Loading...
HomeMy WebLinkAboutWQ0002571_Staff Report_20240510 DocuSign Envelope ID: EBAE4433-E422-4B5F-87A5-E5B830A35C43 State of North Carolina Division of Water Resources Water Quality Regional Operations Section Environmental Staff Report Quality To: ❑NPDES Unit®Non-Discharge Unit Application No.: WQ0002571 Attn: Leah Parente Facility name: Village Oaks Mobile Home Park WWTF From: Jordan Cocanower Wilmington Regional Office Note: This form has been adapted from the non-discharge fg acili . staff report to document the review of both non- discharge and NPDES permit applications and/or renewals. Please complete all sections as they are applicable. I. GENERAL AND SITE VISIT INFORMATION 1. Was a site visit conducted? ® Yes or❑No a. Date of site visit: 5/8/2024 b. Site visit conducted by: Jordan Cocanower,Helen Perez c. Inspection report attached? ❑Yes or®No d. Person contacted: Stanley and their contact information: (252) 503 -5307 ext. e. Driving directions: Southwest of Jacksonville. On the North side of NC Highway 53 gpproximately 0.4 miles West of SR 1109 2. latitude: ' ong Latitude: IJongit Glassi fie ie . River-Basin and Subbasin No. 11. PROPOSED FACILITIES: NEW APPLICATIONS 1. Faeility Classif4eation:— (Please attaeh eampleted rating sheet to be at4aehed to issued pefmit) Proposed flow: 2. Are the new tfeatment facilities adeqtiate fef the type of waste a-ad disposal system? E] Yes or-[D No 3. Are site eenditions(soils, depth to wa4ef table, ete) eeasistei4 with the s4mitted r-epefts? D Yes [=—] No N/A if no,please explaia: 4. Do the plans and site map r-epr-esefft the aetual site (pr-epeft-y lines, ells, ete.)? E] Yes E]No E] N if no,please explaiw — 5. is the proposed r-esiduals management if no,please explain: FORM: WQROSSR 04-14 Page 1 of 5 DocuSign Envelope ID: EBAE4433-E422-4B5F-87A5-E5B830A35C43 ., 7. Afe there my setbaek eenfliets fef pfopesed tfeatment, stefage and disposal sites? E] Yes or-[]-No if yes, acttaeh amcap showing eemgiet areas. if no, explain and reeemmend any changes to thegroundwater-monitoring program: ,. seasonalor- 0 if yes, at4aeh4ist of sites with tfietions(Eerti€ieationB) III.EXISTING FACILITIES: MODIFICATION AND RENEWAL APPLICATIONS 1. Are there appropriately certified Operators in Charge (ORCs) for the facility? ❑ Yes ❑No ❑N/A ORC: Stanley E. Buck Certificate#: 987939 Backup ORC: Brandon Williams Certificate#: 2. Are the design,maintenance and operation of the treatment facilities adequate for the type of waste and disposal system? ® Yes or❑No If no,please explain: Description of existing facilities: A 13,200 gallon per day wastewater treatment and irrigation facility consisting of approximately 1,630 linear feet of 6-inch gravity sewer; a 1,151,172 gallon facultative lagoon with an effective volume of 786,522 gallons at the 2-foot freeboard elevation; a tablet chlorinator; a 332,486 gallon storage lagoon with an effective volume of 91,854 gallons(the storage lagoon is hydraulically connected to the facultative lagoon); a 178 gallon per minute pump station with a variable level suction system; and effluent flow meter; a 3.6 acre spray irrigation area with 47 irrigation heads and two pressure gauges. Proposed flow: 13,200 GPD Current permitted flow: 13,200 GPD Explain anything observed during the site visit that needs to be addressed by the permit, or that may be important for the permit writer to know(i.e., equipment condition, function,maintenance, a change in facility ownership, etc.) 3. Are the site conditions(e.g., soils,topography,depth to water table, etc)maintained appropriately and adequately assimilating the waste? ® Yes or❑No If no,please explain: 4. Has the site changed in any way that may affect the permit(e.g., drainage added,new wells inside the compliance boundary,new development, etc.)? ❑ Yes or®No If yes,please explain: 5. Is the residuals management plan adequate? ® Yes or❑ No If no,please explain: 6. Are the existing application rates(e.g.,hydraulic,nutrient) still acceptable? ® Yes or❑ No If no,please explain: 7. Is the existing groundwater monitoring program adequate? ®Yes ❑No ❑N/A If no, explain and recommend any changes to the groundwater monitoring program: 8. Are there any setback conflicts for existing treatment, storage and disposal sites? ❑ Yes or® No If yes, attach a map showing conflict areas. 9. Is the description of the facilities as written in the existing permit correct? ® Yes or❑No If no,please explain: FORM: WQROSSR 04-14 Page 2 of 5 DocuSign Envelope ID:EBAE4433-E422-4B5F-87A5-E5B830A35C43 10. Were monitoring wells properly constructed and located? ® Yes ❑No ❑N/A If no,please explain: 11. Are the monitoring well coordinates correct in BIMS? ® Yes ❑No ❑N/A If no,please complete the following(expand table if necessary): Monitoring Well Latitude Longitude O l lI O I II O l lI O I II O / // O / // O l 11 O / // O l 11 O I // 12. Has a review of all self-monitoring data been conducted(e.g.,DMR,NDMR,NDAR, GW)? ® Yes or❑No Please summarize any findings resulting from this review: NDMR,NDAR,AND GW-59 were all reviewed from date of most recently issued permit(08-2019,)to present(04-2024).No monitoring NOVs were issued over the review period. Flow through the treatment plant has been well under its permitted allotment,with a significant decrease occurring late 2022 through the present date. Provide input to help the permit writer evaluate any requests for reduced monitoring, if applicable. 13. Are there any permit changes needed in order to address ongoing BIMS violations? ❑ Yes or®No If yes,please explain: 14. Check all that apply: ®No compliance issues ❑ Current enforcement action(s) ❑ Currently under JOC ❑Notice(s)of violation ❑ Currently under SOC ❑ Currently under moratorium Please explain and attach any documents that may help clarify answer/comments (i.e.,NOV,NOD, etc.) If the facility has had compliance problems during the permit cycle,please explain the status. Has the RO been working with the Permittee? Is a solution underway or in place? NOV was issued July 2023 for the following: • lack of documentation of maintenance for irrigation equipment • No flow calibration records for irrigation equipment were available • The BORC listed had invalid certification. • Water level gauge needed to be resurveyed at lowest point of lagoon wall. A response was received August 20', 2023, stating that remedial actions had been taken to prevent further violations.After the site visit it has been confirmed that these issues have been addressed. Have all compliance dates/conditions in the existing permit been satisfied? ® Yes ❑No ❑N/A If no,please explain: 15. Are there any issues related to compliance/enforcement that should be resolved before issuing this permit? ❑ Yes ®No ❑N/A If yes,please explain: 16. Possible toxic impacts to surface waters: 17. Pretreatment Program(POTWs only): FORM: WQROSSR 04-14 Page 3 of 5 DocuSign Envelope ID:EBAE4433-E422-4B5F-87A5-E5B830A35C43 IV. REGIONAL OFFICE RECOMMENDATIONS 1. Do you foresee any problems with issuance/renewal of this permit? ❑ Yes or®No If yes,please explain: 2. List any items that you would like the NPDES Unit or Non-Discharge Unit Central Office to obtain through an additional information request: Item Reason 3. List specific permit conditions recommended to be removed from the permit when issued: Condition Reason 4. List specific special conditions or compliance schedules recommended to be included in the permit when issued: Condition Reason 5. Recommendation: ❑ Hold,pending receipt and review of additional information by regional office ❑ Hold,pending review of draft permit by regional office ❑ Issue upon receipt of needed additional information ® Issue ❑ DenXj&j$4§ptate reasons: ) 6. Signature of report preparer: � U11W Signature of regional supervisor. 9zcA3coaFFsaF�... oo��s;9�ed by: Date: 5/9/2024 � A2B5E126A9394A6... FORM: WQROSSR 04-14 Page 4 of 5 DocuSign Envelope ID: EBAE4433-E422-4B5F-87A5-E5B830A35C43 V. ADDITIONAL REGIONAL STAFF REVIEW ITEMS Reconnaissance inspection performed by Helen Perez and Jordan Cocanower as part of the staff report for a requested ownership name change. Lee Buck,the current ORC of the facility,was onsite to assist with the inspection.Also present was Ashley Sheets,representing the new ownership of the facility. Overall,the facility seems to be running as intended. Mr. Buck noted that the facility is receiving flows well under its permitted allotment which coincided with Ms. Sheets statement that the current occupancy of the trailer park is at just above 50%. The area surrounding the lagoons had been recently mowed and no odors were present, indicating aerobic treatment activity within the lagoon. The primary lagoon is experiencing localized berm erosion,with an obvious low spot in the berm at the northeast corner of the lagoon. The freeboard was found to be adequate at the time of the visit. The spray irrigation fields were in good shape,with adequate cover found throughout most of the field. The fields were dry at the time of the visit.No evidence of prior channelization or standing water was visible in the fields visited.Mr. Buck estimated he has been irrigating twice weekly. Mr. Buck stated that he has not had trouble keeping the lagoons at a reasonable level,though he believes the lagoons to be very shallow in part due to the settled solids that have accumulated. The recent response to the NOV issued August 29th,2023,was revisited during the visit. It was confirmed that the water level gauge was resurveyed,the flow meter was calibrated, and maintenance logs had been utilized. The facility is actively searching for a BORC as the predetermined BORC has failed to gain the necessary credentials for operating the plant. Discussions were had with Ms. Sheets regarding her parry's obligations as it relates to the non-discharge permit. Ms. Sheets indicated a desire for facility upgrades and a future maintenance plan that included berm stabilization, additional signage, and a backup pump as well as finding a backup operator for the facility.Also discussed was the necessity to provide the department with the renewal application,which has not been received at this time. Ms. Sheets stated that after the name change is approved and she receives signature authority, a renewal application will be sent. Overall,the aquisition of the Village Oaks Trailer Park by Ms. Sheets parry seems to be beneficial for the treatment facility as a whole and will help to ensure future compliance through increased funding and a desire to maintain existing infrastructure. FORM: WQROSSR 04-14 Page 5 of 5