Loading...
HomeMy WebLinkAboutBP11.R039 FSM Worksheet NORTH CAROLINA DEPARTMENT OF TRANSPORTATION FIELD SCOPING MEETING WORKSHEET   TIP No.: N/A FIELD SCOPING MEETING DATE:  May 23, 2024      DIVISION: 11 LOCATION: On-Site  COUNTY: Wilkes ROUTE (US / NC / SR): SR 2035  PROJECT DESCRIPTION: Replace Bridge #960236 on SR 2035 over branch Elkin River in Wilkes County  FUNCTIONAL CLASSIFICATION: Local  TIER: Sub-Regional Tier  MPO / RPO AREA: Northwest Piedmont RPO  MUNICIPALITY: N/A   ATTENDEES  NAME (PRINT)  PHONE No  E-MAIL  DIVISION CONSTRUCTION ENGINEER                    AREA BRIDGE CONSTRUCTION ENGINEER                    DIVISION BRIDGE PROGRAM MANAGER                    DIVISION UTILITY COORDINATOR                    DIVISION ENVIRONMENTAL OFFICER                    DIVISION RIGHT OF WAY REPRESENTATIVE                    HYDRAULICS REPRESENTATIVE                    GEOTECHNICAL REPRESENTATIVE                    STRUCTURE DESIGN REPRESENTATIVE                    STEWART                    STEWART                    STEWART                    SUNGATE                    SUNGATE                    VHB                     DIVISION (COMPLETED BY DIVISION STAFF AND SENT WITH THE FSM LETTER) EXISTING FEATURES FEATURE BRIDGED:         (BRIDGE / CULVERT) LENGTH      ’ DECK WIDTH (OUT TO OUT)      ’   WATER DEPTH:      ’ HEIGHT BED-TO-CROWN:      ’   PRIOR SURVEY DATE:       POSTED: SV       TTST:         STRUCTURE TYPE:          SPAN TYPE:          SUFFICIENCY RATING:          POSTED SPEED LIMIT IN PROJECT VICINITY:       (MPH / STATUTORY 55MPH)   DETOUR: OFF-SITE  ON-SITE  STAGE CONSTRUCTION    IF DETOUR IS OFF-SITE, PROVIDE DESCRIPTION OF DETOUR ROUTE          APPROXIMATE LENGTH OF DETOUR?       (MILES)    IMPROVEMENTS NEEDED TO ROAD ON DETOUR?          IMPROVEMENTS NEEDED TO BRIDGES ON DETOUR?          ARE BRIDGES ON DETOUR CURRENTLY PROGRAMMED ON TIP?  COMMENTS:          ARE THERE EMS, SCHOOL , OR BUSINESS ACCESS ISSUES?  COMMENTS:          ARE THERE ANY RAILROAD CROSSINGS ON DETOUR?  COMMENTS:          SHOULD WORK ZONE PEDESTRIAN ACCESS BE MAINTAINED DURING CONSTRUCTION?  REASONS:          IMPACT RATING TO UTILITIES     OVERHEAD UTILITY LINES  IN CONFLICT     POWER TRANSMISSION LINES  IN CONFLICT     TELEPHONE / CABLE LINES  IN CONFLICT     FIBER OPTIC  IN CONFLICT     WATER  IN CONFLICT     SEWER  IN CONFLCIT     NATURAL GAS  IN CONFLICT     OTHER       IN CONFLICT     BASED ON THE PAST HISTORY NEAR THIS PROJECT SITE, WHAT IS THE ESTIMATED TIME REQUIRED TO COMPLETE UTILITY ADJUSTMENTS      MONTHS    IS THERE ANY FUTURE UTILITY CONSTRUCTION ANTICIPATED IN THE PROJECT AREA     IS A FEMA BUY-OUT PROPERTY BEING IMPACTED     HYDRAULICS UNIT (COMPLETED BY HYDRAULICS UNIT STAFF PRIOR TO THE FSM) WILL THIS PROJECT REQUIRE A FEMA PERMIT?   IS THERE UNUSUAL SCOUR POTENTIAL?  IS PROTECTION NEEDED?   ARE BANKS STABLE?  IS PROTECTION NEEDED?   DOES STREAM CARRY APPRECIABLE AMOUNT OF LARGE DEBRIS?   WILL THE PLACEMENT OF BENTS IN THE WATER BE ALLOWED  COMMENTS        WERE HYDRAULIC ALTERNATIVES BESIDES A BRIDGE CONSIDERED  COMMENTS        POSSIBLE SPAN LAYOUT:         GEOTECHNICAL UNIT (COMPLETED BY GEOTECHNICAL UNIT PRIOR TO THE FSM) EXISTING FOUNDATION REPORTS?  IF SO, ATTACH.  KNOWN GEOLOGICAL FEATURES IN AREA WHICH MAY AFFECT DESIGN        ARE PERMITS NEEDED FOR INVESTIGATIVE WORK AT SITE  COMMENTS:        ARE THERE ANY HISTORICAL AND / OR VIBRATION SENSITIVE STRUCTURES NEAR BY  COMMENTS:        ARE THERE ANY KNOWN LANDFILLS AND / OR GEOENVIRONMENTAL HAZARD SITES AT OR WITHIN CLOSE PROXIMITY TO THE PROJECT SITE  COMMENTS:        DEPTH OF WEATHERED ROCK OR ROCK BELOW STREAMBED       ( FT. )  ARE ANY IMPACTS ANTCIPATED TO NATURAL SPRINGS OR ARTESIAN WELLS  COMMENTS:        POSSIBLE FOUNDATION TYPE:      .   PD & EA AND NEU UNIT (COMPLETED BY PDEA STAFF PRIOR TO THE FSM) TRAFFIC FORECAST (AS PREPARED BY TRANSPORTATION PLANNING BRANCH AND PROVIDED BY PDEA)  Accident History:       -L- BASE YEAR (20   )  ANNUAL AVERAGE DAILY TRAFFIC        % TRUCKS/DUALS        -L- DESIGN YEAR (20   ) ANNUAL AVERAGE DAILY TRAFFIC        % TRUCKS/DUALS        SHOW -Y-LINE TRAFFIC IF APPLICABLE FOR BRIDGES OVER / UNDER.  -Y- BASE YEAR (20   ) ANNUAL AVERAGE DAILY TRAFFIC        % TRUCKS/DUALS        -Y- DESIGN YEAR (20   ) ANNUAL AVERAGE DAILY TRAFFIC        % TRUCKS/DUALS        TRAFFIC SAFETY (AS PREPARED BY THE TRAFFIC SAFETY UNIT AND PROVIDED BY PDEA) OPERATING SPEED:       MPH CRASH RATE:       WETLANDS AT SITE  COMMENTS:         KNOWN ENDANGERED SPECIES POPULATIONS IN AREA  COMMENTS:        TROUT OR TVA COUNTY  COMMENTS:        CAMA COUNTY  PRIMARY NURSERY AREA   MORATORIA  IF YES-DURATION        COMMENTS:         IS WATER FEATURE CLASSIFIED AS A WILD AND SCENIC RIVER  COMMENTS:        WHAT IS THE WATER QUALITY CLASSIFICATION FOR THIS PROJECT:        WILL A COAST GUARD PERMIT BE REQUIRED  COMMENTS:        IS THE PROJECT SITE IN OR NEAR ANY OF THE FOLLOWING:   NATIONAL FOREST    WILDLIFE REFUGE    STATE, COUNTY, OR LOCAL PARK    AIRPORT    A LAKE FOR RECREATION OR POWER GENERATION    WATER SUPPLY RESERVOIR    NUTRIENT SENSITIVE WATERS    PUBLIC USE BOAT RAMP    CEMETARIES   WILL A FEDERAL ENERGY REGULATORY COMMISSION PERMIT BE REQUIRED   IS THE PROJECT AREA KNOWN FOR POTENTIAL INDIAN, COLONIAL, OR OTHER ARCHAEOLOGICAL SITES    KNOWN OR POTENTIAL HISTORIC PROPERTIES IN THE AREA   IS THE BRIDGE STRUCTURE ITSELF, OR ANY PART THEREOF, CONSIDERED HISTORIC   WILL THE PROJECT IMPACT A CHURCH, COMMUNITY CENTER, OR OTHER PUBLIC FACILITY   IS THIS PROJECT ON A STATEWIDE BICYCLE ROUTE OR A LOCAL NON-MARKED BICYCLE ROUTE   ANY CLARIFICATION OR COMMENTS ON ITEMS ABOVE:         ROADWAY DESIGN UNIT (COMPLETED BY ROADWAY DESIGN UNIT PRIOR TO FSM)  ALIGNMENT: EXISTING HORIZONTAL    EXISTING VERTICAL   POSSIBLE DESIGN STANDARDS        POSSIBLE DESIGN SPEED       (MPH)  POSSIBLE DESIGN EXCEPTIONS  COMMENT        APPROXIMATE PROJECT LENGTH      ’ NUMBER AND WIDTH OF LANES        SHOULD THIS PROJECT HAVE CURB AND GUTTER OR SHOULDER APPROACHES  COMMENT        TOTAL SHOULDER WIDTH      ’ PAVED SHOULDER WIDTH      ’  CLEAR ROADWAY ON STRUCTURE        WILL EXISTING DRIVEWAYS, BUSINESS ACCESS, -Y- LINES OR RAMPS NEED TO BE RELOCATED  COMMENTS:  IS THERE ADDITIONAL RIGHT OF WAY / PERMANENT EASEMENTS / TEMPORARY EASEMENTS ANTICIPATED FOR CONSTRUCTION  COMMENT       ARE ANY RETAINING WALLS ANTICIPATED   IS THERE A POSSIBILITY OF RELOCATEES  IF SO, DESCRIBE        ADDITIONAL COMMENTS:         STRUCTURE DESIGN UNIT (COMPLETED BY THE STRUCTURE DESIGN UNIT PRIOR TO THE FSM)  POSSIBLE SUPERSTRUCTURE:   TYPE:         NUMBER OF SPANS       LENGTH OF SPANS        WILL RAILROAD INVOLVEMENT BE REQUIRED   WILL STRUCTURE REQUIRE DESIGN FOR VESSEL IMPACT OR FENDER SYSTEM  DESCRIPTION:       ARE ANY RETAINING WALLS ANTICIPATED    CONSTRUCTABILITY AND ACCESS (DISCUSSED AT THE FSM BY DIVISION BRIDGE MANAGER)  METHOD OF ACCESS:        TOP-DOWN   (WORK BRIDGE / CAUSEWAY) PROPOSED LOCATION RELATIVE TO EXISTING STRUCTURE: Work Bridge  PROPOSED LENGTH       (FT) WIDTH       (FT)  MATERIAL AND EQUIPMENT ACCESS TO SITE:  TRACTOR-TRAILER ACCESS  BARGE ACCESS  HEAVY EQUIPMENT ACCESS   POSTED ROADS AND POSTED BRIDGES IN VICINITY THAT MAY AFFECT ACCESS   ARE CONSTRUCTION STAGING AREAS AVAILABLE NEAR SITE  ANY ANTICIPATED AREAS OF TEMPORARY SHORING REQUIRED   ADDITIONAL COMMENTS:        ITEMS TO BE DISCUSSED / RESOLVED AT FSM BY ATTENDEES LIST ALTERNATIVES TO BE STUDIED BY ROADWAY DESIGN: 1) 2) 3) DESCRIBE ANY DISCUSSION REGARDING HOW THE ALTERNATIVES WERE DECIDED UPON, WHY CERTAIN ALTERANTIVES WERE REJECTED, AND IF AN ALTERNATIVE WAS SELECTED, WHY.        CHECK ONE  TYPE OF ENVIRONMENTAL DOCUMENT (CHECK ONE)  CATEGORICAL EXCLUSION (CE)   MINIMUM CRITERIA DETERMINATION CHECKLIST (MCDC)   THE OPTIMUM LET DATE FOR THIS PROJECT IS:        ADDITIONAL COMMENTS AND/OR UNRESOLVED ISSUES TO BE ADDRESSED: