Loading...
HomeMy WebLinkAboutMadison 152_EC_Pset_Color GRAPHIC SCALE STATE STATE PROJECT REFERENCE NO. STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION NO. TOTAL SHEETS N.C. SHEET DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA 4/19/2024 X:\NCDOT\Division 13 M adison 2019\M adison 152\Drainage\Erosion Control\M adison 152_EC_dsn_TSH.dgn User:acochrane PLAN FOR PROPOSED HIGHWAY EROSION CONTROL EC-1 Prepared in the Office of: NAME LEVEL III CERTIFICATION NO. 0 PLANS VICINITY MAP NOT TO SCALE Designed by: TGS ENGINEERS PRO JECT: BP13.R024 for Special Considerations. Refer To E. C. Special Provisions to Sta. From Sta. High Quality Water Zone(s) Exist ON THIS PROJECT HIGH QUALITY WATER(S) EXIST for Special Considerations. Refer To E. C. Special Provisions ON THIS PROJECT SENSITIVE AREA(S) EXIST ENVIRONMENTALLY STANDARDS. SENSITIVE WATERSHED BEEN DESIGNED TO THIS PROJECT HAS End Begin CONSTRUCTION. GRUBBING PHASE OF FOR CLEARING AND EROSION CONTROL PLANS THIS PROJECT CONTAINS Andrew H. Cochrane, PE 3015 ENVIRONMENTAL QUALITY DIVISION OF WATER RESOURCES. AND ISSUED BY THE NORTH CAROLINA DEPARTMENT OF GENERAL CONSTRUCTION PERMIT EFFECTIVE APRIL 1, 2024 THE APPLICABLE REGULATIONS SET FORTH BY THE NCG-010000 THESE EROSION AND SEDIMENT CONTROL PLANS COMPLY WITH SHELBY, NC 28150 201 W. MARION ST-STE 200 20 401020 MADISON COUNTY TYPE OF WORK: GRADING, DRAINAGE, PAVING, AND STRUCTURE ON SR 1318 (BIG LAUREL RD) LOCATION: BRIDGE NO. 560152 OVER SPILLCORN CREEK BP13.R024 BP13.R024.1 BP13.R024.2 BP13.R024.3 N/A N/A N/A PE R/W & UTIL CONST. reference hereby are considered a part of these plans. and the latest revison thereto are applicable to this project and by Department of Transportation - Raleigh, N. C., dated January 2024 The "Roadway Standard Drawings"- Roadway Design Unit - N. C. Roadway Standard Drawings EROSION & SEDIMENT CONTROL LEGEND VICINITY MAP DOCUMENT NOT CONSIDERED FINAL GRADING, DRAINAGE, PAVING, AND STRUCTURE PRO JECT: BRIDGE #560152 OVER SPILLCORN CREEK DESIGN EXCEPTION IS REQUIRED FOR DESIGN SPEED D M 00427 IA-MASH TL-2 VICINITY MAP See Sheet 1A For Index of Sheets PRO JECT:BP13.R024 1434 1316 1316 1319 1318 1327 1328 1318 1329 1330 1318 1334 (212 (212 FIN AL PLAN S -L- SR 1318 BIG LAUREL RD SPILLCORN CREEK SPILLCORN CREEK (BARNES BRANCH RD) TO SR 1329 (SPILLCORN RD)TO SR 1330 BEGIN PROJECT -L- STA. 10+50.00 BEGIN PROJECT -L- STA. 14+50.00 -L- STA. 12+77.55 END BRIDGE -L- STA. 12+19.90 BEGIN BRIDGE 4 -DET- LOCATION PROJECT NAD 83/ 2011 Temporary Silt Ditch Temporary Diversion Temporary Silt Fence Special Sediment Control Fence Temporary Berms and Slope Drains Silt Basin Type B 1630.03 1630.05 1605.01 1606.01 1622.01 1630.02 1633.01 1633.02 1634.01 Description SymbolStd. # 1636.01 1636.02 Excelsior Matting and Flocculant 1633.03 A B C Stilling Basin Special Stilling Basin Skimmer Basin Tiered Skimmer Basin Infiltration Basin 1634.02 1635.01 1635.02 1630.04 1630.06 1632.01 1632.02 1632.03 Type A Type B Type C 1630.07 1630.08 1630.09 Earthen Dam with Skimmer 1636.03 Rock Inlet Sediment Trap: A B FCW EW 1636.01 1636.01 1636.01 1636.03 Description SymbolStd. # TSD TD Temporary Rock Silt Check Type A Temporary Rock Silt Check Type B Temporary Rock Silt Check Type A with Temporary Rock Sediment Dam Type A Temporary Rock Sediment Dam Type B Rock Pipe Inlet Sediment Trap Type A Rock Pipe Inlet Sediment Trap Type B CFW Coir Fiber Wattle Check CFW CFW EW EW EW Excelsior Wattle Check Silt Fence Coir Fiber Wattle Break Excelsior Wattle Barrier Coir Fiber Wattle Barrier Silt Fence Excelsior Wattle Break Coir Fiber Wattle Check with Flocculant Excelsior Wattle Check with Flocculant EC-02 PROJECT REFERENCE NO.SHEET NO. ENGINEER ROADWAY DESIGN HYDRAULICS ENGINEER DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA BP13.R024 EROSION & SEDIMENT CONTROL LEGEND STRUCTURE WITH LINER ONSITE CONCRETE WASHOUT A A BELOW GRADE WASHOUT STRUCTURE (TYP.) SIDE SLOPE 1:1 10 MIL PLASTIC LINING SECTION A-A NOT TO SCALE ABOVE GRADE WASHOUT STRUCTURE NOT TO SCALE PLAN SECTION B-B HIGH COHESIVE & LOW FILTRATION SOIL BERM 8" 6" 2'-0" HIGH COHESIVE & LOW FILTRATION SOIL BERM (TYP.) 1:1 SIDE SLOPE PLASTIC LINING 10 MIL B B A OR STAPLES SANDBAGS (TYP.) OR STAPLES SANDBAGS (TYP.) OR STAPLES SANDBAGS (TYP.) OR STAPLES SANDBAGS (TYP.) STRUCTURE WITH LINER ONSITE CONCRETE WASHOUT WASHOUT CONCRETE WASHOUT CONCRETE PLAN NOTING DEVICE (18"X24" MIN.) CLEARLY MARKED SIGNAGE NOTING DEVICE (18"X24" MIN.) CLEARLY MARKED SIGNAGE 10'-0" MIN. 10'-0" M IN. 10'-0" MIN. 10'-0" M IN. 3'-0" MIN. MIN. 3'-0" CLEARY MARKED WITH SIGNAGE NOTING DEVICE. 3.CONCRETE WASHOUT STRUCTURE NEEDS TO BE INCHES OF FREEBOARD. ADEQUATE HOLDING CAPACITY WITH A MINIMUM 12 75% OF THE STRUCTURES CAPACITY TO PROVIDE MAINTAINED WHEN THE LIQUID AND/OR SOLID REACHES 2. THE CONCRETE WASHOUT STRUCTURES SHALL BE 1. ACTUAL LOCATION DETERMINED IN FIELD NOTES: CLEARY MARKED WITH SIGNAGE NOTING DEVICE. 3.CONCRETE WASHOUT STRUCTURE NEEDS TO BE INCHES OF FREEBOARD. ADEQUATE HOLDING CAPACITY WITH A MINIMUM 12 75% OF THE STRUCTURES CAPACITY TO PROVIDE MAINTAINED WHEN THE LIQUID AND/OR SOLID REACHES 2. THE CONCRETE WASHOUT STRUCTURES SHALL BE 1. ACTUAL LOCATION DETERMINED IN FIELD NOTES: EC-2A HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. BP13.R024 SHEET NO.PROJECT REFERENCE NO. DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER BP13.R024 SITE DESCRIPTION SOIL STABILIZATION TIMEFRAMES STABILIZATION TIME 7 DAYS TIMEFRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITCHES AND SLOPES HIGH QUALITY WATER (HQW) ZONES 7 DAYS NONE SLOPES STEEPER THAN 3:1 7 DAYS IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED. NONE 14 DAYS 7 DAYS FOR SLOPES GREATER THAN 50' IN ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 EC-3 SLOPES 3:1 TO 4:1 LENGTH WITH SLOPES STEEPER THAN 4:1. 7 DAYS FOR PERIMETER DIKES, SWALES, DITCHES PERIMETER SLOPES, AND HQW ZONES 7 DAYS FOR PERIMETER DIKES, SWALES, DITCHES PERIMETER SLOPES, AND HQW ZONES 14 DAYS PI Sta 10+40.03 D L = 79.33' T = 40.03' R = 240.00' PI Sta 12+09.40 D L = 34.94' T = 17.75' R = 80.00' PI Sta 13+06.72 D L = 77.86' T = 42.33' R = 80.00' PI Sta 14+35.60 D L = 81.89' T = 41.30' R = 255.00' -L- CURVE DATA -L- PC 10+00.00 -L- PT 10+79.33 -L- PC 11+91.65 -L- PT 12+26.59 -L- PC 12+64.39 -L- PC 13+94.30 -L- PT 14+76.18 03 037 02 02 -L- STA 10+50.00 BEGIN PROJECT -L- STA 14+50.00 END PROJECT 9.6' 9.8' SE = EXISTSE = EXIST SE = NC SE = NC 022 022 018 01 02 R=25' SHOP CURVE TYPE-III AT-1 AT-1 R=15' SHOP CURVE TYPE-III AT-1 IA-MASH TL-2 -L- STA 12+19.90 BEGIN BRIDGE -L- STA 12+77.55 END BRIDGE PROP. ASPHALT DRIVE R=7' R=60' 10' 10' 10' 10' TO EXIST 50' TAPER + 65 TYP. 15' + 30.00 TYP.15' +35.00 TO EXIST50' TAPER + 00 9.6' 9.5' 8:1 8:1 8:1 END FDPS -L- 13+50.00 END FDPS -L- 11+85.80 BEGIN FDPS -L- 11+33.62 BEGIN FDPS -L- PT 13+42.25 02 02 01 R=10' SHOP CURVE B-83 + 15MILLING & RESURFACING ONLY MILLING & RESURFACING ONLY DS = < 15 MPH DS = < 15 MPH RIGHT OF WAY INSIDE PROPOSED NCDOT ALL OF ROCK FOUNDATION CONTRACTOR TO REMOVE 0.73 MI TO SR 1329 BARNES BRANCH RD. WOODS SR 1318 BIG LAUREL RD. 19' BST EXISTING R/W EXISTING R/W WOODS SECONDARY GROWTH 4SBW WOODS RK&CONC WW EXISTING R/W RK&CONC WW SR 1318 BIG LAUREL RD. 19' BST RK FOUNDATION WD RUINS EXISTING R/W EXISTING R/W 0.07 MI TO SR 1330 SPILLCORN RD. SECONDARY GROWTH LOW LINE ELEV=2063.89' MCKINLEY RICE ET AL WOODS WOODS SACRED MOUNTAIN WATERS, LLC 9' GR MTL 13' GR 18' ACCESS EASEMENT PER DB 140 PG 101 EXISTING R/W RK&CONC WW MTL WW 11.00' 14.00' 14.00' 11.00' 18.00' 14.00' 16.00' MCKINLEY RICE ET AL PATRICK HENNESSEY PATRICK HENNESSEY 1990 2000 2000 2000 2000 2000 2000 2000 2000 2000 20002000 2000 2000 2000 2010 2010 20102010 2010 2010 2010 2010 2010 2010 2010 2010 2020 2020 2020 2020 2020 2020 2020 2020 2020 2020 2020 2020 2030 2030 2030 2030 2030 2030 2030 2030 2030 2030 2030 2040 2040 2040 2040 2040 2040 2040 2040 2040 2040 2040 2050 2050 2050 2050 2050 2050 2050 2050 2050 2050 2050 2060 2060 2060 2060 2060 2060 2060 2060 2060 2060 2060 2060 2070 2070 2070 2070 2070 2070 2070 2070 2080 2080 2080 2080 2080 2080 2080 2090 2090 2090 2100 ITEM) (STRUCTURES RIPRAP (TYP.) CLASS II 1 2 2 1 EX. R/W +79.00 EX. R/W +79.00 33.00' +20.00 EX. R/W +62.00 EX. R/W +62.00 20.00' +24.00 64.00' +28.00 37.93' +50.00 28.00' +15.00 53.00' +75.00 43.00' +73.00 40.00' +40.00 C F F F F F F F F F F F F C C C FC C C F F F F C C C C F C C C HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. PRACTICES FOR CONSTRUCTION AND MAINTENANCE ACTIVITIES MANUAL. NCDOT BEST MANAGEMENTAREA STABILIZED AND ACCORDING TO INSTALL PIPE(S) IN JURISDICTIONAL AREAS WITHOUT IMPACTING STREAM UNTIL SEE PROJECT SPECIAL PROVISIONS ENVIRONMENTALLY SENSITIVE AREA NOTE: UTILIZE TEMPORARY SEDIMENT BASIN OR SPECIAL STILLING BASIN(S) AS STILLING BASIN WHERE APPLICABLE. CORP. LICENSE NO.: C-0275 PH (704) 476-0003 SHELBY, NC 28150 201 W. MARION ST-STE 200 TGS ENGINEERS NOTE: PLACE TEMPORARY ROCK SEDIMENT DAMS TYPE - B AND TEMPORARY ROCK SILT CHECKS TYPE - A AT DRAINAGE OUTLETS. NAD 83/2011 Bridge #560152 Madison County BP13.R024 EC-04/CONST.4 CONSTRUCTION SHEET 4 EROSION CONTROL FOR CLEARING AND GRUBBING SPILLCORN CREEK SPILLCORN CREEK WA -DET- PC 11+13.68 -DET- STA 13+14.10 END DETOUR -DET- STA 11+35.58 BEGIN DETOUR -DET- PT 10+79.33-DET- PT 10+79.33 -DET- PT 11+42.60 -DET- PC 14+06.40 12' 12' 02 0102 -DET- PC 12+97.99 -DET- PC 12+55.25 GREU TL-2 TEMP. GREU TL-2 TEMP BEAM GUARDRAIL TEMP. STEEL 10' TYP.+ 75 PROP. GRAVEL DRIVE CUSHION TEMP. CRASH TO 11+75±) (-DET- STA. 11+20± CONC. BARRIER TEMP. PORTABLE TO 13+65±) (-DET- STA. 12+75± CONC. BARRIER TEMP. PORTABLE 5' TO 12+75±) (-DET- STA. 11+75± (ANCHORED) CONC. BARRIER TEMP. PORTABLE 13+15±, 11'LT) (-DET- STA. 12+75±, 11'LT TO 12+75±, 11'LT) (-DET- STA. 11+87±, 11'LT TO TEMP. SHORING No. 1 & 2 -DET- PC 11+13.68 -DET- STA 13+14.10 END DETOUR -DET- STA 11+35.58 BEGIN DETOUR -DET- PT 10+79.33-DET- PT 10+79.33 -DET- PT 11+42.60 -DET- PC 14+06.40 12' 12' 02 0102 -DET- PC 12+97.99 -DET- PC 12+55.25 GREU TL-2 TEMP. GREU TL-2 TEMP BEAM GUARDRAIL TEMP. STEEL 10' TYP.+ 75 PROP. GRAVEL DRIVE CUSHION TEMP. CRASH TO 11+75±) (-DET- STA. 11+20± CONC. BARRIER TEMP. PORTABLE TO 13+65±) (-DET- STA. 12+75± CONC. BARRIER TEMP. PORTABLE 5' TO 12+75±) (-DET- STA. 11+75± (ANCHORED) CONC. BARRIER TEMP. PORTABLE 13+15±, 11'LT) (-DET- STA. 12+75±, 11'LT TO 12+75±, 11'LT) (-DET- STA. 11+87±, 11'LT TO TEMP. SHORING No. 1 & 2 WOODS SR 1318 BIG LAUREL RD. 19' BST EXISTING R/W EXISTING R/W WOODS SECONDARY GROWTH 4SBW WOODS RK&CONC WW EXISTING R/W RK&CONC WW SR 1318 BIG LAUREL RD. 19' BST RK FOUNDATION WD RUINS MCKINLEY RICE ET AL WOODS SACRED MOUNTAIN WATERS, LLC MTL 13' GR 18' ACCESS EASEMENT PER DB 140 PG 101 EXISTING R/W RK&CONC WW MTL WW 14.00' 18.00' 14.00' 16.00' PATRICK HENNESSEY PATRICK HENNESSEY WOODS SR 1318 BIG LAUREL RD. 19' BST EXISTING R/W EXISTING R/W WOODS SECONDARY GROWTH 4SBW WOODS RK&CONC WW EXISTING R/W RK&CONC WW SR 1318 BIG LAUREL RD. 19' BST RK FOUNDATION WD RUINS MCKINLEY RICE ET AL WOODS SACRED MOUNTAIN WATERS, LLC MTL 13' GR 18' ACCESS EASEMENT PER DB 140 PG 101 EXISTING R/W RK&CONC WW MTL WW 14.00' 18.00' 14.00' 16.00' PATRICK HENNESSEY PATRICK HENNESSEY TEMP 2@78" CSP 2B01 2B02 CONDITIONS. RESTORE STREAM TO PRECONSTRUCTION TEMPORARY FILL AND GEOTEXTILE AND AFTER DETOUR PHASE, REMOVE ALL EST=107 SY TEMPORARY FILL. INSTALL GEOTEXTILE IN STREAM UNDER TEMP 2@78" CSP 2B01 2B02 CONDITIONS. RESTORE STREAM TO PRECONSTRUCTION TEMPORARY FILL AND GEOTEXTILE AND AFTER DETOUR PHASE, REMOVE ALL EST=107 SY TEMPORARY FILL. INSTALL GEOTEXTILE IN STREAM UNDER F F F F F F F F F F F F F F F F HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. BP13.R024 EC-05/CONST.4 NAD 83/2011 NAD 83/2011 PHASE 2PHASE 1 PIPE CONSTRUCTION SEQUENCE STA. 12+31 -L- PIPE CONSTRUCTION SEQUENCE STA. 12+31 -L- P1 P1 P2 4. INSTALL TEMPORARY 78" DRAINAGE PIPE P1 PER NCDOT RDY STD. 1645.01. 3. DEWATER WORK SITE AS NEEDED INTO SPECIAL STILLING BASIN(S). 2. INSTALL IMPERVIOUS DIKE #1. 1. INSTALL TRAFFIC CONTROL DEVICES AND TEMPORARY PAVEMENT AS DESCRIBED ON TMP-2B-1. FINAL GRADE EROSION CONTROL. 5. COMPLETE DETOUR ROADWAY AND DIVERT TRAFFIC. SEE EC-06/CONST. 2B-1 FOR DETOUR 78" DRAINAGE PIPES. 4. REMOVE IMPERVIOUS DIKES #2 & #3, RESTORING FLOW THROUGH BOTH TEMPORARY 3. INSTALL TEMPORARY 78" DRAINAGE PIPE P2 PER NCDOT RDY STD. 1645.01. 2. INSTALL IMPERVIOUS DIKES #2 & #3, DIVERTING FLOW THRU TEMPORARY 78" DRAINAGE PIPE P1. 1. REMOVE IMPERVIOUS DIKE #1. SPILLCORN CREEK SPILLCORN CREEK WA SPILLCORN CREEK SPILLCORN CREEK WA DIKE #1 IMPERVIOUS DIKE #3 IMPERVIOUS DIKE #2 IMPERVIOUS -DET- PC 11+13.68 -DET- STA 13+14.10 END DETOUR -DET- STA 11+35.58 BEGIN DETOUR -DET- PT 10+79.33-DET- PT 10+79.33 -DET- PT 11+42.60 -DET- PC 14+06.40 12' 12' 02 0102 -DET- PC 12+97.99 -DET- PC 12+55.25 GREU TL-2 TEMP. GREU TL-2 TEMP BEAM GUARDRAIL TEMP. STEEL 10' TYP.+ 75 PROP. GRAVEL DRIVE CUSHION TEMP. CRASH TO 11+75±) (-DET- STA. 11+20± CONC. BARRIER TEMP. PORTABLE TO 13+65±) (-DET- STA. 12+75± CONC. BARRIER TEMP. PORTABLE 5' TO 12+75±) (-DET- STA. 11+75± (ANCHORED) CONC. BARRIER TEMP. PORTABLE 13+15±, 11'LT) (-DET- STA. 12+75±, 11'LT TO 12+75±, 11'LT) (-DET- STA. 11+87±, 11'LT TO TEMP. SHORING No. 1 & 2 -L- PT 10+79.33 -L- PC 11+91.65 -L- PT 12+26.59 -L- PC 12+64.39 -L- PC 13+94.30 03 037 02 02 -L- STA 10+50.00 BEGIN PROJECT 9.6' 9.8'022 022 018 01 02 R=25' SHOP CURVE TYPE-III AT-1 AT-1 R=15' SHOP CURVE TYPE-III AT-1 IA-MASH TL-2 -L- STA 12+19.90 BEGIN BRIDGE -L- STA 12+77.55 END BRIDGE PROP. ASPHALT DRIVE R=7' R=60' 10' 10' 10' 10' TO EXIST 50' TAPER + 65 TYP. 15' + 30.00 TYP.15' +35.00 TO EXIST50' TAPER + 00 9.6' 9.5' 8:1 8:1 8:1 END FDPS -L- 13+50.00 END FDPS -L- 11+85.80 BEGIN FDPS -L- 11+33.62 BEGIN FDPS -L- PT 13+42.25 02 02 01 R=10' SHOP CURVE B-83 + 15MILLING & RESURFACING ONLY RIGHT OF WAY INSIDE PROPOSED NCDOT ALL OF ROCK FOUNDATION CONTRACTOR TO REMOVE -L- PT 10+79.33 -L- PC 11+91.65 -L- PT 12+26.59 -L- PC 12+64.39 -L- PC 13+94.30 03 037 02 02 -L- STA 10+50.00 BEGIN PROJECT 9.6' 9.8'022 022 018 01 02 R=25' SHOP CURVE TYPE-III AT-1 AT-1 R=15' SHOP CURVE TYPE-III AT-1 IA-MASH TL-2 -L- STA 12+19.90 BEGIN BRIDGE -L- STA 12+77.55 END BRIDGE PROP. ASPHALT DRIVE R=7' R=60' 10' 10' 10' 10' TO EXIST 50' TAPER + 65 TYP. 15' + 30.00 TYP.15' +35.00 TO EXIST50' TAPER + 00 9.6' 9.5' 8:1 8:1 8:1 END FDPS -L- 13+50.00 END FDPS -L- 11+85.80 BEGIN FDPS -L- 11+33.62 BEGIN FDPS -L- PT 13+42.25 02 02 01 R=10' SHOP CURVE B-83 + 15MILLING & RESURFACING ONLY RIGHT OF WAY INSIDE PROPOSED NCDOT ALL OF ROCK FOUNDATION CONTRACTOR TO REMOVE WOODS SR 1318 BIG LAUREL RD. 19' BST EXISTING R/W EXISTING R/W WOODS SECONDARY GROWTH 4SBW WOODS RK&CONC WW EXISTING R/W RK&CONC WW SR 1318 BIG LAUREL RD. 19' BST RK FOUNDATION WD RUINS MCKINLEY RICE ET AL WOODS SACRED MOUNTAIN WATERS, LLC MTL 13' GR 18' ACCESS EASEMENT PER DB 140 PG 101 EXISTING R/W RK&CONC WW MTL WW 14.00' 18.00' 14.00' 16.00' PATRICK HENNESSEY PATRICK HENNESSEY WOODS SR 1318 BIG LAUREL RD. 19' BST EXISTING R/W EXISTING R/W WOODS SECONDARY GROWTH 4SBW WOODS RK&CONC WW EXISTING R/W RK&CONC WW SR 1318 BIG LAUREL RD. 19' BST RK FOUNDATION WD RUINS MCKINLEY RICE ET AL WOODS SACRED MOUNTAIN WATERS, LLC MTL 13' GR 18' ACCESS EASEMENT PER DB 140 PG 101 EXISTING R/W RK&CONC WW MTL WW 14.00' 18.00' 14.00' 16.00' PATRICK HENNESSEY PATRICK HENNESSEY TEMP 2@78" CSP 2B01 2B02 CONDITIONS. RESTORE STREAM TO PRECONSTRUCTION TEMPORARY FILL AND GEOTEXTILE AND AFTER DETOUR PHASE, REMOVE ALL EST=107 SY TEMPORARY FILL. INSTALL GEOTEXTILE IN STREAM UNDER ITEM) (STRUCTURES RIPRAP (TYP.) CLASS II ITEM) (STRUCTURES RIPRAP (TYP.) CLASS II F F F F F F F F C F F F F F F F F F F F F C C C FC C C F F F F C C C C F C C C C F F F F F F F F F F F F C C C FC C C F F F F C C C C F C C C HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. BP13.R024 EC-05A/CONST.4 NAD 83/2011 NAD 83/2011 PHASE 3 PHASE 4 4. COMPLETE ROADWAY AND SHIFT TRAFFIC FROM DETOUR. 3. REMOVE IMPERVIOUS DIKES #4 & #5. 2. REMOVE EXISTING BRIDGE AND CONSTRUCT PROPOSED BRIDGE. 1. INSTALL IMPERVIOUS DIKES #4 & #5. PIPE CONSTRUCTION SEQUENCE STA. 12+31 -L- P2 P1 STREAM ACCORDING TO CONST. PLANS. 2. COMPLETE ANY NECESSARY INLET/OUTLET CHANNEL IMPROVEMENTS AND REESTABLISH 1. DISPOSE OF TEMPORARY 78" DRAINAGE PIPES AS DESCRIBED IN DRAINAGE PLANS. SPILLCORN CREEK SPILLCORN CREEK WA SPILLCORN CREEK SPILLCORN CREEK WA DIKE #4 IMPERVIOUS DIKE #5 IMPERVIOUS -DET- CURVE DATA PI Sta 10+40.03 D L = 79.33' T = 40.03' R = 240.00' PI Sta 11+28.35 D L = 28.92' T = 14.67' R = 70.00' PI Sta 12+78.39 D L = 42.74' T = 23.13' R = 45.00' PI Sta 14+47.70 D L = 81.89' T = 41.30' R = 255.00' -DET- PC 11+13.68 -DET- STA 13+14.10 END DETOUR -DET- STA 11+35.58 BEGIN DETOUR -DET- PT 10+79.33-DET- PT 10+79.33 10+00 -DET- PT 11+42.60 -DET- PT 14+88.28 -DET- PC 14+06.40 12' 12' 02 0102 -DET- PC 12+97.99 -DET- PC 12+55.25 GREU TL-2 TEMP. GREU TL-2 TEMP BEAM GUARDRAIL TEMP. STEEL 10' TYP.+ 75 PROP. GRAVEL DRIVE CUSHION TEMP. CRASH TO 11+75±) (-DET- STA. 11+20± CONC. BARRIER TEMP. PORTABLE TO 13+65±) (-DET- STA. 12+75± CONC. BARRIER TEMP. PORTABLE 5' TO 12+75±) (-DET- STA. 11+75± (ANCHORED) CONC. BARRIER TEMP. PORTABLE 13+15±, 11'LT) (-DET- STA. 12+75±, 11'LT TO 12+75±, 11'LT) (-DET- STA. 11+87±, 11'LT TO TEMP. SHORING No. 1 & 2 0.73 MI TO SR 1329 BARNES BRANCH RD. WOODS SR 1318 BIG LAUREL RD. 19' BST EXISTING R/W EXISTING R/W WOODS SECONDARY GROWTH 4SBW WOODS RK&CONC WW EXISTING R/W RK&CONC WW SR 1318 BIG LAUREL RD. 19' BST RK FOUNDATION WD RUINS EXISTING R/W EXISTING R/W 0.07 MI TO SR 1330 SPILLCORN RD. SECONDARY GROWTH LOW LINE ELEV=2063.89' MCKINLEY RICE ET AL WOODS WOODS SACRED MOUNTAIN WATERS, LLC 9' GR MTL 13' GR 18' ACCESS EASEMENT PER DB 140 PG 101 EXISTING R/W RK&CONC WW MTL WW 11.00' 14.00' 14.00' 11.00' 18.00' 14.00' 16.00' MCKINLEY RICE ET AL PATRICK HENNESSEY PATRICK HENNESSEY TEMP 2@78" CSP 2B01 2B02 CONDITIONS. RESTORE STREAM TO PRECONSTRUCTION TEMPORARY FILL AND GEOTEXTILE AND AFTER DETOUR PHASE, REMOVE ALL EST=107 SY TEMPORARY FILL. INSTALL GEOTEXTILE IN STREAM UNDER 1 2 2 1 EX. R/W +79.00 EX. R/W +79.00 33.00' +20.00 EX. R/W +62.00 EX. R/W +62.00 20.00' +24.00 64.00' +28.00 37.93' +50.00 28.00' +15.00 53.00' +75.00 43.00' +73.00 40.00' +40.00 F F F F F F F F HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. CORP. LICENSE NO.: C-0275 PH (704) 476-0003 SHELBY, NC 28150 201 W. MARION ST-STE 200 TGS ENGINEERS NAD 83/2011 Bridge #560152 Madison County BP13.R024 DETOUR APPROPRIATE FOR FINAL DETOUR PHASE. PROTECTION FROM EC-04/CONST.4 AS MAINTAIN EROSION CONTROL PERIMETER -L- -DET- EC-06/CONST.2B-1 EST. 201 SY -DET- Sta. 11+50 to 12+50 RT Control on Slope as Work Allows. Place Coir Fiber Matting for Erosion SPILLCORN CREEK SPILLCORN CREEK WA PI Sta 10+40.03 D L = 79.33' T = 40.03' R = 240.00' PI Sta 12+09.40 D L = 34.94' T = 17.75' R = 80.00' PI Sta 13+06.72 D L = 77.86' T = 42.33' R = 80.00' PI Sta 14+35.60 D L = 81.89' T = 41.30' R = 255.00' -L- CURVE DATA -L- PC 10+00.00 -L- PT 10+79.33 -L- PC 11+91.65 -L- PT 12+26.59 -L- PC 12+64.39 -L- PC 13+94.30 -L- PT 14+76.18 03 037 02 02 -L- STA 10+50.00 BEGIN PROJECT -L- STA 14+50.00 END PROJECT 9.6' 9.8' SE = EXISTSE = EXIST SE = NC SE = NC 022 022 018 01 02 R=25' SHOP CURVE TYPE-III AT-1 AT-1 R=15' SHOP CURVE TYPE-III AT-1 IA-MASH TL-2 -L- STA 12+19.90 BEGIN BRIDGE -L- STA 12+77.55 END BRIDGE PROP. ASPHALT DRIVE R=7' R=60' 10' 10' 10' 10' TO EXIST 50' TAPER + 65 TYP. 15' + 30.00 TYP.15' +35.00 TO EXIST50' TAPER + 00 9.6' 9.5' 8:1 8:1 8:1 END FDPS -L- 13+50.00 END FDPS -L- 11+85.80 BEGIN FDPS -L- 11+33.62 BEGIN FDPS -L- PT 13+42.25 02 02 01 R=10' SHOP CURVE B-83 + 15MILLING & RESURFACING ONLY MILLING & RESURFACING ONLY DS = < 15 MPH DS = < 15 MPH RIGHT OF WAY INSIDE PROPOSED NCDOT ALL OF ROCK FOUNDATION CONTRACTOR TO REMOVE 0.73 MI TO SR 1329 BARNES BRANCH RD. WOODS SR 1318 BIG LAUREL RD. 19' BST EXISTING R/W EXISTING R/W WOODS SECONDARY GROWTH 4SBW WOODS RK&CONC WW EXISTING R/W RK&CONC WW SR 1318 BIG LAUREL RD. 19' BST RK FOUNDATION WD RUINS EXISTING R/W EXISTING R/W 0.07 MI TO SR 1330 SPILLCORN RD. SECONDARY GROWTH LOW LINE ELEV=2063.89' MCKINLEY RICE ET AL WOODS WOODS SACRED MOUNTAIN WATERS, LLC 9' GR MTL 13' GR 18' ACCESS EASEMENT PER DB 140 PG 101 EXISTING R/W RK&CONC WW MTL WW 11.00' 14.00' 14.00' 11.00' 18.00' 14.00' 16.00' MCKINLEY RICE ET AL PATRICK HENNESSEY PATRICK HENNESSEY ITEM) (STRUCTURES RIPRAP (TYP.) CLASS II 1 2 2 1 EX. R/W +79.00 EX. R/W +79.00 33.00' +20.00 EX. R/W +62.00 EX. R/W +62.00 20.00' +24.00 64.00' +28.00 37.93' +50.00 28.00' +15.00 53.00' +75.00 43.00' +73.00 40.00' +40.00 C F F F F F F F F F F F F C C C FC C C F F F F C C C C F C C C EC-07/CONST.4 WILL NOT BE PLATED WITH STONE. EXPOSED SOIL UNDER BRIDGE WHICH PLACE COIR FIBER MATTING ON WILL NOT BE PLATED WITH STONE. EXPOSED SOIL UNDER BRIDGE WHICH PLACE COIR FIBER MATTING ON EST. 142 SY -L- Sta. 11+25 to 12+20 RT Control on Slope as Work Allows. Place Straw Matting for Erosion EST. 117 SY -L- Sta. 12+78 to 13+25 LT Control on Slope as Work Allows. Place Straw Matting for Erosion HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. NOTE: UTILIZE TEMPORARY SEDIMENT BASIN OR SPECIAL STILLING BASIN(S) AS STILLING BASIN WHERE APPLICABLE. CORP. LICENSE NO.: C-0275 PH (704) 476-0003 SHELBY, NC 28150 201 W. MARION ST-STE 200 TGS ENGINEERS NAD 83/2011 Bridge #560152 Madison County BP13.R024 EC-04/CONST.4 SPILLCORN CREEK SPILLCORN CREEK WA STATE STATE PROJECT REFERENCE NO. STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION NO. TOTAL SHEETS SHEET HEALING IN DIBBLE PLANTING METHOD firming soil at top. 5. Push handle forward PLANTING NOTES: N.C.D.O.T. - ROADSIDE ENVIRONMENTAL UNIT protected area. 1. Locate a healing-in site in a shady, well the root collar is at ground level. against the sloping end so that 4. Place a single layer of plants as necessary and water thoroughly. 6. Repeat layers of plants and sawdust correct depth. and place seedling at 2. Remove planting bar USING THE KBC PLANTING BAR SEEDLING / LINER BAREROOT PLANTING DETAIL PLANTING DETAILS MIXTURE, TYPE, SIZE, AND FURNISH SHALL CONFORM TO THE FOLLOWING: toward planter. as shown and pull handle 1. Insert planting bar root systems from drying. container to prevent the canvas bag or similar shall be kept in a moist During planting, seedlings PLANTING BAG soil at bottom. toward planter, firming 4. Pull handle of bar thoroughly. hole open. Water 6. Leave compaction 12 inches deep and provide drainage. 2. Excavate a flat bottom trench a sloping angle. sawdust over the roots maintaining 5. Place a 2 inch layer of well rotted at one end of the trench. well rotted sawdust at a sloping angle rotted sawdust. Place a 2 inch layer of 3. Backfill the trench with 2 inches well 2 inch from seedling. 2 inches toward planter 3. Insert planting bar 1 inch thick at center. 4 inches wide and be 12 inches long, cross section, and shall blade with a triangular Planting bar shall have a KBC PLANTING BAR root collar. 10 inches below the no roots extend more than pruned, if necessary, so that All seedlings shall be root ROOT PRUNING REFORESTATION AVERAGING 8 FT. ON CENTER, APPROXIMATELY 680 PLANTS PER ACRE. TREE REFORESTATION SHALL BE PLANTED 6 FT. TO 10 FT. ON CENTER, RANDOM SPACING, REFORESTATION REFORESTATION DETAIL SHEET RF-1BP13.R024N.C. 25% NYSSA SYLVATICA 25% BETULA NIGRA 25% PLATANUS OCCIDENTALIS 25% LIRIODENDRON TULIPIFERA BLACK GUM RIVER BIRCH SYCAMORE TULIP POPLAR 12 in - 18 in BR 12 in - 18 in BR 12 in - 18 in BR 12 in - 18 in BR