Loading...
HomeMy WebLinkAbout20240673 Ver 1_BR0086_Wetlands_Permit_Drawings_3_4_24_20240510Highway. North Carolina Department of Transportation StOrmv*w" Highway Stormwater Program 1 STORMWATER MANAGEMENT PLAN (Version 3.00; Released August 2021) FOR N CDOT PROJECTS WBS Element: 67086.1.1 TIP/Proj No: BR-0086 County(ies): Johnston Page 1 of 2 General Project Information WBS Element: 67086.1.1 TIP Number: BR-0086 Project Type: Bridge Replacement Date: 11/1/2023 NCDOT Contact: Galen Call, PE Contractor / Designer: David Holmes Address: 1000 Birch Ridge Dr. Address: 1000 Birch Ridge Dr. Raleigh, NC 27610 Raleigh, NC 27610 Phone: 919-707-6710 Phone: 919-707-6715 Email: gcailCa)ncdot.goy Email: DkhoImes Ca)ncdot.00v City/Town: Smithfield County(ies): Johnston River Basin(s): Neuse CAMA County? No Wetlands within Project Limits? Yes Project Description Project Length (lin. miles or feet): 0.192 Mi. Surrounding Land Use: lConservation and Open Space/ Commercial Proposed Project Existing Site Project Built -Upon Area (ac.) 1.5 lac. 1.0lac. Typical Cross Section Description: (3) 12' Travel Lanes, 4' Paved Shoulder, 2' Grass Shoulders. 6:1-2:1 Side Slopes, 10' (2) 11' Travel Lanes, 2' Shoulders, 2:1-1.5:1 Side Slopes Fututre Multi -Use Path Annual Avg Daily Traffic (veh/hr/day): I Design/Future: 15240 1 Year: 2043 Existing: 1 12540 1 Year: 1 2023 General Project Narrative: The project consists of replacing Bridge #70 on US 301 (S. Brightleaf Blvd.) over the Neuse River. The approach work will consist of providing paved shoulders/ curb & gutter, (Description of Minimization of Water guardrail, and future multi use path. Bridge #70 existing sic span structure (375' total length) will be replaced with a 3 span (1 @ 105', 1@130', 1 @ 105') - 63" Florida I Beam at the Quality Impacts) existing crossing. Existing bridge deck drains from vehicle travel lanes drain across the entire width of the Neuse River. Proposed deck drains will only drain the multi -use path and will not contain flow from the vehicle travel lanes. Drainage from the proposed bridge travel lanes will be separated from the multi -use path by a dividing wall. There will be no proposed deck drains discharging on to the banks of the river. The bridge will utilize staged construction to maintain existing traffic during construction. Best Management Practices: -All storm drains outlet onto rip rap pads. -Bank stabilization and rip rap at outlet in NE quadrant to prevent erosion. -Elimination of three interior bents, one in water. -Bridge opening will be increased between existing and proposed bridge layouts resulting in nominal reduction in backwater and bridge opening velocities. -Deck drains will be eliminated along the travel lane and be retained forthe multi -use path only. Highway North Carolina Department of Transportation Stormwater Highway Stormwater Program STORMWATER MANAGEMENT PLAN (Version 3.00; Released August 2021) FOR NCDOT PROJECTS WBS Element: 67086.1.1 TIP/Pro' No.: BR-0086 Coun ies : Johnston Page 2 of 2 General Project Information Waterbody Information Surface Water Body 1 : Neuse River NCDWR Stream Index No.: 27- 41.7 NCDWR Surface Water Classification for Water Body Primary Classification: Water Supply V (WS-V) Supplemental Classification: Nutrient Sensitive Waters NSW Other Stream Classification: Impairments: dissolved oxygen (DO) iron (Fe) copper (Cu) lead (Pb) zinc (Zn) A uatic T&E Species? Yes Comments: Atlantic Sturgeon: May Affect, Not likely to Adversely Affect NRTR Stream ID: 27 - (41.7) Buffer Rules in Effect: Neuse Project Includes Bridge Spanning Water Body? iYes I Deck Drains Discharge Over Buffer? iYes Dissi ator Pads Provided in Buffer? IYes Deck Drains Discharge Over Water Body? IYes (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative) (If yes, provide justification in the General Project Narrative) I Surface Water Body (2): 1 NCDWR Stream Index No.: NCDWR Surface Water Classification for Water Body Primary Classification: None Supplemental Classification: Other Stream Classification: Impairments: Aquatic T&E Species? Comments: NRTR Stream ID: Buffer Rules in Effect: Project Includes Bridge Spanning Water Body? Deck Drains Discharge Over Buffer? Dissi ator Pads Provided in Buffer? Deck Drains Discharge Over Water Body? (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative) (If yes, provide justification in the General Project Narrative) I Surface Water Body 3 : 1 NCDWR Stream Index No.: NCDWR Surface Water Classification for Water Body Primary Classification: Supplemental Classification: Other Stream Classification: Impairments: Aquatic T&E Species? Comments: NRTR Stream ID: Buffer Rules in Effect: Project Includes Bridge Spanning Water Body? iYes I Deck Drains Discharge Over Buffer? Yes Dissi ator Pads Provided in Buffer? Yes Deck Drains Discharge Over Water Body? IYes (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative) (If yes, provide justification in the General Project Narrative) I See Sheet 9 A For Index of Sheets See Sheet I For Conventional Symbols 2548 , NTERSTATE ♦ 95 ' " ♦ 1341 ---- 96 -,-' 1007 2 549 Q e 'Cr1 o vo CID 1343 ,-' 2549 a, a - ♦,O� - `�� 2547 -'' 301 ♦� X` "96 ♦ O� INTERSTATE " 95 , PRO ECT ITE VICINITY MAP BUFFER DRAWING SHEET 1 OF 8 N Z e STATE OF NORTH CAROLINA JOHNSTON CO UNTY LOCATION. REPLACE BRIDGE No.500.070 ON US 301 OVER NE USE RIVER TYPE OF WORK: GRADING, PAVING, DRAINAGE AND STRUCTURE WETLAND AND SURFACE WATER IMPACTS PERMIT J BEGIN CONSTRUCTION BR-0086 —L— STA 11 + 59.00 SITE 1\ BEGIN TIP PROJECT BR-0086 BEGIN BRIDGE SITE 2 y —L— STA 17 + 56.00 E �� 'y- —DRWY— �� O FOUR OAKS SEABOARD COASTLINE RAILROAD THIS PROJECT HAS NO CONTROLLED ACCESS THIS PROJECT IS WITHIN THE MUNICIPAL BOUNDARIES OF THE TOWN OF SMITHFIELD CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III SITE 3 BRIDGE TA 20+96.00 —L— US 301/NC 96/S BRIGHTLEAF BLVD --------------------- TO SELMA END TIP PROJECT BR-0086 -L- STA 2 6 + 00.00 STATE STATE PROJECT REFERENCE NO. SHEET NO. TOTAL SHEETS N.C. BR-0086 I STATE PROD. NO. F. A. PROD. NO. DESCRIPTION 67086.1.1 WA PE 67086.2.1 WA ROW & UTIL. -IF DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED GRAPHIC SCALES DESIGN DATA PROJECT LENGTH Prepared in the Office of: HYDRAULICS ENGINEER 7 ADT 2023 = 12540 DIVISION OF HIGHWAYS 50 25 0 50 100 ADT 2043 = 15240 K — 9 % D = 65 % T = 4 % V = 50 MPH * TTST = 2% DUAL = 2% FUNC CLASS = LENGTH ROADWAY TIP PROJECT BR-0086 = 0.192 MI. LENGTH STRUCTURE TIP PROJECT BR-0086 = 0.064 MI. TOTAL LENGTH TIP PROJECT BR-0086 = 0.256 MI. 1000 Birch Ridge Dr., Raleigh NC, 27610 ----------------------- P.E. SIGNATURE: G° �� NOR? �o ��'� ��OQ Q a ��''�' 0� 2018 STANDARD SPECIFICATIONS RUSSELL BROADWELL, PE PLANS 50 25 0 50 100 RIGHT OF WAY DATE: May 26, 2023 PROJECT MANAGER JORDAN A. WOODARD, PE ROADWAY DESIGN' ENGINEER PROFILE (HORIZONTAL) 10 5 0 10 20 LETTING DATE: PROJECT ENGINEER DOUGLAS KRETCHMAN, PE MINOR ARTERIAL REGIONAL TIER July 16 , 2 02 4 ----------------------- P.E. SIGNATURE: PROJECT TEAM LEAD PROFILE (VERTICAL) N Z 0 W W PERMIT DRAWING SHEET 2 OF 8 �JS JS --- BEGIN -L- STA SITE 1 TIP PRO 12+5-6 SEABOARD COASTLINE R411 R Annann BEGIN CONSTRUCTION TIP PROJECT BR-0086 -L- STA 11 + 59.00 FILL IN WETLAND MECHANIZED CLEARING (GRUBBING) TEMPORARY SURFACE WATER IMPACTS SURFACE WATER IMPACTS PROPOSED 4' BRIDGE CAP W/ PILE lAj CLASS II RIP RAP SLOPING ABUTMENT(TYP.) 2' THICK UNCLASSIFIED STRUCTURE EXCAVATION BACKFILL W/NATIVE MATERIAL 1' FLOODPLAIN ELEV. COIR FIBER MATTING PLACED TO PROPOSED TOB PROPOSED TOB EXISTING CHANNEL BANK BEGIN RIP RAP STABILIZATI AND NATIVE BACKFICKFILL AT MIN. 5'SETBACK FROM PROPOSED TOB 1.1 LAYBACK OF CLASS II RIP RAP TO ENDBENT KEYED IN ELEV. CLASS II RIP RAP FOR BANK EXCAVATION STABILIZATION (THROUGH BRIDGE LIMITS ONLY) ENDBENT KEYED IN ELEV. r1 AAA111 AT\1 rVA A11 A TT A\1 ATA r%9rI T-I ATT 0%\1 1%rTA TI **If used, temporary work bridge may not expand the width of the river without agency approval. RIP RAP AT EMBANKMENT ( Not to Scale) NATURAL 2.O'min• 1 �3, GROUND 2 0' GEOTEXTILE TvDe of Liner= 67 TONS. CL II R FROM STA. 18 + 44 LT TO STA. 18 + 68 LT FROM STA. 20+00 LT TO STA. 20+34 LT i / **CAUSEWAY NOT TO BLOCK MORE THAN 50% OF THE CHANNEL. STAGE I CAUSE WAY TO BE REMOVED PRIOR TO INSTALLING STAGE II. STAGE 2A TO BE REMOVED PRIOR TO INSTALLING STAGE 2B. v L i i"u L o DECK DRAIN DISSIPATER SWALE ( Not to Scale) GROUND d SIPEOTEXTILE & RRAP INTO NATURAL GROUN ype of Liner= CLASS B Rip -Rap 38 TONS CLASS B r=8 FT 105 SY GEOTEXTILE = 0.4 FT FROM STA —L— 20 + 34 LT TO 20 + 79 LT SITE 3 PROJECT REFERENCE NO. SHEET NO. BR -0086 1 4 R/W SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER I ENGINEER INCOMPLETE PLANS USE FOR NOT USE � ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED TOP=125.3�' 30" HDPE 70P=)24.76'- 30 HDPE D — / 5 II I I I I I 1 II I I I I 1 I Zl BST BST TOP=124.78' DI �7 �^ 1\LIV1%aVL LAIJI11`IV I ILPNLJYYP%LL AND COLLAR AND EXTEND 18" PIPE AS NEEDED EXISTW� - Tr-AAPnDAQY rAl Mr- /AV nr-TAll ( Not to Scale) Proposed Bridge 81RRCP P,11 Q50 = 2.2 1 HW/D = 0.5 f END TIP PROJECT BR-0086 -L- STA 2 6 + 00.00 5' Existing Bridge 51 Elev. = 99.2/ CLASS 11 _ RIP -RAP MIN. 1.0' N.W.S. Elev. = 98.2' N Z O w W 1/ PERMIT DRAWING SHEET 3 OF 8 126� I I ;////lull / I j 11 ///ll/Illll�=l SITE 1 I/ m- ,b %j I / ! FROM STA. 20+50 LT TO STA. 20+95 LT PROJECT REFERENCE NO. SHEET NO. BR -0086 4 R/W SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER INC®MPL]E/ lE PLANS DO NOT USE FOR W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 1 vi 1 l v I I BEGIN/ B R—� S 4. FOR ALL LOCATIONS OF CLASS I IPRAP, FILL VOIDS WITH CLASS B RIP RAP 0 /�// v / / // / l / / 5� / / / FROM STA. -L- 17 + 96 LT TO 18 + 44 LT // / 5. COIR FIBER MATTING TO BE INSTALLE VER LIMITS OF FLOODPLAIN EXCAVATION / �� /l III (� / lull I l /�� / FROM STA —L— 20+34 LT TO 20+79 LT s� AND AREAS BACKFILLED WITH NATIVE MA IAL/ —L— STA 1% ; I 4 / " % �/% ll� l N - Ill I SITE 3 N 125 , ,� / SITE 2 . , ,, ,� , HDPE_ _ _ _�D� 30^\ V \V 7oP 2 - -"� HDPE 30° —DI 403 m \ / FLOq PLAID EXCAVATION 5.7cfs V / = 3 szr/ I /j � -1 /D ,o \� I STA ILIZATI SEE DETAIL ipe 5=0.39 ftift / l Pipe n=0.0.3fts /I J 1 �/� j �� 6 L IDISSIPATORNPAD l Channel V,--01.9ftf/s4t l I ��l Liner=CL SS.08 i I I i i s \ EE DETAIL B Ile I I I�II� � 3 BANK STABILIZATION `� / / J i �/ S6E 14ETAIL C ,� _ l l / v DETAIL B DECK DRAIN DISSIPATER SWALE ( Not to Scale) NATURAL NATI GROUND GRo GEOTEXTILE & d INSET INTO NATUI E WHERE EXISTING ABUTMENTS AND BULKHEADS ARE TO BE COMPLETELY REMOVED I / FROM STA. 18+44 LT TO STA. 18+68 LT i (IIII / FROM STA. 20+00 LT TO STA. 20+34 LT 72. EXCAVATE TO FL LAIN ELEVATION AS SPECIFIED ON PRELIMINARY GENERAL DRAWINGS /��� / / / 3. FLOODPLAIN STABILIZATI TO BEGIN WITH A 5' MINIMUM SETBACK FROM PROPOSED TOB� l ��� f J DETAIL NOTES: r 11 �, •� �►� ggc . �BST .�, , ,,rig. y d ;/ :. •'. i AV -�aA -.W I`I � i''r�� 7� V � � � r,�irrasisi�rr�rrrmnrrin .�' � ���,c•s���er.�erreuu��iru�r'yrr ■��i���dl��Il�������I momw . �:;► � -o � �®_� ��",��►r�s�i.�r�i.�r�i " � k�' . "A= _ - t �� � � � � �_� �i� ���ta.._ "�-�Ar na r�.��r�d9!�:rv:�ai�ldl'_�.�''w W KIN �FAMM lid►n6:'W�rl1111PCTnlrr.!?�trlZP�iRl.!/'�►�I���w� LO o — — yS MINC 961S BRIGHTLE BLVD -32' BST US 30//NC 96/S BRIGHT LEAF BLV 28' BS I — — — — —171 — — — — — �— — _ _�_ -- �_—�— _ -- - — — — = _ — — — — — — F _ _ —F — — P-F III �// — / /---12�— = 3zi €U L � _ — _-1zs— - — — — — — — — — ��'/ / 5— _ — — T — — — — _— -- — — _ _ — __--_—_ - • — — 12 TIN —, / / I 1 III mti✓ _ F .. . .. — �—_--� —�� — — ,= —_ _ —=a—� —�--'n-------1�_ _�v A � �XSTI� v I —� — � -s z — — _ _ _ = nz—__— — �sr — -- � — — — #— II A �1s� 1 �- A F A — — — — - — — — — — Q50 = 2 \TEMf�Q�ARRI°��A�JSE�VA HWiD = 0.5 1 /— —ss1—�).—/� /"LJ" --`�—J� "V�s"�3,— �u 3 _l'L,��`t—`-b' Sr 4 1hV A \ , ���,—T' —_ .sc Fcrc -13r s\✓. —Ara5��z�L �A0�E7—i 1- �\—�� 135 ZT� _£'\�©i- =_42�cL— A_ _ 1,-3 - \ 'L 1-2sr—. — �.-1za- -�sy n-4:035 -- �12— e Liner=Grass 11 OATLINE �— = — — — SEABOARD L��L — — _ �_� — -7-- — �- v e — , -135— 3 — ✓ — _ -35_ _ — I I / t I �� v� IIIIIIII 1 — ,Y� /\ / "� �. ! _. ✓ 13 \ ✓ ��3 ^ '� / �• J3� /� / '� - / I // l l i� �. / / JS \ �. ✓ \ ` E -ZE\ �_ O - / � REIGIOV� �CIS�r 6' H v �� ✓ / ✓ A 1s 1sz� �. -^ �.� / \ _J _ �' z9 J \ s'� '35 I71� _ s � � � I�� — � — � .� � / � e� ^ AND COlL�A� �N D EX E� "� ��� ��130 s ✓��^� -� ]29= ^ _/� —ice — ti=-�� .__. ti �� 3� \�/.r �/�� =� �. / Z 2�/ %/ Im �---� � 1 _ — �QN"I Rod/ D �— i — _ _=1z5-__777=5_ BRIDGE ✓ / / \ 18" PIPE AS NEEDED tA �z�z-- _ — _ _ —1z1- e 1 i — — z� f = L = = — _ \5ci n n L ------- —3zm_— -- --zei Ti-- _ _ — _ _ _ — — �1z� _ / —1s_ _ — — _11� — _ _ \ _11 _ — — _ ...... I i J m9 IIII \ \ SE Z] •— —�� � ./� V 1i5 �G _� 113= ?/ I I I I I \ 1 ` \ /-—��--1�a, 1 \ _ _ — =ua i-= _1 r== i J ,az— lam( ! IN ,� \ ��33 �z9�O64RD ✓ AD 'z ✓ y35 v / �. �w'� _ �DASTL/NE RAILR y — �,vS=J �i _ J / l r ✓ — J r a \ ^ \ ( / / I \�\ 23L — =_J _]39 —r— J \/ % J r ✓ .� '-\132- s� JEX�ST��I L�1 �I /W BEGIN C;Q�ST-RITION TIP PROJECT BR-Ob86 l 11 ` _ =�2�= - - _ =--2 �1 / / / IIII I I I �� 2 / \ / ( / II / / \ 2 1 �- ��j=zJ3 f �_ �� ✓ / �25 \ \ / \ 131� �-\33 .� ✓ a -L- STA 11 + 59.00 I I 6,e6 f / 9� �! l v g� v �2125 �s 29 s�� _ l' �\ _ 1=z ,12 A / A 'e''1 l l / — hr- a / 's / — 1z �A�- V� �� \. \ A I '.� �bz 2� . _ �s v ^� o ' �m�� v � � � **If used, tem ora work bride � � 14 , � � o �' l I I�(� I, � �- � � �� _,�_-= w ,, ✓ v . v �a e3, w � �� ' � � � � a � ' � I � p rY g ti � , I���//,l,/l/��, � �s -�� � e-'l'��_ �� s `� v I may not expand the width of the N� � �/�� '1 I ��� � v � /� � �� // /��1��� � � � , I I � END TIP PROJECT BR-0086 / /� J/ l ll l / -L- STA 2 6 + 00.00 4/ //I/ river without agency approval. m l/� �' ��� �� I'I�' / � 11 BODED/ J / //� n 1 I a FILL IN WETLAND 10 00 — v%— m MECHANIZED CLEARING (GRUBBING) /,,m• J — ) I » I I l l ll� / 6 (l ll I 11 o TEMPORARY SURFACE WATER IMPACTS a - a a L SURFACE WATER IMPACTS "CAUSEWAY NOT TO BLOCK MORE THAN 50% OF THE CHANNEL. a 0 CL STAGE I CAUSE WAY TO BE REMOVED PRIOR TO INSTALLING STAGE 11. 5 5 '° 150 STAGE 2A TO BE REMOVED PRIOR TO INSTALLING STAGE 2 B. E� o a GRAPHIC SCALE �s o 03 m 3 E' L a 00 0 m a L a a� N �3 a L a N E 0 W V) W o_ i N .j a 00 0 m m V N .O L CL .o L D_ 0 V) 0 L CL O 0 0 L CV E o 0 PERMIT DRAWING SHEET 4 OF 8 SITE 1 SITE 2 y � 1 1 TON CLiB RIP 'RAP 5 5 Y GEOTEXiILE o CIO � N F. Q,o,%8L7 R r� D X 1 F S ZJL / C&G > — Z — — z TT T — AEFANDON-16"_11TILLTY ,YspE— �TT ACANDON 16 U I I c Ni u H < I UTILITY PI _ AB NDON 8° UTILITY PIPE F F TYPE —III —V =11 L F I--, \ — - J JS JS _ WOODED N N s CO m F FILL IN WETLAND MECHANIZED CLEARING (GRUBBING) TEMPORARY SURFACE WATER IMPACTS SURFACE WATER IMPACTS 12" FSS E9 I` SITE 3 s FLOODPLAIN EXCAVATION STABILIZATION SEE DETAIL DECK DRAIN DISSIPATOR PAD\ SEE DETAIL B If O IT 403 5.7cfs ipe S - 0.39 ftift i pe V,,,= 2 3 . ft/s Pipe n = 0.0 3 Channel S 0.06ftift o Channel V,=1.9ft/s Channel n = 0.084 Liner=CL SS II o / DOCUMENT NOT CONSIDEREE Gj UNLESS ALL SIGNATURES CON PAD AT OUTLET 17 ONS CL II RIP RAP ° ° I D I I I v AB DO T IT E BANDO UT T ABANDON 8" UTILITY PIP ✓ �./ ' PE— A�DON8"UT TY PIPE ' EXISTING R / W EXISTING R/W - W�0'DED F �F TEMPORARY WORK PAD SEE NOTE BELOW - — — - - - - co WOODEDNJ �2 — — — I I F--L n A A n P J � — y CONC RAILROAD BRIDGE � o EXISTING "CAUSEWAY NOT TO BLOCK MORE THAN 50% OF THE CHANNEL. STAGE I CAUSE WAY TO BE REMOVED PRIOR TO INSTALLING STAGE II. STAGE 2A TO BE REMOVED PRIOR TO INSTALLING STAGE 2B. **If used, temporary work bridge may not expand the width of the river without agency approval. 'AD 2 5' 0' 2 5' 5 0' 7 5' GRARHC SCALE 03 m �I CL 3 E► L 00 C<, a L a N / �3 a a N C O W V► W OL / N .j a 2 00 O m / m a CL O oL / 0 0 L CL 0 O O L CV E O O PROJECT REFERENCE NO. SHEET NO. l l/ l /r// / / / / I / 1 ► v, ,I / li�l/lull l l l l l l I / BR-0086 4 / / R/W SHEET NO. ROADWAY DESIGN HYDRAULICS -UL-ICC, SITE 1SITE SPERMIT DRAWING /// // SITE 3'I ENGINEER ENGINEER SHEET 5 OF 8- /I �►/ � l// //// I � I I v� / /Ili 1/ I �!' = 1 I I I 1 i � � /� It=A�l� l / / / /Ill ► I l/l l/ ll t I \ / O �/-�_�/ —��/1I 1 �I I �I/iI" / I1, /_ I\\ � 8/ � �/��•_ ���_I -�-/ I— �/ - /— /I ►`l—_ �� --/_I--I ---__/�---_ -- —�— —��� ---- � —_—X— — ——� x _— `-- —_,-- -- —X_ _ _��'I I I_Ia `�I—\I���I =\�V�I \ , A � -o-,\1\ \ \ \`\�_�\ —�\ C_I � LI 1-6 V—"_o1--F1— --- -i1---- — _-- - _' -- - U-T—ILI_T �— __ --_� —711— t—_ 1 -- I _I���f I /�I �� 1-G//� ��1�1 � 1/1/S I ,\ ///A- / I ►/�I l l-� /II 1 I /iI PI� / —f/� / — g_g1 //l �I }//pI 1/ I �p / I1/1��� 11/l// 1 \/ �\ I/ �/� // A/ � Al �l/�/ I� /r ►1�\ / l_I /�I /ii;—►i /N /1" P — DOCUMENT —/ —N-- O—T- -- C =—O�EN — --S—ID-f—E R-ED -_�FI_ ,N--- A �3 LTLET 403 UNLESS ALL SIGNATURES COMPLETEDFLOOPPLAI� EXCAVATION 5.7cfs i e S=0.39 Rf� 1 T CURIP ' AP / STABILIZATION SEE DETAIL AT OQT LET e V,o=23. ftsL 5 S. GEOTEX ErSo wt: n_0.0 3 17 IONS CLII RIP RAP �CECK\-\DRAIN annel S O.Obft/ft �Channel V=1.9ft/sDISSIPATOR PAD I/'j- / Channel n =0.084 Liner=CL SS IISEE DETAIL B /�/ BANK lSTABILIZATION DTAEIL C < 2(' /Lu LU VE E F GV- —— — —— i— 2FS8� 1 r E- N11 fen ro o _ _ — — A�D0fTD0�1 *ANDON 16' UTILITY PIPE ABANDON 16" UTILIT — Y— �- P I CO— ITY�PIPE AHHO16 � D I)/ABANDON�ONT LITY\Y PIP _TYYPE-TYPE_-- -—— =���_Q���—r ��—_y���—��—I� ' __ —-- -?__�1 —_ —,—_�—=--t-- - �i-=,- =_—�� _—_=— _z�—1�—` --__— -- _ -- =—�_— - �--_,—= _-- _ =_=—_ �—_ — �_ 1-�= _�- \== �^=1_ti--e—_ =--_r_ _ _==---_ _ _- =---- = _- —_��- _—���= _,,,� � _=- — __L =�=�--�zi _�_�--- _—`_�— ? ��-__ �-,-1 _�`�—�----� _�_ ._ -__ =_ —_�—_-__ --_- �—_ - --_- 1,_�`'- ---- _ /, �-i'-i_=/»'-II — /I��II��� `I�J1/IIv= 1_I/vI -l=II\ 1-i %/f\/1�/1/\-ti/�,�/ 1\—/-_r1I ` llI �� —I�/I / , �/! //�—�� hI� / .I _I 1 I�l �i=I�►IIII,IIIIIIA�I/�I' II►1I ��I I/�I�1'IIII//II1I/III/` 1��I�I V,I/ ��II /1IA II1I1/\I/\/1II 1 I%�/ /�VI� / I /II�AIAI I�I /r AI I,� llrI � I lIl /llll � ll ` /lI� / \r�►I / l /I/ /II I �`rII/�//I�_ I /IA1 ,� I v�A�l _I�1/' I,I�I �\1 I - ���/�I I ` AI I,� �1 ��°I�_� �/►\ \- v1 —/�v �-\�� � ), �� /-I� I \ _ c-� _I/ -\�� \�- � � / � � 1 /( �If��-'��� � / / �-�I � �/tA �I-�I T ,.�I/�.'' I `,► �_ 11 / = /i �'Li— � �I/ L' I /-1//�/III � � K� S�I1I /vIII1ITNIIV - _ - - - _ l NC1��I//II/I�I 1/I/ III/ I�1lI�Io I j1I II//4IlI1// I/1IIIlI`� /l l�/v�1/ rI////II/�i /IIIIIlwIlII/ /��IIIl►/III I� III 1 1Il/IIl �If�I/1/ Il� II/II II1�,ILIIl� /'�I\I1i�� ll��l 1lIt1l II—I—�I/_►I ► iI�/ — // _/�/��—�/�-- 1��/;-1 iti—I /Z/1�/r-\/i/ / _ ///�= ����` �/,—ll%/ �_//l�1—��/� ��I/ // —t\— r� �;`�1/I' —( ������II~vv�v=/i_iIi/`�l��� Iil_1��l �1I__=1I�_�I � _/_�/—� �_I =I I/ =� -�- ___�__—_ __A � "--i-- -�_'_/�-_ � _I '—/- --�1_1�_11/-"= �— =_�_=— -_, \� —� -_ _ _ __�_ �-_ _ �_ �--_- �- _�-- �__-- - —=�-_,�—__- \ \ ,_ __ —,� _- _-_�_ ---i_ =�_-, ��_�-- � —_—��1-�1- 1 =--� �---�11-1_��-<—�� _ W—�..- -- _— _FR JS pOR�Y�I�ORC PAC*`llIT� 7-77 z = CSEENOtEvv A L _ -� �**If usedtemporary work bridge may not expand the width of the77 � 11river without agency approval. —AT 0 1 — I _UROAD BRDGE�—t�F FILL IN WETLAND 777 �LlllllRgll QAD MECHANIZED CLEARING (GRUBBING) PC _ EIxISTIN�1 1I I/1/ TEMPORARY SURFACE WATER IMPACTS A /P VV �+ "CAUSEWAY NOT TO BLOCK MORE THAN 50% OF THE CHANNEL. 25 0 25 50 75 S SURFACE WATER IMPACTS STAGE I CAUSE WAY TO BE REMOVED PRIOR TO INSTALLING STAGE II. MENEEMEMENSTAGE 2A TO BE REMOVED PRIOR TO INSTALLING STAGE 2B. GRAPH C SCALE 0- 03 LD PROJECT REFERENCE NO. SHEET NO. BR -0086 1 5 ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER �Ez N E, O j s� DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED i ----------- MEN ■■■■■■■■I■■■■■■■■■■■■■■■■■■■11■iY■■■!rl/I/ICISJu■■■■■■■■■■■■■■■■■■■■■■■■■1►►IC7Ia,/,iIII_:IIII//1II■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■IIf/iE3■if:L■I■■■■11■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■I■►If■iEi■/17/li■■■■■11■■■■■■■■■■■ ------------ ---- ---�- -------------------------- --- - ----------------------------------------------- ---- _-; ---- -------------------------------------------------------------------------------------------------------- ----- - ----- ----------- i, ■■■■■■■■■■I/■■■■■■■■■■■■■■■■■■■■11■rY11■!9■R7!7Ei7i■■■■■■■■■■■■■■■■■■■■■■■■I■dY■�iil/ii■1■I■WMMyiA■■■■■■■■■■■■■1r.7E:7■■■■■■■rii■■■■■■■■■■■■■■■■■I■■!■hl■■■■�iriii■■■■11■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■I■1■Id■■■■!■wr■■■■■■11■■■■■■■■■■■ ■■■■■■■■■■►I■■■■■■■■■■■■■■■■■■■■11■'=L'!■■■LSJZiI■■■■■■■■■■■■■■■■■■■■■■■■■■I■l��I■III)JIL■!■P■■■1�/% 'II%il1■■■■Gil1JILi■■■■■■■r/L■■■■■■■■■■■■■■■■■■I■■I:1■E■■if:!f:./■■■■■11■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■I■LI■E■■1L:!%!■■■■■■■11■■■■■■■■■■■ ■■■■■■■■■I,■■■■■■■■■■■■■■■■■■■■■II■Iril9■R- �1!a■■■■■■■■■■■■■■■■■■■■■■■■■■■I■■li■■Iif11i■i■ir■■irrll■YYiil■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■I■■ii■■■■ir1"i■■■■■11■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■I■■i■■■■f`rY■■■■■■■11■■■■■■■■■■■ ■■■■■■■■■11■■■■■■■■■■■■■■■■■■■■■II■IIL:■■■■I/i'J■■■■■■■■■■■■■■■■■■■■■■■■■■■iEEEEEEEEEEEEEEEEEEE:EEEEEEEEE:EEEEEEEEE:EEEEEEEi■■■■■■■■■■■■i'iiiiiiiiiiiiiiiir■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■L!!!!!!!!!!!!!!!!J■■■■■■■■■■■ ■■■■■■■I�■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■I■■lI7GGZT:tT■■■■■■lAIG7F■771!!■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■II■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■iii�1111�;�1iT!!d■■I/_�\■■■lLl�Elld�■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■II■■■■■■■■■■■■■■■■■■■■■■■■■A!1■AI■■■■■■■IlIIR7GriiTiT■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■��������===;_.�C:��....■■■■■■■■■■■■■■■��■■■■���������������������������������■■■■■■■■Id■■■■■■■■■■■■■■■■■■■.....������������� ======���.����������■■■■■■■■■r7■■■■■■■■■■■■■I/.\■■■■■■■■■■■■■r1iiJ!'T ■■■■■■I■■■■■■■■■■■■■■■■■■■■t•!Jf//'1'//II■■■I\■■i!■LI.�L•L'1'lG■!7■■■■■■.■.■�������---------- _ -- —��—_����_���■�■C�lJ■CJlE■L''J!J!_■C9!_■I-�1��■C��i��■���C��a__�C��=��■���C��a__�C��=��■���C��a__�E��=��■�..■C:■�■C�■�■C�i�■C��■�iri�■ai�i■ii`■1■iifi7■aG.7i�iGa■�iC�■�iC�■�■C�Cii�■Gii�■�■i?7��s��.■r.��■■■�rl�1rI:735�■Iir■r■■ �.. ■■■■■II■■■■■■■■■■■■■■■■■■!■■■i■f11i�iYilfi���_i,..�._���i��i����fir■�■rr■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■I ■■■i■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■11■■I ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!�i■11►�i1iI1111I1G■■■■■■fii�I11I�F7liiliZ■'a■■■■■■■ ■■■■e:■■■■...���_,"__��������■■ir■■■■■isa■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■I■■■�■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■rl■■I■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ee■■■■■■■■■■■1■ae■a1r■■■■■■■■■■■■■■ee/�eaeeee ■i■■!J■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■i1■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■lseas■i■■i■■I■■■■■■■■■■■■■■■■■■i■■i■e■■■!■■!■■iIi■■■■■Ii■■■■■■ ■■■■see■■■i■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■I■■■�>,■■■■■■■■■■■_■_■_■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■�1■■■■■■■■■■■■■■■■■■■■■■■a■■e■■■1►�■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■r■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!:!�._.':'-===E�E���1:.....i■■■■i■■■■■■■■■■�■■■■■■■■■■11■■I■■■■■■■■I■■■■■■■■■ivy■il■■■■■■■■■■■■■■■■■■■i■■■■■■■■!■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■I■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■I logos ■■■■■■■■I■■■■■■■■I■■■I■■■■■■■■■■I■■■■■■■�■■11■■I■■■■■■■■I■■■■■■■■!:!1!!!II■■■■■■■■■■■■■■■■■■■■■■■■■■■■L!!gtl'�I■lii■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■II■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■11►■!■►.\■■■■■■■■I■■■■■■■■I■■■I■■■Tiff'!�litrrllil■!!!�!u!!11■■I■■■■■■■■I■■■■■■■■I11/�■I1■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■61■Yi■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!i■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■1�1,i■I►►5�1■■■■■■■■1■■■■■■■■I■■■I■■■■r■■■i■I■■�!�■���■LI■■I■■■■■■■■!■■■■■■■■IAI��■ill■■■■■■■■■■■■■■■d■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■II■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■►.it!:,'""�►� �'\■■■■■■■I■■■■■■■■I■■■IR3!l'GE■llla]liaiiiai■■■■11■■I■■■■■■■■I■■■■■■■■�A►5Ma'�ii/■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■_■_■_■_■_■_■_■_■_■_■_■_■_■_■_■_■_■_■_■_■_■_■_■_■_■_■_■_■_■_■_■_■_■_■_■_■_■_■■■■■■■■■Ii■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■[lIL9lC�L`!;:■■Er■■■I ■iL►`.Ili\■■■■■■■I■■■■■■■■I ■■■I■■■■■■■■■■I■■■■■■■■■■11■■I ■■■■■■■■I ■■■■■■■I►i�l►i�'./I ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■i■■■■■■■i■■■■■■■■.■■■■■■■■■.■■■■■■■■■.■■■■■■■■oiiii7■■■■►I■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■I ■��■I►�►:�1■■■■■■■!■■■■■■■■I ■■■1■■■■■■■■■■I■■■■■■■■■■N■■I ■■■■■■■■I■■■■■■■11► �!1►'I■I ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■C■■■■■■■■■■■!■■III■!■■■IIl9■■■■■■lE�J■■E!■■1_III!■�C■■■■■■■■■I■■■■I■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■I ■■Oid►�■■■■■■■I■■■■■■■■I ■■■I■■■■■■■■■■I■■■■■■■■■■11■■I ■■■■■■■■I■■■■■■■►I'�►�l!ll1■I ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■I:I1,1//,■n!I;:11��1/�/a■C71i■■f:111�1■fifa.'�II;Od1i::n■■■■■■■■■■I ■■■■I■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!��■�!■■■■■■■■■■■■■■■ ■■�� �:�����■■■■■■■■■■■■■■ ■■■I■■■■■■■■■■�■■■■■■■■■11■■ ■■■■■■■■■■■■■■I,����`�41■ ■■■■■■■■■■■■■■■■■■■■■■.■�■!�■�■��■■■■■■■■■■�■■�I�.i�YLr��.Y�ii�Viiisiii�'i�f1�iE�irf��iJi'iiiiiiiii iiil���J■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■n�■�■►■■■■■■■■■■i■■■■I■■��!•-•�■■■■■■a■■■■■■■I■■■1■■■■■■■■■■I■■■■■■■■■■11■■I■■■■■■■■a■■■■■n_�►:e�■■I■■■■■■■■■■■■■■■■■e■ea■r�■■■■■■■■■■■■■■■■■■■■■■■■re�iee�nr�I�r,■■■■■■■i■■■■■■■■■■■■■■■■■■■■■■■i■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■eye■■■■■■■'�■■■■I■■■�►_�►.�a■■■■!■■■■■■■■■■■I■■■■■■■■■■I■■■■■■■■■■n■■I■■■■■■■■I■■■■■r�►,lihll■■■■■■e■■■■■■■■e■■■■■■Y►�■■■■■■■■■■■■■■■■■■■■■■■■aia■■■I�a�s�■�■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■I■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■i■■■■\■F71ral*13��JIT.1■I ■�.■!■Ylli■■■■I■■■■■■■■I ■■■I■■■■■■■■■■I■■■■■■■■■■11■■I ■■■■■■■■I■■■■■Il■i�■I ■■■■■■■■■■■■C■■■■■■■■■\■■!IP!■�!■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■I■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!■!■■■■■■■■■■■■■■■`I!�!!1i31I!YYI■I ■C !�111111EI■■[�■■■I■■■■■■■■I ■■■I■■■■■■■■■■11■■■■■■■■■11■■I ■■■■■■■■I■■■�■111■■lllllc!■I ■a■=■r■■■■1■i■■■■■■■■■■■■■■■u�■ati■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ i ■■■■■■■!�J!■■■■■■■■■■■■■■e■■■■■■■■■i■■■■e■■■■■■■■■■■■■■■■■■■■■■■■'J■■■L1■fia!■■!!■■■■■■■■■■C■■■■■■■■■■■■IULl�ls�ll ■■,I■I;I■■■■i■■■I■■■■■■■■ ■■■I■■■■■■■■■■I■■■■■■■■■■M■■ ■■■■■■■■!■�i■■111'/11■1!4'!1■■ ■■■■■■■■!■■■■■!■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ i■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■1■■■C■i:■C■i:■■i■i■hii■■■ii■■i■■i■■i■■■■i■■■■■■■■■i■■■■■■■■G�f■■i■■!■■■■I■■■I%■■■■■■\■I■■■■■■■■I■■■I■■■■■■■■■■I■■■■■■■■■■11■■I■■■■■■!91■■■■■111:■:i11■■I■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■Illd■!■■Ii■■■■■■Ili■■■I■■■IIIii■■■■■li■I■■■■■■■■I■■■I■■■■■■■■■■I■■■■■■■■■■11■■I■■■■�I■■I■■■■■11■ii■Y11■■I■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■1�1�■il■■r■■■■■■■I■■■■I■■■I11■■■■■■■l��I!■■■■■■■I■■■I■■■■■■■■■■I■■■■■■■■■■LI■■I■■■■■■■■!■■■■■11■■■■I11■■I■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■[y�I�6i11MEEEEEI:E:;J■■■■■■■■■I■17■■■■■■I■■■I■■■■■■■■■■V■Efi1 �171T1 it'111■■I■■■■7■■■■■■■■11■■■i:;■■:■■LJl �7■Jl1■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■1I171�II7■■■■■■I ■■■I■■■■■■■■■■I■■A■■■■■I ■■■I■■■■■■■■■►i■■I,IIII'r1111lRllhlll■■I ■■■il■■■■I■■■■■11■■■■A■■I ■■■R}11L111■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■iYii■1`�i■■■■■■■ ■■■I■■■■■■■■■■I■■�`.■■■■■ ■■■I■■■■■■■II■I■■■SiL�i/iilall■■ ■■■1f■■■■I■■■■■11■■■■11■■ ■■■Ilia■iliri■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■fI><Z77J1/_11�11�IR�ld`TdCli!IEEI:E: EE■■■■■■■■I■■■\1■■■■I ■■■I■■■■■■■■■■Il■■■■■■■■■11■■I ■■■■■■■■I■■■■■11■■■■N■■I ■■Ala*7■��fI1If11■r1�1�R�lf.C!*�!r1■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■[i71'R1R7.�CiG1�!fEl3■G137R■■■I ■■■I■■■■■■■■■■I■■■■■■■■I ■■■I■■■■i■■■■■I■■■■■■■■■■11■■I ■■II■■■■■I■■■■■11■■■■11■■I ■■■N3�:14:1■iL•1�i11iW�3'iFi1\I+iI111■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■filWliiliiii/iiiiYl■iiliilihiWliii■■I ■■■I■■■■■■■■■■I■■■■7■■■I ■■■1■!!■■■■■■■I■■■■■■■■■■N■■I ■■■■■■■■I■■■■■11■■■■11■■I ■■■t]IL11L"1L'L'11L'11J1193L''J3lL'119■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■I'I�T1IlITl79■�■REl!!■■I ■■■1■■■■■■■■■■I■■■■1����1 ���irrif:'��'_'iF13K�Y■■l�i�a��������n��i ��7■■■■■I■■■■■11■■■■11■■I ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■13�Ii�l1FliEYl:r■Iiiil�Cl■■■I ■■■I■■■■■■■■■■I■■■■!!!!i ■!L!!:'d�3EEicLi!► i!i■■!!!!!!!!!!!■!I!6■■■■■■I■■■■■11■■■■11■■I ■■�III�IIIfllalt\rlfL1@!!■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■L31!■li�'iL'JIlI■■■■■■■■■I ■■■I■■■■■■■■■■I■■■■i!■■I ■■■1■II■■■■■■r-i1■V■■■■■■■■■■Il■■I ■1/■■■■■■I■■■■■■■■■■11■■I ■■i3li■[dW�lai`ifai■IKi■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■I■■■I■■■■■■■■■■I■■■■■■!■■I■■■I■fld■■■■ICl/■I■■■■■■■■■■II■■ILi■■■■■■!■■■■■■■■■■11■■I■■L�71/■1S11I!■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ 3r■dF: \ ■1 Ivl ��`LD/I:\�i"Al ■■\11 i idol d li!■■ all ir.6i►l II■■I\I,ll.iol 17■ -i i W ■� IL`■'\I 1■■�Ii1.�7I■■r�l'Mimi id ■ 11041111111FAM11 II:\\I 111111-I loom■■■■■■■I ■■■I■■■■■■■■■■ ■■■■■■■■I:!■I■■!■■■■■■■I■■■■■■■■■■11■!i ■■■■■■■■I■■■■■■■■■■11■■I ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■1:7�.]!1�JL■■iJ;I�.ILI■■>:1.�J11■■LIL�■■lrL�l'�J�iL■■►:LL■.11►7!■■IJIJIl�►1\:1■!!I�JIC�]■■Lill■■l1I■19■L�JLInG:II:IL■►1L■■E�■■■■■■■■■I ■■■I■■■■■■■■■■I■■■■■■■■I ■■C�■■�■■■■■II■■I■■■■■■■■■■II■■I ■■■■■■■■!■■■■■■■■■■11■■I ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ m■■■■■■■-3 ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■I■■■I■■■■■■■■■■I■■■■■■■■I■■■I■III■■■■11■■I■■■■■■■■■■III,iI■■■■■■■■I■■■■■■■■■■11■■I■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■.�`i�.\ri���■rlfi►7�.\n■1�1�1!\7�.\f► rTTiT�■ii�r�■■Illy■CiTiiill7flnl�nr�■■[iTiiil;! ��7�i■T■■■■■■I ■■■I■■■■■■■■■■I■■■■■■■■I ■■■I■■�C,I�JL/■■I■■■■■■■!1■■Ilr■I ■■■■■■■■I■■■■■■■■■■11■■I ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ • ' ■■■■■■W%'■ I�l1rl I�■1 MML%W: 0WJnoI ��',�',�,� ■ ■■■ ■\IJ■■1 III ■WINE.01 ■!1�rI■ri7i1■■r7�■E7�/Tfi�lT�lil■■:►VRINFI\`;■ AI ■VJ■■ 111111 LWA kq■■I ■l\I,■■■ 11 W RON BIZ:\ MI MI 1110 Il\r,■■Noll 1I.;:\,\P11 ■■■ I ■■■■■■ ■■■I■■■■■■■■■■I■■■■■■■■I OEM ■■■■■I■■■■■■■■■■NO■■I ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ 13+00 :::::::: 1 14+00 15+00 16+00 17+00 18+00 19 + 00 20+00 21 + 00 22 + 00 23+00 24+00 25+00 26+00 WETLAND PERMIT IMPACT SUMMARY Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 1 -L- 13+65 / 17+91 LT Bridge / Fill Slope 0.139 0.098 2 -L- 18+52 / 21+06 LT Temporary Access/ Causeway / Bank Stabalization 0.022 0.576 20 175 3 -L- 20+57 / 21+06 LT Outlet Pipe / Bank Stabaliztion 0.009 50 TOTALS': 0.139 0.000 0.000 0.098 0.000 0.031 0.576 70 175 0 'Rounded totals are sum of actual impacts NOTES: Proposed bridge foundation will have 2 bents in the water. Proposed bents will be 42" drilled Piers with 4 piers per bent Total area of proposed piers: 77 Sq. Ft.