Loading...
HomeMy WebLinkAboutCredit Release Task 2,7- Saints Delight.docxDocuSign Envelope ID: F01FA60E-F1A4-4CDA-9AOA-EE9A65FB613B ROY COOPER Governor ELIZABETH S. BISER Secretary RICHARD E. ROGERS, JR. Director NORTH CAROLINA Environmental Quality May 8, 2024 Restoration Systems, LLC DWR ID# 2021-1037v2 Attn: John Preyer & Barrett Jenkins Craven County (via electronic mail: barrett.jenkinskdavey.com ) Re: Restoration Systems' Neuse 04 Nutrient Offset Banking Instrument (NOBI) Saints Delight Bank Parcel Credit Release — Tasks 2 & 7 Dear Mr. Jenkins: On March 11, 2024, the Division of Water Resources (DWR) received documentation from Restoration Systems, LLC (RS) that the Saints Delight site had been planted and constructed in its entirety and monitoring plots had been installed. On March 22, 2024, staff with DWR, with assistance from staff with RS, inspected the site and confirmed that the subject site had been adequately planted and that all monitoring plots were installed. Additionally, the conservation easement boundary for the site has been adequately marked. On January 29, 2024, RS provided confirmation to DWR that the conservation easement for the subject site has been successfully assigned to North Carolina Wildlife Habitat Foundation, Inc (NCWHF). NCWHF is a 501(c)(3) non-profit corporation and has been approved by DWR as a long-term steward for this mitigation bank. DWR received a performance bond (#K41730158) issued to RS from Federal Insurance Company, in the amount of $150,000, to cover performance obligations for the construction of the subject site. The term of this bond will remain in effect until DWR has provided a written approval of the As - Built Report. In accordance with the NOBI, signed on February 24, 2023, the following Project Milestones have been met and the corresponding credits shall be released: Task/Milestones Credit 2) All riparian Earthwork, Planting & Installation of monitoring devices 20% completed, easement boundaries adequately marked, and all applicable permits obtained. A site visit by DWR was performed 3) Item B (1) of Section X in the NOBI (assign the easement 5% to stewardship) has been completed and approved by DWR TOTAL: 25% North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 1 1611 Mail Service Center I Raleigh, North Carolina 27699-1611 NORTH CARCLINA 919.707.9000 DocuSign Envelope ID: F01FA60E-F1A4-4CDA-9AOA-EE9A65FB613B Saints Delight Site Rcstoration Systems, LLC May 8, 2024 By copy of this correspondence, DWR confirms that you have satisfied the above requirements for the above -referenced tract and therefore, the following credits are being released and are now available to sell: • 25% of the Nitrogen nutrient offset credits (0.25 x 83,821.385 lb-N — 20,955.346 lb-N) Please note that nutrient offset credits generated at this site must be used for impacts in HUC 03020204 of the Neuse River Basin pursuant to 15A NCAC 02B .0703, which became effective on April 1, 2020. Upon receiving this correspondence update credit ledgers accordingly. Please feel free to contact Katie Merritt at katie.merrittgdeq.nc.gov if you have any questions regarding this correspondence. Sincerely, DocuSigned by: 5��� GbSS 755ABFOCD80B428... Stephanie Goss, Supervisor 401 & Buffer Permitting Branch cc:File Copy (Blake Hartshorn) Caitlyn Parker — (RS/Davey — via electronic mail) Page 2 of 2