Loading...
HomeMy WebLinkAbout20150288 Ver 1_Precon_20160128Wanucha, Dave From: Braquet, Stephanie Sent: Thursday, January 28, 20161;23 PM To: Wanucha, Dave Cc: Haff, Richard Subject: RE; Peeler Rd precon Dave, What material do you want them to use for the ramp they are �onstru�ting behind the 1' sill, native bed material or �on�rete? Thanks ° �r � DIUISION ENUIRONMEN�iALSPECIALIST Division ofi Hi�hwaVs—Division Nine (336� 747-7$�0 From: Wanucha, Dave Sent: Wednesday, January 27, 201611;33 AM To: Braquet, Stephanie Subject: Peeler Rd precon Hi Stephanie, I have a pressing issue in Div 7 that requires cny attention tocnorrow cnorning, As su�h, I will not be able to attend the pre�onstru�tion cneeting for Bridge 281 Peeler Road, I reviewed the proje�t again and noti�ed that the low flow barrel was not to be ba�kfilled but a 1' sill will be installed in the inlet side, As with the bridge to �ulvert proje�t on US 311 in Stokes County, will DOT ba�kfill the low flow barrel with native cnaterial just behind the sill �approxicnate 3'-5') to fa�ilitate passage of aquati� life? Other than the usual NPDES requirecnents, I have nothing else to add, Thanks, and let cne know about the low flow barrel, Dave W, Dave Wanucha Division of Water Resources Transportation Permitting llnit NC Department of Environmental Quality 336-776-9703 office 336-403-5655 mobile Dave:War�.ucha, r�c�er�r,c��v NC DEQ Winston Salem Regional Office 450 West Hanes Mill Road, Suite 300 Winston Salem, NC 27105 �n��il ��rr����rr��rr�� C� �rrd �r�n� Chi� ��dr��� i� ��!�j�cC C� Ch� I��rCh ��r�lir�� ��!��i� ��c�r�� ����r �r�d n���r �� �i��l���d C� Chir� ��rCi�� Illki��i�il �oi�i�ospoi��ei°�ao �Co �i°�d �fi�oi��i �Cl�is woi°�doi� Is wublea�C �Co �Cl�o IV C� I':��'ubIIG I��oaoi�ds I.�N� �i°�d i��i�y bo dls�lose� �Co �Cl�li�d p�i��Clos�