Loading...
HomeMy WebLinkAboutSW6230603_Design Calculations_20240510 (2) 4D Site Solutions, Inc. DESIGN REQUIREMENTS: A. Pass the storm event Aberdeen US 15-501 DG-Detention Basin Pre-Development Runoff-10-yr Drainage Area,(DA)= 1.53 acres Intensity,(I)= 7.84 inches/hr Composite Runoff Coefficient,(C)=> 0.31 Maximum Release Rate,(Q10)=> 3.72 cfs Aberdeen US 15-501 DG-Detention Basin Post-Development Runoff-10-yr Drainage Area,(DA)= 1.53 acres Intensity,(I)= 7.84 inches/hr Composite Runoff Coefficient,(C)=> 0.67 Peak Release Rate,(Q10)=> 8.04 cfs Detention Pond Stage-Storage Function Contour Contour Incr. Accum. Stage Elev. Area Storage Storage(S) (Z) (ft) (sf) (cf) (cf) (ft) In(S) In(Z) Z est 346.30 11,166 - - - - 346.80 11,791 5,739 5,739 0.50 8.66 -0.69 0.52 347.30 12,430 6,055 11,795 1.00 9.38 0.00 1.00 347.80 13,083 6,378 18,173 1.50 9.81 0.41 1.49 348.30 13,750 6,708 24,881 2.00 10.12 0.69 1.99 348.80 14,432 7,046 31,927 2.50 10.37 0.92 2.51 Regression Output: b= 1.09 (X Variable Coeff) Ks= 11,756 (eY-n'terOePt) Stage-Storage Equation is of the form:S=(Ks)(Z)b printed:5/10/2024 2:04 PM Page 1 of 3 4D Site Solutions, Inc. Infiltration Infiltration rate= 0.1 in/hr 2.31E-06 ft/s SF of Retention 11166 sf Outflow from infiltration= 0.03 cfs Primary Spillway Width of Spillway(Approx.)= 1 feet Weir Coefficient= 3.3 Crest Elevation= 346.60 feet Emergency Spillway Width of Spillway(Approx.)= 15 feet Weir Coefficient= 3.3 Crest Elevation= 347.80 feet Summary of Results Maximum Release Rate,(Qio)= 3.72 cfs Infiltration Rate,(Qio)= 0.03 cfs Overflow Rate,(Q10)= 2.55 cfs Water Surface Elev.@ Outlet(Q10)= 347.44 feet printed:5/10/2024 2:04 PM Page 2 of 3 4D Site Solutions, Inc. Inflow Hydrograph-10-yr Peak Inflow,(Qp)_> 8.04 cfs Time to Peak Calculation: CN= 85 P= 5.46 in. S= 1.76 in. Q*= 3.80 in. (depth of runoff) Vol= 21,080 cf (vol.of runoff) Time to Peak,(Tp)=> 31.5 minutes (SCS TR-55) printed:5/10/2024 2:04 PM Page 3 of 3