HomeMy WebLinkAbout20150288 Ver 1_Precon_20160128Wanucha, Dave
From: Braquet, Stephanie
Sent: Thursday, January 28, 20161;23 PM
To: Wanucha, Dave
Cc: Haff, Richard
Subject: RE; Peeler Rd precon
Dave,
What material do you want them to use for the ramp they are �onstru�ting behind the 1' sill, native bed material or �on�rete?
Thanks
° �r �
DIUISION ENUIRONMEN�iALSPECIALIST
Division ofi Hi�hwaVs—Division Nine
(336� 747-7$�0
From: Wanucha, Dave
Sent: Wednesday, January 27, 201611;33 AM
To: Braquet, Stephanie
Subject: Peeler Rd precon
Hi Stephanie,
I have a pressing issue in Div 7 that requires cny attention tocnorrow cnorning, As su�h, I will not be able to attend the pre�onstru�tion cneeting for Bridge 281
Peeler Road,
I reviewed the proje�t again and noti�ed that the low flow barrel was not to be ba�kfilled but a 1' sill will be installed in the inlet side, As with the bridge to
�ulvert proje�t on US 311 in Stokes County, will DOT ba�kfill the low flow barrel with native cnaterial just behind the sill �approxicnate 3'-5') to fa�ilitate passage
of aquati� life?
Other than the usual NPDES requirecnents, I have nothing else to add,
Thanks, and let cne know about the low flow barrel,
Dave W,
Dave Wanucha
Division of Water Resources
Transportation Permitting llnit
NC Department of Environmental Quality
336-776-9703 office
336-403-5655 mobile
Dave:War�.ucha, r�c�er�r,c��v
NC DEQ Winston Salem Regional Office
450 West Hanes Mill Road, Suite 300
Winston Salem, NC 27105
�n��il ��rr����rr��rr�� C� �rrd �r�n� Chi� ��dr��� i� ��!�j�cC C� Ch�
I��rCh ��r�lir�� ��!��i� ��c�r�� ����r �r�d n���r �� �i��l���d C� Chir� ��rCi��
Illki��i�il �oi�i�ospoi��ei°�ao �Co �i°�d �fi�oi��i �Cl�is woi°�doi� Is wublea�C �Co �Cl�o IV C� I':��'ubIIG I��oaoi�ds I.�N� �i°�d i��i�y bo dls�lose� �Co �Cl�li�d p�i��Clos�