Loading...
HomeMy WebLinkAboutWQCS00179_Notification of Collection Rehab_20230807Baker, Caroline D From: Vince Tomaino <vtomaino@mesco.com> Sent: Monday, August 7, 2023 2:38 PM To: Vinson, Scott Cc: Chris Doherty; bahsar.almasri@ncdenr.gov Subject: [External] Franklinton Pump Stations Rehabilitations ±complete Attachments: 06-25-2020_APPVL_FCPU_PS Rehab.PDF; Franklin Co_18-0155_FIR_230728.pdf CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Mr. Vinson, Per a checklist from the Division of Water Infrastructure, I am informing you that the Franklin County Public Utilities has done the referenced project (rehabilitation of three pump stations). The pump stations are in operation, and construction is complete save punchlist and control system / shakedown / optimization. This is only a courtesy notification; the project was not subject to permitting because it was funded as a like -for -like replacement with no expansion. No action on your part is required. For your convenient reference, the DWI's Plan Approval Letter and Final Inspection Report are attached. Please call me if you have any questions. Vincent Jude Tomaino, PE Principal Project Manager/Engineer Municipal Engineering, Inc vtomaino@mesco.com 1 919.801.7354