HomeMy WebLinkAbout20070544 Ver 2_Approval Letter_20071204O~O~ SAT ~ApG
~_ ~
O "C
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Coleen H. Sullins, Director
Division of Water Quality
December 4, 2007
Mr. Greg Dickerson
Duck United Methodist Church
8 Juniper Trail
Southern Shores, NC 27949
Re: Duck United Methodist Church,. Dare County
DWQ #20070544, Ver. 2; USACE ORM ID #: SAW- 2007-01226-128
APPROVAL of 401 Water Quality Certification and with Additional Conditions
Dear Mr. Dickerson:
Attached hereto is a copy of Certification No. 3717 issued to Mr. Greg Dickerson of Duck United
Methodist Church, dated December 4, 2007. In addition, you should get any other federal, state or local
permits before you go ahead with your project including (but not limited to) Solid Waste, Sediment and
Erosion Control, Stormwater, Dam Safety, Non-discharge and Water Supply Watershed regulations.
If we can be of further assistance, do not hesitate to contact us.
CHS/cbk/ijm
Attachments: Certificate of Completion
Sincerely,
Coleen H. Sullins
cc: U.S. Army Corps of Engineers, Washington Regulatory Field Office, Wilmington District, USACOE
Kyle Barnes, DWQ, Washington Regional Office
DLR Washington Regional Office
File Copy
Central Files
Mike Street, P.O. Box 769, Morehead City, NC 28557
Helen Mattioni Furr, Environmental Professionals, Inc., P.O. Box 3368, Kill Devil Hills, NC 27948
Filename: 070544 Ver2DuckUnitedMethodistChurch(Dare~01_IC
401 Oversight/Express Review Permits Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone: 919-733-17861 FAX 919-733-6893 / intemet: http://h2o.enr.state.nc.us/ncwetlands
No ` Carolina
~atura!!y
An Equal OpportunitylAffirmative Action Employer- 50% Recycled/10% Post Consumer Paper
Duck United Methodist Church
Page 2 of 5
December 4, 2007
NORTH CAROLINA 401 WATER QUALITY CERTIFICATION
THIS CERTIFICATION is issued in conformity with the requirements of Section 401 Public Laws 92-
500 and 95-217 of the United States and subject to the North Carolina Division of Water Quality (DWQ)
Regulations in 15 NCAC 2H, Section .0500 to Mr. Greg Dickerson of the Duck United Methodist Church,
to 6110.16 acres of jurisdictional wetland, associated with the construction of additional parking for the
Duck United Methodist Church, located at 1214 Duck Road, to the west of NC 12, adjacent to Currituck
Sound, in the Town of Duck, Dare County, North Carolina, pursuant to an application filed on the 13~' day
of September of 2007 (received by DWQ on October 25, 2007), and by Public Notice by the U.S. Army
Corps of Engineers issued on the 15~' day of October 15 of 2007 (received by DWQ on October 17, 2007).
The application and supporting documentation provides adequate assurance that the proposed work will
not result in a violation of applicable Water Quality Standards and discharge guidelines. Therefore, the
State of North Carolina certifies that this activity will not violate the applicable portions of Sections 301,
302, 303, 306, 307 of PL 92-500 and PL 95-217 if conducted in accordance with the application, the
supporting documentation, and conditions hereinafter set forth.
This approval is only valid for the purpose and design submitted in the application materials and as
described in the Public Notice. If the project is changed, prior to notification a new application for a new
Certification is required. If the property is sold, the new owner must be given a copy of the Certification
and approval letter and is thereby responsible for complying with all conditions of this Certification. Any
new owner must notify the Division and request the Certification be issued in their name. Should wetland
or stream 611 be requested in the future, additional compensatory mitigation may be required as described
in 15A NCAC 2H .0506 (h) (6) and (7). If any plan revisions from the approved site plan result in a
change in stream or wetland impact or an increase in impervious surfaces, the DWQ shall be notified in
writing and a new application for 401 Certification may be required. For this approval to be valid,
compliance with the conditions listed below is required.
Conditions of Certification:
Impacts Approved
The following impacts are hereby approved as long as all of the other specific and general
conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are
approved including incidental impacts:
Amount A roved Units Plan Location or Reference
404/CAMA Wetlands 0.16 (acres) PN and Construction Plans
Sediment and Erosion Control:
2. Erosion and sediment control practices must be in full compliance with all specifications governing
the proper design, installation and operation and maintenance of such Best Management Practices
in order to protect surface waters standards:
a. The erosion and sediment control measures for the project must be designed, installed,
operated, and maintained in accordance with the most recent version of the North Carolina
Sediment and Erosion Control Planning and Design Manual.
b. The design, installation, operation, and maintenance of the sediment and erosion control
measures must be such that they equal, or exceed, the requirements specified in the most recent
version of the North Carolina Sediment and Erosion Control Manual. The devices shall be
Duck United Methodist Church
Page 3 of 5
December 4, 2007
maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including
contractor-owned or leased borrow pits associated with the project.
c. Sufficient materials required for stabilization and/or repair of erosion control measures and
stormwater routing and treatment shall be on site at all times.
No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the
footprint of the impacts depicted in the 404/401 Permit Application. All construction activities,
including the design, installation, operation, and maintenance of sediment and erosion control Best
Management Practices, shall be performed so that no violations of state water quality standards,
statutes, or rules occur;
Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum
extent practicable. If placement of sediment and erosion control devices in wetlands and waters is
unavoidable, they shall be removed and the natural grade restored within six months of the date that
the Division of Land Resources has released the project;
Protective Fencing -The outside buffer, wetland or water boundary and along the construction
corridor within these boundaries approved under this authorization shall be clearly marked with
orange warning fencing (or similar high visibility material) for the areas that have been approved to
infringe within the buffer, wetland or water prior to any land disturbing activities to ensure
compliance with 15A NCAC 2B .0233 and GC 3404;
Continuing Com liu ance:
Mr. Greg Dickerson and the Duck United Methodist Church, shall conduct construction activities in
a manner consistent with State water quality standards (including any requirements resulting from
compliance with section 303(d) of the Clean Water Act) and any other appropriate requirements of
State law and federal law. If the Division determines that such standards or laws are not being met
(including the failure to sustain a designated or achieved use) or that State or federal law is being
violated, or that further conditions are necessary to assure compliance, the Division may reevaluate
and modify this Certification to include conditions appropriate to assure compliance with such
standards and requirements in accordance with 15A NCAC 2H.0507(d). Before modifying the
Certification, the Division shall notify Mr. Greg Dickerson and/or the Duck United Methodist
Church, NC and the US Army Corps of Engineers, provide public notice in accordance with 15A
NCAC 2H.0503 and provide opportunity for public hearing in accordance with 15A NCAC
2H.0504. Any new or revised conditions shall be provided to Mr. Greg Dickerson and/or the Duck
United Methodist Church, NC in writing, shall be provided to the United States Army Corps of
Engineers for reference in any Permit issued pursuant to Section 404 of the Clean Water Act, and
shall also become conditions of the 404 Permit for the project;
Deed Notification:
7. A deed notification or similar mechanism shall be attached to the deed and final plat clearly
denoting all remaining jurisdictional wetlands and waters. This mechanism shall be put in place
within 30 days of the date of issuance of the 401Certification letter or the issuance of the 404
Permit (whichever is later). A sample deed notification format can be downloaded from the
401/Wetlands Unit web site at http://h2o.enr.state.nc.us/ncwetlands. DWQ shall be sent copies of
all deed restrictions applied to these lots;
Duck United Methodist Church
Page.4 of 5
December 4, 2007
Written Stormwater Management Plan (Final Plan and Approval NeededZ
Written Stormwater Management Plan (Final P1amNeeded)
A final, written Stormwater management plan (including a signed and notarized Operation and
Maintenance Agreement) shall be submitted to the 401 Oversight and Express Permitting Unit
(2321 Crabtree Blvd., Suite 250, Raleigh, NC, 27604) within 60 days of the issuance of the 401
Water Quality Certification. The stormwater management plans shall be approved in writing by
this Office before the impacts specified in this Certification occur. You have the option of using
the Express Review Program for expedited approval of these plans. If you propose to use the
Express Review Program, remember to include the appropriate fee with the plan. The Stormwater
management plan must include plans, specifications, and worksheets for Stormwater management
facilities that are appropriate for the surface water classification and designed to remove at least
85% TSS according to the most recent version of the NC DENR Stormwater Best Management
Practices Manual. These facilities must be designed to treat the runoff from the entire project,
unless otherwise explicitly approved by the Division of Water Quality. Also, before any permanent
building is occupied at the subject site, the facilities (as approved by this Office) shall be
constructed and operational, and the stormwater management plan (as approved by this Office)
shall be implemented. The structural stormwater practices as approved by this Office as well as
drainage patterns must be maintained in perpetuity. No changes to the structural stormwater
practices shall be made without written authorization from the Division of Water Quality.
Where a State Stormwater Permit (in accordance with 15 A NCAC 2H .1000) is required, this
permit may be considered to meet this condition.
9. Construction Stormwater Permit NCGO10000
Upon the approval of an Erosion and Sedimentation Control Plan issued by the Division of Land
Resources (DLR) or a DLR delegated local erosion and sedimentation control program, an NPDES
General stormwater permit (NCGO10000) administered by DWQ is automatically issued to the
project. This General Permit allows stormwater to be discharged during land disturbing
construction activities as stipulated by conditions in the permit. If your project is covered by this
permit [applicable to construction projects that disturb one (1) or more acres], full compliance with
permit conditions including the sedimentation control plan, self-monitoring, record keeping and
reporting requirements are required. A copy of this permit and monitoring report forms may be
found at http://h2o.enr.state.nc.us/su/Forms_Documents.htm.;
10. Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable
Buffer Rules, and any subsequent modifications, the applicant is required to return the attached
certificate of completion to the 401 Oversight/Express Review Permitting Unit, North Carolina
Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650.
Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as
depicted in your application shall expire upon expiration of the 404 or CAMA Permit.
Duck United Methodist Church
Page 5 of 5
December 4, 2007
If this Certification is unacceptable to you, you have the right to an adjudicatory hearing upon written
request within sixty (60) days following receipt of this Certification. This request must be in the form of a
written petition conforming to Chapter 150B of the North Carolina General Statutes and filed with the
Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. If
modifications are made to an original Certification, you have the right to an adjudicatory hearing on the
modifications upon written request within sixty (60) days following receipt of the Certification. Unless
such demands are made, this Certification shall be final and binding.
This the 4~' day of Dece r 2007
DIVI ONO W ALITY
Coleen H. Sullins
3717
CHS/cbk/ijm
Certification of Completion
DWQ Project No.:
Applicant:
Project Name:
county:
Date of Issuance of Certification or Authorization:
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any
subsequent modifications, the applicant is required to return this certificate to the 401 Oversight/Express Permitting Unit,
North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be
returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send
certificates from all of these.
Applicant's Certification
I, ,hereby state that, to the best of my abilities, due care and diligence was
used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications,
and other supporting materials.
Signature: Date:
Agent's Certification
I, ,hereby state that, to the best of my abilities, due care and diligence was
used in the observation of the construction such that the construction was observed to be built within .substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications,
and other supporting materials.
Signature:
Date:
If this project was designed by a Certified Professional
~.
I, as a duly registered Professional (i.e., Engineer,
Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been. authorized to observe (periodically,
weekly, full time) the construction of the project, for the Permiee hereby state that, to the best of my abilities, due care
and diligence was used in the observation of the construction such that the construction was observed to be built witfiin
substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and
specifications, and other supporting materials,
Signature: Registration No, Date