Loading...
HomeMy WebLinkAboutNCC203198_NOT Closeout Documents_20240513 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 610 East Center Avenue, Suite 301, Mooresville, NC 28115 (704)663-1699 County: Cabarrus Project: Cad Parmer Drive Out Parcel Grading River basin: Yadkin-Peebee Person financially responsible:Charlotte Real Estate Development-\lark Swartz Project#: CABAR-30_'0-094 Address: 4350 MAIN ST,Suite 220,Harrisburg,NC' 28075 1. Project Location: Carl Partner[)rive, Harrisburg Pictures: No 2. Weather and soil conditions: Sunny.workable soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Storntwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No IfYcs,where? (check all that apply) Degree of damage: 8. Contact made with (name): No one on site Title: Inspection report: Sent Report Date given/sent: April 05,2024 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self-monitoring or self-inspections are required. Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCGOI)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at: https:/'Iedocs.deq.nc.govFomms'NCGOI-Termination.Please note that this correspondence • •• must be uploaded as part of completing the NOT process. All projects that have been approved prior to April 01,2019,under the old permit system,are not required to take any additional actions.The stormwater permit is terminated at the same time as the termination of this erosion control permit. Reported by: Matthew Gigante Others present: Date of inspection: April 03,2024 Time arriving on site: 10:45 AM Time leaving site: 10:50 AM CC: