection Permanent 6 linear feet 28 square feet 28 cubic feet 0.003 acre 1-26 Stream fill Permanent 48 linear feet 127 square feet Lawson Creek-p 127 cubic feet 0.022 acre Channel dewatering Temporary 44 linear feet 947 s uare feet <0.000 acre Culvert outlet protection Permanent 5 linear feet 16 square feet 16 cubic feet 0.001 acre 1-29 TR-W19 Wetland fill Permanent 37 linear feet 64 square feet 64 cubic feet 0.004 acre Channel dewatering Temporary 48 linear feet 185 s uare feet 0.001 acre Culvert outlet protection Permanent 12 linear feet 48 square feet 48 cubic feet 0.001 acre Stream fill Permanent 22 linear feet 47 square feet TR-NWW-4i 47 cubic feet 0.001 acre Culvert inlet protection Temporary 5 linear feet 1-30 25 square feet 0.009 acre Channel dewatering Temporary 70 linear feet 381 s uare feet <0.000 acre Culvert outlet protection Permanent 4 linear feet 20 square feet TR-W 10 20 cubic feet 0.001 acre Channel dewatering Permanent 14 linear feet 56 square feet Table 2. Total Impacts for the Trent River drainage basin (continued) Associated Project Potential Reason for Impact Type of Impact Impact Amount Site* Jurisdictional Feature <0.000 acre Culvert outlet protection Permanent 8 linear feet 8 square feet 8 cubic feet <0.000 acre 1-33 TR-NWW-38 Stream fill Permanent 12 linear feet 6 square feet 6 cubic feet 0.001 acre Channel dewatering Temporary 37 linear feet 39 square feet 0.001 acre Culvert outlet protection Permanent 6 linear feet 61 square feet 1-34 TR-NWW-4p 61 cubic feet 0.005 acre Channel dewatering Temporary 23 linear feet 236 s uare feet <0.000 acre TR-W 17 Culvert outlet protection Permanent 5 linear feet 11 square feet 1-35 11 cubic feet <0.000 acre TR-W 17 Channel dewatering Temporary 7 linear feet 18 square feet 0.001 acre Culvert outlet protection Permanent 11 linear feet 64 square feet 1-39 TR-NWW-5p 64 cubic feet 0.003 acre Channel dewatering Temporary 21 linear feet 116 s uare feet Total Potential Stream Impacts Permanent 0.036 acre, 618 linear feet Temporary 0.149 acre 780 linear feet Permanent 0.005 acre, Total Potential Wetland Impacts 118 linear feet, 231 square feet Temporary 0.022 acre, 208 linear feet, 972 square feet Table 3. Total Neuse River Riparian Buffer Impacts Total Temporary Impacts Zone 1 0.062 acre / 2,712 square feet Zone 2 0.156 acre/ 6,797 square feet