HomeMy WebLinkAbout20151097 Ver 1_More Info Received_20160104BUNCOMBE COUNTY NORTH CAROLINA - --OOVLRNMLNt - December 28, 2015 Buncombe County Soil & Water Conservation District US Army Corps of Engineers NC Department of Environmental Quality NC Wildlife Resources Commission Gary Higgins Director RECEIVED Division of Water Resources 3 s" JAN - 4 2016 Water Quality Regional Operations Asheville Re ional Office I have revised the PCN for the Leicester Youth Center to include and additional 275 feet of stream impact from grading below the ordinary high water mark. This grading should be minimal, but engineer Jeff Young feels that it will be necessary to achieve stable side slopes. Please let me know if you have any questions or comments. Thank you. Sin rely, Gary Hi ins, Dir r Buncombe SWCD 49 Mount Carmel Road, Suite 101, Asheville NC 28806 buncombecounty.org p.828.250.4785 C 828.250.6008 C. Proposed Impacts Inventory pacts Summary hich sections were completed below for your project (check all that apply): ❑ Pond Construction La.❑ Wetlands X Streams —tributaries❑ ❑2.Wetland Buffers ❑ Open Waters Impacts on the site, then complete this question for each impacted. area im2e If there are wetland impacts proposed 2d. 2e. 2f 2a. 2b. Wetland impact 2c. Type of impact Type of wetland Forested Type of jurisdiction Corps (404,10) or Area of impact number DWQ (401, other) (acres) Permanent (P) or Tem ora T Choose one Yes/No W1 - Choose one Yes/No W2 _ Choose one Choose one W3 _ Choose one Choose one Yes/No W4 _ .Choose one Choose one Yes/No W5 _ Choose one Choose one Yes/No W6 _ Choose one Choose one Yes/No 2g. Total Wetland Impacts: 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3e 3f 3g• 3b. 3c. 3d' Impact 3a. a of Average Stream impact Type of impact Stream name Perennial (PER) jurisdiction stream length number intermittent (INT) . 1 width (linear Permanent (P) or (feet) feet) Temporary (T) Corps 3 20 S1 P Culvert Trib. to Sluder Branch PER S2 T Excavation Trib. to Sluder Branch PER Corps 3 275 S3 Choose one S4 Choose one S5 Choose one S6 - Choose one 3h. Total stream and tributary impacts 3i. Comments: along inch e to In order to stabilize the stream banks, d with eroding banks in this llarea and bis locateldtlery close to a paved walk ng tra I and street sohsloping e new pback of the existing pipe. The stream is incise the stream banks is not feasible. Below this area, the stream banks will be reshaped and sloped back including establishment of vegetation. Page 4 of 10 PCN Form —Version 1.4 January 2009