Loading...
HomeMy WebLinkAboutWQCS00179_Notification of Collection Rehab_20230807 (2) 0—"t TEa� ROY COOPER 4 _ Governor a2 ELIZABETH S.BISER ` Secretary SHADI ESKAF NORTH CAROLINA Director Environmental Quality July 28, 2023 Mr. Christopher Doherty, Public Utilities Director Franklin County 1630 US Hwy 1 Youngsville,NC 27593 Subject: Final Inspection Report Franklin County Franklinton SS Pump Station Rehabs Project No. E-SRP-W-18-0155 Dear Mr. Doherty: The Division of Water Infrastructure performed a final inspection for the subject project on July 7, 2023. The project was substantially complete on May 17, 2023, and expected to be finally complete on August 31, 2023. This letter and attachments should be filed with the other project documents in your possession. If you have any questions or comments, please contact me at (919) 707-9159 or by email at bashar.al-masri@deq.nc.gov. Sincerely, Bashar Al-Masri Project Manager Attachments cc: Gary Flowers, PE, Municipal Engineering, Inc., (via email: gflowers@mesco.com) Vincent Tomaino, PE, Municipal Engineering, Inc. (via email: vtomaino@mesco.com) Antonio V Evans, PE (via email) Mark Hubbard, PE (via email) Bashar Al-Masri (via email) SRP (I/FIR) D E Q�� North Carolina Department of Environmental Quality I Division of Water Infrastructure e::�5—` 512 N.Salisbury Street 1 1633 Mail Service Center I Raleigh,North Carolina 27699-1633 NOW H CAR-NA o.wrun.m m Emlmnm l a.\ /`� 919.707.9160 Franklin County Franklinton SS Pump Station Rehabs Project No. E-SRP-W-18-0155 Inspection Date: July 7, 2023 Page 2 of 3 Final Inspection Report I. Funding Administration The project was funded through a state loan. The loan amount is $1,428,871 with a 0% interest rate and a 20-year term. Construction was scheduled to be complete and interest began accruing on June 16, 2023. II. General comments, action items and follow up from previous inspection. 1- All works associated with this project and the relevant change orders were found to have been completed satisfactorily. A few remaining punch list items are being addressed by the contractor. 2- Change order No.2 and Final Adjusting Change Order(No. 3) are expected to be submitted to DWI soon to determine their eligibility for reimbursement. III.Disbursements Loan $1,428,871 Cumulative No. Date Disbursement Amount % 1 12/5/2022 478,448 478,448 33% 2 2/14/2023 342,114 820,562 57% 3 5/5/2023 384,0541 1,204,616 84% Total 1 1,204,616 1,204,616 84% Balance 1 224,255 Franklin County Franklinton SS Pump Station Rehabs Project No. E-SRP-W-18-0155 Inspection Date: July 7, 2023 Page 3 of 3 IV.Change Orders Summary Contract Contract Contract Eligible Duration Completion Amount Total Amount (days) Date Notice to Proceed 9/19/2022 Original Contract 1,079,160.00 1,079,160.00 Original Contract 270 6116/2023 Change Order No 1 8,694.00 8,694.00 Additional Time 0 6/16/2023 New Contract 1,087,854.00 1.087.854.00 New Contract 270 6i16,2023 Amount Completion V. Attachments Draft Closeout Checklist (completed up to final inspection date) Engineer's Meeting Minutes Division of Water Infrastructure ' Project Closeout Checklist Owner: C144OL4 1` L, V � Project No.: Project Name: b na, Owner certifies that the following checked-off items have been received* or have occurred (put N/A if not applicable). Do not submit items 1-13 to DWI: 1. As-Built/Record Drawings (certified/sealed) 2. O&M Manuals 3. Test Reports: pipe/pressure tests recorded, concrete, compaction, etc. 4. Field Notes from the designated Construction Observer (often called "daily logs") 5. Approved Shop Drawings and Submittals 6. Warranty Information (both from contractor and manufacturers of equipment) 7. Release of Liens & Consent of Surety to Final Payment from contractor 8. Spare Parts Inventory and List (i.e., spare parts normally provided gratis by manufacturers) 9. Training sessions completed 10. Release/Approval from NC-DOT and/or Rail Roads 11. Contact DEQ Regional Office to inform them of facility startup n!/4 12. Davis-Bacon certified payrolls, complete ' `/ ' 13. AIS manufacturers certifications, complete Authorized Representative (Print) Authorized Representative (Signature) Date Submit the following to the attention of the appropriate DWI staff, as indicated: To the construction inspector for this project: 14. Final adjusting change order (must match final reimbursement request) To the accountant for this project: (DWI.BusinessOffice@ncdenr.gov) 15. Final reimbursement request and supporting invoices, plus final sales tax report To Pam Whitley: 16. This Project Closeout Checklist, signed & dated by the Authorized Representative 17. DWI's Owner's Certification of Completion (Form on website**) 18. DWI's Engineer's Certification (Form on website**) h 11A 19. Clear Site/Easement Certification (a) by Owner& (b) by Owner's Counsel, if changes were 77— made 20. Fiscal Sustainability Plan Certification (CWSRF only) *Document format,whether electronic, hard copy, or combination, is left up to the Owner. **Website with forms: https://deg.nc.gov/about/divisions/water-infrastructure/i-have-funding/construction rei m bursem ent#srf-and-state-reserve-forms Revised 9/24/2021 JNIC/p� 28 J UN E 2023 9 T H M O N T H L Y P R O G R E S S 1 � M E E T I N G M I N U T E S 68 Shipwash Drive Garner,North Carolina 27529 919.772.5393 tel. 919.772.1176 fax PROJECT: Franklin County Public Utilities/ Franklinton Pump Station Rehabilitations DATE: 28 June 2023 TIME: 10:00 am—noon LOCATION: Met at the Franklin County Public Utilities Business Office, 1630 US 1 Hwy, Youngsville, NC 27596 -- Toured the Pump stations after brief standup meeting Google Meet joining info: Video call link: https://meet.google.com/nnf-meao-ain (active only until we start the walkthrough) Dial: (US)+1 651-571-1425 PIN: 613 521 536# More phone numbers: https://tel.meet/nnf-meao-awn?pin=3663756634427 ME Project No. G18099 FUNDING Nos. NC DWI Project No. E-SRP-W-18-0155 I. Summary: Held a brief discussion of the closeout checklist led by Mr. al-Masri; discussed some basic project status questions, then walked through the project developing the punchlist. II. Unresolved and Old Business: A. Closeout: Division of Water Infrastructure Closeout Checklist was attached to Agenda. Emphases include the following (Discussion led by Bashar al-Masri): a. Classified each item as either "owed", "received" or "not applicable. b. See attachment. c. Recall, FCPU wants 2 hardcopies and one flashdrive with PDF of all such documents sent to Payton Proctor. d. Update previous action Item: for Payton Proctor provided a list of who gets trained on what. The following staff are to be trained on "Pump Control Panel", "Flow Meter"and "Transfer Switch": Payton Proctor, Nick Roberson & Hunter Williams. B. Other State Inspection Comments: none C. Have the Korea Street Valve Vault &flowmeter been checked off yet? yes D. Have the US1A Vault Risers been installed? yes a. Has the work been checked off after the risers were installed? Punchlist generated . E. Has the backwater valve been installed /checked off at the Oak Ridge? yes III. Work completed to date (Step to report): A. Status at 1A: PS 1A is running, but controlled by floats vs transducers. Control panel was set to use floats rather than transducers. Transducer guy coming today to confirm. A. Status at Korea St.: Running, no alarms. Generator/Transfer switching still needs to be tested under load. B. Status at Oak Ridge: Oak Ridge is running on the lag settings rather than lead pump settings. Rob Tifton of Flvgt Pumps was scheduled to arrive at 13:30 to address. IV. Work anticipated in next period: See Attached Draft Punchlist. Note the following in particular: A. FCPU wants Ballard-style Camlock quick connects on the bypass pumping standpipes. Step suggested that this constitutes a change order because the specifications called for Bauer Style quick connects (Sheet D-4). However, the shop drawings, section #16 were "approved as noted" with that note to the contractor being "verify conformance w/FCPU fitting". The approval sheet is attached. Contractor is to place Ballard-Style Camlock quick connects to the Town's specifications. V. Schedule A. NTP was issued 16 May to commence on 19 September 2022. B. Contract Days: • 240 calendar days to Substantial Completion, 17 May 2023 • 270 calendar days to Final Completion, June 16, 2023 • 282 days through Contract as of COB, 28 June 2023 • Project is at due for Final Completion and 94% percent paid out after PR5. C. Status of monthly weather delays: none requested yet D. We agreed that the project reached Substantial Completion on 17 May 2023. E. We agreed that the project has not yet reached final completion. F. Bashar al-Masri will schedule a second walkthrough for state funding agency inspection purposes. NOTE: All involved are aware of current procurement and delivery delays of specific equipment and materials.Time extensions will be considered upon receipt of documentation from the manufacturer or supplier supporting the Contractor's delay claims. VI. New Issues/Concerns/Submittals: None noted VII.Safety, Traffic Control and Erosion Control Issues: none noted 2 VIII. Cleanup/Performance Related issues: none noted IX. Payment/Reimbursement Requests: A. PRS—approved by FCPU on 31 May 2023. B. PR6 drafted by Kevin Lanier— bills work to 100%, does not include changeorder for the positive drain. Need the following to approve: a. Closeout materials, esp: ii. Lien waivers from subcontracors and suppliers iii. Do not need bond completion documentation from surety C. Lien Waivers are required for Pd*w+­_ payment requests. D. Unless otherwise directed by Jamie Holtzman, Municipal will draft a reimbursement request on approving this PR. X. Accepted and or Anticipated Changes: A. Change Order#1 to add nonwoven fabric under the stone approved by all. B. Engineer drafted Change Order for cost escalation. Rejected by FCPU. C. At Highway 1A: FCPU requested CO2 to raise the top for the meter vault, valve vault and wet well by ... 16 inches. Approved by FCPU. Review by DWI pending. D. Reminder: A final adjusting change order will be required for final payment. Will include the positive drain from meter vault (through valve vault) at Korea Street. Will not include alternative quick-connects on bypass, because those quick connects do not constitute a change. XI. Walk-through Review of Contractor's Field Mark-Up Drawings: walk-through performed, punchlist developed, Contractor's Field Mark-Up Drawings received by engineer . XII. State Inspection Comments: Bashar will conduct a separate walk-through. XII I. Other/Misc. Items: A. Recall that the project is funded through the Division of Water Infrastructure and therefore requires the contractor to comply with all mandated MBE/WBE/DBE requirements—in particular the need to reach out to MBE/WBE/DBE subcontractors. Please see the Contract Specifications for MBE/WBE/DBE requirements and attachments. However, the project is NOT subject to American Iron and Steel nor Davis-Bacon wage requirements. B. The route of communication between the Contractor and the Owner is always through the Construction Administrator or the Construction Observer, except when coordinating 3 marking of utilities (including electric, water and sewer), opening or closing existing valves or activating switches or breakers to assist with construction. C. Construction debris/waste—All debris/waste/unsuitable materials shall be legally disposed of off-site by the Contractor at no additional expense to the Owner. The Owner may agree to take some excavated materials from the construction project as long as the materials is free of debris, large fragments, boulders, etc. Owner may also wish to salvage other materials such as pumps, piping, valves, etc. Contractor should coordinate with the Owner for those items and a location and time to deliver these materials to the Owner. • Currently: Owner wants the SCADA panels, but not the pumps D. Special Emphasis-The project was bid as Unclassified Excavation. No payment will be made for rock excavation or removal. E. Follow up on previous Action Item I marked John Kerley as in attendance in May, which attendance Mr. Kerley confirmed. Attachments: Sign-In Sheet, Draft Punchlist Shop drawing Section 16 approval as noted sheet, Marked-up Closeout Checklist The Progress Meeting Minutes constitute the author's understanding of the progress to date based on information provided by the Resident Construction Observer, Contractor, Owner and other Progress meeting attendees. If there are any errors, omissions or discrepancies, please report these to me within seven calendar days and I will amend the minutes and issue the final meeting minutes. If there are none to report within the seven calendar days,the minutes will be deemed final and no further minutes will be issued. Minutes drafted 29 June 2023, Rev 3 July 2023 By:Vincent Jude Tomaino, PE Principal Project Manager M ESCO 4 SIGN-UP SHEET 11 Municipal Engineering, Inc. Project No.: G18099 fProject Name: Franklinton Pump Station Rehabilitations c,NEER Date: 28 June 2023 Name Company Phone FAX/email Vincent Tomaino Municipal Engineering 919-801-7354 vtomaino@mesco.com Wayne Woodlief Municipal Engineering 919-427-6028 wwoodliefl@nc.rr.com Chris Doherty FCPU 919-556-6177 cdoherty@franklincountync.gov Payton Proctor FCPU 919-495-0105 pproctor@franklincountync.gov Jamie Holtzman FCPU—finance director 919-495-0105 jholtzman@franklincountync.gov Nicholas Roberson FCPU Kevin Lanier Step Construction 252-268-0833 klstepcons@yahoo.com Michael E.Tarrant Step Construction 252-566-2182 stepcons@yahoo.com John Kerley(remote) Sanford Electrical co. (SEC) 919-602-1932 Jkerley@sanfordeleletricalcontractors.com Louis E. Solomon III KL Shane, Inc. 919-522-8217 Isolomon@klshaneinc.com Heather Wood FCPU 919-556-6177 hwood@franklincountync.gov Mattie May FCPU - Finance 919-496-3182 mmay@franklincountync.gov J Bashar al-Masri (first section, remote) DEQ/DWI 919-707-9159 Bashar.al-masri@deq.nc.gov Kamal Koudas DEQ/DWI 919-707-3883 Kamal.koudas@deq.nc.gov Greg Boains FCPU * Include FAX number or email address if you want a completed copy of the sign-up sheet sent to you. Page _1_of—1—