HomeMy WebLinkAbout20130702 Ver 1_BMP Closeout Error_20151105
Strickland, Bev
From:Allen, Melonie
Sent:Thursday, November 05, 2015 2:09 PM
To:Merritt, Katie
Cc:Eric Kulz; Schaffer, Jeff
Subject:Town of Cary BMP Closeout
Attachments:Town_Of_Cary BMP Closeout Acceptance.pdf
Follow Up Flag:Follow up
Flag Status:Flagged
Katie,
There was a mistake in the 2013 summary report that resulted in the 5,322 lbs N being included in the closeout letter.
The 5,322 should not have been included in an EEP/DMS document because we never funded that restoration phase (II)
of the project. EEP did fund phase I which resulted in 40,180 lbs of total N reduction (1,339.32 lbs/year for 30 years). I’ve
drafted a closeout summary, found the 2005 feasibility study that defined the nitrogen removal rates estimated for
phase I and included the final As-built for the site. The As-built included BMPs from phase I and II, but the feasibility
study defined the foot print of the treated areas for phase I. You can find these documents at the link below.
https://northcarolinadeptofenvandnat.sharefile.com/d-sb84a31efe2e45218
Eric- I’m ccing you because there are apparently additional nutrient offset credits associated with phase II (reach north
of Normandy St) The 2013 report Jeff had sent prior to the site visit included additional removal potential associated
with this phase of the project but EEP/DMS never funded this.
I’ve done my best to piece together the history and pertinent documents associated with this site. Let me know if you
need any additional information or have questions.
Thanks,
Melonie
Melonie Allen
Science & Analysis
Division of Mitigation Services
Department of Environmental Quality
919-707-8540 office
919-368-9352 mobile
Melonie.Allen@ncdenr.gov
217 West Jones St.
Raleigh, NC 27603
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
1
2