EJ to 14-4 0 Ijivers ENGINEERS & ASSOCIATES, INC. TO: NCDEQ DIVISION OF WATER RESOURCES FAYETTEVILLE REGIONAL OFFICE 225 GREEN STREET SUITE 714 FAYETTEVILLE, NC 28301-5095 PLANNERS SURVEYORS LANDSCAPE ARCHITECTS LETTER OF TRANSMITTAL Date 7/18/2023 .lob No. 2021113 ATTENTION: rSUBJECT: WHITE OAK CREEK CROSSING SEWER PERMIT APPLICATION GENTLEMEN: WE ARE SENDING YOU [X ] Attached [ ] Under separate cover via [ ] Shop Drawings [ ] Prints [ ] Plans [ ] Samples [ ] Copy of letter [ ] Change order [ ] Other [ ] Specifications the following items: COPIES DATE No. DESCRIPTION 2 2 FAST TRACK SEWER APPLICATION (ORIGINAL + I COPY).. ;r COVER LETTER / NARRATIVE I CHECK - $480 JUL (J 2 V 9023 C� 2 FLOW TRACKING/ACCEPTANCE FORM (ORIGINAL + I COPY) i � / lJ 2 USGS MAP OF-IFAYFTTE ILLS �: "10iNAL OFFir, 2 AERIAL MAP THESE ARE TRANSMITTED as checked below: [ X ] For approval [ ] Approved [ ] For your use [ ] Approved as noted [ ] As requested [ ] Disapproved [ ] For review and comment [ ] Other [ ] Resubmit copies for approval [ ] Submit copies for distribution [ ] Return corrected prints REMARKS: Please approve the water permit for this project and send us documentation of approval. If you have any questions or concerns, then please email me at bedwards@riversandassociates.com Thank You, COPY TO File Ifenclosui-es are not as noted. kind1v notifi7 its at once B rlE Edwards, PE bedwards(?riversandassociates.com Six Forks Place III ■ 353 E. Six Forks Road, Suite 230 ■ Raleigh, NC 27609 ■ Phone: 919-594-1626 NCBELS Lic. No. F-0334 www.riversandassociates.com NCBOLA Lic. No. C-312 verENGINEERS 11-4pjis & ASSOCIATES, INC. NCDEQ DIVISION OF WATER RESOURCES Fayetteville Regional Office 225 Green Street Suite 714 Fayetteville, North Carolina 28301-5095 PROJECT: White Oak Creek Crossing 1251 N Raleigh Street Angier, NC Dear Sir/Mam, PLANNERS SURVEYORS LANDSCAPE ARCHITECTS .:?UL 2' 0 2023 IDE&FAYETTEVILLE RrGIONAL OFFICL We are requesting a fast -track sanitary sewer permit for a gravity sanitary sewer main extension. This project includes 78 proposed single-family residents and 148 proposed townhomes. See attached application and supporting documents. If you have any questions or concerns, then please email me at bedwardskriversandassociates.com RIVERS AND ASSOCIATES Brian K Edwards, PE Six Forks Place III ■ 353 E. Six Forks Road, Suite 230 ■ Raleigh, NC 27609 ■ Phone: 919-594-1626 NCBELS Lic. No. F-0334 www.riversandassociates.com NCBOLA Lic. No, C-312 State of North Carolina Department of Environmental Quality DWR Division of Water Resources FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources FTA 06-21 & SUPPORTING DOCUMENTATION Application Number: W U (h yi-A(9 Zg (to be completed by DWR) All items must be completed or the application will be returned I. APPLICANT INFORMATION: 1. Applicant's name: Town of Angier (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Privately -Owned Public Utility ❑ Federal ❑ State/County ® Municipal ❑ Other 3. Signature authority's name: Jimmy per 15A NCAC 02T .0106(b) Title: Director of Public Utilities 4. Applicant's mailing address: PO Box278 -- VC. L) City: Angier State: NC Zip: 27501- N� 20 12 0 13 5. Applicant's contact information: !/ 1 / / ,r1 • 7 / Phone number: (919) 331-6708 Email Address: j cook@angier . org 0EQ-FAYETTEVILLE REGIONAL OFFICE II. PROJECT INFORMATION: 1. Project name: White Oak Creek Crossing 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: WQ00 and issued date: , For modifications, also attach a detailed narrative description as described in Item G of the checklist. If new construction, but part of a master plan, provide the existing permit number: WQ00 3. County where project is located: Harnett 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.525376" Longitude:-78.749906' 5. Parcel ID (if applicable): 0406740254, 040674002203 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: l . Professional Engineer: Brian Edwards License Number: 043152 Firm: Rivers and Associates, Inc. Mailing address: 107 E 2nd Street City: Greenville State: NC Zip: 27858 Phone number: (252) 752-4135 Email Address: bedwards(a�riversandassociates.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: NHRWWTP Permit Number: NCO021636 Owner Name: Harnett Regional Water V. RECEIVING DOWNSTREAM SEWER INFORMATION: 1. Permit Number(s): WQ 2. Downstream (Receiving) Sewer Information: 12 inch © Gravity ❑ Force Main 3. System Wide Collection System Permit Number(s) (if applicable): WQCS 00183 Owner Name(s): Town of Angier FORM: FTA 06-21 Pagel of 5 VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? [:]Yes [:]No ® N/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached? ❑ Yes ❑ No ® N/A 3. If the Applicant is a Home/Property Owners' Association, has an HOA/POA Operational Agreement (FORM: HOA) and supplementary documentation as required by 15A NCAC 02T.0115(c) been attached? [:]Yes [:]No ® N/A 4. Origin of wastewater: (check all that apply): ® Residential (Individually Owned) ❑ Retail (stores, centers, malls) ❑ Car Wash ❑ Residential (Leased) ❑ Retail with food preparation/service ❑ Hotel and/or Motels ❑ School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool/Clubhouse ❑ Food and drink facilities ❑ Church ❑ Businesses /offices /factories El Swimming Pool/Filter Backwash ❑ Nursing Home ❑ Other (Explain in Attachment) 5. Nature of wastewater: 100 % Domestic % Commercial % Industrial (See 15A NCAC 02T .0103(20)) If Industrial, is there a Pretreatment Program in effect? ❑ Yes ❑ No 6. Hasa flow reduction been approved under 15A NCAC 02T .0114(f)? ❑ Yes ®No y If yes, provide a copy of flow reduction approval letter with this application 7. Summarize wastewater generated by project: Establishment Type (see 02T.0114(f)) Daily Design Flow a,b No. of Units Flow Single Family Houses 225 gal/day 78 17,550 GPD Townhouses 225 gal/day 148 33,300 GPD gal/ GPD gal/ GPD gal/ GPD gal! GPD Total 50,850 GPD a See 15A NCAC 02T .0114(b) (d) (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.0114] shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. Wastewater generated by project: 50,850 GPD (per 15A NCAC 02T .0114) Do not include future flows or previously permitted allocations If permitted flow is zero, please indicate why: ❑ Pump Station/Force Main or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line. Please provide supplementary information indicating the approximate timeframe for permitting upstream sewers with flow. ❑ Flow has already been allocated in Permit Number: Issuance Date: ❑ Rehabilitation or replacement of existing sewers with no new flow expected ❑ Other (Explain): FORM: FTA 06-21 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers): 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8" 4,013 PVC 8" 588 DIP ➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirements is not allowed and a violation of the MDC 2. Appfea . ems} -Degree) 3. Total pump stat'i'ew -)0- This sheald r-ePeet the total GPM for- the riamp statiefi with the jar-gest r ump eiat of s Size Length gt1, (fee*) Material - 0 Mmn= rr!� N_ 7 > j Shall be pfevide FORM: FTA 06-21 Page 3 of 5 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(f)): Does the project comply with all separations/alternatives found in 15A NCAC 02T .0305(f & W? ® Yes [—]No 15A NCAC 02T.0305(f) contains minimum separations that shall be provided for sewer systems: Setback Parameter* Separation Required Storm sewers and other utilities not listed below (vertical) 18 inches Water mains (vertical - water over sewer preferred, including in benched trenches) 18 inches Water mains (horizontal) 10 feet Reclaimed water lines (vertical - reclaimed over sewer) 18 inches Reclaimed water lines (horizontal - reclaimed over sewer) 2 feet **Any private or public water supply source, including any wells, WS-I waters of Class I or Class II impounded reservoirs used as a source of drinking water, and associated wetlands. 100 feet **Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water (or tide elevation) and wetlands associated with these waters (see item IX.2) 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches, as well as wetlands associated with these waters or classified as WL. 10 feet Any building foundation (horizontal) 5 feet Any basement (horizontal) 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade (vertical) 36 inches ➢ If noncompliance with 02T.0305(fl or (g), see Section X.1 of this application * 15A NCAC 02T.0305(g) contains alternatives where separations in 02T.0305(fl cannot be achieved. Please check "yes" above if these alternatives are used and provide narrative information to explain. **Stream classifications can be identified using the Division's NC Surface Water Classifications webpage 2. Does this project comply with the minimum separation requirements for water mains? ® Yes [:]No ❑ N/A ➢ If no, please refer to 15A NCAC 18C.0906(f) for documentation requirements and submit a separate document, signed/sealed by an NC licensed PE, verifying the criteria outlined in that Rule. 3. Does the project comply with separation requirements for wetlands? ® Yes [-]No ❑ N/A ➢ Please provide supplementary information identifying the areas of non-conformance. ➢ See the Division's draft separation requirements for situations where separation cannot be met. ➢ No variance is required if the alternative design criteria specified is utilized in design and construction. 4. Is the project located in a river basin subject to any State buffer rules? ❑ Yes Basin name: ® No If yes, does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ❑ Yes ❑ No ➢ This includes Trout Buffered Streams per 15A NCAC 2B.0202 5. Does the project require coverage/authorization under a 404 Nationwide/individual permits ® Yes ❑ No or 401 Water Quality Certifications? ➢ Please provide the permit number/permitting status in the cover letter if coverage/authorization is required. 6. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? ® Yes ❑ No Per 15A NCAC 02T.0105(cX6j, directly related environmental permits or certification applications must be being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 7. Does this project include any sewer collection lines that are deemed "high -priority?" ❑ Yes ® No Per 15A NCAC 02T.0402, "high -priority sewer" means any aerial sewer, sewer contacting surface waters, siphon, or sewers positioned parallel to streambanks that are subject to erosion that undermines or deteriorates the sewer. Siphons and sewers suspended through interference/conflict boxes require a variance approval. );,- If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permittee's individual System -Wide Collection permit. FORM: FTA 06-21 Page 4 of 5 X. CERTIFICATIONS: I. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stati�,rls AMA Force MaitL_(�test v rsic�tl and the Gr vit ' ewer M�ni� m Design Criteria (,latest v___ �rsi as applicable? ® Yes No If no, for projects requiring a single variance, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review to the Central Office. Approval of the request will be issued co view times with the a roval of thepermit..and ro'ects re uirin a variance a roval ma be subject to longer review times. For ro'ects reguiring two or more variances or where the variance is determined by the Division to be a significant portion of the project ° the full technical review is required 2. Professional Engineer's Certification: 1, Brian K Edwards attest that this application for White Oak Creek Crossin (Professional Engineer's name from Application Item I11.1.) (Project Name from Application Item 11.1) has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Minitnu�n _Des- inn Criteria for Gravity Sewers rlatest versionl, and the Minimum Design Criteria for the cast -Track i'ermittina ��f Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. Misrepresentation of the application information, including failure to disclose any design non-compliance with the applicable Rules and design criteria, may subject the North Carolina -licensed Professional Engineer to referral to to licensing board. (21 NC 05 ry70p),,e North Carolina Professional Engineer's seal, signature, and date: ° ®'® SEAL r �ii6!'rl'rt I Applicant's Certification per 15A NCAC 02T .0106(b): 1, Jimm Cook , attest that this application for White oak Creek Cros_ (Signature Authority Name from Application Item 1.3.) sing (Project Name from Application Item 11.1) attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non -discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and!or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this pen -nit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-215.6A and 143-2_ _ . , any person who knowingly makes any false statement, representation, or certification in any application package shall a guilty of a Class 2 misdemeanor, which m include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. may Signature: FORM: FTA 06-21 o,,. �7-1733 Page 5 of 5 USGS MAP NOT FOR LEGAL USE . State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: Town of Angier Project Name for which flow is being requested: White Oak Creek Crossing More than one FTSE maybe required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewaterflow. - I. Complete this section only if you are the owner of the wastewater treatment plant. V E Ur"" a. WWTP Facility Name: North Harnett WWTP JUL 2 0 2023 b. WWTP Facility Permit #: NC0021636 ��-�_ FAYFTTFuILLE RE': QFFI�;c. All flows are in MGD c. WWTP facility's permitted flow 1.008 d. Estimated obligated flow not yet tributary to the WWTP .870 e. WWTP facility's actual avg. flow .634 f. Total flow for this specific request .050 g. Total actual and obligated flows to the facility 1.55 h. Percent of permitted flow used 154% II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Pump Average Approx. Not Yet Total Current Station Station Firm Daily Flow** Current Tributary Flow Plus (Name or Permit Capacity, * (Finn / pf), Avg, Daily Daily Flow, Obligated Available Number) No. MGD MGD Flow, MGD MGD Flow Capacity*** * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pi) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Town of Angier, NHRWWTP Downstream Permit Number: WQCS00183, NCO021636 Page 1 of 6 FTSE 10-18 III. Certification Statement: I Henry J. Cook certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. cial Signature (A,�U lY- tle of Signing Official -as-a Date Page 2 of 6 FTSE 10-18 State of North Carolina Department of Environmental Quality Division of Water Resources r; Flow Tracking/Acceptance for Sewer Extension Applications (FTSE 04-16) Entity Requesting Allocation: Harnett Regional Water Project Name for which flow is being requested: White Oak Creek Crossin.:, (Amaer r Afore than one FTSE may he required -for a singleprojeet if the owner of the 4"K'TP is not responsible for till pump stations along the route of the proposed-wtistewater floe-. 1. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: b. WWTP Facility Permit # North Harnett Re,;ional WWTP : NCO021636 All flows are in MGD c. WWTP facility's permitted flow 7.5 MGD Fuquay-Varina Allocated Flow 2.60 MGD Lillington Allocated Flow 1.20 MGD Angier Allocated Flow 1.008 MGD d. Estimated obligated flow not yet tributary to the WWTP 3.154 MGD FV Obligated Flow NYT 0.459 MGD Lillington Obligated Flour NYT. 0.372 MGD HC Obligated Flow NYT 1.453 MGD Angier Obligated Flow NYT 0.870 MGD e. WWTP facility's actual a<<,,g. flow 5.292 MGD FV Actual Flow 1.493 MGD Lillington Actual Flow 0.597 MGD HC Actual Flow 2.568 MGD Angier Actual Flow 0.634 MGD f. Total flow- for this specific request 0.050 MGD iAnaler g. Total actual and obligated bows to the facility $.496 MGD FV Actual Avg. + Obligated Flow 1.952 MGD Lillington Actual Avg. + Obligated Flow 0.969 MGD HC Actual Avg. + Obligated Flow 4.021 MGD Angier Actual + Obligated Flow 1.554 MGD h. Percent of permitted flow used 113.28%" *A PER to expand the NI RWTTP treatment capacity has been completed and design of the expansion is currently underway. Page 1 of 3 l ` II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design. Obligated, Pump Average Daily Approx. Not Yet Total Current Station Firm Flow** Current Avg. Tributary Flow Plus (Name or Capacity, * (Firm / pf), Daily Flow, Daily Flow, Obligated Available Number) MGD MGD MGD MGD Flow Capacity*** SLS-120 14.4 5.76 3.209 3.191 6.400 -0.640 * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): North Harnett Regional WWTP Downstream Permit Number: N00021636 III. Certification Statement: I � t certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form indicates acceptance of this wastewater flow. Signing Official Signature 1 Date Page 2 of 3 FTSE 06-13 PLANNING ASSESSMENT ADDENDUM (PAA) Submit a planning assessment addendum for each pump station listed in Section H where Available Capacity is < 0. Pump Station (Name or Number): SLS-120 Given that: is The proportion and amount of Obligated, Not Yet Tributary Daily Flow (C) accounts for 55.40 %nd; 3.191 MGD of the Available Caaci (E) in Pump Station j - . SLS-120 and that • The rate of activation of this obligated, not yet tributary capacity is currently approximately 0.3 1 MGD per year; and that • A funded Capital Project that will provide the required planned capacity, namely__________ TBD is in desi or under construction with Tanned com letion in TBD ; and/or • The following applies: I HRW is currently- reconciling, actual and not -yet -tributary flows to accurately assess available capacity. The reconciliation is expected to be completed in i July 2023. Given the size of the pump station, the ---- - _ -- percentage of not -yet -tributary. and the rate of activation, this will be the first step to determine if potential ClP project is needed and timeline for any capacity increase. - __ _--- Therefore: Given reasonably expected conditions and planning information, there is sufficient justification to allow this flow to be permitted, without a significant likelihood of over -allocating capacity in the system infrastructure. I understand that this does not relieve the collection system owner from complying with G.S. 143- 215.67(a) which prohibits the introduction of any waste in excess of the capacity of the waste disposal system. Signing O, ff icial Signature '`-�* "013 Date Page 3 of 3 FTSE 06-13 State of North Carolina DWR Department of Environmental Quality Division of Water Resources FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources FTA 06-21 & SUPPORTING DOCUMENTATION Application Number: (to be completed by DwR) All items must be completed or the aiiiplication will be returned I. APPLICANT INFORMATION: I. Applicant's name: Town of And (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Privately -Owned Public Utility ❑ Federal ❑ State/County ® Municipal ❑ Other 3. Signature authority's name: Jimmy ook per 15A NCAC 02T .0.106(b) Title: Director of Public Utilities 4. Applicant's mailing address: PO Box278 City: And State: NC Zip: 27501- 5. Applicant's contact information: Phone number: (919) 331-6708 Email Address: j cook@angi er. . org II. PROJECT INFORMATION: 1. Project name: White Oak Creek Crossing 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: WQ00 and issued date: , For modifications, also attach a detailed narrative description as described in Item G of the checklist. If new construction, but part of a master plan, provide the existing permit number: WQOO 3. County where project is located: Harnett 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.525376' Longitude:-78.749906' 5. Parcel 1D (if applicable): 0406740254, 040674002203 (or Parcel 1D to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: Brian Edwards License Number: 043152 Firm: Rivers and Associates. Inc. Mailing address: 107 E TO Street City: Greenville State: NC Zip: 27858 Phone number: (252) 752-4135 Email Address: bedwards riversandassociates.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: North Harnett Regional WWTP Permit Number: NCO021636 Owner Name: Harnett County Public Utilities V. RECEIVING DOWNSTREAM SEWER INFORMATION: 1. Permit Number(s): WQW,4CS00183 2. Downstream (Receiving) Sewer Information: 12 inch Z Gravity ❑ Force Main 3. System Wide Collection System Permit Number(s) (if applicable): WQCS00183 Owner Name(s): Town of Angier FORM: FTA 06-21 Page 1 of 5 VI. GENERAL REQUIREMENTS I. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑ No ® N/A 2. If the Applicant is a Developer of lots to be sold, has a Develo er's Operational Agreement FORM: DEV been attached? ❑ Yes ❑ No ® NIA 3. If the Applicant is a Home/Property Owners' Association, has an HOA/POA Operational Agreement FORM: HOA and supplementary documentation as required by 15A NCAC 02T.0115(c) been attached? ❑ Yes ❑ No ® NIA Origin of wastewater: (check all that apply): ® Residential (Individually Owned) ❑ Retail (stores, centers, malls) ❑ Car Wash ❑ Residential (Leased) ❑ Retail with food preparation/service ❑ Hotel and/or Motels ❑ School / preschool 1 day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool/Clubhouse ❑ Food and drink facilities ❑ Church ❑ Businesses /offices /factories El Swimming Pool/Filter Backwash ❑ Nursing Home ❑ Other (Explain in Attachment) 5. Nature of wastewater: 100 % Domestic % Commercial % Industrial See 15A NCAC 02T .0103 20 ) If Industrial, is there a Pretreatment Program in effect? ❑ Yes ❑ No 6. Hasa flow reduction been approved under 15A NCAC 02T .01 14 ? [:]Yes ®No ➢ If yes, provide a copy of flow reduction aDDroval letter with this a lication Summarize wastewater generated by project: Establishment Type (see 02T,0114(f)) Single Family Houses Townhouses Daily Design Flow a,a JNo. of Units Flow 360 gal/day 78 28,080 GPD 360 gal/day 148 53,280 GPD gal/ GPD gall GPD gall GPD gal/ GPD Total 1 81,360 GPD a See 15A NCAC 02T .01 14(b� (d),(e)(1).,and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.0114] shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 81,360 GPD (per 15A NCAC 02T .0114) 7= Do not include future flows or previously permitted allocations If permitted flow is zero, please indicate why: ❑ Pump Station/Force Main or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line. Please provide supplementary information indicating the approximate timeframe for permitting upstream sewers with flow. ❑ Flow has already been allocated in Permit Number: Issuance Date: ❑ Rehabilitation or replacement of existing sewers with no new flow expected ❑ Other (Explain); FORM: FTA 06-21 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (if Applicable) - 02T .0305 & MDC(Gravity Sewers): I. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8" 4,013 PVC 8" 588 DIP ➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirements is not allowed and a violation of the MDC ➢ .as PCH4 of station pewer--(�, -of a multiple FORM: FTA 06-21 Page 3 of 5 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(f)): 1. Does the project comply with all separations/alternatives found in 15A NCAC 02T .0305M & (e)? ® Yes ❑ No 11 11V11L V111PL1a1JUVi w«l u= i .u.su.3tr,t orif.), see Nection x. I or this application 15A NCAC 02T.0305contains alternatives where separations in 02T.0305(f) cannot be achieved. Please check "yes" above if these alternatives are used and provide narrative information to explain. "Stream classifications can be identified using the Division's NC Surface Water Classifications web a e 2. Does this project comply with the minimum separation requirements for water mains? ® Yes ❑ No ❑ N/A ➢ If no, please refer to 15A NCAC 18C.0906(0 for documentation requirements and submit a separate document, signed/sealed by an NC licensed PE, verifying the criteria outlined in that Rule. 3. Does the project comply with separation requirements for wetlands? ® Yes ❑ No ❑ N/A ➢ Please provide supplementary information identifying the areas of non-conformance. ➢ See the Division's draft se aration re uirements for situations where separation cannot be met. ➢ No variance is required if the alternative design criteria specified is utilized in design and construction. 4. Is the project located in a river basin subject to any State buffer rules? ❑ Yes Basin name: ® No If yes, does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ❑ Yes ❑ No ➢ This includes Trout Buffered Streams per 15A NCAC 2B.0202 5. Does the project require coverage/authorization under a 404 Nationwide/individual permits ® Yes ❑ No or 401 Water Quality Certifications? ➢ Please provide the permit number/permitting status in the cover letter if coverage/authorization is required. 6. Does project comply with 15A NCAC 02T.0105 c 6) (additional permits/certifications)? ®Yes ❑ No Per 15A NCAC 02T.0105 c 6 , directly related environmental permits or certification applications must be being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 7. Does this project include any sewer collection lines that are deemed "high -priority?" ❑ Yes ® No Per 15A NCAC 02T.0402, "high -priority sewer" means any aerial sewer, sewer contacting surface waters, siphon, or sewers positioned parallel to streambanks that are subject to erosion that undermines or deteriorates the sewer. Siphons and sewers suspended through interference/conflict boxes require a variance approval. ➢ if yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permittee's individual System -Wide Collection permit. FORM: FTA 06-21 Page 4 of 5 X. CERTIFICATIONS: I . Does the submitted system comply with 15A NCAC 02T, the Minimum Design Cri eria for the Permitting of Punip Stations and FOTCC Mains latest veisioli . and the Gravity Sewer Minimum Design Criteria (latest version) as applicable? ® Yes ❑ No If no, for projects requiring a single variance, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review to the Central Office. Angroval of the request will be issued concurrent)y with the a roval of the germit, and provects requiring a variance ay roval may be subject to lon er review times. For provects rgguirinE two or more variances or where the variance is determined by the Division to be a significant portion of the pro4ect, the full technical review is re uired. 2. Professional Engineer's Certification: I, Brian K Edwards . attest that this application for White Oak Creek Crossing (Professional Engineer's name from Application Item I11.1.) (Project Name from Application Item 11.1) has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Minimum Design Criteria for Gravity Sep%ers latest version, and the Minimum Design Criteria for the Fast -Track 111ennittin� of Pump Stations and I-orce Mains latest version . Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. Misrepresentation of the application information, including failure to disclose any design non-compliance with the applicable Rules and design criteria, may subject the North Carolina -licensed Professional Engineer to referral to the licensing board. (21 NCAC 56.0701) SI:l59tNkil4 North Carolina Professional Engineer's seal, signature, and date: 110 04, SEPAL 52 3. Applicant's Certification per 15A NCAC 02T .0106(b): S1t4lv� I, Jimmy Cook , attest that this application for _White_ oak Creek Crossing (Signature Authority Name from Application Item 1.3.) (Project Name from Application Item I1.1) attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non -discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Signature: Date: V 14J FORM: FTA 06-21 Page 5 of 5 State of North Carolina Department of Environmental Quality DWR Division of Water Resources Mv#slon of Water Resources Flow Tracking/Acceptance for Sewer Extension Applications (FTSE 04-16) Entity Requesting Allocation: Harnett Regional Water Project Name for which flow is being requested: White Oak Creek Crossing (Angier) More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: North Harnett Regional WWTP b. WWTP Facility Permit #: NC0021636 All flows are in MGD c. WWTP facility's permitted flow 7.5 MGD Fuquay-Varina Allocated Flow 2.60 MGD Lillington Allocated Flow 1.20 MGD Angier Allocated Flow 1.008 MGD d. Estimated obligated flow not yet tributary to the WWTP 3.154 MGD FV Obligated Flow NYT 0.459 MGD Lillington Obligated Flow NYT 0.372 MGD HC Obligated Flow NYT 1.453 MGD Angier Obligated Flow NYT 0.870 MGD e. WWTP facility's actual avg. flow 5.292 MGD FV Actual Flow 1.493 MGD Lillington Actual Flow 0.597 MGD HC Actual Flow 2.568 MGD Angier Actual Flow 0.634 MGD f. Total flow for this specific request 0.081 MGD An ier g. Total actual and obligated flows to the facility 8.527 MGD FV Actual Avg. + Obligated Flow 1.952 MGD Lillington Actual Avg. + Obligated Flow 0.969 MGD HC Actual Avg. + Obligated Flow 4.021 MGD Angier Actual + Obligated Flow 1.585 MGD h. Percent of permitted flow used 113.69%* *A PER to expand the NHRWTTP treatment capacity has been completed and design of the expansion is currently underway. Page 1 of 3 FTSE 06-13 II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Average Daily Approx. Not Yet Total Current Station Firm Flow** Current Avg. Tributary Flow Plus (Name or Capacity, * (Firm / p fl, Daily Flow, Daily Flow, Obligated Available Number) MGD MGD MGD MGD Flow Capacity*** SLS-120 14.4 5.76 3.209 3.222 6.431 -0.671 * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): North Harnett Regional WWTP Downstream Permit Number: NCO021636 III. Certification Statement: I Steve Ward certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form indicates acceptance ogthjs� wastewater flow. Signing Official Signature Y - ? " 'IJ Date Page 2 of 3 FTSE 06-13 PLANNING ASSESSMENT ADDENDUM (PAA) Submit a planning assessment addendum for each pump station listed in Section H where Available Capacity is < 0. Pump Station (Name or Number): SLS-120 Given that: • The proportion and amount of Obli ted, Not Yet Tributuy Daily Flow C accounts for 55.94 1 1% and 3.222 1MGD of the Available Ca aci (E) in Pump Station SLS-120 ; and that • The rate of activation of this obligated, not yet tributary capacity is currently approximately 0.3 1 MGD per year, and that A_ funded Capital Project that will provide the TBD Manned completion in TBD • The fnllnwino nnnliec- is in design or under construction with : and/or BRW is currently reconcilin . actual and not -yet -tributary flows to accurately assess available capacity. The reconciliation is expected ected to be completed in August 2023. Given the size of the pump station, the ercenta a of not-yet-tributary,not-yet-trib!Ltary, and the rate of activation, this will be the first step to determine if potential CIP project is needed and timeline for any capacity increase. Therefore: Given reasonably expected conditions and planning information, there is sufficient justification to allow this flow to be permitted, without a significant likelihood of over -allocating capacity in the system infrastructure. I understand that this does not relieve the collection system owner from complying with G.S. 143- 215.67(a) which prohibits the introduction of any waste in excess of the capacity of the waste disposal system. Signing Official Signature P- 3 Date Page 3 of 3 FTSE 06-13 State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Applications (FTSE 04-16) Entity Requesting Allocation: Harnett Regional Water Project Name for which flow is being requested; White Oak Creek Crossin-. (Angier afore than one FTSE main he required for a single project if the owner of the u� "-7P is not responsible for all pump statiom along the route of the proposed wastewater flow. 1. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: b. WWTP Facility Permit # North Harnett Rey}ional WWTP : NC0021636 .411 flows are in MGD c. WWTP facility's permitted flow 7.5 MGD Fuquay-Varina Allocated Flow 2.60 MGD Lillington Allocated Flow 1.20 MGD Angier Allocated Flow 1.008 MGD d. Estimated obligated flow not yet tributary to the WWTP 3.154 MGD FV Obligated Flow NYT 0.459 MGD Lillington Obligated Flow NYT 0.372 MGD 14C Obligated Flow NYT 1.453 MGD Angier Obligated Flow NYT 0.870 MGD e. WWTP facility's actual avg. flow 5.292 MGD FV Actual Flow 1.493 MGD Lillington Actual Flow 0.597 MGD HC Actual Flow 2.568 MGD Angier Actual Flow 0.634 MGD f Total flow for this specific request 0.050 MGD lAn ier g. Total actual and obligated flows to the facility 8.496 MGD FV Actual Avg. + Obligated Flow 1.952 MGD Lillington Actual Avg. + Obligated Flow 0.969 MGD HC Actual Avg. + Obligated Flow 4.021 MGD Angier Actual + Obligated Flow 1.554 MGD h. Percent of permitted flow used 113.28%* *A PER to expand the N1JRWTTP treatment capacity has been completed and design of the expansion is currently undem,ay. Page l of 3 �II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Average Daily Approx. Not Yet Total Current Station Firm Flow** Current Avg. Tributary Flow Plus (Name or Capacity, * (Firm 1 pf), Daily Flow, Daily Flow, Obligated Available Number) MGD MGD MGD MGD Flow Capacity*** SLS-120 14.4 5.76 3.209 3.191 6.400 -0.640 The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 4. Downstream Facility Name (Sewer): North Harnett Regional WWTP Downstream Permit Number: NCO021636 III. Certification Statement: I 90(t yvaA certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form indicates acceptance of this wastewater flow. Signing Official Signature q", (' ` ;� Date Page 2 of 3 FTSE 06-13 1 PLANNING ASSESSMENT ADDENDUM (PAA) Submit a planning assessment addendum for each pump station listed in Section H where Available Capacity is < 0. Pump Station (Name or Number): SLS-120 Given that: • The proportion and amount of Obligated, Not Yet Tributary Daily Flow (C) accounts for ---- - 55.40 _ % and 3.191 MGD of the Available Capacity (E) in Pump Station SLS-120 and that • The rate of activation of this obligated, not yet tributary capacity is currently approximately 0.3 MGD per year; and that • A funded Capital Project that will provide the required_ planned capacity, namely___ - TBD is in design or under construction with lanned completion in TBD ; and/or • The follow applies: HRW is currently reconciling actual and not -yet -tributary, flows to ---._ _ accurately assess available capacity. The reconciliation is expected to be completed it July 2023. Given the size of the pump station, the percentage of not -yet -tributary, and the rate of activation, this will be the first step to determine itential CIP project is needed and timeline for anY capacity increase. Therefore: Given reasonably expected conditions and planning information, there is sufficient justification to allow this flow to be permitted, without a significant likelihood of over -allocating capacity in the system infrastructure. I understand that this does not relieve the collection system owner from complying with G.S. 143- 215.67(a) which prohibits the introduction of any waste in excess of the capacity of the waste disposal system. 1--4 - a-) Sning Official Signature _ j _ Date Page 3 of 3 FTSE 06-13 State of North Carolina DWR Dlvislon of Water Resources Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: Town of Angier Project Name for which flow is being requested: White Oak Creek Crossing More than one FTSE may be required for a single project if the owner of the WWTP is not responsible far all pump stations along fire route of the proposed wastewater flow. 1. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: North Harnett WWTP b. WWTP Facility Permit #: NCO021636 Alt flows are in AIGD c. WWTP facility's permitted flow 1.008 d. Estimated obligated flow not yet tributary to the WWTP .870 e. WWTP facility's actual avg. flow .634 f. Total flow for this specific request 0.08136 g. Total actual and obligated flows to the facility 1.585 h. Percent of permitted flow used 157% 11. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Pump Average Approx. Not Yet Total Current Station Station Firm Daily Flow** Current Tributary Flow Plus (Name or Permit Capacity, * (Firm 1 pf), Avg. Daily Daily Flow, Obligated Available Number) No. MGD MGD Flow, MGD MGD Flow Capacity*** * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped now that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Town of Angier, NHRWWTP Downstream Permit Number: WQCS00183, NCO021636 Page 1 of 6 FTSE 10-18 III. Certification Statement: I HenryJ. Cook certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. fficial Signature r r tle of Signing Official 3 Date Page 2 of 6 FTSE 10-18 State of North Carolina DWR Department of Environmental Quality Division of Water Resources FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources FTA 06-21 & SUPPORTING DOCUMENTATION Application Number: (to be completed by DwR) All items must be completed or the aiiiplication will be returned I. APPLICANT INFORMATION: I. Applicant's name: Town of And (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Privately -Owned Public Utility ❑ Federal ❑ State/County ® Municipal ❑ Other 3. Signature authority's name: Jimmy ook per 15A NCAC 02T .0.106(b) Title: Director of Public Utilities 4. Applicant's mailing address: PO Box278 City: And State: NC Zip: 27501- 5. Applicant's contact information: Phone number: (919) 331-6708 Email Address: j cook@angi er. . org II. PROJECT INFORMATION: 1. Project name: White Oak Creek Crossing 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: WQ00 and issued date: , For modifications, also attach a detailed narrative description as described in Item G of the checklist. If new construction, but part of a master plan, provide the existing permit number: WQOO 3. County where project is located: Harnett 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.525376' Longitude:-78.749906' 5. Parcel 1D (if applicable): 0406740254, 040674002203 (or Parcel 1D to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: Brian Edwards License Number: 043152 Firm: Rivers and Associates. Inc. Mailing address: 107 E TO Street City: Greenville State: NC Zip: 27858 Phone number: (252) 752-4135 Email Address: bedwards riversandassociates.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: North Harnett Regional WWTP Permit Number: NCO021636 Owner Name: Harnett County Public Utilities V. RECEIVING DOWNSTREAM SEWER INFORMATION: 1. Permit Number(s): WQW,4CS00183 2. Downstream (Receiving) Sewer Information: 12 inch Z Gravity ❑ Force Main 3. System Wide Collection System Permit Number(s) (if applicable): WQCS00183 Owner Name(s): Town of Angier FORM: FTA 06-21 Page 1 of 5 VI. GENERAL REQUIREMENTS I. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑ No ® N/A 2. If the Applicant is a Developer of lots to be sold, has a Develo er's Operational Agreement FORM: DEV been attached? ❑ Yes ❑ No ® NIA 3. If the Applicant is a Home/Property Owners' Association, has an HOA/POA Operational Agreement FORM: HOA and supplementary documentation as required by 15A NCAC 02T.0115(c) been attached? ❑ Yes ❑ No ® NIA Origin of wastewater: (check all that apply): ® Residential (Individually Owned) ❑ Retail (stores, centers, malls) ❑ Car Wash ❑ Residential (Leased) ❑ Retail with food preparation/service ❑ Hotel and/or Motels ❑ School / preschool 1 day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool/Clubhouse ❑ Food and drink facilities ❑ Church ❑ Businesses /offices /factories El Swimming Pool/Filter Backwash ❑ Nursing Home ❑ Other (Explain in Attachment) 5. Nature of wastewater: 100 % Domestic % Commercial % Industrial See 15A NCAC 02T .0103 20 ) If Industrial, is there a Pretreatment Program in effect? ❑ Yes ❑ No 6. Hasa flow reduction been approved under 15A NCAC 02T .01 14 ? [:]Yes ®No ➢ If yes, provide a copy of flow reduction aDDroval letter with this a lication Summarize wastewater generated by project: Establishment Type (see 02T,0114(f)) Single Family Houses Townhouses Daily Design Flow a,a JNo. of Units Flow 360 gal/day 78 28,080 GPD 360 gal/day 148 53,280 GPD gal/ GPD gall GPD gall GPD gal/ GPD Total 1 81,360 GPD a See 15A NCAC 02T .01 14(b� (d),(e)(1).,and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.0114] shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 81,360 GPD (per 15A NCAC 02T .0114) 7= Do not include future flows or previously permitted allocations If permitted flow is zero, please indicate why: ❑ Pump Station/Force Main or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line. Please provide supplementary information indicating the approximate timeframe for permitting upstream sewers with flow. ❑ Flow has already been allocated in Permit Number: Issuance Date: ❑ Rehabilitation or replacement of existing sewers with no new flow expected ❑ Other (Explain); FORM: FTA 06-21 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (if Applicable) - 02T .0305 & MDC(Gravity Sewers): I. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8" 4,013 PVC 8" 588 DIP ➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirements is not allowed and a violation of the MDC ➢ .as PCH4 of station pewer--(�, -of a multiple FORM: FTA 06-21 Page 3 of 5 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(f)): 1. Does the project comply with all separations/alternatives found in 15A NCAC 02T .0305M & (e)? ® Yes ❑ No 11 11V11L V111PL1a1JUVi w«l u= i .u.su.3tr,t orif.), see Nection x. I or this application 15A NCAC 02T.0305contains alternatives where separations in 02T.0305(f) cannot be achieved. Please check "yes" above if these alternatives are used and provide narrative information to explain. "Stream classifications can be identified using the Division's NC Surface Water Classifications web a e 2. Does this project comply with the minimum separation requirements for water mains? ® Yes ❑ No ❑ N/A ➢ If no, please refer to 15A NCAC 18C.0906(0 for documentation requirements and submit a separate document, signed/sealed by an NC licensed PE, verifying the criteria outlined in that Rule. 3. Does the project comply with separation requirements for wetlands? ® Yes ❑ No ❑ N/A ➢ Please provide supplementary information identifying the areas of non-conformance. ➢ See the Division's draft se aration re uirements for situations where separation cannot be met. ➢ No variance is required if the alternative design criteria specified is utilized in design and construction. 4. Is the project located in a river basin subject to any State buffer rules? ❑ Yes Basin name: ® No If yes, does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ❑ Yes ❑ No ➢ This includes Trout Buffered Streams per 15A NCAC 2B.0202 5. Does the project require coverage/authorization under a 404 Nationwide/individual permits ® Yes ❑ No or 401 Water Quality Certifications? ➢ Please provide the permit number/permitting status in the cover letter if coverage/authorization is required. 6. Does project comply with 15A NCAC 02T.0105 c 6) (additional permits/certifications)? ®Yes ❑ No Per 15A NCAC 02T.0105 c 6 , directly related environmental permits or certification applications must be being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 7. Does this project include any sewer collection lines that are deemed "high -priority?" ❑ Yes ® No Per 15A NCAC 02T.0402, "high -priority sewer" means any aerial sewer, sewer contacting surface waters, siphon, or sewers positioned parallel to streambanks that are subject to erosion that undermines or deteriorates the sewer. Siphons and sewers suspended through interference/conflict boxes require a variance approval. ➢ if yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permittee's individual System -Wide Collection permit. FORM: FTA 06-21 Page 4 of 5 X. CERTIFICATIONS: I . Does the submitted system comply with 15A NCAC 02T, the Minimum Design Cri eria for the Permitting of Punip Stations and FOTCC Mains latest veisioli . and the Gravity Sewer Minimum Design Criteria (latest version) as applicable? ® Yes ❑ No If no, for projects requiring a single variance, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review to the Central Office. Angroval of the request will be issued concurrent)y with the a roval of the germit, and provects requiring a variance ay roval may be subject to lon er review times. For provects rgguirinE two or more variances or where the variance is determined by the Division to be a significant portion of the pro4ect, the full technical review is re uired. 2. Professional Engineer's Certification: I, Brian K Edwards . attest that this application for White Oak Creek Crossing (Professional Engineer's name from Application Item I11.1.) (Project Name from Application Item 11.1) has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Minimum Design Criteria for Gravity Sep%ers latest version, and the Minimum Design Criteria for the Fast -Track 111ennittin� of Pump Stations and I-orce Mains latest version . Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. Misrepresentation of the application information, including failure to disclose any design non-compliance with the applicable Rules and design criteria, may subject the North Carolina -licensed Professional Engineer to referral to the licensing board. (21 NCAC 56.0701) SI:l59tNkil4 North Carolina Professional Engineer's seal, signature, and date: 110 04, SEPAL 52 3. Applicant's Certification per 15A NCAC 02T .0106(b): S1t4lv� I, Jimmy Cook , attest that this application for _White_ oak Creek Crossing (Signature Authority Name from Application Item 1.3.) (Project Name from Application Item I1.1) attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non -discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Signature: Date: V 14J FORM: FTA 06-21 Page 5 of 5 State of North Carolina Department of Environmental Quality DWR Division of Water Resources Mv#slon of Water Resources Flow Tracking/Acceptance for Sewer Extension Applications (FTSE 04-16) Entity Requesting Allocation: Harnett Regional Water Project Name for which flow is being requested: White Oak Creek Crossing (Angier) More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: North Harnett Regional WWTP b. WWTP Facility Permit #: NC0021636 All flows are in MGD c. WWTP facility's permitted flow 7.5 MGD Fuquay-Varina Allocated Flow 2.60 MGD Lillington Allocated Flow 1.20 MGD Angier Allocated Flow 1.008 MGD d. Estimated obligated flow not yet tributary to the WWTP 3.154 MGD FV Obligated Flow NYT 0.459 MGD Lillington Obligated Flow NYT 0.372 MGD HC Obligated Flow NYT 1.453 MGD Angier Obligated Flow NYT 0.870 MGD e. WWTP facility's actual avg. flow 5.292 MGD FV Actual Flow 1.493 MGD Lillington Actual Flow 0.597 MGD HC Actual Flow 2.568 MGD Angier Actual Flow 0.634 MGD f. Total flow for this specific request 0.081 MGD An ier g. Total actual and obligated flows to the facility 8.527 MGD FV Actual Avg. + Obligated Flow 1.952 MGD Lillington Actual Avg. + Obligated Flow 0.969 MGD HC Actual Avg. + Obligated Flow 4.021 MGD Angier Actual + Obligated Flow 1.585 MGD h. Percent of permitted flow used 113.69%* *A PER to expand the NHRWTTP treatment capacity has been completed and design of the expansion is currently underway. Page 1 of 3 FTSE 06-13 II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Average Daily Approx. Not Yet Total Current Station Firm Flow** Current Avg. Tributary Flow Plus (Name or Capacity, * (Firm / p fl, Daily Flow, Daily Flow, Obligated Available Number) MGD MGD MGD MGD Flow Capacity*** SLS-120 14.4 5.76 3.209 3.222 6.431 -0.671 * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): North Harnett Regional WWTP Downstream Permit Number: NCO021636 III. Certification Statement: I Steve Ward certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form indicates acceptance ogthjs� wastewater flow. Signing Official Signature Y - ? " 'IJ Date Page 2 of 3 FTSE 06-13 PLANNING ASSESSMENT ADDENDUM (PAA) Submit a planning assessment addendum for each pump station listed in Section H where Available Capacity is < 0. Pump Station (Name or Number): SLS-120 Given that: • The proportion and amount of Obli ted, Not Yet Tributuy Daily Flow C accounts for 55.94 1 1% and 3.222 1MGD of the Available Ca aci (E) in Pump Station SLS-120 ; and that • The rate of activation of this obligated, not yet tributary capacity is currently approximately 0.3 1 MGD per year, and that A_ funded Capital Project that will provide the TBD Manned completion in TBD • The fnllnwino nnnliec- is in design or under construction with : and/or BRW is currently reconcilin . actual and not -yet -tributary flows to accurately assess available capacity. The reconciliation is expected ected to be completed in August 2023. Given the size of the pump station, the ercenta a of not-yet-tributary,not-yet-trib!Ltary, and the rate of activation, this will be the first step to determine if potential CIP project is needed and timeline for any capacity increase. Therefore: Given reasonably expected conditions and planning information, there is sufficient justification to allow this flow to be permitted, without a significant likelihood of over -allocating capacity in the system infrastructure. I understand that this does not relieve the collection system owner from complying with G.S. 143- 215.67(a) which prohibits the introduction of any waste in excess of the capacity of the waste disposal system. Signing Official Signature P- 3 Date Page 3 of 3 FTSE 06-13 State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Applications (FTSE 04-16) Entity Requesting Allocation: Harnett Regional Water Project Name for which flow is being requested; White Oak Creek Crossin-. (Angier afore than one FTSE main he required for a single project if the owner of the u� "-7P is not responsible for all pump statiom along the route of the proposed wastewater flow. 1. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: b. WWTP Facility Permit # North Harnett Rey}ional WWTP : NC0021636 .411 flows are in MGD c. WWTP facility's permitted flow 7.5 MGD Fuquay-Varina Allocated Flow 2.60 MGD Lillington Allocated Flow 1.20 MGD Angier Allocated Flow 1.008 MGD d. Estimated obligated flow not yet tributary to the WWTP 3.154 MGD FV Obligated Flow NYT 0.459 MGD Lillington Obligated Flow NYT 0.372 MGD 14C Obligated Flow NYT 1.453 MGD Angier Obligated Flow NYT 0.870 MGD e. WWTP facility's actual avg. flow 5.292 MGD FV Actual Flow 1.493 MGD Lillington Actual Flow 0.597 MGD HC Actual Flow 2.568 MGD Angier Actual Flow 0.634 MGD f Total flow for this specific request 0.050 MGD lAn ier g. Total actual and obligated flows to the facility 8.496 MGD FV Actual Avg. + Obligated Flow 1.952 MGD Lillington Actual Avg. + Obligated Flow 0.969 MGD HC Actual Avg. + Obligated Flow 4.021 MGD Angier Actual + Obligated Flow 1.554 MGD h. Percent of permitted flow used 113.28%* *A PER to expand the N1JRWTTP treatment capacity has been completed and design of the expansion is currently undem,ay. Page l of 3 �II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Average Daily Approx. Not Yet Total Current Station Firm Flow** Current Avg. Tributary Flow Plus (Name or Capacity, * (Firm 1 pf), Daily Flow, Daily Flow, Obligated Available Number) MGD MGD MGD MGD Flow Capacity*** SLS-120 14.4 5.76 3.209 3.191 6.400 -0.640 The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 4. Downstream Facility Name (Sewer): North Harnett Regional WWTP Downstream Permit Number: NCO021636 III. Certification Statement: I 90(t yvaA certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form indicates acceptance of this wastewater flow. Signing Official Signature q", (' ` ;� Date Page 2 of 3 FTSE 06-13 1 PLANNING ASSESSMENT ADDENDUM (PAA) Submit a planning assessment addendum for each pump station listed in Section H where Available Capacity is < 0. Pump Station (Name or Number): SLS-120 Given that: • The proportion and amount of Obligated, Not Yet Tributary Daily Flow (C) accounts for ---- - 55.40 _ % and 3.191 MGD of the Available Capacity (E) in Pump Station SLS-120 and that • The rate of activation of this obligated, not yet tributary capacity is currently approximately 0.3 MGD per year; and that • A funded Capital Project that will provide the required_ planned capacity, namely___ - TBD is in design or under construction with lanned completion in TBD ; and/or • The follow applies: HRW is currently reconciling actual and not -yet -tributary, flows to ---._ _ accurately assess available capacity. The reconciliation is expected to be completed it July 2023. Given the size of the pump station, the percentage of not -yet -tributary, and the rate of activation, this will be the first step to determine itential CIP project is needed and timeline for anY capacity increase. Therefore: Given reasonably expected conditions and planning information, there is sufficient justification to allow this flow to be permitted, without a significant likelihood of over -allocating capacity in the system infrastructure. I understand that this does not relieve the collection system owner from complying with G.S. 143- 215.67(a) which prohibits the introduction of any waste in excess of the capacity of the waste disposal system. 1--4 - a-) Sning Official Signature _ j _ Date Page 3 of 3 FTSE 06-13 State of North Carolina DWR Dlvislon of Water Resources Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: Town of Angier Project Name for which flow is being requested: White Oak Creek Crossing More than one FTSE may be required for a single project if the owner of the WWTP is not responsible far all pump stations along fire route of the proposed wastewater flow. 1. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: North Harnett WWTP b. WWTP Facility Permit #: NCO021636 Alt flows are in AIGD c. WWTP facility's permitted flow 1.008 d. Estimated obligated flow not yet tributary to the WWTP .870 e. WWTP facility's actual avg. flow .634 f. Total flow for this specific request 0.08136 g. Total actual and obligated flows to the facility 1.585 h. Percent of permitted flow used 157% 11. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Pump Average Approx. Not Yet Total Current Station Station Firm Daily Flow** Current Tributary Flow Plus (Name or Permit Capacity, * (Firm 1 pf), Avg. Daily Daily Flow, Obligated Available Number) No. MGD MGD Flow, MGD MGD Flow Capacity*** * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped now that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Town of Angier, NHRWWTP Downstream Permit Number: WQCS00183, NCO021636 Page 1 of 6 FTSE 10-18 III. Certification Statement: I HenryJ. Cook certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. fficial Signature r r tle of Signing Official 3 Date Page 2 of 6 FTSE 10-18